1 Attachment FF-6 and Potential Tariff Gap Regional Expansion Criteria & Benefits Working Group Workshop (RECBWG) May 26, 2016 Revised 5/31/2016
2 Overview Objective Review original intent of Attachment FF-6 Highlight tariff gap for interregional economic projects outside of MISO Discuss options to address gap Key Takeaways Two of our Joint Operating Agreements (JOAs) allow for interregional projects to reside wholly in another RTO Attachment FF-6 only addresses projects terminating in MISO Attachment FF-6 gap for interregional economic projects located wholly outside of MISO. MISO is presenting 4 potential options: No tariff change and apply existing Market Efficiency Project (MEP) cost allocation Modify Attachment FF-6 with threshold test Benefiting Local Resource Zones (LRZs) pay Apply 20% postage stamp to sub-regions 2
3 Hypothetical Interregional Projects During the Transition Period Scenario 1 Economic project terminates exclusively in MISO North/Central Provides benefits to MISO North/Central and/or South MISO North/Central pays Scenario 2 Economic project terminates in MISO North/Central AND South Benefiting LRZs pay 80% and the remaining 20% is postage stamped across the MISO footprint Scenario 3 Economic project terminates exclusively in MISO South Provides benefits to MISO North/Central and/or South MISO South pays Scenario 4 Project terminates wholly outside of MISO Provides benefits to MISO North/Central and/or South Current gap in Attachment FF-6 regarding who pays GAP
4 Option 1 No Tariff Change, Default to Existing Att FF MEP Cost Allocation Since Att FF-6 is silent on what to do with an interregional project that terminates solely outside of MISO, an option is to default to current Attachment FF procedures for economic projects. This however, implements a 20% postage stamp allocation of costs across the entire MISO footprint. Hypothetical Examples Interregional project provides economic benefits to MISO but is located wholly outside of MISO: Hypothetical Examples for Option 1 A B C Total Interregional Project Cost $100M $100M $100M Total MISO Benefit 30% 30% 30% Analysis Results North/Central Benefit 100% 0% 50% Analysis Results South Benefit 0% 100% 50% MISO Cost Share $30M $30M $30M MISO Regional Cost Allocation in Attachment FF LRZs 80% 80% 80% Postage Stamp Footprint Wide 20% 20% 20% Allocation of 80% to Benefitting LRZs LRZs in North/Central Planning Area Cost $24M $0 $12M LRZs in South Planning Area Cost $0 $24M $12M 20% Postage Stamp Allocation Footprint Wide $6M $6M $6M 4
5 Option 2 - Modify Attachment FF-6 Introduces a benefit threshold to address a scenario where analysis shows that benefits span across North/Central and South. If at least 80% of MISO s benefit is to one particular region, then default to transition period language outlined in Attachment FF-6 Projects would be treated as if they terminate in the area benefiting by 80% or greater Modification to Attachment FF-6 required and only effective for the remainder of the transition period Hypothetical Examples Interregional project provides economic benefits to MISO but is located wholly outside of MISO. 80% of benefit resided in one MISO sub-region: Hypothetical Examples for Option 2 D E Total Interregional Project Cost $100M $100M Total MISO Benefit 30% 30% Analysis Results North/Central Benefit 80% of the 30% = 24% 20% of the 30% = 6% Analysis Results South Benefit 20% of the 30% = 6% 80% of the 30% = 24% MISO Cost Share $30M $30M MISO Cost Allocation for South Transition Period 100% to where project terminates North/Central Planning Area Cost $30M $0 South Planning Area Cost $0 $30M 80% Threshold met Hypothetical Examples for Option 2 F Total Interregional Project Cost $100M Total MISO Benefit 30% Analysis Results North/Central Benefit 75% of the 30% = 22.5% Analysis Results South Benefit 25% of the 30% = 7.5% MISO Cost Share $30M Allocation of 80% to Benefitting LRZs = $24M LRZs in North/Central Planning Area Cost 80% of $22.5M = $18M LRZs in South Planning Area Cost 80% of $7.5M = $6M 20% Postage Stamp = $6M North/Central Planning Area Cost Load ratio portion of $6M South Planning Area Cost Load ratio portion of $6M 80% Threshold not met 5
6 Option 3 Benefiting LRZs Pay 100% of Cost Project cost would be paid 100% by LRZs that benefit Elimination of postage stamp Modification to Attachment FF-6 required Hypothetical Examples Interregional project provides economic benefits to MISO but is located wholly outside of MISO: Hypothetical Examples for Option 3 A B C Total Interregional Project Cost $100M $100M $100M Total MISO Benefit 30% 30% 30% Analysis Results North/Central Benefit 100% 0% 50% Analysis Results South Benefit 0% 100% 50% MISO Cost Share $30M $30M $30M New Cost Allocation in Attachment FF-6 LRZs 100% 100% 100% Allocation of 100% to Benefitting LRZs LRZs in North/Central Planning Area Cost $30M $0 $15M LRZs in South Planning Area Cost $0 $30M $15M 6
7 Option 4 Postage Stamp applied to sub-regions Project cost would be paid 80% by LRZ(s) that benefit and the remaining 20% would be postage stamped to the benefiting subregion(s) Modification to Attachment FF-6 required Hypothetical Examples Interregional project provides economic benefits to MISO but is located wholly outside of MISO: Hypothetical Examples for Option 4 A B C Total Interregional Project Cost $100M $100M $100M Total MISO Benefit 30% 30% 30% Analysis Results North/Central Benefit 100% 0% 50% Analysis Results South Benefit 0% 100% 50% MISO Cost Share $30M $30M $30M New Cost Allocation in Attachment FF-6 Sub-region 100% 100% 100% Allocation of 80% to Benefitting LRZs = $24M LRZs in North/Central Planning Area Cost $24M $0 $12M LRZs in South Planning Area Cost $0 $24M $12M 20% Postage Stamp = $6M North/Central Planning Area Cost $6M $0 $3M South Planning Area Cost $0 $6M $3M 7
8 Next Steps MISO South Transition Period gap Apr May Jun Jul Aug Sep Oct Nov Dec Review summary of issue and conceptual proposal In meeting stakeholder discussion RECBWG Workshop related to Attachment FF-6 In meeting stakeholder discussion Review draft Tariff redlines In meeting stakeholder discussion Stakeholders provide feedback Review final Tariff redlines File with FERC, if needed 2016 Blue highlight = RECB meeting month 8
9 Eric Thoms (651) Contacts Davey Lopez (317) Cathy Brewster (317)
10 Appendix 10
11 Regional Project Types and Cost Allocation Allocation Category Driver(s) Allocation to Beneficiaries Participant Funded ( Other ) Transmission Delivery Service Project Generation Interconnection Project Transmission Owner identified project that does not qualify for other cost allocation mechanisms. Can be driven by reliability, economics, public policy or some combination of the three. Transmission Service Request Interconnection Request Paid by requestor (local Pricing Zone) Generally paid for by Transmission Customer; Transmission Owner can elect to roll-in into local Pricing Zone rates Primarily paid for by requestor; 345 kv and above 10% postage stamp to load Baseline Reliability Project NERC Reliability Criteria 100% allocated to local Pricing Zone Market Efficiency Project Multi-Value Project Reduce market congestion when benefits are 1.25 in excess of costs Address energy policy laws and/or provide widespread benefits across footprint 345 kv and above: 80% distributed to Local Resource Zones commensurate with expected benefit, 20% postage stamp to load 100% postage stamp to load and exports other than what is exported to PJM 11
12 SPP SERTP PJM Interregional Planning and Cost Allocation Project Requirements Metrics Used Seam Transmission Need Reliability Benefit to Cost Interconnection in both RTOs > $5 Million Avoided Cost Adjusted Production Cost Net Load Payments Economic >1.25 Public Policy Reliability >1.25 Economic >1.25 Public Policy >1.25 Reliability Economic Public Policy As of 5/23/
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationPJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement
PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement Asanga Perera Market-to-Market Lead Market Implementation Committee August 12, 2015 Purpose Overview This presentation provides
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationCase 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
More informationFERC Order 1000 Transmission Planning and Cost Allocation. FRCC Board Briefing June 28, 2012
FERC Order 1000 Transmission Planning and Cost Allocation FRCC Board Briefing June 28, 2012 Agenda Background Order 1000 Compliance Filings Regional Compliance Concepts Florida Sponsors Proposal Florida
More informationAshley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationFrom: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer Date: September
More informationINDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)
INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional
More information2017 Budget and Grid Management Charge Initial Stakeholder Meeting
2017 Budget and Grid Management Charge Initial Stakeholder Meeting June 16, 2016 Page 1 Agenda Topic 2017 Budget Process & GMC Rate Outlook Managing Employee Compensation Presenter(s) Ryan Seghesio & April
More informationGrid Operations and Planning
Grid Operations and Planning Report Kent Saathoff ERCOT Board of Directors April 20, 2010 Kent Content Summary March 2010 Operations Peak Demand: Actual vs. Forecast On-line Resources: Total at Peak and
More informationPJM LMP Market Overview
PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people
More informationFirm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0
Firm Flow Entitlement on M2M Flowgates Readers' Guide Last Updated: February 01, 2016 Version: 4.0 1 Table of Contents 1 DISCLAIMER...3 2 INTRODUCTION...3 3 GLOSSARY OF TERMS...3 4 FFE FILE...3 4.1 DESCRIPTION...
More information[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014
2015 Anthony Star Director [ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 Illinois Power Agency 2015 Electricity
More information14-Dec-15. Number Amount Number Amount Number Amount Number Amount Number Amount
14-Dec-15 and Number of Qualifying Children, 2013 Returns with no Returns with one Returns with two Returns with three or Size of AGI qualifying children qualifying child qualifying children more qualifying
More informationDetailed guidance for employers
April 2015 3 Detailed guidance for employers Appendix A: Pay reference periods This document accompanies: Detailed guidance no. 3 Assessing the workforce Pay reference period calendars where the definition
More informationDiscussion Outline. A. KPIs Defined. B. Why KPIs Matter. C. KPI Menu. D. Implementation. E. Example KPIs. F. Pitfalls
Discussion Outline A. KPIs Defined B. Why KPIs Matter C. KPI Menu D. Implementation E. Example KPIs F. Pitfalls 1 Key Performance Indicators (KPI s) Defined Periodic assessment of an organization, business
More informationData Management Issues associated with the August 14, 2003 Blackout Investigation
Material derived from PNNL-SA-40401 Originally presented June 8, 2004 Data Management Issues associated with the August 14, 2003 Blackout Investigation Jeff Dagle, PE Chief Electrical Engineer and Team
More informationAccident & Emergency Department Clinical Quality Indicators
Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect
More informationInformational Report of the California Independent System Operator Corporation
California Independent System Operator Corporation June 30, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Informational
More informationGas Electric System Interface Study. PPA Stakeholder Forum: MISO ENGCTF 6/03/2013 Eric Thoms (MISO)
Gas Electric System Interface Study PPA Stakeholder Forum: MISO ENGCTF 6/03/2013 Eric Thoms (MISO) Table of Contents History Participating Planning Authorities (PPAs) / Study Region PPA Stakeholder Groups
More informationBusiness Plan Example. 31 July 2020
Business Plan Example 31 July Index 1. Business Overview 1.1Objectives 1.2Vision Mission and Values 1.3 Keys to Success 2. Business Management 3. Services 2.1 Company Summary 2.2 Company Ownership 2.3
More informationAddressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m.
Addressing Affected System Impacts of Generator Interconnection: Processes and Principles Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. 1. Introduction Mercy Parker Helget Sr. Stakeholder Engagement
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014
2014-2015 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2014 TERM Key: P/T = Part of Term P/T Description
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013
2013-2014 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2013 TERM Key: P/T = Part of Term P/T Description
More informationP/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015
2015-2016 SPECIAL TERM ACADEMIC CALENDAR For Scranton Education Online (SEOL), Masters of Business Administration Online, Masters of Accountancy Online, Health Administration Online, Health Informatics
More informationElectricity from the Power Plant To the Consumer
Electric Transmission Lines Electricity from the Power Plant To the Consumer The Nature of Electricity Electricity must be used as it is generated. Unlike other commodities, there is very little ability
More information2016 Examina on dates
Please note the following informa on: The following exams are available throughout the year: Please click on the exam for which you wish to see the dates. When you have finished, you can select to return
More informationThe Wind Coalition WIND ENERGY IS HERE TODAY AND IN AMERICA S FUTURE
The Wind Coalition 1 WIND ENERGY IS HERE TODAY AND IN AMERICA S FUTURE We will harness the sun and the winds and the soil to fuel our cars and run our factories. And we will transform our schools and colleges
More informationThe remainder of this memo provides a summary of market performance and trends in 2014 through November.
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Eric Hildebrandt, Director, Market Monitoring Date: December 10, 2014 Re: Market monitoring report This memorandum
More informationCAFIS REPORT 2015.10
CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card
More informationCENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
More informationGilead Clinical Operations Risk Management Program
Gilead Clinical Operations Risk Management Program Brian J Nugent, Associate Director 1 Agenda Risk Management Risk Management Background, Benefits, Framework Risk Management Training and Culture Change
More informationOPTIMIZING THE USE OF VHA s FEE BASIS CLAIMS SYSTEM (FBCS)
VA-CASE VISN 11 VA Center for Applied Systems Engineering OPTIMIZING THE USE OF VHA s FEE BASIS CLAIMS SYSTEM (FBCS) The Fee Basis Claims System (FBCS) Optimization initiative aims to improve, standardize,
More informationGrid Applications for Energy Storage
Grid Applications for Energy Storage Flow Cells for Energy Storage Workshop Washington DC 7-8 March 2012 Joe Eto jheto@lbl.gov (510) 486-7284 Referencing a Recent Sandia Study,* This Talk Will: Describe
More information2012-2016 Strategic Plan
2012-2016 Strategic Plan A Message from John R. Bear, President and CEO J. Michael Evans, Chairman of the Board of Directors MISO prides itself on continually fostering a transparent, effective stakeholder
More informationRIIO-T1 business plan submission London Tuesday 6 September 2011
RIIO-T1 business plan submission London Tuesday 6 September 2011 Cautionary statement This presentation contains certain statements that are neither reported financial results nor other historical information.
More informationManchester City Council Report for Information. Managing Attendance (Real Time Absence Reporting)
Manchester City Council Report for Information Report to: Subject: Overview and Scrutiny Human Resources Subgroup - 25 January 2011 Managing Attendance (Real Time Absence Reporting) Report of: Assistant
More informationCDL Warrior Truck Driver Communication & Safety (TDCS) System. May 12, 2015
CDL Warrior Truck Driver Communication & Safety (TDCS) System May 12, 2015 Background Estimated that 4,000 to 9,000 trucks used over the life of a well. This volume, combined with the remote location,
More informationGOVERNING BODY MEETING held in public 29 July 2015 Agenda Item 4.4
GOVERNING BODY MEETING held in public 29 July 2015 Agenda Item 4.4 APPENDIX A Strategic Planning Process 2016/17 Strategic Planning Process 2016/17 Interlocking processes 5 Year strategic process: reviewed
More informationDeveloping Effective Metrics for Supply Management
Developing Effective Metrics for Supply Management Carol Marks, Director of Purchasing Industrial Distribution Group 7-398-5666; carol.l.marks@idg-com William McNeese, Partner Business Process Improvement
More informationTHE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS
THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS Presentation by George Gross University of Illinois at Urbana-Champaign Modernizing the National Electric Power Grid NSF Workshop November 18-19,
More informationProposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Capacity Deliverability Across the ) Midwest Independent Transmission System ) Docket No. AD12-16-000 Operator, Inc./PJM Interconnection,
More informationCity & County of San Francisco Permit & Project Tracking System
City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.
More informationNYISO Business Issues Committee Meeting Minutes DRAFT. October 6, 2010 10:00 a.m. 3:00 p.m.
DRAFT NYISO Business Issues Committee October 6, 2010 10:00 a.m. 3:00 p.m. 1. Introductions, Meeting Objectives, and Chairman s Report Mr. Glenn Haake (Dynegy), the Chair of the Business Issues Committee
More informationComputing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Last Modified
More informationNew York State of the Market System - NYISO Success Project
Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State
More informationMED-DESIRE. MEDiterranean Development of Support schemes for solar Initiatives and Renewable Energies
MED-DESIRE MEDiterranean Development of Support schemes for solar Initiatives and Renewable Energies The MED-DESIRE Strategic Project At policy level aims at strengthening the capacity of Partner Countries
More informationThe U.S. Leveraged Loan Market Today s drivers, tomorrow s challenges. Meredith Coffey, LSTA 212-880-3019 mcoffey@lsta.org
The U.S. Leveraged Loan Market Today s drivers, tomorrow s challenges Meredith Coffey, LSTA 212-88-319 mcoffey@lsta.org Presentation Overview Today s Leveraged Loan Market Tomorrow s Regulatory Environment
More informationProject Tracking and Cost Estimation Tool Member Impacting Project Overview
Project Tracking and Cost Estimation Tool Member Impacting Project Overview Page 1 of 5 Table of Contents PR20120007 Project Tracking and Cost Estimation Table of Contents... 2 Version Control... 2 Executive
More informationIllinois Job Index. Jan 2012 Negative. Talking Points. Illinois Notes. Nation Notes. www.real.illinois.edu
Illinois Job Index Release Data Issue 01/31/2011 Jan 1990 / Dec 2011 2012.01 www.real.illinois.edu For November Illinois Job Index, the state and the Nation had positive job growth, the RMW had negative
More informationDepartment of Public Welfare (DPW)
Department of Public Welfare (DPW) Office of Income Maintenance Electronic Benefits Transfer Card Risk Management Report Out-of-State Residency Review FISCAL YEAR 2012-2013 June 2013 (March, April and
More informationACA EXCHANGES WHAT YOU NEED TO KNOW NOW!
ACA EXCHANGES WHAT YOU NEED TO KNOW NOW! August 22, 2013 Martin Sheffield Natter & Fulmer, P.C. 3800 Colonnade Parkway No representation is made that the quality of the legal services to be performed is
More information2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
More informationComments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015
Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers On MISO South Market Congestion Planning Study September 18, 2015 In response to the MISO Staff s September 11, 2015 request
More informationHow to develop a small business marketing plan
How to develop a small business marketing plan Introduction This template has been designed to assist you in the development of your marketing plan. Once you have undertaken each of the activities in this
More informationGM Area Team NPSA Conference 2013 COMMISSIONING FOR IMPROVEMENT: GREATER MANCHESTER HARM FREE CARE CQUIN 12/13
COMMISSIONING FOR IMPROVEMENT: GREATER MANCHESTER HARM FREE CARE CQUIN 12/13 Greater Manchester Large Scale Improvement 2.6 Million people NHS Greater Manchester = 1 cluster PCT (from 10 PCT s) (will become
More informationUS Army Corps of Engineers. Vision Statement. Be the premier stewards of entrusted hydropower resources
Vision Statement Be the premier stewards of entrusted hydropower resources Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles,
More informationNGTL Transportation Procedures - Credit and Financial Assurances -
Introduction NOVA Gas Transmission Ltd. ( NGTL ) reviews all Customers and potential Customers to determine if financial assurances are required. The provision of financial assurances, when requested,
More informationMedicare Part D Prescription Drugs
City of Boston Medicare Part D Prescription Drugs May 10, 2016 Copyright 2016 by The Segal Group, Inc. All rights reserved. Educational Sessions Schedule Medicare RFP and Prescription Drug Review PEC Meeting
More informationBEHIND UNDERSTANDING AND MANAGING. SaaS BUSINESSES. Recurly counts some of the world s most successful subscription businesses as its customers
BEHIND UNDERSTANDING AND MANAGING SaaS BUSINESSES Recurly counts some of the world s most successful subscription businesses as its customers Subscription and Software-as-a-Service (SaaS) are commonly
More informationGeneration and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents
More informationConsumer ID Theft Total Costs
Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially
More informationHawai i s PV Challenge/Opportunity
Hawai i s PV Challenge/Opportunity UWIG Solar Integration Workshop Lahaina, Maui October 11, 2011 Mark Duda President, PO Box 37070 Honolulu HI, 96837 www.hsea.org mark@dephawaii.com Hawai i Market Drivers
More informationConsultatio Asset Management
Consultatio Views View Macro Argentina View Badlar View FX SPOT View BCS Current government s legacy 2 View Macro Argentina: Macro Equation G + C + I + (X-M) = GDP (X-M) = GDP G C I Balance of Payments
More informationArchitectural Services Data Summary March 2011
Firms Typically Small in Size According to the latest U.S. Census Survey of Business Owners, majority of the firms under the description Architectural Services are less than 500 in staff size (99.78%).
More informationPennsylvania Home And Community Based Services (HCBS) Waiver Settings Transition Plan
Section 1: Identification - Pennsylvania will use its statewide transition plan as a way to determine its compliance with CMS s rule on HCBS. Pennsylvania will determine the current level of what state
More informationOracle EBS Service Contracts Extensions for Oracle Endeca
Oracle EBS Service Contracts Extensions for Oracle Endeca Amit Jha Project Leader, Product Management Oracle EBS Procurement & Contracts October 02, 2014 Safe Harbor Statement The following is intended
More informationDepartment of Transitional Assistance Report on Paperless Documentation
Department of Transitional Assistance Report on Paperless Documentation January 4, 2016 REPORT ON PAPERLESS DOCUMENTATION DECEMBER 2015 Description of the Report Chapter 158 of the Acts of 2014 Section
More informationOMBU ENTERPRISES, LLC. Process Metrics. 3 Forest Ave. Swanzey, NH 03446 Phone: 603-209-0600 Fax: 603-358-3083 E-mail: OmbuEnterprises@msn.
OMBU ENTERPRISES, LLC 3 Forest Ave. Swanzey, NH 03446 Phone: 603-209-0600 Fax: 603-358-3083 E-mail: OmbuEnterprises@msn.com Process Metrics Metrics tell the Process Owner how the process is operating.
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Rock Island Clean Line LLC ) Docket No. ER12-365-000 ROCK ISLAND CLEAN LINE LLC S ANSWER TO COMMENTS OF INTERSTATE POWER AND LIGHT
More informationThe Changing Relationship Between the Price of Crude Oil and the Price At the Pump
In 2007, what goes up, does not necessarily come down... May 3, 2007 The Changing Relationship Between the Price of Crude Oil and the Price At the Pump Prepared by: Tim Hamilton Petroleum Industry Consultant
More informationMerchant Interconnectors
Merchant Interconnectors David Newbery EPRG Winter Research Seminar Cambridge 15 December 2006 http://www.electricitypolicy.org.uk Outline Strong pressure from EC to increase interconnection impeded by
More informationLeSueur, Jeff. Marketing Automation: Practical Steps to More Effective Direct Marketing. Copyright 2007, SAS Institute Inc., Cary, North Carolina,
Preface. Overview. PART 1: Marketing Financials. Chapter 1 Profit and Loss Fundamentals. Chapter 2 Profit and Loss Component Details. Chapter 3 Managing the P&L. Chapter 4 Measuring Marketing Effectiveness.
More informationFinancial Operating Procedure: Budget Monitoring
Financial Operating Procedure: Budget Monitoring Original Created: Jan 2010 Last Updated: Jan 2010 1 Index 1 Scope of Procedure...3 2 Aim of Procedure...3 3 Roles & Responsibilities...3 Appendix A Timetable...7
More informationPerformance Dashboards in Local Government: What, Why, and How?
Performance Dashboards in Local Government: What, Why, and How? City of Portland TriMet TSCC Quarterly Meeting August 18, 2015 Dashboards: An Overview What s Driving the Interest in Performance Dashboards?
More informationAOBA Utility Committee
AOBA Utility Committee Energy Markets in Tailspin Major Economic Recession Continues to Pull Energy Prices Downward Where Will It End? Presented By Bruce R. Oliver President, Revilo Hill Associates, Inc.
More informationKey Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out
1 2 3 Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out Speaker Notes: Drive-In refers to transactions that originate
More informationUpdate on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting
Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented
More information2015 Examination dates
Please note the following information: The following exams are available throughout the year: BULATS Paper-based: Please click on the exam for which you wish to see the dates. When you have finished, you
More informationCHOOSE MY BEST PLAN OPTION (PLAN FINDER) INSTRUCTIONS
CHOOSE MY BEST PLAN OPTION (PLAN FINDER) INSTRUCTIONS Anthem Medical Plan For Employees Working In the US February 10, 2012 Page 1 IMPORTANT NOTES YOU SHOULD CONSIDER BEFORE USING THE TOOL The Choose My
More informationAn Introduction to the. Society Program Portfolio Management Process
An Introduction to the Society Program Portfolio Management Process Presentation Topics What is Society Program Portfolio Management or SPPM? What is the Goal of SPPM? Who Oversees SPPM? Who Participates
More informationOne Newport s Performance Management Framework 2014/15
One Newport s Performance Management Framework 2014/15 1) Introduction One Newport s Performance Management Framework (PMF) sets out One Newport s vision for how it plans to manage performance and delivery
More informationPresentation for The National Commission for Energy State Regulation of Ukraine
Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection
More informationOpportunities and Challenges
Current International Perspectives on Smart Grid Developments in Mexico in Light of Energy Reforms Opportunities and Challenges Presented to: Austin Electricity Conference UT Executive Education and Conference
More informationGovernment proposals to reform vocational qualifications for 16-19 year olds in England
Government proposals to reform vocational qualifications for 16-19 year olds in England A consultation published by the Department for Education (DfE) on 7 th March 2013 What reforms does the consultation
More informationAnnual General Meeting
Annual General Meeting Daniel Rabie Chief Operating Officer Growth Opportunities: Cloud Accounting & Document Management Cloud Accounting Reckon One Enormous Market Opportunity We re just getting started...
More informationIndependent Accountants Report on Applying Agreed-Upon Procedures
Independent Accountants Report on Applying Agreed-Upon Procedures Board of Trustees We have performed the procedures, as discussed below, with respect to the employer contributions remitted by to the in
More informationTreasury Presentation to TBAC
Treasury Presentation to TBAC Office of Debt Management Fiscal Year 2015 Q1 Report Table of Contents I. Fiscal II. A. Quarterly Tax Receipts p. 4 B. Monthly Receipt Levels p. 5 C. Eleven Largest Outlays
More informationRBC Insurance Fetes Online Auto/Home Insurance Growth
Case Studies, K. Harris Research Note 29 October 2002 RBC Insurance Fetes Online Auto/Home Insurance Growth RBC Insurance's e-business successes are generating greater than $3 million in premiums per month.
More informationA Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations
A Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations S. Fink, K. Porter, C. Mudd, and J. Rogers Exeter Associates, Inc. Columbia, Maryland NREL is a national laboratory
More informationImplementation Plan: Development of an asset and financial planning management. Australian Capital Territory
Implementation Plan: Development of an asset and financial planning management framework for TAMS Australian Capital Territory NATIONAL PARTNERSHIP AGREEMENT TO SUPPORT LOCAL GOVERNMENT AND REGIONAL DEVELOPMENT
More informationIndustries Association. ERCOT Successes and Challenges
Texas Renewable Energy Industries Association ERCOT Successes and Challenges Laura Doll Board Chair Electric Reliability Council of Texas November 7, 2011 ERCOT Overview The ERCOT market covers roughly
More informationCharting the Future FY 2016 Work Plan. Gantt Charts. February, 2016
Charting the Future FY 2016 Work Plan Gantt Charts February, 2016 1 Overview The Gantt charts will be reviewed and updated on a quarterly basis Significant changes to tasks or milestones that affect progress
More informationAAPG 2011 Annual Convention & Exhibition April 10, 2011
Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &
More informationMarsha Ingram, Head of Corporate Affairs
Date of Board meeting: 26 th November 2008 Subject: Annual Cycle of Board Business Trust Board lead: Marsha Ingram, Head of Corporate Affairs Presented by: Marsha Ingram, Head of Corporate Affairs Aim
More informationEnterprise Projects Fiscal Year 2011/2012 Third Quarter Report
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
More information