Hydro One Major Incident Report. Operational response and incident review of flooding at Manby and Richview Transformer Stations on July 8, 2013
|
|
- Eleanor Lyons
- 8 years ago
- Views:
Transcription
1 Hydro One Major Incident Report Operational response and incident review of flooding at Manby and Richview Transformer Stations on July 8,
2 Toronto Flood, July 8, 2013 On July 8, 2013, the Greater Toronto Area was hit by record rain fall with Pearson Airport reporting 90 mm of rain between 4:23 1 p.m. and 6:00 p.m. and 123 mm over a 24 hour period. The rainfall broke the previous daily record of 121 millimeters of rain set in 1954 by Hurricane Hazel. The rain came down with no advanced warning of the severity from Environment Canada weather services and caused major damage to the infrastructure serving the West GTA. The flash flooding that came with the rain overwhelmed rail, subway, sewers and drainage across the affected area as well as major electricity infrastructure serving the western portion of the Greater Toronto Area. Hydro One Networks Inc. experienced severe flooding at its Richview and Manby Transformer Stations (TS) causing interruptions of twenty-six 230,000 volt and eight 115,000 volt circuits supported by these stations and damaging communications equipment within these stations. Water damage continued to wreak havoc on operations as a building housing internal computer systems and telecommunications infrastructure filled with water from cable conduit penetrations, insufficient weeper sump pump capacity and loss of AC power to the weeper sump pumps. The flooding was significant, and reports from the response team indicate that the water removed from in and around Manby TS would have filled 15 Olympic-sized swimming pools. Hydro One declared a Level 2 Transmission Emergency after 3,400 MW of load was interrupted, causing widespread power outages to more than half a million households and businesses in the GTA. Six local distribution companies who receive their supply from Hydro One were directly affected by this event: Toronto Hydro, Hydro One Brampton, Enersource, Oakville Hydro, PowerStream, and Veridian. Four transmission connected customers were also directly affected: Ontario Power Generation Kipling Complex, Ford Oakville, IBM and Kinetrics HV Lab. During this time, Hydro One s Ontario Grid Control Centre (OGCC) was inundated with more than 126,500 alarms and 9600 phone calls. The unprecedented rush of water flooded into buildings at Richview TS (specifically into the OGCC Transmission and Distribution back-up control facilities) damaged and/or rendered critical equipment unavailable. Compounding this situation, the ITMC control room had to evacuated to their back up control room. Additionally, corporate IT systems were impacted, including mobile access on non-blackberry devices and Call Centre numbers. 1 All times are in Eastern Daylight Time (EDT) 2
3 Restoration began immediately and over the following five days the GTA power system was reconfigured and stabilized while station repairs were made and flood damage was assessed. Chronology of Restoration Hydro One crews were immediately dispatched, however with transportation systems across the city impacted by severe flooding, the speed of the response was hampered. Throughout the evening and into the night, crews made their way to these stations, at times receiving escorts from Toronto Police Services. The restoration focus was to transfer the affected 115 kv Toronto West load to Leaside TS and restore 230 kv circuits from remote stations outside of Richview TS and Manby TS. Hydro One worked closely with Local Distribution Companies (LDCs) and the Independent Electricity System Operator (IESO) to coordinate the system reconfiguration. By 4:00 a.m. on July 9, about 10 hours after the intense rain front hit the GTA, the electricity system was 91% restored with only 300 MW 2 directly supplied load out of Richview TS and Manby TS remaining unrestored, roughly representing10,000 homes and businesses served mostly by Toronto Hydro. On site work continued around the clock as crews removed water from flooded buildings, dried and inspected damaged equipment. Additionally, the OGCC dealt with the predetermined 115 kv corridor thermal limit issues that would knowingly ensue as the normal load profile demand would increase the following day after the storm. To alleviate the loading issues on these corridors voltage reductions and load shedding was implemented at the associated stations throughout the GTA. By 3:24 p.m. on July 10, all affected load had been restored, however the GTA power system required significant work to bring it back to normal configuration. The Transmission Emergency Level 2 remained in effect until 5:34 p.m. on July 12 th as Hydro One worked to reinforce the system with restored transmission connections between Richview TS and its remote terminal stations: Trafalgar TS, Cherrywood TS, Parkway TS and Claireville TS. This provided redundant supplies and vastly improved network security. Further remediation continued at both Richview and Manby over the following few days and at 2:44 p.m. on July 15 th the system was officially back to normal status. 2 Some of the 300 MW was restored through internal load transfers within the LDC systems. 3
4 Communication with the public during the event was vital and Hydro One depended on the news media to help tell the story. Hydro One s media relations team conducted more than 200 media interviews, issued 6 media releases and tweeted 36 times. Hydro One s President and CEO Carmine Marcello participated in an on-site press conference with the Mayor of Toronto and the President and CEO of Toronto Hydro. Status updates and conference calls were held to provide updates to government officials and the City of Toronto s Emergency Operations Centre. Summary of Root Causes The OGCC and Asset Management conducted investigations into the cause and response to this event. The OGCC assessed the response and actions taken from an operational perspective including IT, Corporate Communications and Security, identifying valuable lessons learned. Asset Management identified the causes for the flooding and recommended corrective actions to prevent a recurrence. This summary report provides high level information taken from their detailed internal analyses. Weather There was no prior warning of serious rainfall or potential for flooding issued by any of the weather forecasting providers used by the OGCC. Water from the flash flooding primarily entered impacted buildings via cable penetrations in building basements. AC powered sump pumps at Manby TS and Richview TS Building O were quickly rendered inoperable due to loss of AC station service power at both stations. Employees were significantly delayed in reaching Richview TS and Manby TS to aid in the restoration efforts during the onset of this event due to extreme weather and road closures. Local news updates on the road conditions were indicating road closures, sink holes, nonfunctioning traffic signals and high traffic volume. On site Construction crews at Manby TS proactively called for vacuum trucks to help with the flood relief. Even though some on-call employees had been able to respond within minutes from dispatch, due to amount of rainfall received, they could not prevent the resultant water damage. 4
5 Hot weather during the days following the initial flooding led to high energy usage across the GTA. As a result transformers and transmission lines were heavily loaded as restoration efforts progressed. The reconfigured circuits had additional loading, which led to heavy thermal loading on several corridors. Communication challenges Incident Command Centre-Transmission was not readily initiated and could have been initiated earlier; however the functional requirements of ICCT were already being implemented and managed by the OGCC frontline support and the first responders without an official corporate wide declaration. The initiating conditions were satisfied with the Level 2 SENS but declaration of establishment corporately was not immediately conveyed. OGCC and IESO complied with proper communication and policy protocols throughout the event; however review of these protocols will take place to explore opportunities of increased operating automomy during localized events which would further decrease restoration times. Response to station alarms was affected due to the high number in a short period. As a result, communications to customers did not occur immediately as would under normal operating procedures. Customers that contacted the OGCC for status updates were kept apprised. Constant requirement for information between involved agencies led to delays and discrepancies (for example, forecasted restoration times). The Hydro One media line was inundated with calls and triage was conducted with the largest outlets with the greatest reach receiving priority. Equipment Condition and Design Both site drainage systems at Manby TS and Richview TS were designed for a 100 year one-hour storm event. Immediately, prior to the July 8, 2013, storm, there was no evidence to suggest that either site drainage system was not operating as designed. At Manby TS, the site drainage system was recently inspected, flushed and upgraded ($4.7M spent, completed fall 2011). Similar investments were not required at Richview TS, as this site had no history of significant site or building flooding. At Manby TS, although the drainage capacity of the site drainage system and the City of Toronto stormwater sewer system was likely exceeded during the storm peak, this was not the primary cause of building flooding. The primary cause was 100+ year rainfall plus aging/plugged cable trench underdrainage systems. As a result, stormwater from flooded cable trenches in the switchyards entered buildings via unsealed/poorly sealed cable penetrations in basement walls. 5
6 Water rendered inoperable critical power system equipment located in these basements (terminal racks, battery rectifiers, etc). At Richview TS, as a result of a 100+ year rainfall, stormwater once again flooded the yard cable trenches and entered both the East and West Relay Buildings via cable penetrations in the basement walls. Additional stormwater entered the West Relay Building via a poorly sealed window well. Flooding of terminal racks in these Relay Basement buildings caused circuits to be removed from service and the loss of AC power at Richview TS and Manby TS. Stormwater also entered the Richview TS Telecom Building via cable penetrations, sump pit overflow/backflow and the loss of AC power to the sump pumps. Follow-up Actions Following the event a rigorous review was undertaken to document the full scope of damage and the resulting system repairs completed in the days following the initial damage. To conduct this review information was collected from Operating and Field staff, various lines of business, affected customers, the Network Management System information and storage retrieval system, and the review of 9,600 phone calls relating to the event from the OGCC control room audio log system. The detailed report provides a breakdown of all affected stations, line reconfigurations, system impacts related to Corporate IT infrastructure and relationship management with external agencies and customers. Follow up actions related to the below Key Learning s are documented and will be tracked on an ongoing basis. Follow-up actions with regards to the events surrounding the GTA flood will support Hydro One s compliance commitments and service level agreements and goal of operating a safe and reliable system for all customers. Key Learnings and Recommendations Findings, relevant comments and concerns, lessons learned and recommendations arising from this review of the GTA blackout that occurred on July 8 th have been documented and continue to be implemented into regular operating procedures and future emergency response planning. Operational recommendations Review and evaluate back up options for key computer and telecommunication services, and back-up systems integral to OGCC s 6
7 operability of the power system. Business Information Technology will assess opportunities to build further redundancies in the system thus avoiding future vulnerability to the Corporate IT services. Response time for Hydro One staff can be reduced by engaging local police services to explore options for faster transfer of people and equipment to required sites. Operations staff may be directed to drive personal vehicles to a non-impacted common location to rendezvous with a police escort in order to get to the site of emergency quicker. A review of the benefit of creating a standard system emergency message that could be issued at the onset of extreme events to notify customers and internal staff that Hydro One is not in a normal operating state. This could assist in reducing low priority calls and would ensure that the customers have been notified in a prompt manor. Clarification is required on declaration of ICCT dependent on the classification of the level of emergency. As an example, when an ICCT is initiated non-emergency transmission calls could be re-routed to other sectors not affected by the event. Other required logistical processes are put in place under ICCT that assist with dissemination of communications and coordination efforts. Coordinate joint messaging with Toronto Hydro and emergency response organizations to ensure consistent messaging is delivered during other large-scale events to avoid public confusion. Explore opportunities for IESO pre-approved load restoration plans during localized emergencies. Asset Management recommendations To prevent the entry of stormwater during severe rainfall events into building basements containing critical power system/it equipment, Hydro One is undertaking the following actions: Seal watertight all cable penetrations and window wells at Richview TS and Manby TS. Re-design the AC supply system to the Richview TS Telecom Building sump pumps to ensure automatic back-up supply via the diesel generators. 7
8 Review consultant s recommendations and compare against as built site drainage system/sump pump upgrades at Manby TS. Identify all transmission station buildings with critical power system equipment located in basements and, where appropriate, develop a mitigation plan for incorporation into the 5 year investment plan. This plan may include the following: 1) sealing and maintaining cable penetrations; (2) relocating new/replacement equipment and/or cable entrances to above grade locations; 3) inspecting/replacing/maintaining basement check valves (or backflow prevention valves); 4) upgrading cable trench under drainage systems and/or 5) upgrading building sump pits/pumps. Determine if changes to the Hydro One design criteria for transmission station site drainage systems are required (ie, design for a 200 year one-hour storm event). As part of planned infrastructure investment projects, replace the Richview TS 230 kv air blast circuit breakers and relocate protection and control equipment to new relay buildings. 8
OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:
Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission
More informationWhy Homeowners Need a Backup Sump Pump System
Why Homeowners Need a Backup Sump Pump System Most homeowners understand that they have a Primary Sump Pump (a main pump that runs on electricity) in their basement to protect them from flooding. However,
More informationExtreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods
Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system
More informationIESO Supply Deliverability Guidelines
PUBLIC IMO_GDL_0021 IESO Supply Deliverability Guidelines Issue 3.0 This document is to be used to evaluate long-term system adequacy and connection assessments Public Disclaimer The posting of documents
More informationStorm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines
Storm Restoration Bill Smeaton Distribution Superintendent Provincial Lines About Hydro One Hydro One owns and operates Ontario's 29,000 km high voltage transmission network that delivers electricity to
More informationCity of Buffalo Municipal Electric Utility Energy Emergency Response
City of Buffalo Municipal Electric Utility Energy Emergency Response Table of Contents Page 1. Goals 2 2. Types of Energy Emergencies..3 3. Utility Emergency Operating Plans.4 4. Link to General Reliability/Outage
More informationPennsylvania Summer Reliability
A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured
More informationONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008
ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater INFLOW AND INFILTRATION CUSTOMER OUTREACH
More informationMARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
More informationChair and Members of the Planning and Public Works Committee. Peter M. Crockett, P. Eng., Commissioner of Planning and Public Works
THE REGIONAL MUNICIPALITY OF HALTON Report To: From: Chair and Members of the Planning and Public Works Committee Peter M. Crockett, P. Eng., Commissioner of Planning and Public Works Date: May 16, 2007
More informationReview of Footing Drain Disconnection Projects
Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents
More informationPreventative Plumbing Program Guide
Preventative Plumbing Program Guide Overview: On January 10, 2012, Council for the City of Kingston approved the establishment of a financial assistance program to be administered by Utilities Kingston.
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found
More informationMaster/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers
Master/LCC Procedure No. 13 - Communications Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications 1. References... 2 2. Background... 3 3. Responsibilities... 3 4. Procedure... 4 4.1
More informationVerizon, 911 Service and the June 29, 2012, Derecho
Verizon, 911 Service and the June 29, 2012, Derecho August 13, 2012 Verizon, 911 Service, and the June 29, 2012 Derecho Late in the evening of Friday June 29, 2012, a severe storm hit the Mid-Atlantic
More informationSUMP PUMP. Sump Pump Backup Systems. City of Ann Arbor B A C K U P O P T I O N S. Does everyone need a backup system?
Sump Pump Backup Systems A backup sump pump is a system used to protect your basement from flooding when the main sump pump isn't operating. There are several types of backup systems including battery
More informationSubmission to Queensland Floods Commission of Inquiry Order (No. 1) 2011
Submission to Queensland Floods Commission of Inquiry Order (No. 1) 2011 This submission addresses sections b), d) and g), which are listed as matters that the inquiry will address: Private insurers and
More informationNewmarket-Tay Power Distribution Ltd.
Newmarket-Tay Power Distribution Ltd. Electrical January 2008 590 Steven Court Newmarket Ontario L3Y 6Z2 Telephone: (905) 895-2309 Newmarket-Tay Power Distribution Ltd. No person may copy, reproduce, distribute
More informationTo provide an update on the extreme storm event that took place on July 8, 2013 and opportunities to improve future outcomes.
Wonkirp fan you REPORT Meeting Date: September 12,2013 Regional Council For Information DATE: August 24,2013 REPORT TITLE: FROM: Dan Labrecque, Commissioner of Public Works OBJECTIVE To provide an update
More informationDISASTER RECOVERY PLANNING FOR CITY COMPUTER FACILITIES
APPENDIX 1 DISASTER RECOVERY PLANNING FOR CITY COMPUTER FACILITIES March 2008 Auditor General s Office Jeffrey Griffiths, C.A., C.F.E. Auditor General City of Toronto TABLE OF CONTENTS EXECUTIVE SUMMARY...1
More informationBASEMENT FLOODING. Prevention Guide for. Homeowners
BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result
More informationRainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation
Ground Surface Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation Ground Surface Soil Ground Water Level Basement Wall Groundwater drains to
More informationHow To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
More informationCorporate Report. Report from Transportation and Environmental Services, Environmental Services
Corporate Report Report from Transportation and Environmental Services, Environmental Services Date of Report: January 9, 2015 Date of Meeting: January 26, 2015 Report Number: TES-020-2015 File: 68.81.4
More informationStorm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection
Storm Ready Prep and Safety Power Restoration Your Service Connection Generator Safety Power Outage Map Stay Connected with Gulf Power Storm Ready 3 Gulf Power Ready for the storm 4 Be prepared, be safe
More informationOVER-HEAD SEWER ASSISTANCE GRANT
OVER-HEAD SEWER ASSISTANCE GRANT The Village of North Aurora has a vested interest in the proper operation of the North Aurora sanitary system. Understanding that some residential users of the sanitary
More informationPlanned, Limited Notice and Emergency Outage Guidelines
Applies to: All Facilities Management Employees GUIDELINES: Issued: April 22, 2014 Revised: February 24, 2015 Author: Communications Coordinator PURPOSE: The purpose of these guidelines is to define roles
More informationFirst in Service First in Safety
7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;
More informationHow To Get A Flood Risk Reduction Rebate
1. Address Number of Property 2. Street Name of Property 3. Last Name 4. First Name 5. Phone Number 6. Preferred time to be contacted o Morning o Afternoon o Evening preference 7. Email Address 8. Are
More informationScope of Restoration Plan
RWG Area Restoration Review Worksheet (10/28/09) EOP-006-02 Directory 8 EOP-005 NYSRG Rule G Text Restoration Plan Requirement R1.Each Reliability Coordinator shall have a Reliability Coordinator Area
More informationHow to Prevent Liquid Damage Property Losses
1. The leading cause of property losses is from liquid damage. A review of Zurich North America claims data highlights the problem. 2. Water damage originates from a number of sources: Domestic water lines
More informationHow To Write A Flood Emergency Response Plan For Texamona University
Title: TTUHSC-El Paso Campus Flood Emergency Response Plan (FERP) Policy Number: 10.12 Regulation: Reference: Original Approval Date: Revised Date: Next Review Date: 09-09-2011 01-23-2013 01/2014 Policy
More informationa guide to PREVENTING HOME FLOODING DURING STORMS
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING HOME FLOODING DURING STORMS DCWATER.COM Updated August 15, 2012 Flooding can damage District homes and businesses. It results when the
More informationTexas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston
Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston Business Continuity and Disaster Recovery State of Texas Executive Summary
More informationlater damage - Loss ControL
later damage - Loss ControL axisinsurance.ca Table of Contents EXECUTIVE SUMMARY... 1 FACILITY SYSTEMS WATER DAMAGE... 2 Frozen Pipes.....................................................................................
More informationA Century of Progress with Pride
The City of Berwyn Engineering Department A Century of Progress with Pride November 12, 2014 Re: Waiting List Application I am interested in the following programs and would like to be added to the waiting
More informationVILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
More informationUnderstanding the Auckland electricity network
Understanding the Auckland electricity network Introduction This presentation describes how electricity reaches homes and businesses in Auckland, with a particular focus on the distribution network run
More informationPreparation. Preparation. Step 2 Prepare an emergency kit. Step 1 Prepare your emergency plan. Step 4 Tune into warnings
This emergency toolkit provides you with steps to take before and during emergencies to protect you and your property. The Victoria State Emergency Service (SES) is a volunteer organisation dedicated to
More informationHistoric Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
More informationEmergency Restoration Plan (ERP) Components
Note: Each electric utility is different. The differences may include: System Configuration Designs and Construction Standards Construction and Line Materials Operating procedures and practices Work methods
More informationPREPARING FOR A FLOOD
Floods are typically caused by seasonal melting snow, ice jams, heavy spring rains and summer thunderstorms. Flash flooding is often caused by violent rain storms or breaking dams, and usually occurs with
More informationSANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
More informationTRANSMISSION BUSINESS PERFORMANCE
Filed: 0-0- Tx 0-0 Rates Tab Schedule Page of TRANSMISSION BUSINESS PERFORMANCE.0 INTRODUCTION 0 Hydro One is focused on the strategic goals and performance targets in the area of safety, customer satisfaction,
More informationAN UPDATE ON LOUISVILLE MSD s BASEMENT BACKFLOW PREVENTION PROGRAM 10 YEARS AND 6,700 INSTALLATIONS LATER
AN UPDATE ON LOUISVILLE MSD s BASEMENT BACKFLOW PREVENTION PROGRAM 10 YEARS AND 6,700 INSTALLATIONS LATER W. Brian Bingham Louisville Jefferson Metropolitan Sewer District 700 W. Liberty Street Louisville,
More informationWeeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario
Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario September 19, 2013 Kyle Chambers, P.Eng. City of London Environmental and Engineering Services Department Today s presentation
More informationREPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM
J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING
More informationINFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
More informationSCHEDULE 25. Business Continuity
SCHEDULE 25 Business Continuity 1. Scope 1.1 This schedule covers TfL s requirements in respect of: any circumstance or event which renders, or which TfL considers likely to render, it necessary or desirable
More informationPractical Measures for the Prevention of Basement Flooding Due to Municipal Sewer Surcharge. Plumbing stack. Figure 1
research highlight January 2004 Technical Series 04-104 Practical Measures for the Prevention of Basement Flooding Due to Municipal Sewer Surcharge introduction This highlight is based on a project funded
More informationDownspout to storm sewer. Leaky laterals
Flooded street Surface water through MH top Blocked street catch basin Cracked MH or sewer Property line Downspout to storm sewer BREATHERS Leaky laterals Weeping Tile to sanitary or storm sewer BASEMENT
More informationMandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding May 26, 2011 Kyle Chambers, P.Eng. Environmental and Engineering Services Department City of London kjchambe@london.ca 519-661-2500
More informationcontractors, etc. and establish relationships with lease and rental companies.
The following may serve as a checklist when preparing for a Tropical Storm or Hurricane. Although Tornadoes usually provide little advance warning, locations subject to Tornadoes may apply much of the
More informationREFERRAL TO RECOMMENDED DIRECTION REQUIRED RECEIPT RECOMMENDED. Dear Kathryn Lockyer,
From: Carrnela Radice [rnailto:carmela.radice@mississauga.ca] Sent: June 28, 2013 10:14 AM To: Lockyer, Kathryn Subject: Council Resolution 0110-2013 - June 19, 2013 Dear Kathryn Lockyer, The Council of
More informationSatellite technology delivers dependability for disaster crisis management
Satellite technology delivers dependability for disaster crisis management communication technology is quickly advancing with new, improved ways to collect and manage the vital information needed before,
More informationHomeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS
Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS MAINTAINING YOUR HOME BASEMENT FOUNDATION BY HOMEOWNER PREVENTATIVE MAINTENANCE LUX WATERPROOF
More informationReport in respect of. Service Disruption on 9 April 2012
Report in respect of Service Disruption on 9 April 2012 1. Introduction On 9 April 2012, a power outage occurred in the Shatin Switching Centre, one of three switching centres deployed by SmarTone Mobile
More informationSewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010
Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 A. Purpose The purpose of this policy is to explain how and why sewer or stormwater backups occur, what to do in the event a homeowner
More informationHow to Protect Your Property Against Plumbing Disasters
How to Protect Your Property Against Plumbing Disasters Over 15 Years of Experience Servicing Toronto & GTA Available 24-Hours a Day CONTENT Why Your Home Plumbing Matters...2 Plumbing 101...3 Caring For
More informationMarch 1997 &FM. Handbook. Post at all station operator positions. Federal Communications Commission. Emergency Alert System
March 1997 &FM AM Handbook Post at all station operator positions Federal Communications Commission Emergency Alert System Attention Station Managers Pocket for EAS Authenticator Envelope Ensure the Authenticator
More informationAppendix B. Property Owner Questionnaire
Appendix B Property Owner Questionnaire WEST WINDSOR TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT PROPERTY QUESTIONNAIRE DIVISION OF ENGINEERING As someone who owns and lives and/or works on a property
More informationScorecard - Oakville Hydro Electricity Distribution Inc.
Scorecard - Oakville Hydro Electricity Distribution Inc. 9/24/215 Performance Outcomes Performance Categories Measures 21 211 212 213 214 Trend Industry Distributor Target Customer Focus Services are provided
More informationHurricane Irene Response Before, During and After the Storm. John D. Rea Director of Operations Support, Penelec. October 12, 2011
Pennsylvania Public Utility Commission Special Electric Reliability Forum Hurricane Irene Response Before, During and After the Storm John D. Rea Director of Operations Support, Penelec October 12, 2011
More informationSEWER BACKUP PREVENTION PROGRAM
SEWER BACKUP PREVENTION PROGRAM PROGRAM DESCRIPTION The Village will provide partial funding for a Village approved overhead sewer, backflow prevention device and/or related equipment to single-family
More informationfoundation designed to keep water out of the basement.
Preventing Sewer Backups To safeguard your home against flooding from sewer backups, you should understand your home's basic plumbing and the preventative techniques discussed in this brochure. Basement
More informationStorm Ready: How to Prepare Your Business
Storm Ready: How to Prepare Your Business Emergency Planning and Storm Preparedness Louis DeBrino, Manager, Emergency Preparedness 1 PSEG Long Island: Who We Are and the Promises We ve Made 2 PSEG Vision,
More informationDISASTER RECOVERY. Omniture Disaster Plan. June 2, 2008 Version 2.0
DISASTER RECOVERY Omniture Disaster Plan June 2, 2008 Version 2.0 CHAPTER 1 1 Disaster Recovery Plan Overview In the event that one of our data collection environments are unavailable due to an event,
More informationImplementation Date: May 5, 2009. Table of Contents. Section Description Page. 1.0 Description 1. 2.0 Initial Response 2
Recommended by Emergency Preparedness Committee: April 21, 2009 Recommended by President s Council: May 1, 2009 Approved by Executive Committee: May 5, 2009 NAIT Procedures CS1.2.6 Flood Implementation
More informationHYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS
HYDRO ONE LIMITED REPORTS FOURTH QUARTER 2015 RESULTS Quarterly results reflect a number of timing, unusual and unseasonal weather related items while core operations remain strong; Board declares first
More informationTown of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
More informationThe calm after the storm
The calm after the storm Human decision support in storm outage recovery Rafael Ochoa, Amitava Sen It s a fact of life that interruptions in an electrical distribution utility happen. Although they can
More informationWetrofit Property Flood Assessment
Wetrofit Property Flood Assessment Address 445 E 89 th St City, ST Chicago, IL Owner Lori Burns Initial Assessment 10/15/2013 Assessor(s) Ryan Wilson and Nick Furtek Prepared by Ryan Wilson On 10/15/2013
More information(EMR) system in resource-constrained settings. The use of the EMR at point-of-care (POC)
Centralized Power Backup System and Low-Power Computing A reliable power source is a core requirement for using an electronic medical record (EMR) system in resource-constrained settings. The use of the
More informationAIS Power Reliability
Case Study AIS Power Reliability How a Wayward Raccoon Sparked a Major Power Distribution System Upgrade Company executives welcome open, frank discussion and want to address all questions and concerns
More informationFlood Warning & Evacuation Plan
1.00 Planning and Procedures for Staff / Management This Evacuation Plan records the contingency measures that have been drawn up to provide maximum safety to the management and staff using Esperanto Way
More informationWorkforce Solutions Business Continuity Plan May 2014
Workforce Solutions Business Continuity Plan May 2014 Contents 1. Purpose... 3 2. Declaration of Emergency... 4 3. Critical Operations... 4 3.1 Communication... 4 3.1.1 Internal Communication During Emergencies...
More informationTHERE S NO USE CRYING OVER SPILLED SEWAGE: USING STANDBY LIFT STATION PUMPS TO PREVENT SSOS BEFORE THEY HAPPEN
THERE S NO USE CRYING OVER SPILLED SEWAGE: USING STANDBY LIFT STATION PUMPS TO PREVENT SSOS BEFORE THEY HAPPEN ABSTRACT Michael J. Delzingaro Godwin Pumps of America, Inc. One Floodgate Road Bridgeport,
More informationComponents of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
More informationOncor Storm Restoration Questions/Answers
Oncor Storm Restoration Questions/Answers Oncor understands that electricity is an essential service to today s businesses and homes, and loss of power places a significant burden on everyone. Oncor performs
More informationProtect your. home from. basement. have you done everything you can?
Protect your home from basement flooding have you done everything you can? No matter where you live in Winnipeg, your home can be at risk of basement flooding. Heavy rainstorms that fall over short periods
More informationThe Emergency Operations Plan provides guidance for managing emergency communications resources.
Emergency Support Function #2 - Communication ESF # 2 Primary Agency Office of Emergency Preparedness Information Technology University Relations 911 Centers Secondary/Support Agencies Law Enforcement
More informationUnderstanding the Electric Power Industry s Response and Restoration Process
Understanding the Electric Power Industry s Response and Restoration Process Electricity is a crucial product many of us take for granted. We scarcely think about it, unless we don t have it. Because electricity
More informationCITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG
CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG WHY IS THERE WATER IN MY BASEMENT? There are two major sources of water in a basement as the
More informationNumber 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
More informationUniversity of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood
More informationDoes Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5
PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor
More informationSEWER BACKUPS WHAT TO DO AND HOW TO PREVENT
SEWER BACKUPS WHAT TO DO AND HOW TO PREVENT Disclaimer: The following will explain Village policies and the actions you should consider. In no way does it obligate the Village to assist in any repair or
More informationHOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON?
Service: Program: 3.4. Wastewater Removal & Storm Water Management Environmental Services HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON? The desired population results in
More informationWHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA
WHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA We all take reliable electric service for granted. Flip a switch, push a button, turn a knob; the lights come on; the home computer powers
More informationHydro One Networks Inc. Subject: Regional Planning Status GTA West Region
483 Bay Street Tel: (416) 345-5420 13 th Floor, North Tower Fax: (416) 345-4141 Toronto, ON, M5G 2P5 ajay.garg@hydroone.com www.hydroone.com June 25, 2015 Bruno Pereira, P. Eng, MBA Director of Engineering
More informationGLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1
PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public
More informationFLOOD RESPONSE PLAN. River Flood Guide
FLOOD RESPONSE PLAN River Flood Guide Effective Date: January 2013 Updated: February 2014 1 SCOPE This guide has been developed to deal with any situation where high water levels in the Upper Thames River
More informationPortland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES
P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an
More information2011 NASCIO Recognition Award Nomination State of Georgia
2011 NASCIO Recognition Award Nomination State of Georgia Nomination Category: Enterprise IT Management Initiatives Title of Nomination: Georgia Enterprise Technology Services Nomination Submitted By:
More informationWater Main Breaks After Normal Operating Hours
Emergency Guideline GU.FAC.019 - Version 1.0 For Project Supervisor, Team Leader, Caretakers, Trades Approved by FS Leadership Team, March 27, 2013 Water Main Breaks After Normal Operating Hours Introduction
More informationBasement Flood Risk Reduction City of Winnipeg. Charles Boulet
Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where
More informationThe following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade
More informationEmergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.
CITY OF HOUSTON Office of Emergency Management October 2004 Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations. Houston is exposed
More informationA Guide to the Role of Community Flood Wardens
A Guide to the Role of Community Flood Wardens What is a Community Flood Warden Scheme? Community Flood Warden schemes are completely voluntary, and can consist of a single person or several people acting
More informationA cure for water damage in real estate
A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:
More information