1 Filed: September 30, 2008 EB Exhibit D2 Tab 2 Schedule 3 Page 1 of INVESTMENT SUMMARY FOR PROGRAMS/PROJECTS IN EXCESS OF $3 MILLION Sustaining Capital S1 to S36 Development Capital D1 to D38 Operations Capital O1 to O3 Shared Services and Other Capital IT1 to IT 3 C1 to C3

2 Investment Category: Sustaining Capital Stations - Circuit Breakers S1 2009/2010 Oil Circuit Breaker Replacements $8.5 M Late 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to address end of life issues of the aging population of oil circuit breakers (OCBs) by way of proactive replacement of those that represent the highest risk to system security and customer connection reliability. Implications of not proactively managing this population of breakers include overall decline of health of the OCB population and employee safety. Inaction will result in a trend of equipment unavailability, inadequate equipment fault ratings, an increase in probability of failure and equipment outages (both customer and network connected) and an increased risk to Hydro One's Safety & Environment business values. Hydro One currently owns and manages over 4,000 circuit breakers of which oil circuit breakers account for greater than 50% of the total population. These bulk oil circuit breakers, which utilize organic insulating fluids for extinguishing arc produced during opening sequences, are no longer commercially available and are being replaced with new SF6 Circuit Breaker (CB) technology at end of life. Historically, OCBs have provided excellent in-service performance but a portion of the entire population reaches end of life each year. Based on various studies conducted since 1990 to assess the condition of OCBs, both refurbishment and replacement programs had been developed. As a result, an overall replacement strategy was developed by Hydro One to address the condition and ratings of OCBs on a prioritized basis. The strategy takes into account age, physical condition, parts obsolescence and equipment ratings. These criteria are used to assess the replacement candidates, and to put into motion the recommendations of the strategy. Current performance measures have steadily improved from 13 catastrophic failures during to only 3 catastrophic failures during since the onset of annual replacement and refurbishment programs. As a result of program success, future overall performance trends are expected to remain stable at the current levels of funding. The OCB replacement program as of 2005 will have addressed a total of 873 end of life oil circuit breakers throughout the province. In summary, the strategy identifies candidates for replacement based on assessed condition and switching duty-cycle requirements, equipment health index reports, the needs database, equipment defects reports and other localized special studies. Prioritization is based on risk as it relates to the HONI Business Values and Key Performance Indicators. The transmission system development and transmission load connections departments have reviewed the replacement candidates included in this investment for integration opportunities, and have concurred with the program prioritization. This plan will replace end of life OCBs in 2009 and Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

3 Investment Category: Sustaining Capital Stations - Circuit Breakers S2 2009/2010 Metalclad Circuit Breakers Replacement - $8.0 M Late 2010 GTA Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to address the end of life (EOL) condition of the low-voltage metalclad switchgear in the Greater Toronto Area (GTA) and the lack of arc proofing on these units. The implications of not proactively replacing EOL metalclad equipment are: A reliability reduction to Toronto Hydro and its customers resulting in a negative impact on reputation Increased maintenance expenditures and difficulty in obtaining or fabricating technically obsolete spare parts GTA metalclads are not arc proofed which creates a safety risk Thirty one (31) of the 100 metalclad line-ups in the GTA are currently exceeding manufacturer's life expectancy of 40 years. Three (3) Metalclad line-ups have been replaced since Toronto Hydro (THESL) and Hydro One (HONI) have recently identified 4 locations in the GTA for replacement over the next two years. They are at EOL based on age, parts availability, reliability and safety considerations. The supporting information is obtained from consultations with THESL, asset condition assessment, data registries, routine diagnostics, inspection results, system analysis and outage logs. This existing switchgear is not built to present day arc proof type C standards which results in safety and reliability concerns. HONl has experienced, on average, 2 major faults per year with inadequate metalclad arc proofing design. This can result in damages to the adjacent feeders and a potentially hazardous situation for personnel. The switchgear includes feeder breakers that are owned by THESL and bank breakers that are owned by HONI. THESL and HONl have agreed to purchase switchgear from the same manufacturer for technical and logistic reasons and to allow for easier installation, maintenance, stocking of parts, training, and to retain common system spare breakers. Switchgear from the same manufacturer also eliminates the limited space issues at these stations. The program includes new protections and the 15 kv cables that supply the switchgear. Reduce the life cycle cost and maintain customer reliability Provide up to date maintenance practices with the addition of a modern design and safety interlocks Upgrade breakers to current safety standards by the addition of arc proofing Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

4 Investment Category: Sustaining Capital - Stations - System Re-Investment S3 Abitibi Canyon Switching Station (SS) and Pinard $20.2 M Late 2012 Transformer Station (TS) - Replace EOL Components Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace Oil Circuit Breakers (OCB s) and other equipment that is reaching end of life at these stations to minimize life cycle costs and to de-merge Hydro One assets from Ontario Power Generation s (OPG) powerhouse. If this work is not completed, there is significant risk of a system decline in the health and reliability of the OCB population and other EOL components, a reduction in system reliability and a decrease in customer reliability. Originally built in the early 1930 s, Abitibi Canyon SS facilitates 350 MW of hydraulic generation and bulk power flows on the 230 kv and 115 kv networks. There are one 230 kv and three 115 kv circuits connected at Abitibi Canyon SS. The 115 kv oil circuit breakers are used for both ring bus switching and generation unit synchronization. Hydro One s 115 kv ring bus arrangement is situated on the OPG owned powerhouse dam. All the ancillary services and protection and control systems are within the powerhouse dam. The 115 kv breakers at Abitibi Canyon SS are 60 years old and rank amongst the top 30 worst breakers in the Hydro One system. Furthermore, the sole provider of spare parts for these breakers has indicated that they no longer support the breaker type. In addition to the breakers, the insulation systems, switches, protection and control facilities, foundations and ancillary systems have all reached end of life. An asset condition and risk assessment has determined that the kv OCB s at Abitibi Canyon SS have reached end of life and have been prioritized for replacement with new SF6 breakers. The investments contained in this proposal primarily focus on the end of life 115 kv power equipment and the required 115 kv system reconfigurations. In addition, investments are required to fully de-merge the integrated control, metering, relaying, annunciation and ancillary systems for both the 230 kv and 115 kv systems. Reduce the operational risks, minimize life cycle costs, eliminate safety and environmental issues, and improve the bulk system equipment reliability. De-merger of Hydro One assets from the OPG powerhouse and the resulting reduction in business liability. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

5 Investment Category: Sustaining Capital - Stations - System Re-Investment S4 Beck #1 SS: Air Blast Circuit Breaker (ABCB) Re- $35.0 M Late 2011 Investment Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace Air Blast Circuit Breakers (ABCB s) and other equipment that is approaching end of life to minimize the life cycle costs, to de-merge Hydro One assets from the Ontario Power Generation (OPG) powerhouse and to reduce regulatory maintenance requirements from the Technical Standards and Safety Authority (TSSA) If this work is not completed, there will be a continued decline in the health and reliability of the ABCB population and associated End of Life (EOL) components, and reduced system reliability and customer reliability in the area. Originally built in the 1920 s, Beck #1 SS facilitates bulk power transfers on the 115 kv network, and connects 563 MW of hydroelectric generation at Beck #1 GS. In addition to providing a major network path, the 115 kv circuits supply several load stations and large customers including Allanburg TS, Niagara TS, Gage TS, Stanley TS, Murray TS, Decew Falls SS, Beamsville TS and Niagara on the Lake Hydro (2 TSs). There are twelve 115 kv circuits connected at Beck #1 SS including two circuits to USA Niagara Mohawk. Seven of the circuits operate at 60 cycle and the remaining five at 25 cycle. Ten of the breakers are owned by Hydro One. At the present time discussions are underway between OPG and Hydro One, which will result in Hydro One acquiring additional breaker(s) and other equipment. The 115 kv air blast circuit breakers include six English Electric (EE) type OBN8G / OBN9G built in 1950 (5) and 1954 (1). The breakers are 56 and 52 years old. The original breaker manufacturer is no longer in business. Technical support and spare parts are no longer available. This investment is required to address the deteriorating condition of the four in-service EE breakers. Air blast circuit breakers employ high pressure air as an interrupting and insulating medium. At this point the o-rings and seals have deteriorated to such an extent that the breakers are unable to contain the insulating air properly resulting in an increased risk of failure. Two of the EE breakers are out of service at this time due to air system capacity issues. In 2006, a site assessment identified kv ABCB's to be replaced with new SF6 breakers, as well as replacement of 32 high voltage switches, 2 high voltage ground switches, and 12 high voltage instrument transformers. This investment will also enable a staged de-merger from the common systems including highpressure air systems that are shared with OPG. Reduce operational risks, minimize life cycle costs, and improve system reliability. De-merger of Hydro One assets from the OPG powerhouse and resulting reduction in business liability. Project Classification per OEB Filing Guidelines: Sustaining Project Non-Discretionary

6 Investment Category: Sustaining Capital - Stations - System Re-Investment S5 Orangeville TS: Air Blast Circuit Breaker (ABCB) Re- $17.7 M Late 2010 Investment Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace end of life Air Blast Circuit Breakers (ABCB's) and other end of life station components and reduce regulatory maintenance requirements from the Technical Standards and Safety Authority (TSSA). If this work is not completed, there is significant risk of the decline in the health and reliability of the ABCB population and associated End of Life (EOL) components, and reduced system reliability and customer load security impacts. Originally built in the 1960 s, Orangeville TS facilitates bulk power transfers on the 230 kv network between Bruce NGS, Detweiler TS and Essa TS. In addition to providing a major network path, the 230 kv circuits supply several load stations and large customers including Alliston TS, Hanover TS, Fergus TS, Campbell TS, Detweiler TS, Amaranth CTS / Melancthon Grey Wind NUG, Waterloo North MTS and Scheifelle MTS. There are six 230 kv circuits connected at Orangeville TS. The 230kV ABCBs at Orangeville TS were built in 1968 and 1969 and were originally installed at Beck #2 TS. These breakers are at end of life based on their condition, performance and availability of spare parts. The interrupter contacts have been a source of problems since the breakers were installed at Orangeville in The contact fingers develop cracks after 1200 breaker operations, a major design problem. Other major problems include premature mechanical and electrical wear to the stationary and moving contact fingers. Forced outage rates for air blast breakers have been increasing and the sole provider of spare parts for these breakers has indicated that they no longer support this type of breaker. Once the air blast circuit breakers are retired the related high pressure air system will be decommissioned and the major components (i.e. compressors, dryers) will be used at other Hydro One stations. In 2006, a team conducted a site assessment to identify EOL components within the 230 kv switchyard, with the intention of bundling the work into a single efficient work package. The identified work within this investment includes replacement of kv ABCB's with new SF6 breakers and associated replacement of 20 High Voltage (HV) Switches, 6 high voltage line ground switches, 4 High Voltage Instrument Transformers and the main AC transfer schemes and switchgear. Reduce operational risks and life cycle costs and regulatory maintenance requirements (TSSA). Improve the bulk system equipment availability indices and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

7 Investment Category: Sustaining Capital Stations - System Re-Investment S6 Beck #2 TS - Air Blast Circuit Breaker (ABCB) Re- $35.0 M Late 2012 Investment Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace End of Life (EOL) Air Blast Circuit Breakers (ABCB's) and other associated EOL assets (i.e. switches, insulators, instrument transformers, infrastructure) in order to optimize the life cycle costs, improve the bulk system equipment availability index by replacing other associated EOL components and to reduce regulatory maintenance requirements from the Technical Standards and Safety Authority (TSSA). Implications of not executing this investment include the decline in the health and reliability of the ABCB population and associated End of Life (EOL) components, and reduced system reliability and customer load security. Originally built in the 1950 s, Beck #2 TS is a critical station that facilitates bulk power transfers on the 230 kv network and connects 1,775 MW of hydroelectric generation from Beck #2 GS and Pump GS. In addition to providing a major network path, the 230 kv circuits supply several load stations and large customers including (4) circuits to the USA (two at 345kv). There are 20 air blast circuit breakers at this station. This investment is required to address the deteriorating condition of the air blast circuit breakers. Air blast circuit breakers employ high pressure air as an interrupting and insulating medium. The breaker manufacturer recommends that the breakers require re-gasketing and rebuilding mid-way through their 40-year life. At this point the o-rings and seals have deteriorated to such an extent that the breakers will not contain the air properly resulting in an increased risk of failure. Hydro One has experienced five explosive failures on the Delle type PK breaker. The explosive failures resulted in porcelain fragments landing 80 feet away. Quebec Hydro, BC Hydro and Manitoba Hydro have experienced similar failures over the last 25 years. Most utilities worldwide have programs in place to replace airblast circuit breakers. The identified work within this investment includes replacement of kv ABCB's with new SF6 breakers and associated replacement of insulators on 24 high voltage breaker disconnect switches and 25 high voltage Instrument transformers. Reduce the operational risks, minimize life cycle costs, reduce regulatory requirements (TSSA). Improve the bulk system equipment availability indices and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

8 Investment Category: Sustaining Capital - Stations - System Re-Investment S7 Nanticoke TS: Air Blast Circuit Breaker (ABCB) Re- $35.0 M Mid 2011 Investment Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace end of life Air Blast Circuit Breakers (ABCB's) and other end of life station components, and de-merge Hydro One assets from the Ontario Power Generation (OPG) facilities. If this work is not completed, there is significant risk of the decline in the health and reliability of the ABCB population and associated End of Life (EOL) components, and reduced system reliability and customer reliability in the area. Originally built in the early 1970 s, Nanticoke TS is a station that facilitates bulk power transfers on the 500 kv and 230 kv network, and connects 4000 MW of coal-fired generation at Nanticoke GS. There are three 500 kv and six 230kV circuits connected at Nanticoke TS. The 230 kv breakers at Nanticoke TS are approximately 35 years old, partially rebuilt in the mid-1990 s and are no longer supported by the original equipment manufacturer. The high-pressure air system was also partially refurbished to support the ABCB population. In addition to providing a major network path, the 230 kv circuits supply several load stations including Jarvis TS, Caledonia TS and large customers. As part of the Ontario Government s coal replacement initiative, Nanticoke GS is planned to be shutdown in phases during the 2011 to 2014 period. Even without the Nanticoke generation, the transmission facilities at Nanticoke TS are required for ongoing system and customer load security. Fourteen 230 kv ABCB s, which are at end of life, will be replaced at Nanticoke TS with new SF6 breakers. The sole provider of spare parts for these ABCB breakers has indicated that they no longer support this breaker type. The 230 kv breakers at Nanticoke TS are unique within Hydro One in so far as the parts are not interchangeable with any other ABCB on the system. End of life components within the 230 kv switchyard have been identified for replacement. These components include 34 High Voltage Switches, 27 High Voltage Instrument Transformers and the main AC/DC transfer schemes and switchgear. The 230 kv yard perimeter fence will also be replaced in order to address site security and safety issues. This investment will also enable a staged demerger from the common systems including AC station service and high-pressure air systems that are shared with OPG (230 kv only, as 500kV systems remain integrated with OPG). Reduce the operational risks, minimize life cycle costs, and satisfy regulatory requirements. The de-merger of the Hydro One assets from the OPG powerhouse will also be accomplished thereby reducing business liability and risk. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

9 Investment Category: Sustaining Capital - Stations - System Re-Investment S8 Claireville TS - Replace 230 kv ITE Gas Insulated $122.7 M Late 2009 Switchgear (GIS) Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace 230 kv ITE gas insulated switchgear (GIS) and other equipment that is approaching end of life to minimize the life cycle costs, improve customer reliability through reconfiguration of the 230 kv supply circuits and to provide one new diameter and nine new breakers to accommodate new local generation and future network expansions. Claireville TS was originally built in the late 1970 s and has experienced system expansions during the 1980 s and early 1990 s. Claireville TS is at the electrical centre of Hydro One s high voltage network and supplies 33% of the bulk system transfers between the 500 kv and 230 kv systems in the Greater Toronto Area (GTA). Claireville TS has 4 x 500 kv autotransformers, 16 x 500 kv GIS circuit breakers, 8 x 500 kv circuits, 17 x 230 kv GIS circuit breakers and 8 x 230 kv circuits. An asset condition and risk assessment determined that 6 x 230 kv GIS circuit breakers at Claireville TS had reached end of life and were prioritized from the entire population for replacement starting in The investments contained in this proposal primarily focus on the EOL 230 kv ITE GIS power equipment assets and the required 230 kv system reconfigurations. In addition, investments are required to the integrated control, metering, relaying and annunciation (CMR&A) assets for both the 500 kv and 230 kv systems. The 6 x 230 kv ITE GIS first-generation breakers were installed in The GIS circuit breakers are at EOL due to spare parts unavailability, high maintenance costs, poor performance and technical obsolescence. The original equipment manufacturer ceased production of the ITE breakers in the mid 1980 s and subsequently spare parts and technical support has become a significant issue. The first generation ITE GIS is being phased out by all other similar sized utilities. All major electrical faults at Claireville TS have the potential for widespread impact due to voltage sags and subsequent customer process disruptions. ITE equipment outages due to SF6 gas leaks and major catastrophic failures are an issue in maintaining system reliability, minimizing customer impacts and mitigating health, safety and environmental risks. With the Ontario Government s Coal Replacement initiative, the GTA and its western boundaries are experiencing additional power demand which requires transmission system upgrades and new installations to accommodate the load and generation requirements. Claireville TS is a critical station to these areas and the proposed investments are essential to accommodate the future works without network constraints. Replacement of the EOL 230 kv ITE GIS will reduce the operational risks, minimize life cycle costs, reduce maintenance and lessen health, safety and environmental concerns. Reconfiguration of the 230 kv circuits will improve the customer supply reliability, limit the available system fault levels as well as accommodate the upcoming transmission upgrades and new generation connections while maintaining the integrity and reliability of the system. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

10 Investment Category: Sustaining Capital - Stations - System Re-Investment S9 Gage TS Replace End of Life Components $40.0 M Late 2012 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to optimize the life cycle costs of Hamilton Gage TS by reducing the operating and maintenance expenditures and the outage requirements through integration of the component replacement programs in order to maintain the current load base through load retention initiatives, to address the safety and maintenance issues and to improve the security to the 115 kv area supply. Implications of not proactively managing the end of life issues of Transmission facilities include increased risk to employees to known deficiencies, an increase in customer complaints, and a decline in reliability. Hamilton Gage TS is a complex facility and unique in its configuration. The station is comprised of an original switchyard built in the 1940 s, with a further capacity increase in the 1960 s. The site is located in the heart of a highly industrial setting with close proximity to a number of steel mills and other heavy industry. The station is supplied by four 115 kv 60 Hz network circuits and two 115 kv 25 Hz radial circuits from Niagara area generation. The transformation load station supplies critical steel industry load. An asset condition and risk assessment has determined that many of the assets currently utilized at this station are at or near end of life. Included in this population of assets are the transformers, insulators, switches, surge arresters, breakers, station service and protection schemes. The low voltage oil circuit breakers have been prioritized from the entire provincial population as being in the worst condition. Operating restrictions are currently in place on the circuit breakers due to their operating ratings and the available fault current concerns that could cause the breaker to fail catastrophically. The need for reinforced and corrective maintenance has been increasing in recent years. With the increasing failure rates the time from defect identification to repair completion is increasing primarily due to the accessibility of spare parts and the outage restrictions imposed by the load customers and the system. Much of the low voltage equipment has insufficient safe working clearance to facilitate routine maintenance. There is a very restricted window during short periods in the year when outages can be arranged in order to facilitate load transfers to neighboring stations. Repair and preventative maintenance work has to be delayed for several months before an outage can be arranged which increases the risk of cascading failures due to multiple failures. Pollution from environmental contaminants has an extreme negative impact on the operability of the equipment. Electrical flashover due to high levels of pollution is common. Atmospheric corrosion degrades the equipment protective coatings and allows the ingress of moisture. The operating costs exceed those expected of a similar sized facility. The lead and execution time of any investment will be significant (estimated at >50% longer) due to the complexity of the station layout and the outage restrictions. Included in the work is refurbishment of the end of life station components, installation of new transformers, and reconfiguration of the 115 kv supply circuits. Reduce the operational risks, minimize life cycle costs, reduce regulatory requirements (TSSA) Improve the bulk system equipment availability indices and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

11 Investment Category: : Sustaining Capital - Stations Power Transformers S10 Birmingham TS - Replace EOL Large Transformers $8.2 M Mid 2010 T2/T3 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace the end-of-life (EOL) equipment at Birmingham TS. The EOL equipment includes the T2 and T3 transformers, transformer rod gaps, high voltage (HV) switches, auto ground switches and, cap and pin insulators. If this work is not completed, there is significant risk of transformer failure that may cause: (1) increased risk of customer impact, (2) potential high cost corrective action after a catastrophic failure, (3) reduced availability and increased operational constraints. Birmingham TS is located in Hamilton. It has a peak loading of 98 MVA and is connected to 115 kv circuits HL3 and HL4 through four transformers. TI and T2 operate as a pair, and T3 and T4 operate as another pair supplying a local distribution company and local industrial customers. TI is 35 years old and T2 is 41 years old. They are both 75 MVA 115/14/14 kv units. T3 is a 48 year old, 66 MVA 11 5/14/14 kv unit and T4 is a 12 year old 75 MVA 1 15/14/14 kv unit. EOL for power transformers is typically between 40 to 60 years. In addition to its advanced age, outages for T2 average 1.4 / yr, which is more than 5 times the provincial norm and unavailability averages 43 hrs/yr, which is more than 1.5 times the norm. As well, T2 undergoes more frequently scheduled maintenance due to a known tap changer deficiency associated with Pioneer manufactured transformers. In addition to its advanced age T3 is a sister unit to the former Birmingham T4 which was replaced after a failure in Insulation deterioration consistent with carrying heavy loads over 45 years was found during tear down of the failed T4 unit. The T3 unit is expected to be in similar condition to the former T4 as it is the same design and it is operating under the same operating conditions. These replacements are consistent with the current Asset Management Strategy to manage an aging transformer fleet through programmed replacements based on asset performance and condition information. Reduce operational risks and life cycle costs. Improve bulk system equipment availability and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

12 Investment Category: Sustaining Capital - Stations Power Transformers S11 Elgin TS Replace EOL Large Transformers T3/T4 $10.3 M Late 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace End-of-Life (EOL) equipment at Elgin TS including T3 and T4 transformers and associated equipment. If this work is not completed, there is significant risk of transformer failure that may cause: (1) load interruptions, (2) high corrective costs, (3) increased operational constraints and (4) adverse environmental effects. Elgin TS is located in downtown Hamilton. It is fed by 115 kv underground cables HL3/HL4. It consists of 2 33 MVA 115/14 kv transformers T3/T4, 2 Grounding Transformers GT3 /GT4, 2 75 MVA 115/14/14 kv transformers T1/T2, plus associated HV and LV switchgear. Elgin TS is the main supply point for the downtown Hamilton load. Elgin T3/T4 are English Electric units built in Condition assessment test (DGA and furan analysis) show that the insulation in these transformers is reaching its EOL. These transformers were first installed at Strachan TS in It was known then that the transformers in this family could not withstand full vacuum. Elgin T4 failed at Strachan in 1980 following several gas accumulation alarms. Both units were replaced at Strachan and moved into the Central Maintenance Shop in They were then installed at Elgin in Since then the numerous gas accumulation alarms incidents have continued. So far, they have been false alarms caused by air ingress. Numerous modifications have been over the life of these transformers to deal with these alarms. An on-line Hydrogen monitor is presently installed on T4 supervising the gas accumulation alarm. Reduce operational risks and life cycle costs. Improve bulk system equipment availability and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

13 Investment Category: Sustaining Capital - Stations Power Transformers Reference # Investment Name Gross Cost In-Service Date S12 Leaside TS - Replace EOL Transformers T19, T20 and $10.2 M Late 2009 T21 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to address replace End-of-Life (EOL) equipment at Leaside TS including T19, T20 and T21 transformers, associated transformer protections and all cap and pin insulators in the transformer zone. If this work is not completed, there is significant risk of transformer failure that may cause: (1) increased risk of customer impact, (2) potential high cost corrective action after a catastrophic failure, (3) reduced availability and increased operational constraints. Leaside TS is located in the city of Toronto. T19/T20/T21 operate in parallel and are unique, non-standard, 83 MVA kv units which supply THES. In the summer of 2007, an on line monitor on T21 indicated an increasing trend in the build up of internal fault gasses. An internal inspection confirmed that T21 should be replaced and off-loaded. T21 is presently available for emergency use only. EOL for power transformers is typically between 40 to 60 years. TI9 and T20 are 49 years old and T21 is 46 years old. Transformer population demographics coupled with condition assessments indicate that failure rates are expected to increase among all transformer groups due to natural insulation degradation found on both failed sister units. Both transformers suffered internal winding failures. This plan includes the replacement of associated transformer protections and all cap and pin insulators in the transformer zone. Reduce operational risks and life cycle costs. Improve bulk system equipment availability and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

14 Investment Category: Sustaining Capital - Stations Power Transformers S13 Glengrove TS - Replace EOL Transformers T1/T4 $6.4 M Late 2009 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to address replace End-of-Life (EOL) equipment at Glengrove TS including TI and T4 transformers, their associated protections and redundant GT2 and GT4 grounding transformers. If this work is not completed, there is significant risk of transformer failure that may cause: (1) increased risk of customer impact, (2) potential high cost corrective action after a catastrophic failure, (3) reduced availability and increased operational constraints. Glengrove TS is located in the City of Toronto and was built in the 1950's. It has a peak loading of 63 MVA and it is connected to 115 kv circuits DY6 and L2Y through four 33 MVA transformers. TI and T3 operate as a pair and supply Toronto Hydro (THES) A1 - A2 busses. T2 and T4 operate as another pair and supply THES A5-A6 busses. EOL for power transformers is typically between 40 to 60 years old. TI is 50 years old and T4 is 54 years old. The EOL condition of these transformers is confirmed by the severe insulation degradation found on two sister units to these transformers (T2 and T3), which previously failed and were replaced in 2006 and Both transformers suffered internal winding failures. This plan also includes the removal of redundant oil filled grounding transformers GT2lGT4 as the new transformers are equipped with standard secondary neutral reactors for grounding purposes. Other than protection changes due to the removal of grounding transformers, no other upgrades are required. Reduce operational risks and life cycle costs. Improve bulk system equipment availability and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

15 Investment Category: Sustaining Capital Stations Power Transformers S14 Woodroffe TS Replace EOL Transformers T1/T2/T3/T4 $12.5 M Early 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace End-of-Life (EOL) equipment at Woodroffe TS including TI, T2, T3 and T4 transformers, transformer rod gaps, high voltage (HV) switches and insulators, existing transformer low voltage power cables and protections. Install transformer spill containment and sound barrier; remove grounding transformers GTlI GT21 GT31 and GT4 that become redundant as new transformers are equipped with secondary neutrals for grounding purposes. Delaying the replacement of these EOL transformers results in an unacceptable risk of a transformer failure which may cause: load interruptions, high corrective costs, increased operational constraints and adverse environmental effects. Woodroffe TS is located in Ottawa and was built in the 1950's. It has a peak loading of 40 MVA and is connected to 115 KV circuits C7BM and F1OMV through four 33 MVA transformers. T1 and T2, which are operated as a pair, and T3 and T4, which are also operated as another pair. Each pair supplies two separate busses. EOL for power transformers is typically between 40 to 60 years. TI and T2 are both 49 years old whereas T3 and T4 are 53 and 51 years old respectively. All four transformers are leaking, exhibit excessive vibration and are very noisy. In addition, post mortems conducted on failed units, similar to the T1 and T2 units, indicate significant insulation degradation. T4's tapchanger is not compatible with T3 and therefore cannot be operated in parallel. T4 is used only as a back-up supply in case of a T3 failure. T3 has no selfcooled rating and must be removed from service upon a sustained interruption to the AC station service supply. The transformer breakers and bus tie breakers are housed as indoor metalclad switchgear and were refurbished in the1990's, to extend their life expectancy by years. Ottawa Hydro's (OHEC) metalclad facilities (feeder breakers, switches and metering) are located in a separate building and are scheduled for replacement in the 2010 timeframe. There is no spill containment under the existing transformers. An oil spill resulting from a transformer failure could flow directly into an adjacent school yard and/or the city sewer system. A school adjacent to the site has formally complained about the noise. A noise study done in response to the complaint recorded noise levels above those allowed under Ministry of the Environment limits (NPC-205). Reduce the risk of equipment failure by replacing four EOL Woodroffe TIT2/T3/T4 transformers with two standard 75 MVA 115/14/14 kv units. This is the smallest standard transformer size equipped with dual secondary windings to enable connection to the two OHEC metalclads. The increased capacity will also meet the needs of the load area for the foreseeable future as load growth. EOL transformer rod gaps with surge arresters, EOL HV switches and LV power cables and transformer protections will also be replaced. Adding spill containment and upgrading noise barriers will reduce potential environmental impacts. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

16 Investment Category: Sustaining Capital - Stations Power Transformers S15 Richview TS - Replace EOL Transformers T7/T8 $9.5 M Late 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace End-of-Life (EOL) equipment at Richview TS including transformers T7 and T8. If this work is not completed, there is significant risk of transformer failure that may cause load interruptions, high corrective costs, increased operational constraints and adverse environmental effects. There are 3 DESN stations on the Richview TS site: T1/T2 125 MVA 230/28/28 kv dating from 1969, T5/T6 125 MVA 230/28/28 dating from 1989 and T7/T8 83 MVA 230/28 kv dating from the late 50s. T7 was built in 1956, T8 in Both units are leaking oil. They are not equipped with spill containment. While T7 was undergoing refurbishment work, cracked pressure plates were found on all 3 phases. It appeared that these cracks were not recent. Replacing the cracked pressure plates cannot be done in the field. The refurbishment work has been scaled back in anticipation of the replacement of this unit. The unit will be returned to service and an on-line monitor will be connected to T7 to observe the gas in oil levels on a continuous basis. T8 has a cracked headboard that is also not field repairable. Two alternatives are being considered to mitigate the problems with T7 and T8: 1) Like-for-like replacement of Richview T7/T8 or 2) Increase transformation capacity by replacing T7/T8 with MVA 230/28/28 kv units. In addition, associated EOL equipment will be replaced and spill containment will be installed on T7 and T8. Reduce operational risks and life cycle costs. Improve bulk system equipment availability and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

17 Investment Category: Sustaining Capital - Stations Power Transformers S16 Kingsville TS - Replace EOL Transformers T1, T2 and $8.3 M Late 2010 T4 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to replace End-of-Life (EOL) equipment at Kingsville TS including TI, T2 and T4 transformers, their associated protections and redundant GT1 and GT2 grounding transformers. If this work is not completed, there is significant risk of transformer failure that may cause: (1) increased risk of customer impact, (2) potential high cost corrective action after a catastrophic failure, (3) reduced availability and increased operational constraints. Kingsville TS is located in South Western Ontario, in the outskirts of Leamington. It is connected to K2Z and K6Z from Kent and Lauzon. There are 4 stepdown transformers: T1/T2/T3/T4 and 2 grounding transformers: TG1/TG2 at Kingsville TS. The station is heavily loaded. Kingsville T2 is a CGE transformer built in T4 is a Canadian Westinghouse transformer built in T2 was installed at Crowland TS from 1953 to 1968 and moved to Guelph Cedar TS in 1969 before arriving at Kingsville in T2 has a long history of off-load and underload tap changer problems and failures. T2 is also not suitable for vacuum. T4 was installed at Bathurst TS in 1953 and then moved to Kingsville in Two sister units to the T2 transformer have already failed at Essex TS in the last few years. Furthermore, condition data (furan levels) on both T2 and T4 show significant insulation degradation. T1 is in better condition than T2 & T4. However, replacement is advisable at this time due to station congestion, the removal of the grounding transformers and the heavy load at the site. The existing T3 transformer will remain in-service. Reduce operational risks and life cycle costs. Improve bulk system equipment availability and the reliability of supply to area customers. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

18 Investment Category: Sustaining Capital - Stations Power Transformers S17 Purchase New 230 kv 400 MVA Regulator for Sir $5.2 M Late 2010 Adam Beck TS Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. To provide a new 230 kv, 400 MVA regulator to replace the failed unit at Beck TS. Not proceeding with this investment will increase risks to customer supply reliability and system security. There are MVA 230 kv Regulators in the Beck TS 230 kv Switchyard. These units support the interconnection with New York State. These regulators are unique in the HONI system. There are no spares in inventory to replace a failed unit. R76 is an English Electric unit built in R76 failed on January 30, An internal inspection was conducted on February 8, Severe winding damage was found. It was determined that the unit could not be repaired in the field. Arrangements were made for a more detailed inspection by a manufacturer to determine whether this unit could be re-built. This inspection took place on February 29, 2008 and the unit was deemed not to be economically repairable. To restore the regulation required at the inter connection with New York state. Project Classification per OEB Filing Guidelines: Sustaining Project Non-Discretionary

19 Investment Category: Sustaining Capital - Stations Power Transformers S18 Purchase Spare 750 MVA Autotransformer $7.6 M Late 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to purchase one new 750 MVA, 500/230 kv autotransformer to ensure an optimal number of spares are in the inventory for power system restoration following a failure. Not proceeding with this investment will increase risks to customer supply reliability and system security. 750MVA, 500/230 kv autotransformers are a major component of the Hydro One bulk transmission system and connect the 500 kv system to the 230 kv system. An autotransformer failure has significant implications on transmission capability and system security and may prompt generation to be re-dispatched to keep system loading within limits leading to higher market prices. In extreme situations load may have to be curtailed. Hydro One's transmission network has thirty, three phase 750 MVA, 500/230 kv autotransformers. Based on Hydro One's autotransformer population, the Class 1 failure rate (where the unit suffers non-repairable damage or a lengthy off site repair) for these types of transformers is about 0.01 / per year. Based on this failure rate, the size of Hydro One's autotransformer fleet and repair times, risk assessment studies recommend that Hydro One increase the number of available spare autotransformers from one to two. Maintain spares inventory of 750 MVA, 500/230 kv autotransformers to necessary levels. Project Classification per OEB Filing Guidelines: Sustaining Project Non-Discretionary

20 Investment Category: Sustaining Capital - Stations Power Transformers S19 Purchase Three (3) Spare 83 MVA Transformer $6.8 M Early 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. To provide adequate spare coverage for timely replacement in the event of a severe failure within the 83 MVA 115 kv and 230 kv transformer group. This investment will bring the inventory of spares in this group to the optimum level as determined by risk analysis. Not proceeding with this investment will increase risks to customer supply reliability and system security. The purpose of this investment is to purchase three new 83 MVA transformers as operating spares. A spare 83 MVA 230/28 kv Transformer and a spare 83 MVA 115/44 kv Transformer will cover a transformer group of 16 units installed in 7 stations feeding loads located in Georgian Bay and along the Eastern shore of Lake Ontario. The third transformer is a non-standard kv unit for use at Leaside TS in the GTA. This transformer is more expensive because of the special engineering, construction, type testing and commissioning required at the factory. A probabilistic cost/risk analysis model, consistent with industry standards, has been used to determine the optimum number of spares required for each group. This analysis takes into consideration several factors such as demographics, failure rate and repair/replacement time. To provide adequate spare group coverage and level of customer service in the event of a transformer failure. Project Classification per OEB Filing Guidelines: Sustaining Project Non-Discretionary

21 Investment Category: Sustaining Capital Stations Other Power Equipment S /2010 Low Voltage Capacitor Bank Replacements $7.7 M Late 2010 Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. This investment is required to address the condition of low-voltage (LV) capacitor banks at end of life, in order to optimize the life cycle costs of this population of assets. Implications of not proactively managing this population of capacitor banks include the decline in the overall health, reliability, and deterioration in equipment availability. This would result in reduced system voltage support and customer power quality, as well as increase in the potential for an environment and/or safety impact in the event of failure. Capacitor banks are static devices that provide a source of capacitive reactive power for the transmission system. The primary purpose of capacitor banks is to improve the power factor and provide the necessary voltage support needed for efficient power transmission and customer power quality. A capacitor bank is made up of several capacitor units connected together in an appropriate series-parallel arrangement, which can range from 9 to 216 capacitor units depending on rating and design of LV capacitor banks. Each capacitor unit consists of two conductive plates with a dielectric material in between, where the distance between plates and type of dielectric material determines the amount of capacitance produced. With the increasing need to provide voltage support and improve customer power quality, the LV capacitor bank population has increased by 20 banks over the past five years. There are now a total of 283 LV capacitor banks in-service throughout the transmission system. Overall the capacitor bank population is in good condition. The average age of the LV capacitor bank population is 15 years. Typical manufacturer's life expectancy is approximately 30 years. The need to replace capacitor banks is based on age, condition, operability, capability and criticality to the system. This assessment takes into consideration that end-of-life for a capacitor bank can be defined by either deterioration of individual capacitor units or by general deterioration of structure, insulators, fuses and capacitor units. The units in this program are externally fused capacitor design, which are prone to explosive failures resulting in potential safety and environmental concerns. They have a history of leaking & bulging cans and have exhibited numerous hot spots. All three capacitor banks also show signs of corrosion that will lead to further deterioration and failures if the banks are not replaced. The replacement of the low voltage capacitor banks will maintain overall health and performance of the capacitor bank population by replacing end-of-life capacitor banks in accordance with Hydro One Standards and improve the availability of reactive power for voltage support and improve customer power quality. Project Classification per OEB Filing Guidelines: Project Sustaining Non-Discretionary

22 Investment Category: Sustaining Capital - Stations Other Power Equipment S /2010 Station Cap and Pin Insulator $11.6 M Late 2010 Replacements Please see Exhibit D1, Tab 3, Schedule 2 for cash flows. There are approximately a total of 96,000 cap and pin insulator stacks installed at many older Hydro One stations. Cap and Pin insulators form the majority of the station insulator population. Normal end of life for insulators is years. Due to their design Cap and Pin insulators are prone to cement growth from moisture absorption resulting in premature failures. Cap and Pin insulators historically fail during movement of the switching device they support when cracks or loose caps cause the insulator to fail. This constitutes a safety hazard to personnel conducting switching below the device. Not proceeding with this investment would allow increased risk to customer supply reliability and safety hazards to personnel. The number of units replaced yearly should equal or outpace the rate of units reaching end of life Station insulators perform essential roles in the power system. They are designed to mechanically support and electrically insulate the station equipment. The integrity of these insulators ensures station equipment can perform its duties under all conditions. When the mechanical and electrical integrity of the insulator is compromised due to cracking caused by premature or normal end of life, the equipment it supports is subjected to risk due to lack of adequate insulation. Cap and Pin insulators are one of the oldest designs of insulators installed within the electrical system. These insulators are affected by a common condition referred to as cement growth. Moisture expands the cement used to bond the insulator skirts. This cement expansion causes cracking in the porcelain which reduces the mechanical strength of the insulator. Deterioration of mechanical strength causes the metal cap to separate from the porcelain either suddenly, or during mechanical loading resulting in possible catastrophic failure of the equipment they support. Safe operation of the equipment and personnel / public safety is compromised when this occurs. To improve reliability and system performance. Project Classification per OEB Filing Guidelines: Sustaining Project Non-Discretionary

SUMMARY OF CAPITAL EXPENDITURES

SUMMARY OF CAPITAL EXPENDITURES Filed: May, EB--00 Page of SUMMARY OF CAPITAL EXPENDITURES.0 SUMMARY OF CAPITAL BUDGET The proposed capital expenditures result from a rigorous business planning and work prioritization process that reflects

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 Achieving Operational Efficiencies through On-Line Substation Monitoring Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 1 Agenda Maintenance Monitoring Equipment CMMS Data Historian

More information

Enhance Power Equipment Reliability with Predictive Maintenance Technologies

Enhance Power Equipment Reliability with Predictive Maintenance Technologies Enhance Power Equipment Reliability with Predictive Maintenance Technologies November 2012/1910DB1208 by S. Frank Waterer, Electrical Engineerinig, Fellow Schneider Electric USA, Inc. Make the most of

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

ICM Project Station Infrastructure and Equipment

ICM Project Station Infrastructure and Equipment EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown

More information

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories: Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission

More information

Spending too much to maintain aging switchgear? Circuit breaker solutions from Square D Services.

Spending too much to maintain aging switchgear? Circuit breaker solutions from Square D Services. Spending too much to maintain aging switchgear? Circuit breaker solutions from Square D Services. Spending too much time and money on equipment maintenance? Square D Services: Your source for circuit breaker

More information

DISTRIBUTION OPERATIONS AND MAINTENANCE

DISTRIBUTION OPERATIONS AND MAINTENANCE EB-00-00 Filed: 00 Aug Page of DISTRIBUTION OPERATIONS AND MAINTENANCE PREVENTIVE MAINTENANCE Preventive Maintenance is intended to maintain or improve customer service reliability, extend equipment life

More information

Chapter 1. Network Structures

Chapter 1. Network Structures Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

Advantages of Fixed Circuit Breaker Switchgear

Advantages of Fixed Circuit Breaker Switchgear Advantages of Fixed Circuit Breaker Switchgear by Lionel Mackay, EDF Energy, and Mike Adams, Schneider Electric Ltd Introduction The purpose of this paper is to review the advantages of fixed circuit breaker

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS Meher Capacitors offers reliable and innovative products and solutions in the fields of Reactive Power Compensation, Power Quality and Energy

More information

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively

More information

APS Substation Maintenance. October 8, 2009

APS Substation Maintenance. October 8, 2009 APS Substation Maintenance October 8, 2009 Substation Criticality Ranking Criticality Ranking Tiers Equipment ranked by access, consequence, replacement cost, replacement time, redundancy, safety, and

More information

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission Power transformers Generator step-up and system intertie power transformers Securing high-quality AC transmission Generator step-up transformers Built to withstand continuous full load Generator step-up

More information

IESO Supply Deliverability Guidelines

IESO Supply Deliverability Guidelines PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents

More information

Electrical Predictive and Preventative Maintenance

Electrical Predictive and Preventative Maintenance Electrical Predictive and Preventative Maintenance Electrical and mechanical equipment is subject to failure at the worst possible time for no apparent reason. - Mose Ramieh III There are two types

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star

More information

RCP2 Portfolio Overview Document

RCP2 Portfolio Overview Document RCP2 Portfolio Overview Document Portfolio: Expenditure Class: Base Capex Expenditure Category: Grid Replacement & Refurbishment As at date: 15 November 2013 Expenditure Forecast Real 2012/13 NZ$ (m) 2015-2016

More information

When power interruptions happen.

When power interruptions happen. When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage

More information

TRANSMISSION ALTERNATIVES CONSIDERED

TRANSMISSION ALTERNATIVES CONSIDERED EB-00-0 Tab Page of TRANSMISSION ALTERNATIVES CONSIDERED In determining the proposed facilities, Hydro One and the West GTA LDCs investigated six options to address the two needs identified in this Application

More information

Pump Maintenance - Repair

Pump Maintenance - Repair Pump Maintenance - Repair Brian Trombly Mo Droppers Cummins Bridgeway, Gaylord, Mi The basic centrifugal pump consists of two main elements: 1. The rotating element which includes an impeller and a shaft.

More information

From June 2014 to November 2015 An Assessment of the Reliability and Operability of the Ontario Electricity System

From June 2014 to November 2015 An Assessment of the Reliability and Operability of the Ontario Electricity System From June 2014 to November 2015 An Assessment of the Reliability and Operability of the Ontario Electricity System Executive Summary The outlook for the reliability of Ontario s electricity system remains

More information

Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC

Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC Project name: Customer: Address, location of the system: Serial number

More information

Toronto Hydro-Electric System Limited ( THESL ) 2011-2020 Electrical Distribution Capital Plan

Toronto Hydro-Electric System Limited ( THESL ) 2011-2020 Electrical Distribution Capital Plan Toronto Hydro-Electric System Limited EB-2010-0142 Exhibit D1 Tab 8 Schedule 10 ORIGINAL (33 pages) Toronto Hydro-Electric System Limited ( THESL ) 2011-2020 Electrical Distribution Capital Plan June 2010

More information

Attachment 20.64 SA Power Networks: Asset Management Plan 3.2.01 Substation Transformers 2014 to 2025

Attachment 20.64 SA Power Networks: Asset Management Plan 3.2.01 Substation Transformers 2014 to 2025 Attachment 20.64 SA Power Networks: Asset Management Plan 3.2.01 Substation Transformers 2014 to 2025 ASSET MANAGEMENT PLAN 3.2.01 SUBSTATION TRANSFORMERS 2014 TO 2025 Published: October 2014 SA Power

More information

J W Spencer School of Electrical Engineering, Electronics and Computer Science

J W Spencer School of Electrical Engineering, Electronics and Computer Science J W Spencer School of Electrical Engineering, Electronics and Computer Science To consider the electrical energy network and how it might be affected over the next 100 years and beyond to 2500. Coastal

More information

ACS INDOOR SWITCHGEAR

ACS INDOOR SWITCHGEAR ACS INDOOR SWITCHGEAR Fleet Strategy Document ACS INDOOR SWITCHGEAR 2015 2020 Fleet Strategy Transpower New Zealand Limited 2013. All rights reserved. Page 1 of 63 C O P Y R I G H T 2013 T R A N S P O

More information

Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO

Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO April 2, 2014 Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO Todd Goyette, P.E., POWER Engineers Mousa Hejazi, P.E., Pepco Holdings Inc. 1 Pepco Quick Facts First incorporated in

More information

Engineering innovation

Engineering innovation Eaton's Electrical Engineering Services & Systems Solutions Focus Seamless Solutions for Reliable, Efficient and Safe Power Systems Engineering innovation Progressive solutions for today s power systems

More information

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL FORM CM-36 CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL February 7,2012 AGENDA ITEM Request for Approval to Issue a Request for Qualification (RFQ) of Firms, and Request for Proposal (RFP) to Engineer,

More information

Hydro One Major Incident Report. Operational response and incident review of flooding at Manby and Richview Transformer Stations on July 8, 2013

Hydro One Major Incident Report. Operational response and incident review of flooding at Manby and Richview Transformer Stations on July 8, 2013 Hydro One Major Incident Report Operational response and incident review of flooding at Manby and Richview Transformer Stations on July 8, 2013 1 Toronto Flood, July 8, 2013 On July 8, 2013, the Greater

More information

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

5.0 Reference: Application, Volume I, Chapter 5, Heritage Contract

5.0 Reference: Application, Volume I, Chapter 5, Heritage Contract 1 5.0 Reference: Application, Volume I, Chapter 5, Heritage Contract 1.5.30 5-27: Provide a comprehensive explanation of the application of the Equipment Health Rating process to transformers and generators

More information

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

ECE 586b Course Project Report. Auto-Reclosing

ECE 586b Course Project Report. Auto-Reclosing ECE 586b Course Project Report Auto-Reclosing Srichand Injeti May 5, 2008 Department Of Electrical and computer Engineering University Of Western Ontario, London Ontario Table of contents 1. Introduction...1

More information

Understanding the Auckland electricity network

Understanding the Auckland electricity network Understanding the Auckland electricity network Introduction This presentation describes how electricity reaches homes and businesses in Auckland, with a particular focus on the distribution network run

More information

TRANSMISSION BUSINESS PERFORMANCE

TRANSMISSION BUSINESS PERFORMANCE Filed: 0-0- Tx 0-0 Rates Tab Schedule Page of TRANSMISSION BUSINESS PERFORMANCE.0 INTRODUCTION 0 Hydro One is focused on the strategic goals and performance targets in the area of safety, customer satisfaction,

More information

Extend the Life of Existing Switchgear

Extend the Life of Existing Switchgear Extend the Life of Existing Switchgear January 2011/1910DB1002 by Hal Theobald, Product Manager Schneider Electric USA, Inc. Make the most of your energy SM Summary Introduction... p 3 Maintenance Requirements...

More information

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Grounding of Electrical Systems NEW CODE: Grounding and Bonding Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately

More information

Primary and Secondary Electrical Distribution Systems

Primary and Secondary Electrical Distribution Systems Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility

More information

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your

More information

WIRE AND CABLE ENGINEERING GUIDE

WIRE AND CABLE ENGINEERING GUIDE DC Hi Pot Testing Excerpt from PRYSMIAN S WIRE AND CABLE ENGINEERING GUIDE (FOR INFORMATIONAL PURPOSES ONLY) Page 1 of 6 DC HIGH POTENTIAL TESTING DC Hi-Pot testing can be applied as a withstand test (a

More information

CAPACITOR BANK TESTING SWP

CAPACITOR BANK TESTING SWP 1. PURPOSE AND SCOPE The purpose of this Standard Work Practice (SWP) is to standardise and prescribe the method for testing Capacitor Banks including capacitors, tuning reactors and inrush limiting reactors.

More information

SF 6 Gas Insulated Switchgear Type SDF for 170 kv

SF 6 Gas Insulated Switchgear Type SDF for 170 kv Three Phase Encapsulated Type SF 6 Gas Insulated Switchgear Type SDF for 170 kv 06B1-E-0001 With Trustworthy Technology, Structure Fuji Electric as a manufacturer of comprehensive substation equipment

More information

Advanced Distribution Grid Management for Smart Cities

Advanced Distribution Grid Management for Smart Cities Smart Grid Solutions Advanced Distribution Grid Management for Smart Cities Kevin Corcoran, Director Product Line Management IEEE SmartGridComm 2015 Miami, FL Bridging Smart Cities & Smart Grids Common

More information

Recommended Cost Allocation Treatment for the Supply to Essex County Transmission Reinforcement. Ontario Power Authority

Recommended Cost Allocation Treatment for the Supply to Essex County Transmission Reinforcement. Ontario Power Authority Recommended Cost Allocation Treatment for the Supply to Essex County Transmission Reinforcement Ontario Power Authority January, 01 Contents 1 Executive Summary... Introduction and Purpose... Assessment

More information

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203) 378-2659 FAX: (203) 378-3593 INTERNET:

More information

ABB PSPS Erich Steinmann; Generator control-2013

ABB PSPS Erich Steinmann; Generator control-2013 ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise

More information

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System Prepared By: Transmission Planning Unit Baltimore Gas & Electric Company Table of Contents 1. INTRODUCTION

More information

HVL 5 38 kv Load Interrupter Switchgear. The Standard for Performance, Protection and Dependability

HVL 5 38 kv Load Interrupter Switchgear. The Standard for Performance, Protection and Dependability HVL 5 38 kv Load Interrupter Switchgear The Standard for Performance, Protection and Dependability For a generation of engineers, Square D High Voltage Load (HVL ) Interrupter Switchgear by Schneider Electric

More information

Residual life aspects on GIS with the focus on SF 6

Residual life aspects on GIS with the focus on SF 6 Residual life aspects on GIS with the focus on SF 6 Speaker: Karsten Pohlink 25. March 2015 The presentation refers to CIGRÉ WORKING GROUP B3.17 RESIDUAL LIFE CONCEPTS APPLIED TO HV GIS CIGRE Technical

More information

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach Greg Orloff, MBA Government Relations Officer North America and Europe CSA Group Z662 Technical Committee (TC) Over 250

More information

Variable Frequency Drives - a Comparison of VSI versus LCI Systems

Variable Frequency Drives - a Comparison of VSI versus LCI Systems Variable Frequency Drives - a Comparison of VSI versus LCI Systems Introduction TMEIC is a leader in the innovative design and manufacture of large ac variable f requency drive systems. TMEIC has been

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

MOBILE DC POWER SYSTEMS FOR SUBSTATION APPLICATIONS

MOBILE DC POWER SYSTEMS FOR SUBSTATION APPLICATIONS MOBILE DC POWER SYSTEMS FOR SUBSTATION APPLICATIONS Gary P. Guagliardi Director Sales & Marketing HindlePower, Inc. Easton, PA Introduction This paper explores the use of mobile DC power systems for three

More information

Lifecycle Strategy DISPOSAL AND DIVESTMENT

Lifecycle Strategy DISPOSAL AND DIVESTMENT Lifecycle Strategy DISPOSAL AND DIVESTMENT Document 07/10/2013 Page 1 of 19 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D This document

More information

Paralleling Switchgear

Paralleling Switchgear Paralleling Switchgear By Maurice D Mello, P.Eng. Systems Engineer, GE Consumer & Industrial, Canada What is Paralleling? Paralleling is the operation in which multiple power sources, usually two or more

More information

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) From the SelectedWorks of Radhey Shyam Meena Winter July 12, 2012 SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan) RADHEY SHYAM MEENA, Er. Available at: http://works.bepress.com/radhey_meena/5/

More information

A Practical Guide to Dielectric Testing

A Practical Guide to Dielectric Testing Chroma Systems Solutions, Inc. A Practical Guide to Dielectric Testing 19032 Series Electrical Safety Analyzer & 19050 Series Hipot Tester AC/DC/IR/SCAN Keywords: Dielectric tests, insulation resistance

More information

Evaluating Water-Damaged Electrical Equipment

Evaluating Water-Damaged Electrical Equipment Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to water through flooding, fire

More information

Secondary Unit Substations

Secondary Unit Substations 14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically

More information

(2) Words and expressions used and not defined in these regulations but defined in the Act shall have the meaning assigned to them in the Act.

(2) Words and expressions used and not defined in these regulations but defined in the Act shall have the meaning assigned to them in the Act. (e) condition based maintenance means a set of maintenance actions based on continuous or frequent assessment of equipment condition, which is obtained from either of or a combination of embedded sensors,

More information

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers Specification Guide for RVAC Direct Replacement AC Medium Voltage Circuit Breakers Table of Contents 1.0 General Work Scope...3 2.0 Standards...3 3.0 Supplier Qualifications...4 4.0 Circuit Breaker Element

More information

SIEMENS Transmission and Distribution

SIEMENS Transmission and Distribution TITLE Long Term Maintenance and Care for S36A E. C. Wright 02/09/04 This document is to be used in conjunction with Installation, Operation and Maintenance Schedule IOMS 635. Its aim is to provide guidance

More information

September 13, 2010. Replace Tunis T1 Notification of Conditional Approval of Connection Proposal CAA ID Number: 2010-EX506

September 13, 2010. Replace Tunis T1 Notification of Conditional Approval of Connection Proposal CAA ID Number: 2010-EX506 September 13, 2010 Mr. Charles Wickham General Manager Eastern Operations Capital Power Corporation Suite 1301, 200 University Avenue Toronto, ON M5H 3C6 Dear Mr. Wickham: Replace Tunis T1 Notification

More information

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry Dry-type transformers Dry-type transformers from ABB The ideal solution for the oil and gas industry 2 Dry-type transformers for the oil and gas industry ABB s products and solutions for the oil and gas

More information

Substation Automation and Smart Grid

Substation Automation and Smart Grid GE Energy Substation Automation and Smart Grid John D. McDonald, P.E. GM, T&D Marketing IEEE PES Past President IEEE Division VII Director IEEE Fellow The Smart Grid POWERING POTENTIA L Current Situation

More information

ICM Project Underground Infrastructure and Cable

ICM Project Underground Infrastructure and Cable EB 0 00 Tab Schedule B ( pages) ICM Project Underground Infrastructure and Cable Handwell Replacement Segment (THESL) EB 0 00 Tab Schedule B I EXECUTIVE SUMMARY. Project Description 0 The handwell replacement

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

PowlVac Vacuum Integrity Tester

PowlVac Vacuum Integrity Tester Instructions IB-60025B PowlVac Vacuum Integrity Tester POWELL ELECTRICAL MANUFACTURING COMPANY 8550 MOSLEY DRIVE HOUSTON, TEXAS 77075 USA PHONE (713) 944-6900 FAX (713) 947-4453 www.powellelectric.com

More information

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application Product overview brochure ABB Medium Voltage Products Our one-stop approach for every medium voltage application Overview ABB meets every need for reliable, safe and energy-efficient medium voltage switchgear,

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

HYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS

HYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS HYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS Quarterly results reflect a number of timing, unusual and unseasonal weather related items while core operations remain strong; Board declares first

More information

RELIABILITY PLANNING CRITERIA

RELIABILITY PLANNING CRITERIA RELIABILITY PLANNING CRITERIA Version 4.0 01/20/2016 Date Rev. No. Individual Making Edits REVISION HISTORY Reason / Comments 07/01/2013 1 J. Johnson Initial document 06/06/2014 2 R. Chapman Document review;

More information

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392 1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of

More information

GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE)

GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE) GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE) Matthew Theriault Designer Hindle Power Inc. Easton, PA SCOPE AND PURPOSE OF THE PAPER Why do we bother to monitor

More information

Minimizing Impact of Electric Utility Outages with Backup Generation

Minimizing Impact of Electric Utility Outages with Backup Generation Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Turbine Optimization Programs to Extend Outage Periods and Manage Equipment Breakdown Risk

Turbine Optimization Programs to Extend Outage Periods and Manage Equipment Breakdown Risk Turbine Optimization Programs to Extend Outage Periods and Manage Equipment Breakdown Risk by John A. Latcovich, Jr. Fleet Manager, Rotating Equipment The Hartford Steam Boiler Inspection and Insurance

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

Capacitor Voltage Transformer. Answers for energy.

Capacitor Voltage Transformer. Answers for energy. Capacitor Voltage Transformer Answers for energy. Capacitor Voltage Transformer Siemens Capacitor Voltage Transformers are based on technology from Trench, a recognized world leader in the design and manufacture

More information

Treasure Valley Electric Plan - Community Advisory Committee

Treasure Valley Electric Plan - Community Advisory Committee Treasure Valley Electric Plan - Community Advisory Committee What is a transmission line and why are they necessary? A transmission line is used to conduct electricity between two points. Without high

More information

World Leader in HV Testing Technology

World Leader in HV Testing Technology World Leader in HV Testing Technology Cable Fault Locators w/tdr Oil/Fluid Dielectric Testers Very Low Frequency AC Technology W/TD & PD Diagnostics Portable AC Hipots ---------------------------------

More information

Evaluating Fire- and Heat-Damaged Electrical Equipment

Evaluating Fire- and Heat-Damaged Electrical Equipment Evaluating Fire- and Heat-Damaged Electrical Equipment www.nema.org 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been exposed to heat

More information

On-line PD Monitoring Makes Good Business Sense

On-line PD Monitoring Makes Good Business Sense On-line PD Monitoring Makes Good Business Sense An essential tool for asset managers to ensure reliable operation, improve maintenance efficiency and to extend the life of their electrical assets. Executive

More information

NPCC Regional Reliability Reference Directory # 8 System Restoration

NPCC Regional Reliability Reference Directory # 8 System Restoration NPCC Regional Reliability Reference Directory # 8 Task Force on Coordination of Operations Revision Review Record: October 21, 2008 Adopted by the Members of the Northeast Power Coordinating Council, Inc.

More information

Evaluating Water-Damaged Electrical Equipment

Evaluating Water-Damaged Electrical Equipment Evaluating Water-Damaged Electrical www.nema.org Evaluating Water-Damaged Electrical 1 USE OF THIS PUBLICATION This publication provides information on how to evaluate electrical equipment that has been

More information

Proactive Asset Management for GIS A six step process for reducing risk, cost, and improving reliability

Proactive Asset Management for GIS A six step process for reducing risk, cost, and improving reliability White paper Proactive Asset Management for GIS A six step process for reducing risk, cost, and improving reliability Gas Insulated Substations (GIS) are often critical assets for most organizations. GIS

More information

Electrical Engineering

Electrical Engineering Electrical Engineering Trust our people. R eady is a professional engineering firm with highlyqualified electrical and controls personnel focused on providing solutions to meet your specific needs. Ready

More information

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast. RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER tgood.com Energy. Fast. TGOOD is a world leading manufacturer of prefabricated renewable energy substations PRODUCT CONCEPT ENVIRONMENTAL

More information

CUSTOMER RELATIONSHIP MANAGEMENT

CUSTOMER RELATIONSHIP MANAGEMENT EB-00-0 Tab Schedule Page of CUSTOMER SERVICES CUSTOMER RELATIONSHIP MANAGEMENT Introduction Customer Relationship Management provides services to approximately,000 customers supported by THESL s Call

More information

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS 14:8-4.1 Scope This subchapter sets forth net metering requirements that apply to electric power suppliers, basic generation service providers

More information

Houston Service Center Medium Voltage Service and Aftermarket Solutions

Houston Service Center Medium Voltage Service and Aftermarket Solutions Houston Service Center Medium Voltage Service and Aftermarket Solutions Table of contents Introduction...3 Breaker refurbishment...4 Protective relay & control service and support...5 Power Service and

More information

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects

More information

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Typical Data Requirements Data Required for Power System Evaluation

Typical Data Requirements Data Required for Power System Evaluation Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI

More information