Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Size: px
Start display at page:

Download "Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination"

Transcription

1 Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by evaluating the sewer system requirements needed from now to the year 2030 and beyond. This is completed by developing a strategy to implement a sanitary sewer system in accordance with the anticipated growth and development patterns of the City, as forecasted in the City of Lino Lakes 2030 Comprehensive Plan, and devising a proposed infrastructure system that can be feasibly and economically constructed to support this growth. The second purpose is to produce documentation that can be used by state and local agencies for future local and regional planning purposes. This Plan focuses on the City s future growth and development patterns and evaluates the capacity and hydraulic capabilities of both the City s existing and future proposed sanitary sewer system. A detailed field review of the lift stations was not completed, nor was any sewer televising reviewed to evaluate the physical condition and operational performance of the existing infrastructure. A detailed maintenance schedule is not provided; rather, it is assumed that the City s on-going maintenance procedures will be followed to determine the scope and schedule of future facility upgrades. Based on the ultimate-development forecasted densities, the City can accommodate about 19,500 residential units, including the Correctional Facility. In addition, new commercial employment at ultimate build-out can total approximately 15,600 employees. Much of this development is projected to occur after Nevertheless, in comparing the City s staging plan with the potential build-out scenarios, it appears that many areas of the City could see significant development before 2030, particularly in Districts 1 and 2. In addition, extensive commercial/ industrial development is anticipated, especially in Districts 3 and 5. Therefore the capacity of existing and proposed sewer facilities has been evaluated based on ultimate development. Using the new forecasts for housing development and employment, ultimate sanitary sewer flows were determined and the facility improvements necessary have been identified and summarized in the report. We conclude that with the additional facilities proposed, the growth that has been forecasted by the City can be accommodated by City s sanitary sewer system. Metropolitan Council Coordination The 2030 Sanitary Sewer Plan is required to be submitted to the Metropolitan Council Environmental Services (MCES) for review and approval. By submitting this document, the City will be formally requesting that MCES adequately provide treatment and interceptor capacity in accordance with the City s projected growth and development. This document replaces the Public Facilities Plan - Sewer Element of the City s 2001 Comprehensive Plan. MCES reviews the plans completed and submitted by Lino Lakes and surrounding communities, and utilizes those documents to assess service capacity and required infrastructure needs throughout the region. The City of Lino Lakes is responsible for providing MCES with a Plan that provides sanitary sewer service capacity requirements. The City is also responsible for providing notification to MCES of accelerated development to allow them to accelerate their infrastructure improvements. 7-1

2 Beginning in April 2003, City staff coordinated extensively with MCES to determine the MCES sanitary sewer capacity allocations and future infrastructure planning as they relate to the City of Lino Lakes. MCES responded by indicating that they are in the process of updating their comprehensive planning for the area served by the Forest Lake Interceptor, with an eye to providing additional future capacity in that Interceptor, which serves the eastern part of Lino Lakes. As a result of these discussions, MCES constructed a new interceptor, known as the Lino Lakes Relief Interceptor, from the Lino Lakes corporate boundary to the Forest Lake Interceptor in In addition, MCES determined that additional capacity was needed for both Lino Lakes and Blaine in the North Suburban Interceptor system. Final design of a new Southeast Anoka County Interceptor, which will provide adequate capacity for projected development in Lino Lakes District 2, is now in process. Background and Scope of Plan Background The City of Lino Lakes has a total area of approximately 21,450 acres. The Chain of Lakes Regional Park includes approximately 3,000 acres of land and several lakes. The I-35W and I- 35E corridors occupy about 520 acres. The remainder of the City includes extensive wetland areas and several small lakes. Sanitary wastewater generated in the City is either treated in on-site systems or is collected in city owned sanitary sewers and conveyed to Metropolitan Council interceptors for treatment at the Metropolitan Wastewater treatment Plant in St. Paul. On-site treatment systems are generally located on larger lot developments in the City. Most are in unsewered areas but a few remain in neighborhoods that received service after on-site systems were built. The existing Lino Lakes sanitary sewer system is shown on the Existing Sanitary Sewer System Map, Figure 7-1. For sewer planning purposes, the City has been divided into several Sewer Districts, as shown on the attached Sewer District Map (Figure 7-2). District boundaries are based on the areas that can potentially be served by the various existing and future regional facilities serving the City. The City s Comprehensive Sewer Plan was originally adopted in Portions of the 1990 Plan were updated in 1999 and incorporated into the City s 2001 Comprehensive Plan as Public Facilities Plan - Sewer Element. Planning Scope The scope of this Plan is to develop documentation for sanitary sewer system requirements for the City of Lino Lakes. The scope is limited to providing general guidance and alignment information for implementing future trunk sewer lines and wastewater lift stations, based on the anticipated long-term growth of the City. The final location and detailed design of these trunk sewers and lift stations must be determined and prepared at later dates to conform to the development at each wastewater service area. By following the recommendations of this 2030 Sanitary Sewer Plan, the City will be able to maintain growth without outpacing the available sewer system. Furthermore, the 2030 Sanitary Sewer Plan will provide a more effective and cost-efficient overall system. A major focus of this Plan is estimating the projected wastewater flow from the City and the required capital improvements to the City sewer system over the next several years (i.e., through 2030). At the same time, a long-term (beyond 2030) evaluation is necessary to determine future major facility requirements. Understanding these long-range requirements will allow the City to acquire 7-2

3 7-3

4 7-4

5 sites for their construction and to install initial improvements with adequate size and capacity to convey the future sewer system needs. This Plan should be revisited and updated whenever the development types, densities, growth rate, and/or water use patterns deviate significantly from those estimated herein. The geographic area covered by this Plan includes the entire City with the exception of the Regional Park and freeway corridors. It is understood that complete development of all areas of the City is not expected to occur within the planning period. The proposed facilities have been sized to accommodate projected full build-out. Vision, Goals and Policies The new development forecasts for the City describe the current growth and expected development patterns. The forecasts were developed through a collaborative effort guided by the Citizen Comprehensive Plan Advisory Panel to review past planning documentation and to evaluate the changing demographic conditions and influencing factors. Population projections, land-use, and future growth patterns have been estimated. MCES plans for interceptor sewers and treatment capacities located in the Metropolitan Wastewater Treatment Plant service area inform the Plan, which follows both the Metropolitan Council's Systems Plan - City of Lino Lakes and the Metropolitan Council's Local Planning Handbook. The City s 2030 Sewer Plan evaluates the existing sanitary sewer system to determine the adequacy of the system based on current conditions. This involves updating the existing sewer map and determining the available capacity of existing trunk sewers. Utilizing this information, the Plan provides the guidance and information on future trunk sewers and lift stations necessary to accommodate the City's forecasted growth. This involved reviewing and updating the City's proposed land-use and staged development map, estimating the number of housing units and commercial/industrial properties in the future development sites, and providing solutions for the connection of new lateral sewers to the existing trunk sewer system. The general alignment of new trunk sewers and lift station locations is provided. Figure 7-3 shows the sanitary system compared to future land use and Table 7-1 summarizes existing and ultimate sewered population units. The Citizen Visioning Committee and the Citizen Comprehensive Plan Advisory Panel created goals and strategies to achieve the community vision. The planning done for the 2030 Sanitary Sewer Plan supports this Vision. The cost-effective expansion of the sanitary sewer system indirectly supports achieving many of the City's goals, and, obviously, directly achieves the sanitary sewer goal (Goal 5) identified in the Lino Lakes 2030 Comprehensive Plan Goals and Strategies document. Natural Resources and Amenities Goal 1: Identify, protect and preserve the desirable natural areas and ecological and aquatic resources of the community. Goal 2: Initiate and continue vigorous collaborations and programs to address, restore, and preserve the water quality of the regions lakes, wetlands and other aquatic assets. Sanitary Sewer Support: Careful expansion of sanitary sewer service in support of desired development assures that natural aquatic assets are protected from waterborne household and commercial waste products. 7-5

6 7-6

7 Table 7-1. Summary Of Development Projections Through 2030 Dist. Sub-Dist. Residential Units Existing Sewered ISTS Hookups Projected New Units Total Sewered Units Commercial / Industrial Projected New Employment 1 1A B C D E F G H Sub-Total 2, A B C D E F , G H I J Sub-Total 1, A B C D E F G Sub-Total , A B C D E Sub-Total A ,408 5B C Sub-Total ,408 TOTAL 4, ,600 9,975 4,080 Plus correctional facility (Sub-District 2E) assumed equivalent to 500 residential units TOTAL 4,950 10,475 4,

8 Land Use Policies and Practices Goal 1: Ensure that well-planned, quality residential, commercial, industrial and institutional development to accommodate the City's projected growth needs occurs in a manner that also conserves and enhances the city's natural resources and amenities. Sanitary Sewer Support: Sanitary sewer service expansion, like water service and local street improvements, should be planned to coincide with the timing of desired development, and public sanitary sewer service should be planned in areas identified as having failed on-site sanitary disposal systems, thus protecting both ground and surface water quality. Other Ecological Challenges and Threats Goal 1: Identify and work cooperatively with the state and other local government entities to develop approaches for addressing potential ecological challenges and threats that could adversely affect Lino Lakes. Sanitary Sewer Support: Public sanitary sewer improvements should be planned in areas identified as having failed on-site sanitary disposal systems, protecting both ground and surface water quality from contamination. Community Facilities Goal 5: Maintain the City's residents and businesses with an affordable and safe sanitary sewer system. Policies: 1. Provide a low-maintenance, cost-effective sewer system that meets the long-term needs of the City's residents and businesses. 2. Provide sanitary services to undeveloped areas in a planned manner. 3. Provide for the capacity and extension of sanitary sewer to developed areas of the city currently served by on-site systems. 4. Establish an on-site septic system inspection program to identify potential failing systems. 5. Where possible, direct public sanitary sewer improvements to areas identified as having failed on-site systems. The 2030 Sanitary Sewer Plan directly addresses all of these Policies. Tasks As a first task in the planning process, current growth and development patterns of the City were reviewed in light of past planning documentation and changing demographic conditions. Population projections, land-use, and future growth patterns were estimated. MCES was contacted regarding its future plans for interceptor sewers and treatment capacities located in the Metropolitan Wastewater Treatment Plant service area. Next, the existing sanitary sewer system was evaluated to determine the adequacy or deficiency of the system, based on current conditions. This involved updating the existing sewer map and determining the available capacity of existing trunk sewers. 7-8

9 The third task involved providing guidance and information on future trunk sewers and lift stations that will be necessary to accommodate the City s anticipated growth and development. This included reviewing and updating the City s proposed land-use and staged development map, estimating the number of housing units and commercial/industrial properties in the future development sites, and providing solutions for the connection of new lateral sewers to the existing trunk sewer system. The general alignment of new trunk sewers and lift station locations was determined. Each lift station s general service area was identified. The final task was the preparation of a Plan document summarizing the findings of this investigation and formulating recommendations to the City Council. Lino Lakes Demographic Profile and Forecasts Background The community of Lino Lakes anticipates significant growth in upcoming years. Planning for growth poses significant opportunities and challenges for the community. The City s land use plan is an important tool to ensure that the City is adequately prepared to respond to these opportunities and challenges. The land use plan plays a key role in managing growth within the City. The land use plan builds on the plan vision, goals, and strategies to establish a policy framework in which future development will occur. The future land use map is also used to estimate the community s capacity to accommodate projected household and employment growth. Sewer, water, and transportation infrastructure plans are based on the forecasts and development information presented in the land use plan. Figure 7-3 shows the existing sanitary sewer system and proposed future trunk sewers superimposed over the proposed Future Land Use Plan. Chapter 3: Land Use includes a more detailed discussion of land use and development trends. Past Growth Trends The population of Lino Lakes has grown from 8,807 in 1990 to 16,791 in 2000, an annual increase of 6.7 percent. The Metropolitan Council estimates that the 2005 population of Lino Lakes was 19,698 while the number of households was 5,729. These figures represent annual increases (since 1990) of 5.5 percent in population and 5.4 percent in the number of households. Forecasts Detailed forecasts of land use, population, and employment are included in the 2030 Comprehensive Plan. These forecasts, broken out by sewer planning districts, are briefly summarized below. Existing development by district, as of 2008, is also summarized. District boundaries are shown on Figure 7-2. Forecasts by Sewer Districts Sewer District 1 Sewer District 1 is located in the southwest corner of the City. A significant portion of District 1 is currently developed. As of 2008, District 1 contains approximately 2,260 sewered single family residential units and 350 un-sewered units. There are about 740 developable acres in District 1 currently designated as low density sewered residential, 82 acres designated as medium density residential, 21 acres designated as mixed use-residential, 12 acres designated mixed usecommercial, and 7 acres designated commercial. 7-9

10 The residential areas, including undeveloped lots in the existing subdivisions, are projected to accommodate about 805 new residential units by In addition, approximately 220 existing homes with on-site systems are projected to connect to the sewer system by The total number of sewered residences in District 1 would then be about 3,284 units in In addition, the commercial and mixed use areas will support approximately 140 new employees by Sewer District 2 Sewer District 2 is located in the northwest corner of the City. This area consists of a mixture of urban and rural land uses. District 2 currently contains about 1,710 sewered residential units, 1,085 un-sewered units, and 185 vacant lots in existing developments. This District also contains about 1,220 developable acres designated as low density residential. There are also about 231 developable acres designated as medium density residential, 114 developable acres designated as high density residential, and 60 acres designated as mixed use residential. In total, these areas are projected to support approximately 1,620 new residential units by In addition, District 2 includes the Lino Lakes Correctional Facility. The Correctional Facility houses approximately 1,200 residents, equivalent to about 500 single family residential units. In total, assuming approximately 570 existing un-sewered residential areas receive service, District 2 could contain the equivalent of about 4,403 sewered residential units in District 2 also includes extensive existing commercial and industrial area, as well as approximately 108 developable acres designated commercial, 23 developable acres designated as industrial, and 16 acres designated mixed use - commercial. Projected new employment in the commercial, industrial and mixed use areas totals about 760 employees by Sewer District 3 Sewer District 3 is located on the east side of the City, generally east of Centerville. District 3 also includes sub-district 3F, two small developed areas totaling about 40 homes in the Lamotte Drive area and at the west end of Mound Trail on the north side of Centerville Lake. Sub-district 3F is served by an interconnection to the Centerville sanitary sewer system and by MCES lift station L-4. Existing sewered areas of District 3 contain about 480 existing single family residences, and a few commercial properties. The District also includes about 100 unsewered residences. District 3 contains approximately 247 acres of developable land designated as low density residential; 207 developable acres designated medium density residential; 25 developable acres high density residential; and 302 developable acres designated as mixed use residential. In total, these areas are projected to support approximately 1,857 new residential units by Assuming 40 existing unsewered residences receive service, total sewered residential development in District 3 is projected to be approximately 2,376 units by District 3 also includes approximately 104 developable acres designated commercial, 122 acres designated industrial, and 67 acres designated mixed use-commercial. Total new employment in these areas is projected to be approximately 1,720 employees by Sewer District 4 Sewer District 4 is located in southeastern Lino Lakes, bordering on North Oaks and White Bear Township. There is no existing sewered development in District 4. There are about 140 existing non-sewered residences. District 4 contains approximately 597 developable acres designated low density residential, 48 acres medium density, 9 acres high density, and 20 acres mixed use residential. Most areas of District 4 will probably not be developed by Projected development by 2030 includes about 318 new residential units. In addition, 90 existing units are projected to receive service, resulting in about 412 sewered units in District 4 by In addition, District 4 contains approximately 11 acres designated as mixed use commercial, which could support about 50 employees by

11 Sewer District 5 District 5, located in the northeast corner of the City, is largely rural at present. There is no existing sewered development in this area. There are about 40 existing un-sewered homes and a church located near Peltier Lake. District 5 includes about 150 developable acres designated as low density residential, 299 acres medium density residential, and 41 acres mixed use residential. It is expected that little or no residential development will occur in District 5 before A large portion of District 5 is designated for future industrial (588 acres), commercial (279 acres), and mixed use commercial (9 acres) land uses. Most of these areas will not develop before Total new employment in District 5 is estimated at about 1,410 employees by Sewer District Forecast Summary Based on the 2030 forecasts described in the preceding paragraphs, the City is expected to contain approximately 10,500 equivalent sewered residential units (including the Correctional Facility) by In addition, new commercial/industrial employment by 2030 could total approximately 4,080 employees. Development projections for 2030 are summarized in Table 7-1. In comparing the City s staging plan with the Full-Build-Out Future Land Use Map, it is apparent that large areas of developable land will remain after In addition, in-fill development and redevelopment will continue to occur. Full build-out of proposed residential, commercial, and industrial areas will result in ultimate sewer flows substantially greater than projected 2030 flows. It is therefore prudent to evaluate the capacity of existing and proposed facilities based on ultimate development. Wastewater Flow Projections and Design Flows Water use is associated with population more than any other parameter, and in particular, the per capita consumption is the industry standard for computing water use and, therefore, wastewater flow generated. Both the Minnesota Pollution Control Agency (MPCA) and the Metropolitan Council Environmental Services (MCES) have compiled and documented extensive data that relates wastewater flow generation to population and land-use. This information has been used as our basis for estimating the wastewater design flows and peaking design conditions to determine the size and capacity of the existing and future sewer systems. MCES has established 274 gallons per day (gpd) to be the average daily wastewater production from a typical residential equivalent unit (1 REU = 274 gpd). The following parameters were used for the wastewater flow projections throughout this Plan: Residential Equivalent Unit (REU) = 274 gpd or 100,000 gallons per year Commercial/Industrial Development: 40 gpd per employee or 1,000 gpd per net acre Correctional Facility: 110 gpd per resident; 2.5 residents equals one Residential Unit (REU) Design flows for piping and pumping facilities are based on peak wastewater flow conditions. Peaking factors vary with the total contributing population. The greater the population in the service area the less variable the wastewater flow condition is with time. Standard peaking factors developed by the MCES, as shown in Table 7-2, were utilized to estimate peak flows. Projected average daily flows and peak flows for years 2015, 2020, 2025, 2030, and at ultimate development are summarized in Tables 7-3 through

12 TABLE 7-2. MCES STANDARD PEAKING FACTORS Peak Flow Factor Average Daily Flow Limits (MGD) to to to to to to to to to to to to to to to to to to to to to to to Over

13 TABLE SUMMARY OF PROJECTED FLOWS ALL FLOWS IN MILLIONS OF GALLONS PER DAY (MGD) Dist. Sub-Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non-Residential Total 1 1A B C D E F G H Sub-Total A B C D E F G H I J Sub-Total A B C D E F G Sub-Total A B C D E Sub-Total A B C Sub-Total Total

14 TABLE SUMMARY OF PROJECTED FLOWS ALL FLOWS IN MILLIONS OF GALLONS PER DAY (MGD) Dist. Sub-Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non-Residential Total 1 1A B C D E F G H Sub-Total A B C D E F G H I J Sub-Total A B C D E F G Sub-Total A B C D E Sub-Total A B C Sub-Total Total

15 TABLE 7-5. SUMMARY OF PROJECTED FLOWS ALL FLOWS IN MILLIONS OF GALLONS PER DAY (MGD) Dist. Sub-Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non-Residential Total 1 1A B C D E F G H Sub-Total A B C D E F G H I J Sub-Total A B C D E F G Sub-Total A B C D E Sub-Total A B C Sub-Total Total

16 TABLE 7-6. SUMMARY OF PROJECTED FLOWS ALL FLOWS IN MILLIONS OF GALLONS PER DAY (MGD) Dist. Sub-Dist. Average Daily Flow Peaking Factor Peak Flow Residential Non-Residential Total 1 1A B C D E F G H Sub-Total A B C D E F G H I J Sub-Total A B C D E F G Sub-Total A B C D E Sub-Total A B C Sub-Total Total

17 Table 7-7. Summary of Projected Flows Ultimate Development All Flows in Millions of Gallons Per Day (MGD) Dist. Sub-Dist. Average Daily Flow Peaking Factor Peak Flow Residentia l Non- Residential Total 1 1A B C D E F G H Subtotal A B C D E F G H I J Subtotal A B C D E F G Subtotal A B C D E Subtotal A B C Subtotal Total

18 Metropolitan Council Environmental Services (MCES) Metropolitan Urban Service Area (MUSA) Boundary The MUSA boundary is the boundary in the seven-county Twin City Area within which the Metropolitan Council commits to provide sanitary sewage treatment and conveyance via regional interceptors. The Metropolitan Council required each community in the MUSA to provide a Plan Update in These Plans developed MUSA staging lines in five-year increments up to the year In Lino Lakes, the Stage 1 Utility Staging Area is the MUSA boundary. Collaboration with Metropolitan Council Environmental Services (MCES) Complete sewer collection and treatment service for the City of Lino Lakes is provided through a collaborative effort between the City and MCES. The City is required to provide local sewer collection services in accordance with the City s Comprehensive Plan. Wastewater collected within the City limits is conveyed into MCES interceptors. The collected sewage and the sewage from other communities are then conveyed to the MCES Metropolitan Wastewater Treatment Plant (WWTP), located in the City of Saint Paul. In recent years, there has been substantial growth in Lino Lakes and adjacent communities. MCES is aware of this growth and is reviewing the Plans submitted by each community in this region to evaluate their future wastewater collection, treatment, and infrastructure capabilities. MCES wastewater treatment facilities and interceptor systems are designed based on projected regional land-use and growth plans. Therefore, any significant changes in future land-use and development of the City will have an impact on MCES facilities. MCES Interceptors and Lift Stations Serving Lino lakes The City of Lino Lakes sewer system currently discharges to the MCES Interceptor system at four locations. Sewer District 2 is served by MCES Interceptor 83-61, located in North Road on the Lino Lakes/Circle Pines boundary. Service to District 1 is provided by MCES Lift Station L69, located on Ware Road. Sub-District 3F discharges to MCES Lift Station L4, located at the Lino Lakes/Centerville Corporate boundary. The MCES Centerville Interceptor (Interceptor 76-51), located in Cedar Street, receives the pumped discharge from Lift Station L4, as well as flow from Sewer District 3. Lino Lake s flows will be discharged to the regional system at two additional locations in the future. Sewer District 4 will be served by a White Bear Township trunk sewer, ultimately discharging to the Forest Lake interceptor. District 5 will be served by the newly constructed Lino Lakes Relief Interceptor. The locations of these facilities are shown on Figure 7-1. The following paragraphs provide a brief description of each of the existing MCES and White Bear Township facilities. MCES Interceptor The existing interceptor is a gravity sewer which provides an outlet for Lino Lakes Lift Stations 2 and 4. MCES Meter Station M211 is located at the discharge end of the forcemain serving these two lift stations. A peak flow capacity of 3.6 Million Gallons per Day (MGD) has been allocated to Lino Lakes at this connection. Interceptor flows west and discharges into the North Suburban Interceptor (4-NS-523). As a result of recent development projections by Lino Lakes, Blaine, and other cities, MCES has committed to provide additional capacity at this location. The proposed Southeast Anoka County Interceptor will provide an allocated capacity of 7.6 MGD for Lino Lakes. 7-18

19 MCES Lift Station L-69 This lift station, located on Ware Road, was constructed in to replace an earlier MCES facility, Lift Station L-53. Lift Station L-69 discharges west through a long forcemain to the North Suburban Interceptor (4-NS-523) in the City of Shoreview. The current design capacity of Lift Station L-69 is 2,760 gallons per minute (gpm) or 3.97 MGD. It can be upgraded to 2920 GPM (4.20 MGD) by changing pump impellers. MCES Meter Station M219 is located at the lift station. MCES Lift Station L-4 The service area of this lift station is limited to a small, fully-developed area of Lino Lakes (District 3F), as well as the City of Centerville. This lift station and forcemain were upgraded by MCES in 2000 to provide for the long-term needs of this service area. MCES Meter Station M210 is located at the lift station. The forcemain discharges into MCES Interceptor at the intersection of 21st Avenue and Cedar Street. MCES Interceptor (Centerville Interceptor) This interceptor is a 24-inch gravity sewer constructed in It flows east into the City of Hugo and connects to the Forest Lake Interceptor. Interceptor receives flow by forcemain from MCES Lift Station L-4, and also from forcemains serving Lino Lakes Lift Stations 7 and 8. MCES Meter Station M220 is located on the Lino Lakes/Hugo boundary on Cedar Street. The interceptor at the Lino Lakes boundary has a gravity capacity of 5.00 MGD, of which approximately 3.65 MGD is available to Lino Lakes. MCES Interceptor (Metropolitan Service to Sewer District 4) Lino Lakes Sewer District 4 is not currently served by an MCES facility. Future sewer service to this area is expected to be provided by way of the White Bear Township sewer system, ultimately discharging to MCES Interceptor Recent projects have extended service to the Lino Lakes boundary at three locations: an 18-inch gravity sewer on the west side of Centerville Road, the North Oaks Company s Rapp Farm lift station at the west end of Wilkinson Lake, and a White Bear Township pressure sewer system east of Otter Lake. The capacity potentially available for Lino Lakes in the White Bear Township system is approximately 2.3 MGD. MCES Interceptor (Service to District 5) MCES recently constructed the Lino Lakes Relief Interceptor, which extends west from the Forest Lake Interceptor (MCES Interceptor 70-29) along Washington County Highway 8 to the Lino Lakes boundary. This sewer will serve District 5. Available capacity for Lino Lakes at this location is 5.6 MGD. Future Improvements to MCES Interceptors City staff and consultants have met with MCES staff numerous times in recent years to discuss existing and future MCES service to Lino Lakes. The MCES is in the process of updating their planning for the Northeast Region, which includes Lino Lakes, Centerville, North Oaks, Forest Lake, Hugo, Forest Lake Township, White Bear Lake, and White Bear Township. They anticipate the need to provide additional capacity in the Forest Lake Interceptor and downstream facilities to serve the future needs of those communities. The MCES also anticipates the need to upgrade portions of the North Suburban Interceptor to serve future development in Lino Lakes and Blaine. The proposed Southeast Anoka County Interceptor is a key part of the North Suburban Interceptor improvement program. This 2030 Sanitary Sewer Plan, as well as the Comprehensive Plans of neighboring communities, will be used by MCES to assess the scope and timing of future interceptor improvements. 7-19

20 Existing Sanitary Sewer System Sanitary Sewer Map Figure 7-1 presents the general alignment and layout of the existing sanitary sewer system. The MCES interceptors, lift stations, forcemains, and meter stations serving the City of Lino Lakes are labeled to distinguish them from the City sanitary sewer system. Existing Sanitary Sewer Collection System Most of the City sanitary sewer system consists of PVC gravity sewer lines ranging from 8 inches in diameter to 24 inches in diameter. Lateral sewers serving residential areas are typically 8 inches in diameter, and discharge into 10 inch or larger trunk sewers. The City also currently owns and operates 13 sanitary sewer lift stations which are an integral part of the collection system. The locations are shown on the sanitary sewer system map. Lift stations 1 through 12 were constructed by the City. Lift Station L53 was originally an MCES facility, but was conveyed to the City by MCES in 1998 following construction of new MCES lift station L69. Design information on existing lift stations is summarized in Table 7-8. A brief description of the existing lift stations and their service areas follows. Table 7-8: Existing Lift Stations Lift Station Pumps: Lift Station Address No. No./Capacity/HP Capacity Black Duck Drive 2 pumps/775 gpm/23 HP +1 pump/800 gpm/25 HP 880 gpm Lake Drive 2 pumps/140 gpm/5 HP 140 gpm Ware Road 2 pumps/210 gpm/3 HP 210 gpm Gladstone Drive 3 pumps/1,000 gpm/25 HP 2,000 gpm Snow Goose Trail 2 pumps/300 gpm/10 HP 300 gpm Stagecoach Trail 2 pumps/200 gpm/3 HP 200 gpm Cedar Street 2 pumps/150 gpm/7.5 HP 150 gpm st Avenue 2 pumps/250 gpm/15 HP 250 gpm Ware Road 2 pumps/230 gpm/5 HP 230 gpm Century Trail 2 pumps/300 gpm/10 HP 300 gpm Kelly Street 2 pumps/150 gpm/7.5 HP 150 gpm Village Drive 2 pumps/250 gpm/5 HP 250 gpm L Laurene Avenue 2 pumps/240 gpm/5.5 HP 240 gpm Lift Station No. 1 Located on Black Duck Drive near Birch Street, this lift station currently serves Sewer Sub- Districts 1D and 1F. Future sewer service to Sub-District 1G will also ultimately drain to Lift Station 1. Lift Station No. 1 was reconstructed in 2003 and has three submersible pumps. The station s capacity is 880 gpm with two pumps operating. Lift Station No. 1 discharges via forcemain to the gravity sewer in Country Lakes Drive. Lift Station No. 2 This lift station, located at Lake Drive and 2nd Avenue, serves a small area adjacent to Rice Lake. It discharges to the MCES gravity sewer at Meter Station

21 Lift Station No. 3 This lift station was constructed at its current location in 1998 as part of a general reconfiguration of sewer lines in District 1 associated with the construction of new MCES Lift Station L69. Old Lift Station No. 3, which was located at 6290 Ware Road, was converted into a manhole discharging into the MCES lift station. The new lift station provides service to future residential development near the south end of Ware Road. Lift Station No. 3 discharges to gravity sewer in Linda Avenue, and thence to Lift Station L53. Lift Station No. 4 This lift station, constructed in 1989, receives flow from the 24-inch West Central Trunk Sanitary Sewer. All existing sewered areas of Sewer District 2, except for the Lift Station 2 service area, are tributary to Lift Station No. 4. The existing lift station has three pumps housed in an 8.5-foot diameter vault, and discharges through a 14-inch forcemain to MCES Meter M211. Lift Station No. 5 This lift station serves Sub-District 1F. It discharges to existing gravity sewer near Birch Street and White Oak Road, and thence, by gravity to Lift Station No. 1. Lift Station No. 6 Located near Marshan Lake, this lift station serves a small area east of Lake Drive. It discharges into a gravity sewer in 4th Avenue which is part of the Lift Station 4 service area. Lift Station No. 7 This station serves the part of District 3 east of 35E. It discharges to the MCES gravity sewer upstream of Meter M220. Lift Station No. 8 This lift station was constructed in 1999, in conjunction with sewer construction in 21st Avenue. It serves the portion of District 3 west of 35E and north of Cedar Street. It discharges to the MCES gravity sewer at 21st Avenue and Cedar Street. Lift Station No. 9 Located on Ware Road north of Birch Street, this station was constructed in 2002, to serve new development southeast of Rice Lake. It discharges into the sewer system tributary to MCES Lift Station L69. Lift Station No. 10 This lift station, located near the intersection of Century Trail and Pinto Lane, was constructed in 2003 as part of the Century Farms North development. It serves existing development in Century Farms North, and will receive flow from future development in Sub-District 2I. Lift Station No. 11 This lift station was constructed in 2006 as part of the Pine Glen Subdivision. It serves a small area of Sub-District 2B. Lift Station No. 12 This lift station, located southeast of the 35W/Lake Drive interchange, was constructed in It will serve the Legacy of Woods Edge mixed use development, located north and east of City Hall. This area is part of Sub-District 2F. 7-21

22 Lift Station L53 This lift station was originally owned by MCES, but was conveyed to the City following the construction of new MCES Lift Station L69. It discharges via forcemain to Lift Station L69. Lift Station L53 services the southwest corner of the City (Sub-District 1A) and also receives flow from Lift Station No. 3. Existing Sanitary Sewer System Capacity Analysis Trunk sanitary sewers and lift stations were analyzed to determine the existing service capacity and the total available capacity for future development opportunities. Existing wastewater flows were estimated by a combination of pumping records, MCES meter records, and counts of existing residential units. The total capacity of each trunk facility was calculated to determine the available capacity for future growth and development. Tables 7-9, 7-10, and 7-11 summarize projected flows (at ultimate development) and existing capacity at key points in the sewer system. Flows are given in Millions of Gallons per Day (MGD). Where estimated future peak flows exceed capacity, reconstruction or upgrading of the system may be required. For those locations likely to experience flows in excess of capacity within the planning period, future upgrades are addressed in the Capital Improvement Plan. A discussion of future needs and capacity restrictions in the various Sewer Districts is presented in the following paragraphs. Table 7-9. Capacity Analysis - Existing Sewer System - District 1 FUTURE FLOW FACILITY NAME/ LOCATION SERVICE AREA (Sub-Districts) Avg. (MGD) Peak Factor Peak (MGD) EXISTING CAPACITY (MGD) Lift Station #5 (Pumps to LS 1) 1F Lift Station #1 1D, 1F, & 1G REMARKS May Require Upgrade, See Note 2 May Require Upgrade, See Note 2 12" Trunk Sewer, Country Lakes Drive 1D, 1F, 1G, & about 70 homes in 1B May Require Upgrade, See Note 2 Lift Station #9 1H Adequate Capacity 21" Trunk Sewer at Lift Sta. L69 1B, 1D, 1F, 1G, & 1H Adequate Capacity Lift Station #3 1C May Require Upgrade, See Note 2 Lift Station #L53 1A & 1C Requires Upgrade Future MCES Lift Station L69 All of District NOTES: 1. Future Flow estimates are based on ultimate development of the service areas. 2. Theoretical Peak Flow Exceeds Capacity. The facility may still function due to storage in pipes. Monitor flows as development progresses. 7-22

23 Table Capacity Analysis - Existing Sewer System - District 2 FACILITY NAME/ LOCATION SERVICE AREA (Sub-Districts) Avg. (MGD) FUTURE FLOW Peak Factor Peak (MGD) EXISTING CAPACITY (MGD) Lift Station #2 2H REMARKS Requires Future Upgrade Lift Station #6 2G Adequate Capacity Lift Station #10 Option 1 2I & 2J Option 2 2I Requires Future Upgrade Requires Future Upgrade 15" Sewer, Lilac Lane/4th Avenue Option 1 2E, 2I & 2J Option 2 Half of 2E Does Not Have Adequate Capacity Adequate Capacity; See Note 3 21" Sewer, Main Street/Lake Drive/Apollo Drive 2A, 2B, 2C, & 2D Adequate Capacity 24" Trunk Sewer, 4th & Apollo Option 1 Option 2 2A, 2B, 2C, 2D, 2E, 2I, & 2J A, 2B, 2C, 2D, & half of 2E Does Not Have Adequate Capacity Adequate Capacity; See Note 3 24" Trunk Sewer at L. S. #4 Option 1 Option 2 2A, 2B, 2C, 2D, 2E, 2F, 2G, 2I, & 2J A, 2B, 2C, 2D, half of 2E, most of 2F, & 2G Does Not Have Adequate Capacity Adequate Capacity, See Notes 3 & 4 Lift Station #4 Option 1 Option 2 2A, 2B, 2C, 2D, 2E, 2F, 2G, 2I, & 2J A, 2B, 2C, 2D, half of 2E, most of 2F, & 2G Does Not Have Adequate Capacity Upgrade Lift Station & Forcemain MCES SE Anoka County Interceptor All of District New Facility by MCES NOTES: 1. Future Flow estimates are based on ultimate development of the service areas. 2. Option 1 assumes all areas will be served by existing trunk sewers. 3. Option 2 assumes construction of a West Side Relief Sewer serving sub-districts 2I, 2J, half of 2E, and about 800 homes in 2F. 4. Theoretical Peak Flow Exceeds Capacity, but Pipe will Function with Surcharge and Storage in Pipe. 7-23

24 Table Capacity Analysis - Existing Sewer System - District 3 FACILITY NAME/ LOCATION SERVICE AREA (Sub-Districts) Avg. (MGD) FUTURE FLOW Peak Factor Peak (MGD) EXISTING CAPACITY (MGD) Lift Station #7 3A & 3E REMARKS Requires Future Upgrade 15" Trunk Sewer, Clearwater Cr Drive 21" Trunk Sewer, Otter Lake Road 3A South of Cedar Street & 3E Adequate Capacity 3A North of Cedar Street Adequate Capacity 21" Trunk Sewer, 21st Avenue 3B Adequate Capacity Lift Station #8 3B Requires Future Upgrade MCES Interceptor All of District 3 plus - City of Centerville Adequate Capacity See Note 2 NOTES: 1. Future Flow estimates are based on ultimate development of the service areas. 2. Future average daily flow includes MGD from Centerville. Sewer District 1 MCES Lift Station L69, which serves this District, was constructed with substantial reserve capacity and appears to be adequate for the needs of its service area through the planning period. The current capacity of Lift Station L69 is 3.97 MGD, greater than the projected ultimate flow of 3.84 MGD. The existing trunk sewer system and existing City-owned lift stations were also analyzed, and the results are summarized in Table 7-9. The future service needs shown in Table 7-9 are based on ultimate development of the service areas, that is, development of all currently undeveloped land at urban densities. It is also assumed that all existing homes served by on-site systems will either be redeveloped or connected to the sewer system in the future. Ultimate development of all areas of Sewer District 1 is not expected to occur before Sewer District 2 All currently sewered areas of District 2 are served by MCES Interceptor 83-61, a 24-inch gravity sewer located in North Road. The MCES has allocated a capacity of 3.6 Million Gallons per Day (MGD) to Lino Lakes in the existing interceptor. However, the MCES has initiated a program to construct a new interceptor, known as the Southeast Anoka County Interceptor, which will replace existing interceptor The new interceptor will provide at least 7.6 MGD of capacity for Lino Lakes, which will be adequate for full development of District 2. Currently, all existing sewers in District 2, except for a small area near Rice Lake, discharge to the City s West Central Trunk Sanitary Sewer, thence to Lift Station No. 4, and thence by forcemain to MCES Interceptor The existing trunk sewer, lift station and forcemain do not have sufficient capacity for full build-out of District

Chapter 13: Implementation Plan

Chapter 13: Implementation Plan Chapter 13: 13.1. INTRODUCTION The purpose of the implementation chapter of the Comprehensive Plan is to set forth the actions that the City will take to ensure that the plans, programs and policies set

More information

SANITARY SEWER MASTER PLAN

SANITARY SEWER MASTER PLAN SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS

More information

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8. Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Sewage Disposal plan

Sewage Disposal plan Community Utilities Plan Sewage Disposal plan Existing Facilities There are three public sewage treatment plants and four central sewage systems operating in the Nazareth Area. A public sewage system is

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

Development impact fees can also create a strong financial incentive to discourage inefficient land development patterns by:

Development impact fees can also create a strong financial incentive to discourage inefficient land development patterns by: Development Impact Fees What is it? New development creates a demand for additional schools, roads, sewer lines, and recreational facilities. Development impact fees are one-time fees charged to new development

More information

DeSoto County is not a water service provider and does not operate any

DeSoto County is not a water service provider and does not operate any Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities

CHAPTER 10-2. Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities CHAPTER 10-2 SEWAGE COLLECTION AND TREATMENT FACILITIES Section 1 Inventory of Existing Sanitary Sewer Collection and Treatment Facilities 1.1 SANITARY SEWER COLLECTION SYSTEM The City of Washougal operates

More information

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE 8. Infrastructure 8.1 VISION STATEMENT Infrastructure is a basic building block of the community essential for the health, safety, and welfare of residents.

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste 3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers S:/Engineering/Design Standards/Chapter 9 12/29/2014 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow

More information

Aquatera 2015/16 Business Plan Highlights

Aquatera 2015/16 Business Plan Highlights Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality

More information

5.1 SIZING OF FACILITIES 5.2 PHASING CONSIDERATIONS

5.1 SIZING OF FACILITIES 5.2 PHASING CONSIDERATIONS SECTION 5: COST ESTIMATING PROCESS Section 5 As part of the alternatives development, conceptual (planning level) cost estimates were developed for the options being proposed. These estimates would be

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

Dry Weather Flow from Footing Drains and Service Connections

Dry Weather Flow from Footing Drains and Service Connections Wastewater Master Plan DWSD Project No. CS-1314 Dry Weather Flow from Footing Drains and Service Connections Technical Memorandum Original Date: May 2, 2002 Revision Date: September 2003 Author: CDM Table

More information

Short-term. Action items that fall into this category need to take place over the next one to two years.

Short-term. Action items that fall into this category need to take place over the next one to two years. Implementation Plan Building Momentum Through Incrementalism Queensbury s vision for its future, which emerged from public discussion over the past year, is as a vibrant regional center for living, working,

More information

S-16 Sewer Pump Station Improvements

S-16 Sewer Pump Station Improvements S-16 Pump Station Improvements Status: Ongoing Location: Pump stations throughout the Utility s service area Budget 20,600,491 12,181,491 512,000 1,340,000 2,310,000 1,075,000 1,097,000 1,090,000 995,000

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT

TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT TOWN OF SAUGEEN SHORES WATER AND SANITARY SEWER SERVICING MASTER PLAN 2014 REPORT April 1, 2015 B. M. ROSS AND ASSOCIATES

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

UTILITIES ELEMENT TABLE OF CONTENTS. I. INTRODUCTION 3 1. Growth Management Act Requirements 3 2. Purpose of Utilities Element 3

UTILITIES ELEMENT TABLE OF CONTENTS. I. INTRODUCTION 3 1. Growth Management Act Requirements 3 2. Purpose of Utilities Element 3 TABLE OF CONTENTS I. INTRODUCTION 3 1. Growth Management Act Requirements 3 2. Purpose of Utilities Element 3 II. EXISTING CONDITIONS AND CAPACITY 4 1. Water Supply 4 a. Existing conditions 4 b. Capacity

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

Water and Sewer Utilities

Water and Sewer Utilities Water and Sewer Utilities Capital Improvement Program Utilities Water and Sewer Requested - $98,295,000 - $97,792,600 Funded - $32,951,600 Sewer 53.3% Sewer 54% Water 27% Water Water 46% 46.7% Sewer 73%

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia Georgia Department of Public Health Georgia Onsite Sewage Management Systems Background and Use of Onsite Wastewater Treatment Systems in Georgia Background On-site sewage management systems are designed

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

Parkhill Road Sewage Pumping Station Class EA Study

Parkhill Road Sewage Pumping Station Class EA Study Parkhill Road Sewage Pumping Station Class EA Study Public Information Centre October 4, 2011 6:30 pm 8:30 pm Westmount Public School DRAWING ON EXPERIENCE BUILDING ON STRENGTH Sewage Pumping Station (SPS)

More information

D3 April 8, 2015 Public Hearing

D3 April 8, 2015 Public Hearing D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke

More information

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration

More information

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No. Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment

More information

TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS

TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS TOWN OF LAKESHORE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT FOR LAKESHORE EASTERN COMMUNITIES SEWAGE WORKS Prepared for The Town of Lakeshore 419 Notre Dame Street, Belle River Ontario

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT

APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT This Agreement ("the Agreement ) is entered into this day of, 2011, between the Town of Amherst Sanitary Sewer District 1 (hereinafter SSD 1 ) and Town

More information

Wastewater Regulation and Designing Changes in South East Asia

Wastewater Regulation and Designing Changes in South East Asia Chapter 15 Water Security Agency Regulating Wastewater Systems 1.0 MAIN POINTS Effectively regulating public wastewater systems 1 is essential to protecting our environment and in turn, the health and

More information

Michigan State University Ingham County Health Department Tri- County Regional Planning Commission Land Use and Health Resource Team

Michigan State University Ingham County Health Department Tri- County Regional Planning Commission Land Use and Health Resource Team HEALTH IMPACT ASSESSMENT OF THE URBAN AND RURAL SERVICES MANAGEMENT POLICY Mid- Michigan Region Health In All Project Michigan State University Ingham County Health Department Tri- County Regional Planning

More information

Presentation to Knox County Commission Monday, February 23, 2015

Presentation to Knox County Commission Monday, February 23, 2015 The Northwest County Sector Plan Update Presentation to Knox County Commission Monday, February 23, 2015 COMMUNITIES OF THE NORTHWEST COUNTY SECTOR Ball Camp Cedar Bluff Last NW Sector Update: 2003 Land

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Introduction Community facilities play an important role in ensuring a quality standard of living for Township residents, as well as impacting the location

More information

PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item

PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item Z-15-00063 Item No. 1-1 PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item PC Staff Report 04/20/2015 ITEM NO. 1 Z-15-00063 CS TO RS5; 832 Ohio Street (BJP) Z-15-00063: Consider a request

More information

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals: Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota Land Use Goals: 1. Growth in Wadena will be undertaken in such a manner as to create a full range of living, working, shopping,

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Summary of Pacific Northwest Municipal Tree Regulations Prepared by Seattle DPD in conjunction with Sound Tree Solutions February 8, 2010

Summary of Pacific Northwest Municipal Tree Regulations Prepared by Seattle DPD in conjunction with Sound Tree Solutions February 8, 2010 Summary of Pacific Northwest Municipal Tree Regulations Prepared by Seattle DPD in conjunction with Sound Tree Solutions February 8, 2010 The attached table is the comparison of Seattle to eleven Pacific

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by:

Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by: Breslau Settlement Plan Preliminary Servicing and Stormwater Management Report December 2015 Prepared by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone 905 475 1900

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

DRAFT POLICIES COUNTY OF HALIBURTON OFFICIAL PLAN UPDATE

DRAFT POLICIES COUNTY OF HALIBURTON OFFICIAL PLAN UPDATE SETTLEMENT AREAS Introduction Urban Serviced DRAFT POLICIES These urban areas have either full or partial primary urban services, mainly water, sewage and roads. Functionally, they tend to service larger

More information

Review of Footing Drain Disconnection Projects

Review of Footing Drain Disconnection Projects Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Revised May 2007 CAPITAL FACILITIES FINANCIAL PLAN 2007-2012 CLARK COUNTY 20-YEAR GROWTH MANAGEMENT

More information

Onsite options Curtis J. Sparks, P.E. Water conservation and wastewater treatment technologies are keys to sustainable development.

Onsite options Curtis J. Sparks, P.E. Water conservation and wastewater treatment technologies are keys to sustainable development. CENews.com Feature Article Wednesday, March 26, 2008 Onsite options Curtis J. Sparks, P.E. Water conservation and wastewater treatment technologies are keys to sustainable development. In the United States,

More information

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015 I. PROJECT IDENTIFICATION Applicant: Authorized Representative: Village of Eau Claire

More information

PA-14-04/ORDINANCE 14-34 (DTS# 20140263) 24/7 DEVELOPMENT HOLDINGS, LLC BAYSHORE BLACKROCK

PA-14-04/ORDINANCE 14-34 (DTS# 20140263) 24/7 DEVELOPMENT HOLDINGS, LLC BAYSHORE BLACKROCK PC: 9-11-2014 PA-14-04/ORDINANCE 14-34 (DTS# 20140263) 24/7 DEVELOPMENT HOLDINGS, LLC BAYSHORE BLACKROCK Adoption of a Plan Amendment of the Board of County Commissioners of Manatee County, Florida, regarding

More information

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service. After the Flush Published: July 14, 2011 Sewage or wastewater is something we rarely think or talk about. The wastewater from our toilets, showers, washing machines and dishwashers quickly departs our

More information

FY 2015-16 Springs Funding Projects

FY 2015-16 Springs Funding Projects FY 2015-16 Springs Funding Projects Spring Homosassa Springs Project Name and Description Garcia Point Septic Project: Through the connection of 88 residential septic systems to Citrus County s central

More information

GIS in Wastewater Collection System Master Planning

GIS in Wastewater Collection System Master Planning Page 1 of 6 GIS in Wastewater Collection System Master Planning Brad Roeth, EIT Stanley Consultants, Inc. This paper presents the use of GIS in a wastewater collection system master plan. The master plan

More information

Chapter 2 Asset Management

Chapter 2 Asset Management Chapter 2 Asset Management Effectively Managing the City s Infrastructure Systems In 2013, the replacement value of the City of Portland s built infrastructure was estimated at $31.3 billion. 2 Providing,

More information

APPENDIX 8 EXCERPTS FROM STATE HEALTH REGULATIONS

APPENDIX 8 EXCERPTS FROM STATE HEALTH REGULATIONS APPENDIX 8 EXCERPTS FROM STATE HEALTH REGULATIONS Table 8.1 Sewage s Discharge Facility Design Units gpd BODs #/day S.S. #/day Duration Hour Dwellings* per person total 75 0.2 0.2 24 Food Preparation 15

More information

DID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER

DID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER DID YOU KNOW... THE IMPAT OF ON-SITE SEWAGE SYSTEMS AND ILLIIT DISHARGES ON THE ROUGE RIVER by Barry Johnson, P.E., M.S., amp Dresser & McKee and Dean Tuomari, Wayne ounty Department of Environment The

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

Purpose and Approach. Introduction

Purpose and Approach. Introduction City of Ann Arbor Sanitary Sewer Wet Weather Evaluation Project Best Practices Sub- Group of the Citizens Advisory Committee Examples of Wet Weather Improvements from Other Communities December 5, 2013

More information

Philadelphia County. Land Use and Growth Management Profile

Philadelphia County. Land Use and Growth Management Profile Philadelphia County is located in the southeastern corner of Pennsylvania and is bordered by the Pennsylvania counties of Delaware, Montgomery, and Bucks, and the New Jersey counties of Burlington, Camden,

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2)

Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2) SECTION 2 Description of Master Plan Alternatives The six alternatives that constitute the building blocks of the IRWP Master Plan are as follows: Indoor Water Conservation (EIR Alternative 1) I&I Reduction

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees Rates & Fees Residential Accounts Residential Accounts 2015 Calendar Year Initial Charges New Construction or Irrigation 3 Base Meter 2 Account Activation Fee System Development Charge 1 Size Meter Fee

More information

PRELIMINARY INFLOW/INFILTRATION SURCHARGE PROGRAM. Metropolitan Council Environmental Services. October 24, 2005

PRELIMINARY INFLOW/INFILTRATION SURCHARGE PROGRAM. Metropolitan Council Environmental Services. October 24, 2005 Metropolitan Council Environmental Services PRELIMINARY INFLOW/INFILTRATION SURCHARGE PROGRAM October 24, 2005 Metropolitan Council Environmental Services 230 East Fifth Street St. Paul, Minnesota 55101-1626

More information

A Long-Range Plan: Melbourne s Drinking Water Supply

A Long-Range Plan: Melbourne s Drinking Water Supply April 2002 A Long-Range Plan: Melbourne s Drinking Water Supply The long-term water supply of South Brevard County must be dependable, flexible, and affordable. With those goals in mind, we continue to

More information

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING Our shared role in protecting local water resources 1 Goals for this presentation: Water Environment Protection? Clean Water What is it worth?

More information

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy Prepared by: AECOM 410 250 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

Introduction. Do You Need A Water Right? Exempt Groundwater. Plan Ahead

Introduction. Do You Need A Water Right? Exempt Groundwater. Plan Ahead HOMEOWNER S GUIDE TO WELL CONSTRUCTION Introduction This brochure provides guidance in planning the construction of your well. State law requires that all wells meet certain minimum construction standards,

More information

Tables A Present Worth Cost Summary Regional Collection System B O&M Costs Regional Collection System C Estimated Construction Costs - Trunk Forcemain D Estimated Construction Costs Regional Collection

More information

Testimony. Shaun LaLonde Agency Hearing Staff Eduardo Hernandez Applicant Witness

Testimony. Shaun LaLonde Agency Hearing Staff Eduardo Hernandez Applicant Witness ISSUE #4 Is it feasible to connect the proposed Sewer District #27 to Sewer District #23 via a pump station and associated components, taking into account design, location, impacts (such as noise, odors,

More information

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities Fats, Oil and Grease Best Management Practices Manual Information, Pollution Prevention, and Compliance Information For Food Service Facilities Pinellas County Utilities Water Quality Management Division

More information

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS Page No. 1.0 BACKGROUND...1 2.0 INTRODUCTION - SEPTAGE RECEIVING STATION...1

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Rezoning case no. RZ15-08: Adam Development Properties, LP

Rezoning case no. RZ15-08: Adam Development Properties, LP PLANNING AND ZONING COMMISSION STAFF REPORT June 4, 2015 Rezoning case no. RZ15-08: Adam Development Properties, LP CASE DESCRIPTION: LOCATION: a request to amend the development plan of a previously-approved

More information

IMPLEMENTATION STRATEGIES The following sections list the implementation strategies for following chapters.

IMPLEMENTATION STRATEGIES The following sections list the implementation strategies for following chapters. CHAPTER 13: IMPLEMENTATION INTRODUCTION The purpose of the Implementation Chapter is to set forth the actions that the City will take to ensure that the plans, programs, and policies set forth in the plan

More information

9.0 Alta Vista/Faircrest Heights/Riverview Park (Key Principles)

9.0 Alta Vista/Faircrest Heights/Riverview Park (Key Principles) 9.0 Alta Vista/Faircrest Heights/Riverview Park (Key Principles) Official Plan Consolidation for the City of Ottawa 1 9.1 Location This Chapter applies to Alta Vista/Faircrest/Riverview Park, which corresponds

More information

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection

More information