1 [ John E. Lincoln Medical Device Product Verification and Validation John E. Lincoln Device Validation Forum discusses regulatory requirements, scientific principles, strategies, and approaches associated with medical device validation that are useful to practitioners. We intend this column to be a valuable resource for daily work applications. The key objective for this column: Useful information. Reader comments, questions, and suggestions are needed to help us fulfill our objective for this column. Please send your comments and suggestions to column coordinator John E. Lincoln at jel@ jelincoln.com or to journal coordinating editor Susan Haigney at shaigney@advanstar.com. INTRODUCTION This issue of the Device Validation Forum discusses the issues and considerations for successful verification and validation (V&V) of a new or substantially changed medical device. Product validation is different from process, equipment, or software validation, although any or all may be involved in a product s development and included in a product s design history file (DHF). Such product validation must address the US Food and Drug Administration s design control elements of 21 CFR (1, 2). These design elements are required by FDA to document the development and marketing of a new medical device. The purpose of product validation activities (see Figure 1) is to prove by a series of verification and test activities that the product s design (input) requirements have been met by the design output (DO) and the resultant device. Next to the product design itself, change control and the transfer of product defining elements (i.e., the device master record elements drawings, specifications, standard operating procedures [SOPs], and manufacturing process) from the development stage to the production floor (i.e., technology transfer ) are major sources of product quality problems. The FDA s design control and medical device current good manufacturing practice (CGMP) requirements (1) were designed, among other things, to reduce or minimize this risk. And they will, if they are properly and conscientiously applied. V&V DEFINITIONS The design verification requirements per 21 CFR820.30(f) are as follows: Each manufacturer shall establish and maintain procedures for verifying Figure 1: Product validation. User Needs, Standards, Guidance Input Process Output Finished Medical Device Verifications [ For more Author information, go to gxpandjvt.com/bios ABOUT THE AUTHOR John E. Lincoln is principal of J.E. Lincoln and Associates ( a global consulting company with more than 29 years experience serving US FDA-regulated industries. He may be reached by at jel@jelincoln.com or by phone (toll free) at Journal of Validation Technology [Spring 2010] ivthome.com

2 John E. Lincoln. the device design. verification shall confirm that the design output meets the design input requirements. The results of design verification, including identification of the design, method(s), the date and the individual(s) performing the verification, shall be documented in the DHF [ History File]. The design validation requirements per 21 CFR (g) are as follows: Each manufacturer shall establish and maintain procedures for validating the device design. validation shall be performed under defined operating conditions on initial production units, lots, or batches, or their equivalents. validation shall ensure that devices conform to defined user needs and intended uses and shall include testing of production units under actual or simulated use conditions. validation shall include software validation and risk analysis, where appropriate. The results of the design validation, including identification of the design, methods(s), the date, and the individuals(s) performing the validation, shall be documented in the DHF. The design transfer requirements per 21 CFR (h) are as follows: Each manufacturer shall establish and maintain procedures to ensure that the device design is correctly translated into production specifications. THE NEW PRODUCT DEVELOPMENT SYSTEM New or substantially changed medical products need to be developed under design control procedures. Minor changes can be dealt with under a company s change control procedures. The documentation supporting such changes may be pulled from laboratory notebooks, red-lined documents attached to change orders (e.g., drawings, schematics, specifications, etc.), or may be part of formal component product verification or test, research and development (R&D), engineering, validation protocols or test reports, and process or equipment protocols and test reports. Any change, minor or major, must be considered in light of its impact on completed or future V&V activities. SOPs must be developed as guidelines to assure certain minimum elements are addressed and included in test data to meet reproducibility and traceability concerns, and maintain adherence to the scientific method, as well as standardize history, documentation and product or process verification or validation requirements. Documentation should be prepared with sufficient detail so that a person having the requisite training or experience could replicate the data or test using only the written documentation as a guide. INITIAL DESIGN INPUTS NECESSARY FOR PRODUCT DESIGN VALIDATION In order to prove that design inputs (DI) have been met by design outputs, a determination of the specific design inputs is the first obvious step after a general decision has been made to develop a new product. FDA requires that design control be instituted somewhere between the research and development stage. A helpful definition for such a start date is when pure research is shifted to purposeful development, often by the commitment of major dollars by senior management to commercialize a research project. Such commercialization can involve the development of a product to the point of the following: In-house production and sale Outsourced production Sale or spin off of the prototype Any combination of the above. Marketing is often the driving force for such product development, which can take the form of any of the following: A new product A substantially changed old product A line extension to a family of products. With this formal start date, the development of product documentation, under design or change control, starts. This would include a formal design specification, which by definition would include design inputs and design requirements. The marketing or product manager may provide much of the initial design inputs, based on past product experience, and include additional information from focus groups and other consumer research. This is especially true of marketing needs based on competitive products, field requirements, and desires. Concurrent with initial product development is the development of at least a draft Product Hazard Analysis and Risk Management File and Report, per International Organization for Standardization (ISO) (3) and/or International Conference on Harmonisation (ICH) Q9 (4). This usually involves at a minimum a failure mode, effects, and criticality analysis (FMECA) for design, process and use, and any software (see reference 5 for a discussion of product risk management). gxpandjvt.com Journal of Validation Technology [Spring 2010] 59

3 FLESHING OUT DESIGN INPUTS The engineering department will start adding industry standards requirements and adjust inputs to limitations to marketing requirements and the developing risk management file. These are based on what is doable, given the current state of the material and process art, company and/or outsourcing capabilities, and budget constraints. They will start on prototype development, models or kludges, drawings, schematics, specifications, materials, much of the labeling (including instructions for use), and do some feasibility testing, all with marketing, production and manufacturing engineering, and quality assurance (QA) and regulatory assurance (RA) input. Engineering will then determine the type of more formal or structured bench and functional testing, packaging and shipping testing, environmental testing, and manufacturing process and equipment testing and validation required, based on the product, its intended use, and use environment. This is often based on a product s hazard analysis and risk management file and report, per ISO and ICH Q9. Engineering refers to applicable ISO, Association for the Advancement of Medical Instrumentation (AAMI), American National Standards Institute (ANSI), European Standards (EN) (6), and other standards. QA/RA will then add quality and regulatory issues and additional test requirements (i.e., biocompatibility and sterility) to the list, as required by the product, its intended use, and use environment and any applicable standards and/or guidance documents. They will review current good manufacturing practice (CGMP) issues for manufacture, controlled manufacturing, or clean room requirements, test procedures and equipment and sourcing, and human factors or use environment issues. They will then evaluate, assist, and/or actually prepare much of the product and process validation documentation, especially to ensure compliance to regulatory and product quality requirements. A project leader with a product development team will then drive the development of a formal product specification that addresses these realistic and achievable design inputs. These specifications will help drive the project per the milestones and tasks described in Medical Device Development Under Control in the Winter 2010 issue of the Journal of Validation Technology (2), including the periodic project design reviews and the developing V&V requirements. THE PRODUCT VALIDATION PLAN This list of product design inputs, specifications, and requirements now also becomes the basis for developing a product validation plan. The plan will address not only product validation but also the associated manufacturing process, production equipment, and test equipment V&V requirements. These include calibration, PM, spare parts, documentation, site preparation (part of installation qualifications [IQs]), design of experiments (DOEs) (often part of operational qualifications [OQs]), Cpk (process capabilities, centered), gauge repeatability and reproducibility (GRR), and similar. It will include timelines and departmental responsibilities. Time spent in careful up-front project planning and management will prevent key activities from not being considered early on, dropping through the cracks, and surfacing late in the project, if at all, delaying the project unnecessarily, and/or yielding a less than robust finished product. Some product V&V activities can start early on, such as material selection, material-to-material (including any bonding agent(s)) compatibility, material biocompatibility, hemolysis, cytotoxicity, sterilization V&V, etc. Other V&V activities have to wait until a viable prototype or a close to finished product has been developed. FDA correctly demands that functional, stability, and other such product testing and verification activities be performed on product as close to the final production version as possible, including being built by the process, equipment, and personnel involved in actual production. The less that is the case, the more the documentation must explain the differences and test compensations made with rationale, and the higher the risk of incomplete V&V data. While such stipulations are often viewed as burdensome by a product development team and even by management, a review of product recalls and a reading between the lines, indicates that failure to do so can lead to future recalls or other field problems and resulting liability issues. Companies have also taken a major financial hit due to developing products that can only be assembled by engineers or technicians, rather than the planned for production line operators, effectively pricing the product off the market. THE PRODUCT V&V PROTOCOL AND TEST REPORT The product validation protocol or test report should be a controlled document, having a test report num- 60 Journal of Validation Technology [Spring 2010] ivthome.com

4 John E. Lincoln. ber or protocol identification number assigned by QA or document control. Ideally, the calibration of process, production, and test instrumentation should be performed before and after the validation and be included in the V&V file. This is to ensure accuracy of readings that not only validate the product but usually are used to establish equipment parameters for production, as called out in SOPs, and also any on-unit labeling and the instructions for use (IFUs). The validation package should have pre-established and referenced acceptance criteria and both pre-approval and post-approval signature blocks. Lab notebooks and formal protocol or test reports should follow a defined format, such as the following suggested listing. SUGGESTED KEY PROTOCOL ELEMENTS The following is presented as one possible format and recommended sequence, as applicable, for the product validation protocol or test report file: Protocol or test report number Title Approvals. A single signature may suffice for most routine tests or verifications; complex validations may require more reviews and approvals, including pre- and post-approvals. Purpose. Brief statement or rationale for the protocol and reasoning as to its chosen development Equipment. Listing of all non-consumable equipment, tools, instruments, fixtures, etc., used to test and run the protocol, including description, model, S/N, calibration numbers, and expiration dates Material. Listing of all consumables used in the protocol. Include description, part number (P/N) or item/catalog number, lot number, sterile load number and quantity, etc. Procedure. A step-by-step explanation or written narrative of the test and the actual test protocol (i.e., how to run the test), written in such a way that it could be duplicated by someone else with the necessary technical expertise but unfamiliar with the procedure; include any set-up drawings, instructions, sample check sheets or data sheets, etc. This step-by-step narrative should be as follows: Product V&V. See Figure 1 and design control SOP for product V&V steps, to include bench tests, lab tests, and any animal or human clinical studies (IDE required). Equipment or process V&V. Includes the following: qualification (DQ) (Optional). Formal documentation of criteria considered in the purchase and/or manufacture of a piece of equipment, often supplied with a purchase order Installation qualification (IQ). Documented functional requirements of the equipment and how requirements were met during installation, often in checklist format (see design control SOP) Operational qualification (OQ). V&V steps, test cases, or design of experiments (DOE) to establish the key operating parameters, settings, and their tolerance ranges, and verify their proper operation; may also include hazard awareness of critical control points (HACCP), Ishikawa (Fishbone) diagrams, flow charts, process maps, and similar tools Performance qualification (PQ). Challenge process or equipment under validation, usually with a minimum of three runs, under worst case conditions (i.e., different shifts, different material lots, environmental, other varying inputs, etc.); verify reproducibility and repeatability of the equipment or process its capability to consistently produce desired results; should be risk based (i.e., tied to a product risk document where possible) and include at least one unplanned power outage to see how process or equipment recovers or re-initializes. When several PQs are run (the old, de facto standard was a minimum of three runs; now the number should be based on the number of inputs and risks involved), the basic blank PQ may be copied and sequentially numbered prior to running and filling out (e.g., PQ 1 of 3, PQ 2 of 3, and PQ 3 of 3, and so on) Software (product, process, equipment, and hardware) V&V. See also the company s design control, or software V&V SOPs Quality management system (QMS) software (and hardware) V&V. V&V to be performed under requirements of 21 CFR Part 11, Electronic Records/Electronic Signatures Test case format. OQs and PQs should be performed using the suggested test case format shown in Figure 2. There may be numerous test cases under each key element of the process or equipment being validated. Results. List the actual/proven test results, data, and reference the data sheets, check sheets, etc. facts, not opinions gxpandjvt.com Journal of Validation Technology [Spring 2010] 61

5 Figure 2: Suggested test case format. #_. [Operation]: SUGGESTED TEST CASE FORMAT Risk: [describe operation and risk / rationale tie to appropriate risk document, e.g., in Risk Management File / Report, per ISO 14971:2007]. Test Case: [brief operation description and test case verification step]. Verification Element Expected Outcome Observed Outcome [list specific item(s) within the operation that is to be tested] Generally used with OQs and PQs (IQs are usually in a check list format) [list the expected results to be expected from the operational element(s) that is being tested] Tested by: Verified by: [describe the actual, observed result(s) from the operational element when it was run] Date: Date: Conclusions. State obvious and provable conclusions that can be drawn and proven from the data obtained, documented, and collated under the results section. Can include statistical tests and reasonable inferences (identified as such) from the data and results Attachments (Optional). Copies of any supplemental info (e.g., SOPs used, references, manuals, additional calibration, test data, work sheets, sample documents, etc.) Copies of controlled documents should be stamped Copy. Merely referencing the document or copying it and including it in the validation package or file is a matter of preference, balancing ease of use of the validation file versus added bulk. Consideration should be given to the ability to retrieve archived documents years later when questions come up or an audit of the file is conducted. Simple test and verification reports may not require all the protocol elements. Some validation sections, such as IQs, may be handled by a checklist or analysis. Ensure that all information is documented in such a way that it can, years later, be understood, explained, defended (even in a court of law), and/or replicated, including the documents, methodology, and its data, results, and conclusions. The assigned protocol number is to be referenced in other follow-on protocols, lab notebook test write-ups, deviations, ECOs/non-conforming material reports (NCMRs), rework instructions, or where required, to ensure proper device history, and reproducibility or repeatability of test data or the process. CHANGE MANAGEMENT DURING V&V The management of product and/or process changes is always important, but especially during the V&V process. As mentioned, while change is initiated to improve upon some aspect of a product or the V&V process, it often introduces other problems. These are often undetected initially, or even throughout the remainder of the development and production process. The following are types of changes that may occur: Minor changes. May be documented by retaining the existing protocol number and only adding the revision as an addendum, referencing the original protocol and number. At a minimum, a lab book study will be performed to ensure no process change has occurred; and a written rationale will be added to the documentation file or included in the lab book as to why no revalidation or recertification was deemed necessary. Define in a company SOP Major changes. May require that a new protocol number be issued. If so, then any referencing documentation must be annotated or changed to reflect the new protocol number. This may also be the case when a too-early prototype product (or process) was used in a V&V activity, often to speed up the V&V process, but having the opposite effect. Again, define in a company SOP. Major product or process changes must be revalidated by formal protocol (not a lab book study) Determination of what constitutes a major or minor process change is made by senior management, or designee, usually QA, and should be defined in a company SOP. CALIBRATION OF TEST INSTRUMENTATION All applicable gauges and instrumentation will be calibrated or re-calibrated prior to initiation of any V&V activity. Proof of such will be added to the V&V file. Instrumentation or gauges not requiring calibration (usually due to some downstream calibrated instruments or gauges) or verification steps should be labeled as such (e.g., non-calibrated instrument [NCI]), with an explanation as to rationale and referenced accordingly in the V&V file. 62 Journal of Validation Technology [Spring 2010] ivthome.com

6 John E. Lincoln. VALIDATION PROTOCOL TEST CASES A product V&V will include test data from independent labs, especially dealing with product biocompatibility, particulate, bioburden, and/or sterility issues. It may include test data from other labs as to electromagnetic compatibility (EMC) or ground leakage and other electrical data, as applicable to the specific product. However, most of the in-house portion of a V&V protocol, especially the OQs and the PQs involved in production and test equipment as well as product functional testing and much software testing if applicable, will be made up of a series of test cases. Generally test cases are derived from the specific elements needing testing, for example the following: Human factors intuitive; ease of use issues Product start-up and initialization Product functional tests, including purposeful mistakes Product shutdown orderly and un-planned Software, if applicable Product recovery from unintentional power outages, if applicable Environmental (e.g., heat, cold, humidity cycling) Sterilization process, residuals, if applicable Accelerated aging Shake and drop Cross-country shipping Product sterility (different from sterilization above). The composition of the list of such tests is determined by the product itself, its use environment, FDA and Europe s Medical Device Directive (MDD) requirements, applicable standards, and similar. For additional considerations, see the list in the Device Validation Forum column in the Journal of Validation Technology, Winter 2010 issue (2). Such test cases should include the following (see Figure 2): A descriptive title A brief description of the test being preformed Risk justification. In risk-based V&V activities (and most should be risk based), the test case may reference the specific line item in a product risk management file, or FMEA, FMECA, and/or fault tree analysis (FTA) The V&V element The expected outcome The actual observed outcome Test and verification signatures and dates. APPROVALS Pre-approvals, if required, can be obtained at any time during the test cycle. However, if the protocol is changed during the pre-approval cycle, any additional requirements must be addressed and added to the test requirements, with explanation, prior to routing the protocol for post-approval. The greater the risk or cost of changes in the protocol, the greater the need for consensus and support, and hence the stronger the argument for pre-approval prior to start. If the test method is non-controversial, the protocol is a repeat of a previously approved or agreed-to protocol, a recognized industry standard test, etc., or, if the purpose of the protocol is merely to gather data, is a preliminary test prior to the process-defining protocol(s), or test methodology is common for purpose intended to trained personnel, pre-approval may not even be necessary. In such a case, if additional testing is deemed necessary during the post-approval sign-off phase, it can be performed and added as an addendum. Post-approvals are completed once all aspects of the V&V test report are completed, including any changes. The completed protocol is routed to document control for filing and retention. Changed product or product produced by equipment or processes subject to verification, validation, or re-verification/revalidation must be quarantined and cannot be released until post-approval sign-offs are completed. REVALIDATION Revalidation is required whenever a major change occurs to a product or process, or after moving any sensitive process equipment, unless a written extension or exception is granted, with rationale. Such rationale can be included as part of the original validation protocol. Consideration should be made as to whether or not it is to be company policy to re-verify or validate a product or process not on an arbitrary time-based interval (e.g., every year), but as defined by degree of changes, risk analysis, documented. This should be defined in the master validation plan and/ or SOP. CONCLUSION Product verification and validation activities should not be short changed. While there is usually tremendous pressure to get the new product out, the time and effort spent upfront in planning and executing gxpandjvt.com Journal of Validation Technology [Spring 2010] 63

7 a product V&V project will greatly assist in setting up a robust manufacturing process and delivering a product that meets customer requirements, stated, unstated, and required by industry standards, while minimizing fall-off, scrap, rework, risks of recall, and other liability or warranty issues. Lessons learned from reviewing a company s own product development and corrective action and preventive action (CAPA) history, the product s risk management file, FDA adverse events data bases such as MAUDE for similar products problems, and even other industries (even non-medical) recall experiences, will assist in developing a product validation plan that provides such a robust manufacturing process and product. REFERENCES 1. FDA, 21 CFR 820, Quality System Regulation, sections 21 CFR , , and Lincoln, John E., Medical Device Development Under Control, Journal of Validation Technology, Vol. 16, No. 1, Winter ISO, ISO 14971:2007, Medical Devices Application of Risk Management to Medical Devices. 4. ICH, Guidance for Industry, Q9 Quality Risk Management, June Lincoln, John E., Product Risk Management Under ISO 14971:2007, Journal of Validation Technology, Vol. 15, No. 4, Autumn EC, Council Directive 93/42/EEC of 14 June 1993 Concerning Medical Devices, amended by M1-M5, latest dated JVT ARTICLE ACRONYM LISTING AAMI Advancement of Medical Instrumentation ANSI American National Standards Institute CFR Code of Federal Regulations (US) CGMP Current Good Manufacturing Practice DHF History File DI Input DO Output DOE of Experiments, or ed Experiments DQ Qualification ECO Engineering Change Order EMC Electromagnetic Compatibility EN European Standards FDA US Food and Drug Administration FMEA Failure Modes, Effects Analysis FMECA Failure Modes, Effects, and Criticality Analysis FTA Fault Tree Analysis GMP Good Manufacturing Practice GRR Gauge Repeatability and Reproducibility ICH International Conference on Harmonisation IFUs Instructions for Use IQ Installation Qualification ISO International Organization for Standardization MDD Medical Device Directive (EU) NCI Non [or Not] Calibrated Instrument NCMR Non-Conforming Material Report OQ Operational Qualification PM Preventive Maintenance P/N Part Number PQ Performance Qualification QA Quality Assurance QMS Quality Management System QS Quality System(s) R&D Research and Development SOP Standard Operating Procedure V&V Verification and Validation 64 Journal of Validation Technology [Spring 2010] ivthome.com

How to Use the Design Process to Manage Risk: Elements of Design Controls and Why It Matters

How to Use the Design Process to Manage Risk: Elements of Design Controls and Why It Matters environmental failure analysis & prevention health technology development How to Use the Design Process to Manage Risk: Elements of Design Controls and Why It Matters Kevin L. Ong, Ph.D., P.E. Managing

More information

Design Verification The Case for Verification, Not Validation

Design Verification The Case for Verification, Not Validation Overview: The FDA requires medical device companies to verify that all the design outputs meet the design inputs. The FDA also requires that the final medical device must be validated to the user needs.

More information

Best Practice In A Change Management System

Best Practice In A Change Management System Quality & Compliance Associates, LLC Best Practice In A Change Management System President Quality & Compliance Associates, LLC Change Control and Its Role in a Continuous Improvement Environment 3 Benefits

More information

OPERATIONAL STANDARD

OPERATIONAL STANDARD 1 of 11 1. Introduction The International Safe Transit Association (ISTA), a non-profit association whose objective is to prevent product damage and excess packaging usage within the distribution environment.

More information

Working Party on Control of Medicines and Inspections. Final Version of Annex 15 to the EU Guide to Good Manufacturing Practice

Working Party on Control of Medicines and Inspections. Final Version of Annex 15 to the EU Guide to Good Manufacturing Practice EUROPEAN COMMISSION ENTERPRISE DIRECTORATE-GENERAL Single market, regulatory environment, industries under vertical legislation Pharmaceuticals and cosmetics Brussels, July 2001 Working Party on Control

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

Process Validation for Medical Devices

Process Validation for Medical Devices Process Validation for Medical Devices Dan O Leary CBA, CQE, CRE, CSSBB, CIRM, LLC 603-209-0600 OmbuEnterprises@msn.com Copyright 2010 by, LLC Process Validation for Medical Devices 1 Instructor Introduction

More information

Process Validation: Practical Aspects of the New FDA Guidance

Process Validation: Practical Aspects of the New FDA Guidance Process Validation: Practical Aspects of the New FDA Guidance ISPE Boston Chapter Meeting April 18, 2013 Rusty Morrison Commissioning Agents, Inc. Objectives / Summary What is Process Validation? Regulatory

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers.

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers. Supplier Quality Standard 1.0 Purpose The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers. These expectations

More information

Combination Products. Presented by: Karen S. Ginsbury For: IFF March 2014. PCI Pharma

Combination Products. Presented by: Karen S. Ginsbury For: IFF March 2014. PCI Pharma Combination Products Presented by: Karen S. Ginsbury For: IFF March 2014 Types of products Biological and medical device (freeze dried + syringe dual volume) Medical device and plasma devised product (syringe)

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

Overview of Medical Device Design Controls in the US. By Nandini Murthy, MS, RAC

Overview of Medical Device Design Controls in the US. By Nandini Murthy, MS, RAC Overview of Medical Device Controls in the US By Nandini Murthy, MS, RAC 18 controls are a regulatory requirement for medical devices. In the US, compliance with the design controls section of 21 Code

More information

ISO 13485:201x What is in the new standard?

ISO 13485:201x What is in the new standard? ISO 13485:201x What is in the new standard? Eric Finegan, Quality Mgr, BTE Technologies, Inc. 2015-09-10 1 Presentation Slides This slide deck is the presentation performed on 2015-09-10. A more detailed

More information

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc.

Calibration & Preventative Maintenance. Sally Wolfgang Manager, Quality Operations Merck & Co., Inc. Calibration & Preventative Maintenance Sally Wolfgang Manager, Quality Operations Merck & Co., Inc. Calibration: A comparison of two instruments or measuring devices one of which is a standard of known

More information

Conducting a Gap Analysis on your Change Control System. Presented By Miguel Montalvo, President, Expert Validation Consulting, Inc.

Conducting a Gap Analysis on your Change Control System. Presented By Miguel Montalvo, President, Expert Validation Consulting, Inc. Conducting a Gap Analysis on your Change Control System Presented By Miguel Montalvo, President, Expert Validation Consulting, Inc. Standards, Regulations, Guidelines related to Change Control Management

More information

WHITEPAPER: SOFTWARE APPS AS MEDICAL DEVICES THE REGULATORY LANDSCAPE

WHITEPAPER: SOFTWARE APPS AS MEDICAL DEVICES THE REGULATORY LANDSCAPE WHITEPAPER: SOFTWARE APPS AS MEDICAL DEVICES THE REGULATORY LANDSCAPE White paper produced by Maetrics For more information, please contact global sales +1 610 458 9312 +1 877 623 8742 globalsales@maetrics.com

More information

Library Guide: Pharmaceutical GMPs

Library Guide: Pharmaceutical GMPs Library Guide: Pharmaceutical GMPs Table of Contents Overview...3 Courses Listed by Functional Area... 4 Course Descriptions: A Step-by-Step Approach to Process Validation (PHDV79)... 7 A Tour of the FDA

More information

IVD Regulation Overview. Requirements to Assure Quality & Effectiveness

IVD Regulation Overview. Requirements to Assure Quality & Effectiveness IVD Regulation Overview Requirements to Assure Quality & Effectiveness CLIAC Jan. 2002 Statutory and Regulatory Requirements Statute: Food, Drug, and Cosmetic Act Food and Drugs Act of 1906 Food and Drug

More information

GOOD DOCUMENTATION AND QUALITY MANAGEMENT PRINCIPLES. Vimal Sachdeva Technical Officer (Inspector), WHO Prequalification of Medicines Programme

GOOD DOCUMENTATION AND QUALITY MANAGEMENT PRINCIPLES. Vimal Sachdeva Technical Officer (Inspector), WHO Prequalification of Medicines Programme GOOD DOCUMENTATION AND QUALITY MANAGEMENT PRINCIPLES Vimal Sachdeva Technical Officer (Inspector), WHO Prequalification of Medicines Programme Contents 1. Why good documentation is essential? 2. What constitutes

More information

Quality System: Design Control Procedure - Appendix

Quality System: Design Control Procedure - Appendix Quality System: Design Control Procedure - Appendix Page 1 of 10 Quality System: Design Control Procedure - Appendix CORP Medical Products Various details have been removed, indicated by [ ] 1. Overview

More information

QUALITY RISK MANAGEMENT (QRM): A REVIEW

QUALITY RISK MANAGEMENT (QRM): A REVIEW Lotlikar et al Journal of Drug Delivery & Therapeutics; 2013, 3(2), 149-154 149 Available online at http://jddtonline.info REVIEW ARTICLE QUALITY RISK MANAGEMENT (QRM): A REVIEW Lotlikar MV Head Corporate

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

[ABOUT THE AUTHOR. FDA Lifecycle Approach to Process Validation What, Why, and How? PQ Forum. Paul L. Pluta]

[ABOUT THE AUTHOR. FDA Lifecycle Approach to Process Validation What, Why, and How? PQ Forum. Paul L. Pluta] Paul L. Pluta] FDA Lifecycle Approach to Process Validation What, Why, and How? Paul L. Pluta PQ Forum provides a mechanism for validation practitioners to share information about Stage 2 process qualification

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

Quality Risk Management ICH Q9 & ISO 14971. Presented by Michael Kerr 11 th November 2011

Quality Risk Management ICH Q9 & ISO 14971. Presented by Michael Kerr 11 th November 2011 Quality Risk Management ICH Q9 & ISO 14971 Presented by Michael Kerr 11 th November 2011 Agenda Risk Concept QRM Fundamentals Regulatory Expectations Warning Letters / Observations Application of QRM Introduction:

More information

COMPLIANCE BY DESIGN FOR PHARMACEUTICAL QUALITY CONTROL LABORATORIES INSIGHT FROM FDA WARNING LETTERS

COMPLIANCE BY DESIGN FOR PHARMACEUTICAL QUALITY CONTROL LABORATORIES INSIGHT FROM FDA WARNING LETTERS COMPLIANCE BY DESIGN FOR PHARMACEUTICAL QUALITY CONTROL LABORATORIES INSIGHT FROM FDA WARNING LETTERS Primer CONTENTS INTRODUCTION...3 QUALITY AND COMPLIANCE IN QUALITY CONTROL LABORATORIES...5 Compliance

More information

Risk Assessment for Medical Devices. Linda Braddon, Ph.D. Bring your medical device to market faster 1

Risk Assessment for Medical Devices. Linda Braddon, Ph.D. Bring your medical device to market faster 1 Risk Assessment for Medical Devices Linda Braddon, Ph.D. Bring your medical device to market faster 1 My Perspective Work with start up medical device companies Goal: Making great ideas into profitable

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Implementing New USP Chapters for Analytical Method Validation

Implementing New USP Chapters for Analytical Method Validation Implementing New USP Chapters for Analytical Method Validation March 2010 Ludwig Huber Fax.: +49 7243 602 501 E-mail: Ludwig_Huber@labcompliance.com Today s Agenda Handling Method Changes vs. Adjustments

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

ORACLE CONSULTING GROUP

ORACLE CONSULTING GROUP ORACLE CONSULTING GROUP 9 Golder Ranch Rd., Ste. 1 Tucson, Arizona 9 Web Site: E-mail: 20-2-0 20-2-0 (FAX) CONSULTING MEMORANDUM QUALITY SYSTEM INSPECTION TECHNIQUE

More information

GLP vs GMP vs GCP Dominique Pifat, Ph.D., MBA The Biologics Consulting Group dpifat@bcg-usa.com

GLP vs GMP vs GCP Dominique Pifat, Ph.D., MBA The Biologics Consulting Group dpifat@bcg-usa.com GLP vs GMP vs GCP Dominique Pifat, Ph.D., MBA The Biologics Consulting Group dpifat@bcg-usa.com Common Misconception Good Laboratory Practices 1) A quality system concerned with the organizational process

More information

Supplier quality guideline. VOSS Automotive Group Issue 02.06.2014 Rev00

Supplier quality guideline. VOSS Automotive Group Issue 02.06.2014 Rev00 Supplier quality guideline VOSS Automotive Group Issue 02.06.2014 Rev00 Table of Contents 1. General requirements 1.1 Scope of application 1.2 Quality objectives 1.3 Quality management system 1.4 Supplier

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents

More information

INTRODUCTION. This book offers a systematic, ten-step approach, from the decision to validate to

INTRODUCTION. This book offers a systematic, ten-step approach, from the decision to validate to INTRODUCTION This book offers a systematic, ten-step approach, from the decision to validate to the assessment of the validation outcome, for validating configurable off-the-shelf (COTS) computer software

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

Testing Automated Manufacturing Processes

Testing Automated Manufacturing Processes Testing Automated Manufacturing Processes (PLC based architecture) 1 ❶ Introduction. ❷ Regulations. ❸ CSV Automated Manufacturing Systems. ❹ PLCs Validation Methodology / Approach. ❺ Testing. ❻ Controls

More information

Standardizing Best Industry Practices

Standardizing Best Industry Practices MEDICAL DEVICES Current market conditions have created a highly competitive and challenging environment for the medical device industry. With stricter FDA regulatory oversight, increasing material costs

More information

Quality Agreement. by and between. Supplier Name. Address: and. Client Name: Address:

Quality Agreement. by and between. Supplier Name. Address: and. Client Name: Address: NOTE TO USERS This Quality Agreement template was developed by the Bulk Pharmaceutical Task Force (BPTF), an affiliate organization of the Society of Chemical Manufacturers and Affiliates (SOCMA), as a

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

International GMP Requirements for Quality Control Laboratories and Recomendations for Implementation

International GMP Requirements for Quality Control Laboratories and Recomendations for Implementation International GMP Requirements for Quality Control Laboratories and Recomendations for Implementation Ludwig Huber, Ph.D. ludwig_huber@labcompliance.com Overview GMP requirements for Quality Control laboratories

More information

Auditing HACCP Programs

Auditing HACCP Programs Auditing HACCP Programs Roger Roeth Executive Technical Officer 2016 EAGLE Certification Group includes EAGLE Registrations Inc. and EAGLE Food Registrations Inc. 1 Overview This training is applicable

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

Qualification of an Environmental Monitoring Program

Qualification of an Environmental Monitoring Program [ Scott Sutton Qualification of an Environmental Monitoring Program Scott Sutton Microbiology Topics discusses various topics in microbiology of practical use in validation and compliance. We intend this

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL 8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

LIBRARY GUIDE. Online Courses. March 2012

LIBRARY GUIDE. Online Courses. March 2012 LIBRARY GUIDE Online Courses March 2012 i Table of Contents OVERVIEW..................................................................................... 1 COURSE DESCRIPTIONS (LISTED ALPHABETICALLY)...............................................

More information

MHRA GMP Data Integrity Definitions and Guidance for Industry January 2015

MHRA GMP Data Integrity Definitions and Guidance for Industry January 2015 MHRA GMP Data Integrity Definitions and Guidance for Industry Introduction: Data integrity is fundamental in a pharmaceutical quality system which ensures that medicines are of the required quality. This

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

White paper: How to implement a Quality Management System

White paper: How to implement a Quality Management System White paper: How to implement a Quality Management System This whitepaper will help you to implement a Quality Management System (QMS), based on Good Manufacturing Practice (GMP), ISO 9001 or ISO 13485

More information

ICH Q10 - Pharmaceutical Quality System

ICH Q10 - Pharmaceutical Quality System WCC PDA Dinner Meeting Jan 2012 ICH Q10 - Pharmaceutical Quality System Neil Wilkinson NSF-DBA www.nsf-dba.com ICHQ10.1 WCC PDA Dinner Meeting Jan 2012 Your Presenter Partner at NSF-DBA USA Training, Consultancy,

More information

QA GLP audits. Alain Piton. Antipolis,, France. alain.piton@galderma.com

QA GLP audits. Alain Piton. Antipolis,, France. alain.piton@galderma.com Risk based assessment applied to QA GLP audits Alain Piton Galderma R&D, Sophia-Antipolis Antipolis,, France alain.piton@galderma.com RISK BASED ASSESSMENT FOR GLP AUDITS INTRODUCTION Since the origin

More information

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT PA/PH/OMCL (08) 69 3R Full document title and reference Document type VALIDATION OF COMPUTERISED SYSTEMS Legislative basis - CORE DOCUMENT

More information

How to implement a Quality Management System

How to implement a Quality Management System How to implement a Quality Management System This whitepaper will help you to implement a Quality Management System (QMS), based on Good Manufacturing Practice (GMP), ISO 9001 or ISO 13485 within your

More information

ISO 9001:2008 QUALITY MANUAL. Revision B

ISO 9001:2008 QUALITY MANUAL. Revision B ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,

More information

Welcome Computer System Validation Training Delivered to FDA. ISPE Boston Area Chapter February 20, 2014

Welcome Computer System Validation Training Delivered to FDA. ISPE Boston Area Chapter February 20, 2014 Welcome Computer System Validation Training Delivered to FDA ISPE Boston Area Chapter February 20, 2014 1 Background Training Conducted on April 24, 2012 Food & Drug Administration Division of Manufacturing

More information

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union

EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union EUROPEAN COMMISSION HEALTH AND CONSUMERS DIRECTORATE-GENERAL Public Health and Risk Assessment Pharmaceuticals Brussels, SANCO/C8/AM/sl/ares(2010)1064587 EudraLex The Rules Governing Medicinal Products

More information

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS CONTENTS 1. CONTROL PLANS 2. PROCESS APPROACH 3. PERFORMANCE 4. INTERNAL AUDITING 5. CONTROL OF NON-CONFORMING PRODUCT 6.

More information

The FDA recently announced a significant

The FDA recently announced a significant This article illustrates the risk analysis guidance discussed in GAMP 4. 5 By applying GAMP s risk analysis method to three generic classes of software systems, this article acts as both an introduction

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

Medical Device Regulations for Process Validation: Review of FDA, GHTF, and GAMP Requirements

Medical Device Regulations for Process Validation: Review of FDA, GHTF, and GAMP Requirements P e e r - R e v i e w e d : M e d i c a l D e v i c e s Medical Device Regulations for Process Validation: Review of FDA, GHTF, and GAMP Requirements Vladimir Veselov, Helen Roytman, and Lori Alquier ABSTRACT

More information

1.0 INTRODUCTION 1.1 Overview

1.0 INTRODUCTION 1.1 Overview Guidance document for the writing of standard operating procedures (Taken from United States Environmental Protection Agency Guidance for Preparing Standard Operating Procedures (SOPs) EPA QA/G- 6 [EPA/600/B-

More information

White paper: FDA Guidance for Industry Update Process Validation

White paper: FDA Guidance for Industry Update Process Validation White paper: FDA Guidance for Industry Update Process Validation In January 2011, the FDA released the final version of its long-awaited update to its Process Validation Guidance for Industry. Since then,

More information

NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING

NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING NIST HANDBOOK 150-5 CHECKLIST CONSTRUCTION MATERIALS TESTING Instructions to the Assessor: This checklist addresses specific accreditation criteria prescribed in NIST Handbook 150-5, Construction Materials

More information

PROPOSAL FOR REVISION OF THE SUPPLEMENTARY GUIDELINES ON GOOD MANUFACTURING PRACTICES: VALIDATION, APPENDIX 7: NON-STERILE PROCESS VALIDATION

PROPOSAL FOR REVISION OF THE SUPPLEMENTARY GUIDELINES ON GOOD MANUFACTURING PRACTICES: VALIDATION, APPENDIX 7: NON-STERILE PROCESS VALIDATION April 2013 RESTRICTED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 PROPOSAL FOR REVISION OF THE SUPPLEMENTARY GUIDELINES ON GOOD MANUFACTURING PRACTICES:

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Title:: Effective GMP AUDITS for APIs and Formulation Pharma Companies By G.Sundar-Director/Consultant PharmQA Compliance solutions

Title:: Effective GMP AUDITS for APIs and Formulation Pharma Companies By G.Sundar-Director/Consultant PharmQA Compliance solutions WELCOME Title:: Effective GMP AUDITS for APIs and Formulation Pharma Companies By G.Sundar-Director/Consultant PharmQA Compliance solutions Contents: Introduction GMP Audit GMP Audit plan GMP Auditing

More information

Improved Utilization of Self-Inspection Programs within the GMP Environment A Quality Risk Management Approach

Improved Utilization of Self-Inspection Programs within the GMP Environment A Quality Risk Management Approach Improved Utilization of Self-Inspection Programs within the GMP Environment A Quality Risk Management Approach Barbara Jeroncic Self-inspection is a well-established and vital part of the pharmaceutical

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

Guidance on Qualification of existing facilities, systems, equipment and utilities

Guidance on Qualification of existing facilities, systems, equipment and utilities QUALIFICATION_EXISTING_EQUIPMENT_FINAL page 1 / 16 1. Acknowledgement...3 2. Introduction...3 3. Scope...4 4. Regulatory requirements...4 5. Guidance...4 5.1 Risk Assessment... 4 5.2 Procedure... 7 5.3

More information

PPG SUPPLIER DEVELOPMENT ASSESSMENT

PPG SUPPLIER DEVELOPMENT ASSESSMENT Supplier: Address: Products: Assessment Date: Assessment Team: Certification: Supplier Contacts Position E-mail Phone General Comments: Assessment Results Summary Sections Non-conformity Action Point Quality

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems

Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems 800.982.2388 1 Introduction Calibration, maintenance and validation activity, despite operating within the same department

More information

Harmonizing Change Control Processes Globally

Harmonizing Change Control Processes Globally Quality & Compliance Associates, LLC Harmonizing Change Control Processes Globally President Quality & Compliance Associates, LLC When We Deal In A Global Environment, How Do We Design A System That Addresses

More information

Supplier Quality Agreements

Supplier Quality Agreements Supplier Quality Agreements Dan O Leary CBA, CQA, CQE, CRE, SSBB, CIRM President Ombu Enterprises, LLC Dan@OmbuEnterprises.com www.ombuenterprises.com 603-209-0600 1 Speaker Biography Dan O Leary Dan O

More information

What is Process Validation?

What is Process Validation? What is Process Validation? Process Validation is defined as the collection and evaluation of data, from the process design stage throughout production, which establishes scientific evidence that a process

More information

GAMP5 - a lifecycle management framework for customized bioprocess solutions

GAMP5 - a lifecycle management framework for customized bioprocess solutions GE Healthcare Life Sciences GAMP5 - a lifecycle management framework for customized bioprocess solutions imagination at work GE Healthcare s engineering department, Customized Bioprocess Solutions (CBS),

More information

Content Sheet 16-1: Introduction to Documents & Records

Content Sheet 16-1: Introduction to Documents & Records Content Sheet 16-1: Introduction to Documents & Records Role in quality management system The management of documents and records is one of the 12 essential elements of the quality system. The management

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

CUSTOMER SPECIFIC REQUIREMENTS

CUSTOMER SPECIFIC REQUIREMENTS CUSTOMER SPECIFIC REQUIREMENTS For Use With ISO 9001:2008 & ISO/TS 16949:2009 Page 1 SYSTEMS POLICY MANUAL CONTENTS Revision History Approval Document Distribution and Control General Application Background

More information

Annex 2. WHO guidelines on quality risk management. 1. Introduction 62. 2. Glossary 67 3. Quality risk management process 70

Annex 2. WHO guidelines on quality risk management. 1. Introduction 62. 2. Glossary 67 3. Quality risk management process 70 Annex 2 WHO guidelines on quality risk management 1. Introduction 62 1.1 Background and scope 62 1.2 Principles of quality risk management 64 2. Glossary 67 3. Quality risk management process 70 3.1 Initiating

More information

Quality Management Systems Manual

Quality Management Systems Manual Washington Division Quality Management Systems Manual ISO 13485:2003 DOCUMENT NUMBER 01-QM-MED REVISION LEVEL 01 PAGE 1 of 40 This manual describes the quality management systems structure at GM Nameplate

More information

OVERVIEW OF STANDARD 7E & STANDARD 20

OVERVIEW OF STANDARD 7E & STANDARD 20 Standard for Thermal Transport Packaging Used in Parcel Delivery System Shipment 7E 2 010 ISTA 7E Usage Modes VERSION DATE OCTOBER 2010 Initial Release ISTA, Distributing Confidence, Worldwide ISTA 7-Series

More information

Optimizing Quality Control / Quality Assurance Agents of a Global Sourcing / Procurement Strategy

Optimizing Quality Control / Quality Assurance Agents of a Global Sourcing / Procurement Strategy Optimizing Quality Control / Quality Assurance Agents of a Global Sourcing / Procurement Strategy Global Pharma Sourcing Conference December 6-7, 2011 Philadelphia, USA Nigel J. Smart, Ph.D. Smart Consulting

More information

State of Control Over the Lifecycle and Process Validation (New and Legacy Products)

State of Control Over the Lifecycle and Process Validation (New and Legacy Products) State of Control Over the Lifecycle and Process Validation (New and Legacy Products) Grace McNally Branch Chief (acting), Regulatory Policy and Collaboration Branch FDA/CDER/Office of Compliance ICH Q10,

More information

GLP Records Storage and Retrieval

GLP Records Storage and Retrieval GLP Records Storage and Retrieval Cindy Green BBS UNITED, ALEX HAYDEN/GETTY IMAGES GLP Topics addresses topics associated with good laboratory practice requirements. We intend this column to be a useful

More information

FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS

FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS Presented By Clay Anselmo, R.A.C. President and C.O.O. Reglera L.L.C. Denver, CO Learning Objectives Understand the Definitions of Failure Investigation and

More information

itac solutions for the medical industry Quality assurance of the highest standard FDA-compliant. Reliable. Productive.

itac solutions for the medical industry Quality assurance of the highest standard FDA-compliant. Reliable. Productive. Quality assurance of the highest standard FDA-compliant. Reliable. Productive. Market Requirements 1 Statutory regulations and stringent requirements laid down by the American regulatory authority, FDA

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

MHRA GMP Data Integrity Definitions and Guidance for Industry March 2015

MHRA GMP Data Integrity Definitions and Guidance for Industry March 2015 MHRA GMP Data Integrity Definitions and Guidance for Industry Introduction: Data integrity is fundamental in a pharmaceutical quality system which ensures that medicines are of the required quality. This

More information

Commercial Manufacturing - Qualification & Validation-related GMP Deficiencies and Other Lifecycle Considerations

Commercial Manufacturing - Qualification & Validation-related GMP Deficiencies and Other Lifecycle Considerations Commercial Manufacturing - Qualification & Validation-related GMP Deficiencies and Other Lifecycle Considerations Kevin O Donnell PhD Market Compliance Manager, IMB PDA / FDA Conference Pharmaceutical

More information