METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER"

Transcription

1 Page 1 of 6 FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER 0 Issued for Review & Comments Rev. Date Description Eng. A.H Prepared by Checked by Approved by

2 Page 2 of 6 REVISION CONTROL SHEET REV. NO. DATE PAGE NO. DESCRIPTION 0 FIRST ISSUE

3 Page 3 of 6 TABLE OF CONTENTS 1 Purpose Scope of Work Responsible Personnel on Site 4 4 Storage Pre-Installation 5 6 Installation 5 7 Reference Documents. 6 8 Safety 6

4 Page 4 of 6 1. Purpose This method of statement covers the on-site installation of Cable Trays, Trunking & Cable Ladders as defined in the General Specification. 2. Scope of Works This procedure will define the method to be used to ensure that cable trays, trunking & ladders installations are correct and acceptable and shall conform to the Contract Documents and Specification. 3. Responsible Personnel on Site 3.1. Construction Manager 3.2. Electrical Field Engineers 3.3. Safety Officer 3.4. QA/QC Engineer 3.5. Electrical Supervisors 4. Storage 4.1 Cable Trays, Trunking and Ladders shall be properly supported and stacked on a flat surface. 4.2 Cable Trays, Trunking and Ladders shall be protected from sunlight and moisture by covering them with tarpaulin. 4.3 Cable Trays, Trunking and Ladders shall be stacked properly in neat and orderly manner. 4.4 Cable Trays, Trunking and Ladders shall be stored and stacked in dry area and shall be properly protected..

5 Page 5 of 6 5. Pre-Installation 5.1 All materials and documentation relevant to this particular Section of works will be checked by the Construction Department prior to the commencement of works ensuring that these are correct type as reviewed. 5.2 Before any permanent works will proceed, pre-inspection on all materials, tools and access for installation to be carried out. 6. Installation 6.1 Establish the Cable Trays, Trunking and Ladder route on slab soffit and walls, and mark with chalk liner. Ensure that the route conform with the latest coordinated services drawings. 6.2 Mark the locations of supports. For horizontal installation spacing between supports shall not exceed 1.5m for trunking and 1.2m for cable trays and ladders and not more than 150mm from all bends and tees. For vertical installation, spacing between supports shall not exceed 3m for trunking and 1.5m for cable trays and ladders. 6.3 Install the threaded rod and angle bar supports for horizontal installation and uni-strut channel for vertical supports. Make sure that the supports are properly anchored, rigid and aligned. 6.4 Install Cable trays, trunking and ladders ensuring that it is properly fixed to its supports. Where necessary to cut the cable trays, the cutting line of the cable trays shall be through continuous metal parts and not through the perforation. Burrs and sharp ends shall be removed prior to the installation of tray section or accessories. 6.5 Cable Trays, Trunking and Ladders shall be connected to adjacent lengths, tees, bends and fittings with approved couplers and securely fastened by mushroom head steel roofing bolts and nuts. Connection shall be mechanically strong so that there is no relative movement between joints. 6.6 Earth links shall be fixed on the adjacent connection of Cable trays, trunking and ladders and fittings to maintain the electro-mechanical continuity on the runs of cable trays, trunking and ladders. 6.7 Where cable tray or cable ladder crosses, expansion joints, adjacent length of cable tray or ladder shall not be joined and shall be bridged only with a flexible earth connector.

6 Page 6 of A minimum clear space of 25mm shall be kept behind all installed runs of cable trays. Where in a cable trays carrying power cables run in parallel with low current cable trays, a 300mm minimum clear distance shall be kept throughout the installation. 6.9 Raise Request for Inspection for the Cable Trays, Trunking and Ladders Installation. 7. Reference Documents 7.1 Approved Electrical Shop Drawings 7.2 Approved Material Submittals 7.3 Approved Material Inspection Report 7.4 Approved Safety Plan 7.5 Approved QA/QC Inspection & Test Plan. 8. Safety 8.1 All safety precautions shall be followed as per approved safety plan & procedure. Ensure all involved persons are aware of the same. 8.2 Safety Officer to ensure that all working flat forms shall be safe and in good condition. 8.3 Tradesman shall ensure that before leaving their working places, it must be clean, tidy and free from rubbish Procedure End

CABLE INSTALLATION SYSTEMS

CABLE INSTALLATION SYSTEMS The universal cable support systems are used for construction of cable link in closed production premises for direct mounting on even vertical surfaces. They are perforated metal grates and accessories

More information

Manual. Linear scales FOR DIGITAL READ-OUT UNITS

Manual. Linear scales FOR DIGITAL READ-OUT UNITS Manual Linear scales FOR DIGITAL READ-OUT UNITS CONTENT 1. PRECAUTION 2 2. INSTALLATION STANDARDS & REQUIREMENTS 5 Glass grating linear transducer installation manual 1 1. PRECAUTION 1. The travel length

More information

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cabinets, Racks, Frames and Enclosures

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cabinets, Racks, Frames and Enclosures PART 1 GENERAL 1.1 WORK INCLUDED Section 27 11 00 COMMUNICATION EQUIPMENT ROOM FITTINGS Section 27 11 16 Communications Cabinets, Racks, Frames and Enclosures A. Provide all labor, materials, and equipment

More information

A. This Section includes wood roof, and floor trusses and truss accessories.

A. This Section includes wood roof, and floor trusses and truss accessories. SECTION 06176 - METAL-PLATE-CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

CLEAR-DIVISIONS APERTO

CLEAR-DIVISIONS APERTO CLEAR-DIVISIONS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS moveable glass wall system. The yellow highlighted areas in the

More information

SECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.

SECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. SECTION 260536 - CABLE TRAYS PART 1 - GENERAL SECTION INCLUDES: A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. B. Cable tray systems are defined to include, but

More information

Handling, Erection and Bracing of Wood Trusses

Handling, Erection and Bracing of Wood Trusses Handling, Erection and Bracing of Wood Trusses Follow these guidelines for safe installation of Wood Trusses. These guidelines should not be considered to be the only method for erecting and bracing of

More information

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers SnapStak Hangers New design increases stack height SnapStak hangers have become the industry standard for maximizing space utilization on crowded towers and now that utility is further expanded with the

More information

Generic Technical Performance Specification GTS-1653 February 2001 Issue: 01 Revision: 00 Page 1 of 5

Generic Technical Performance Specification GTS-1653 February 2001 Issue: 01 Revision: 00 Page 1 of 5 Issue: 01 Revision: 00 Page 1 of 5 1 ASSEMBLY - GENERAL 1.1 The work of this section includes the provision of all design, labour, materials, equipment and services required to fabricate and install stair

More information

Installation Guide. Philips MX800, MP20/30/40/50/60/70 IntelliVue M-Series Arm Wall Mount Kit

Installation Guide. Philips MX800, MP20/30/40/50/60/70 IntelliVue M-Series Arm Wall Mount Kit Installation Guide Philips MX800, MP20/30/40/50/60/70 IntelliVue M-Series Arm Wall Mount Kit The purpose of this guide is to: 1. Describe attachment of Table Top Mount to Mounting Adapter. 2. Describe

More information

INSTRUCTIONS for ASSEMBLING SEISMIC RACKS

INSTRUCTIONS for ASSEMBLING SEISMIC RACKS SECTION 58.19 INSTRUCTIONS for ASSEMBLING SEISMIC RACKS Read all instructions carefully and observe all warnings before installation. See Safety, Storage, Installation, Operation and Maintenance Manual

More information

Fixed ladders. Fixed ladders. Shaft ladders

Fixed ladders. Fixed ladders. Shaft ladders Fixed ladders Fixed ladders Fixed ladders are perfect to provide safe and permanent access to buildings, equipment or machines also at great heights, e.g.: + + Ascent for inspection and maintenance work

More information

QCS Section 21 Part 22 Earthing and Bonding Page 1 22. EARTHING AND BONDING...2

QCS Section 21 Part 22 Earthing and Bonding Page 1 22. EARTHING AND BONDING...2 QCS Section 21 Part 22 Earthing and Bonding Page 1 22. EARTHING AND BONDING...2 22.1 GENERAL...2 22.1.1 Scope 2 22.1.2 References 2 22.1.3 Quality Assurance 2 22.1.4 Submittals 2 22.2 PRODUCTS...2 22.2.1

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

Solar Energy 1/10. 1. Safety instructions

Solar Energy 1/10. 1. Safety instructions Installation and operation of manual photovoltaic modules Bosch Solar Module c-si P 48 / c-si M 48 Bosch Solar Module c-si P 60 / c-si M 60 Please read the installation and operating manual completely

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

Rev 4, 08APR2014. Pipe and Tubing Central Vacuum Systems Installation Best Practices

Rev 4, 08APR2014. Pipe and Tubing Central Vacuum Systems Installation Best Practices Rev 4, 08APR2014 Pipe and Tubing Central Vacuum Systems Installation Best Practices Welcome! The world of industrial vacuum cleaning systems is as varied as the number of different businesses in our marketplace.

More information

Guide Specification. Sound-Rite Inc. #9, rd Avenue NE Calgary, AB T2A 7P3

Guide Specification. Sound-Rite Inc. #9, rd Avenue NE Calgary, AB T2A 7P3 Guide Specification Sound-Rite Inc. #9, 2821 3rd Avenue NE Calgary, AB T2A 7P3 Tel 403-296-0505 Fax 403-296-0511 Email info@sound-rite.com Web www.sound-rite.com WOOD TILES, SERIES 4000 STYLE: 4200, Lift

More information

STAIRWAY AND FIXED-LADDER INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD:

STAIRWAY AND FIXED-LADDER INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: PROGRAM OVERVIEW STAIRWAY AND FIXED-LADDER INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: 29 CFR - 1910.24 Fixed Industrial Stairs - 1910.27 Fixed Ladder INTRODUCTION: Stairways and fixed ladder systems

More information

Fall Protection Program

Fall Protection Program Introduction It is the intent of the (the division) to provide maximum protection to its employees in the prevention of falls. Known fall hazards will be identified, inspected, and fall protection provided

More information

SECTION METAL BUILDING SYSTEMS. A. Metal wall and roof panels including gutters and downspouts.

SECTION METAL BUILDING SYSTEMS. A. Metal wall and roof panels including gutters and downspouts. New Football Stadium 13.34.19-1 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 13.34.19 METAL BUILDING SYSTEMS A. Metal wall and roof panels including gutters and downspouts. 1.02 RELATED REQUIREMENTS A.

More information

SECTION 710 GUARDRAIL MATERIALS

SECTION 710 GUARDRAIL MATERIALS 710.08 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SECTION 710 GUARDRAIL MATERIALS 710.01 General. Metal beam

More information

Marshall Tufflex. Cable Management. Wire Basket Systems

Marshall Tufflex.  Cable Management. Wire Basket Systems Marshall Tufflex Cable Management www.marshall-tufflex.com Wire Basket Systems Wire Basket Systems from Marshall Tufflex A comprehensive range of wire basket solutions for the simple routing of power and

More information

SECTION 02832 CHAIN LINK FENCE AND GATES

SECTION 02832 CHAIN LINK FENCE AND GATES SECTION 02832 CHAIN LINK FENCE AND GATES PART 1 GENERAL 1.01 SECTION INCLUDES A. Fabrication, furnishing and installation of chain link fence, chain link gates, and extension brackets with barbed wire.

More information

Lightning Protection System Quality Installation and Maintenance. Lightning Protection System Quality Installation and Maintenance

Lightning Protection System Quality Installation and Maintenance. Lightning Protection System Quality Installation and Maintenance Lightning Protection System Quality Installation and Maintenance Lightning Protection System Quality Installation and Maintenance Michael J. Johnston NECA Executive Director Standards & Safety Mark S.

More information

2. Division 05 Structural Steel Framing for steel framework requirements

2. Division 05 Structural Steel Framing for steel framework requirements SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division

More information

CLEAR-DIVISIONS VARIOTEC TRIMLESS

CLEAR-DIVISIONS VARIOTEC TRIMLESS CLEAR-DIVISIONS VARIOTEC TRIMLESS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOTEC TRIMLESS moveable glass wall system.

More information

Since the Steel Joist Institute

Since the Steel Joist Institute SELECTING and SPECIFYING Wesley B. Myers, P.E. An insider s guide to selecting and specifying K-series, LH, DLH-series joists and joist girders Since the Steel Joist Institute adopted the first standard

More information

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions Owner's Manual & Assembly Instructions PM01 BASE KIT Model No. FDN1014 717090311 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY

More information

FORMAL TECHNICAL OPINION

FORMAL TECHNICAL OPINION Jon S. Corzine Governor Issued: March 1985 Revised: June 2001 Code Ref. Update: January 2011 State of New Jersey Department of Community Affairs Division of Codes and Standards PO Box 802 Trenton, New

More information

ThermoLite 100W-300W Solar Panel Installation Guide

ThermoLite 100W-300W Solar Panel Installation Guide ThermoLite 100W-300W Solar Panel Installation Guide General Installation Precautions and Specifications WARNING: Always wear safety glasses and protective gloves when working with batteries. Your company

More information

SECTION METAL STAIRS, LADDERS, AND WALKWAYS

SECTION METAL STAIRS, LADDERS, AND WALKWAYS SECTION 05510 METAL STAIRS, LADDERS, AND WALKWAYS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Technical requirements for metal stairs, ladder, and walkways. 1.2 REFERENCES A. General: References to

More information

FLOW METER INSTALLATION FLOW METER INSTALLATION. water work. making

FLOW METER INSTALLATION FLOW METER INSTALLATION. water work. making FLOW METER INSTALLATION FLOW METER INSTALLATION FLOW METER INSTALLATION FLOW METER GENERAL The accuracy of flow measurement for all flow measuring devices is highly dependent on proper location of the

More information

SPECIFICATIONS Rev:

SPECIFICATIONS Rev: SPECIFICATIONS Rev: 060209 Section Helical Steel Piles 1. General 1.1. Description 1.1.1. The work of this section consists of furnishing and installing steel helical piles manufactured by MacLean-Dixie

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

SECTION CONDUIT AND FITTINGS

SECTION CONDUIT AND FITTINGS SECTION 26 05 33 PART 1 GENERAL 1.1 Furnish and install conduit and fittings as shown on the drawings and as specified herein. 1.2 Submit Manufacturer s data on the following: 1.2.1 Conduit. 1.2.2 Fittings

More information

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms

More information

6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU

6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU 6720616592.00-1.SD Flat roof Rack Mounting AU Installation instructions 2 Contents AU Contents 1 Key to symbols and safety instructions....... 3 1.1 Explanation of symbols................ 3 1.2 Safety

More information

INSTRUCTIONS for ASSEMBLING and MAINTAINING STANDARD and SEISMIC BATTERY RACKS

INSTRUCTIONS for ASSEMBLING and MAINTAINING STANDARD and SEISMIC BATTERY RACKS SECTION 58.15 INSTRUCTIONS for ASSEMBLING and MAINTAINING STANDARD and SEISMIC BATTERY RACKS Read all instructions carefully and observe all warnings before installation. See Safety, Storage, Installation,

More information

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS WARNING Improper installation, adjustment, alteration, service, or maintenance of this product can cause

More information

Bunk Bed Assembly Instructions

Bunk Bed Assembly Instructions Bunk Bed Assembly Instructions Thank you for your purchase of a smartstuff bunk bed. smartstuff bunk beds are designed, engineered and certified to meet the safety guidelines of the Consumer Product Safety

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 26 05 33 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes conduit and tubing, surface raceways, wireways, outlet boxes, pull and junction boxes, and handholes.

More information

CONSTRUCTION METHOD FOR LIGHT GAUGE STEEL FRAME SYSTEM

CONSTRUCTION METHOD FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 10 CONSTRUCTION METHOD FOR LIGHT GAUGE STEEL FRAME SYSTEM 10.1 STEEL WALL FRAMING - Erection Prefabricated steel wall framing can be used with all types of floor construction. Although framing

More information

Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U

Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U Applications The High Density Cabinets are suitable for Central Offices and can be used as fiber nodes and termination points

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

Traction Tread Grating - Design Load Table of Contents & Advantages

Traction Tread Grating - Design Load Table of Contents & Advantages - Design Load Table of Contents & Advantages Design Load Tables, aluminum, stainless steel Planks - 7" width... 54 Planks - 10" width... 55 Planks - 12" width... 56 Planks - 10" width, large hole... 57

More information

1. Mark out the starting line To ensure starting line and level as per approved shop drawings.

1. Mark out the starting line To ensure starting line and level as per approved shop drawings. 6. INSTALLATION It is essential to identify location of openings, mechanical and electrical (M&E) services, and other fixtures before installation of drywall. The setting out of the framing system, openings

More information

INSTALLATION OF DOORS AND FRAMES Very Low Range (VLRB) Low Range (LRB)

INSTALLATION OF DOORS AND FRAMES Very Low Range (VLRB) Low Range (LRB) DOOR COMPANY VLRB LRB INSTALLATION OF DOORS AND FRAMES Very Low Range (VLRB) Low Range (LRB) Excerpts From: Hollow Metal Technical and Design Manual The National Association of Architectural Metal Manufacturers

More information

CLEAR-DIVISIONS CENTERFOLD

CLEAR-DIVISIONS CENTERFOLD CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in

More information

5M coaxial cable. Antenna

5M coaxial cable. Antenna The installation of the Glomex Discovery is in my experience of moderate difficulty for anyone with average practical abilities using fairly standard hand tools. The most onerous part is probably the drilling

More information

BUILDING INSULATION 07210

BUILDING INSULATION 07210 This MANU-SPEC«utilizes the Construction Specifications Institute (CSI) Manual of Practice, including MasterFormat«, SectionFormat«and PageFormat«. A MANU-SPEC is a manufacturer-specific proprietary product

More information

Fall Protection. Developed by Navy Fall Protection Working Group September 2010

Fall Protection. Developed by Navy Fall Protection Working Group September 2010 Fall Protection Awareness Training for Architects/Engineers and other inspectors involved in conducting Inspection, Investigation and Assessment work on roofs Developed by Navy Fall Protection Working

More information

Install Manual GC Standing Seam Roof System Rail Seam Mount

Install Manual GC Standing Seam Roof System Rail Seam Mount Install Manual GC Standing Seam Roof System Rail Seam Mount CONTENTS I II III IV V VI VII VIII IX GENERAL MATERIALS AND TOOLS REQUIRED SYSTEM COMPONENTS INSTALLATION OF SYSTEM SYSTEM OVERVIEW MATERIALS

More information

Lista Shelf Converter Assembly Instructions for Multiple Shelving Applications

Lista Shelf Converter Assembly Instructions for Multiple Shelving Applications Lista Shelf Converter Assembly Instructions for Multiple Shelving Applications Table of Contents Safety Check List...2 Existing Shelving Assembly Notes...3 Three Basic Assembled Types...3 Recommended Drawer

More information

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY SECTION 28 05 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply

More information

CLEAR-DIVISIONS VARIOFOLD

CLEAR-DIVISIONS VARIOFOLD CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

Technical Specification. Transport and Main Roads Specifications MRTS79 Fabrication of Aluminium Components

Technical Specification. Transport and Main Roads Specifications MRTS79 Fabrication of Aluminium Components Technical Specification Transport and Main Roads Specifications MRTS79 Fabrication of Aluminium Components June 2013 Copyright http://creativecommons.org/licenses/by/3.0/au/ State of Queensland (Department

More information

SECTION 07410 METAL ROOF & WALL PANELS

SECTION 07410 METAL ROOF & WALL PANELS This document specifies Metal Roofing Systems prefinished factory formed metal roofing marketed as MRS System 2500 steel and aluminum roofing systems and includes MRS flashing and Trim. MRS finish is a

More information

NYU Safety Policy Manual

NYU Safety Policy Manual NYU Safety Policy Manual Page 1 of 7 APPLICATION All New York University academic, commercial and residential facilities. PURPOSE To prevent injuries and assure safe operation when working with ladders.

More information

Roof Safety Hook in Accordance with EN517, Type B, and Anchorage Point in Accordance with EN795, Types A and B, Certified for All Directions of Load

Roof Safety Hook in Accordance with EN517, Type B, and Anchorage Point in Accordance with EN795, Types A and B, Certified for All Directions of Load ABS-Lock DH03 Roof Safety Hook in Accordance with EN517, Type B, and Anchorage Point in Accordance with EN795, Types A and B, Certified for All Directions of Load The ABS-Lock DH03 roof safety hook is

More information

Aracruz 52AC. Owners Manual and Installation Instructions. Part Number: PL-3238 (Revised ) A Commitment to Excellence

Aracruz 52AC. Owners Manual and Installation Instructions. Part Number: PL-3238 (Revised ) A Commitment to Excellence Aracruz 52AC Owners Manual and Installation Instructions Part Number: PL-3238 (Revised 05.02.07) A Commitment to Excellence READ AND SAVE THESE INSTRUCTIONS Before beginning installation of your new Concord

More information

SECTION 02845 GUARDRAILS

SECTION 02845 GUARDRAILS SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein

More information

Blind rivet VENTILATION

Blind rivet VENTILATION Length Sheet thread Self-drilling screws DIN 7504, with hexagonal head, for the attachment of air pipes, ducts, spiral-seam pipes, without pre-drilling, galvanised Screw head Ø Spanner size S 13 4.2 8.5

More information

Corner Soldier Corner Soldier

Corner Soldier Corner Soldier Wall Formwork Corner Soldier Corner Soldier Designed to be used in congunction with standard soldiers, they simplify the construction of corners. By allowing ties to pass through in both direction, each

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes: BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors

More information

Axiomet AX-B100 USB Video Inspection Camera

Axiomet AX-B100 USB Video Inspection Camera Axiomet AX-B100 USB Video Inspection Camera 1. Safety instructions Failure to follow the instructions listed below may result in electric shock or personal injury. Read and understand all instructions

More information

OKU solar heating for swimming Pool. Instruction for installation an operating

OKU solar heating for swimming Pool. Instruction for installation an operating OKU solar heating for swimming Pool Instruction for installation an operating Introduction Solar heating for swimming pools with OKU-Absorbers normally will be operated with a direct circuit. The water

More information

TYPICAL RESIDENTIAL OVERHEAD INSTALLATION

TYPICAL RESIDENTIAL OVERHEAD INSTALLATION TYPICAL RESIDENTIAL OVERHEAD INSTALLATION A. GENERAL NOTES: Service entrance line and load conductors, conduit straps, weatherhead, lock nuts, bushings, connectors, and miscellaneous mounting hardware

More information

Light Gauge Metal Trusses Specification Architectural Guide Specification

Light Gauge Metal Trusses Specification Architectural Guide Specification Precision Walls, Inc. 1230 NE Maynard Rd. Cary, NC 27513 Light Gauge Metal Trusses Specification Architectural Guide Specification PART 1: GENERAL * Instructions, options and comments for the specification

More information

ST. PETERSBURG NATIONAL GUARD SECTION 11132

ST. PETERSBURG NATIONAL GUARD SECTION 11132 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: This Section specifies electrically operated front projection screens and ac cessories. 1.02 RELATED SECTIONS A. Div 16 Electrical Common Work Results for

More information

CT-02 CABLE TRAY SYSTEMS

CT-02 CABLE TRAY SYSTEMS CT-02 CABLE TRAY SYSTEMS SYSTEMS THAT MAKE SENSE Introduction B-Line Systems was formed in 96 and has over 30 years experience manufacturing cable tray systems in which it has grown to become the industry

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

LLOYD INDUSTRIES INC. DAMPER INSTALLATION INSTRUCTIONS

LLOYD INDUSTRIES INC.  DAMPER INSTALLATION INSTRUCTIONS DAMPER Installation and Maintenance Instructions 1-1/2 Hour Rated, UL Classified model 75 fire dampers For use in fire barriers with ratings of less than 3 hours INSPECTION 1. Inspect for shipping damage.

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

GLASS WALL POCKET DOORS

GLASS WALL POCKET DOORS GLASS WALL POCKET DOORS KWIK-WALL... One Source for Wall Systems. KWIK-WALL s Pocket Doors for glass wall systems bring you the clear solution to your space division requirements. The beauty and elegance

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Application 14.1(1) This Part applies to every workplace where there is a risk of a worker falling

Application 14.1(1) This Part applies to every workplace where there is a risk of a worker falling PART 14 FALL PROTECTION Application 14.1(1) This Part applies to every workplace where there is a risk of a worker falling (a) a vertical distance of 3 m or more; (b) a vertical distance of less than 3

More information

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version CEILING SYSTEMS Between us, ideas become reality Installing Suspended Ceilings North America Version 1 Installing Armstrong Suspended Ceilings An Armstrong suspended mineral fiber ceiling is functional,

More information

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

AM/FM ANTENNA KIT (TOUR-PAK MOUNT) -J077 REV. 008-0-0 AM/FM ANTENNA KIT (TOUR-PAK MOUNT) GENERAL Kit Number 7-98A Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

the complete solution

the complete solution the complete solution... to support building services and access equipment on flat roofs free 48hr design service www.bigfootsystems.co.uk Index GUIDE TO BIG FOOT SYSTEMS BENEFITS CUSTOM FRAMEWORKS MODULAR

More information

Ateo 4/6. User & Installation Manual.

Ateo 4/6. User & Installation Manual. Ateo 4/6 User & Installation Manual www.audac.eu 2 Introduction 2-Way speaker with Clevermount The ATEO is a series of extraordinary loudspeakers especially designed for fixed install in indoor applications,

More information

SECTION 07 XX XX. Poly-Rubber Gel Injection Restorative Membrane System

SECTION 07 XX XX. Poly-Rubber Gel Injection Restorative Membrane System SECTION 07 XX XX Poly-Rubber Gel Injection Restorative Membrane System NOTES TO THE DESIGNER THIS SPECIFICATION SHALL BE USED FOR THE USE OF POLY-RUBBER GEL TO SEAL WATER LEAKS WITHIN STRUCTURES AND PERFORM

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

White Level Certifying the Advanced Manufacturing Workforce Labs Engine Lathe Lab Manual Mill Lab Grinding Lab SMAW Lab GMAW Lab SkillsTrac GTAW Lab

White Level Certifying the Advanced Manufacturing Workforce Labs Engine Lathe Lab Manual Mill Lab Grinding Lab SMAW Lab GMAW Lab SkillsTrac GTAW Lab Certifying the Advanced Manufacturing Workforce SkillsTrac White Level Labs Engine Lathe Lab Manual Mill Lab Grinding Lab SMAW Lab GMAW Lab GTAW Lab Certifying the Advanced Manufacturing Workforce SkillsTrac

More information

ACCESS EQUIPMENT THE LADDER WITH THE BLUE TRIM

ACCESS EQUIPMENT THE LADDER WITH THE BLUE TRIM THE LADDER WITH THE BLUE TRIM PAINTERS AND EXTENSION TRESTLES 1 FEATURES Painters Trestles & Extension Trestles are robust, durable products. They are portable and can be erected by one person. The hard

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

Chapter 1 WIRING 1.1 Mains in Metal Conduit WG-MA/MC 1.2 Mains in PVC conduit WG-MA/PC 1.3 Bunch of Wires WG-MA/BW 1.4 Mains on GI Bare wire

Chapter 1 WIRING 1.1 Mains in Metal Conduit WG-MA/MC 1.2 Mains in PVC conduit WG-MA/PC 1.3 Bunch of Wires WG-MA/BW 1.4 Mains on GI Bare wire Chapter 1 WIRING 1.1 Mains in Metal Conduit WG-MA/MC 1.2 Mains in PVC conduit WG-MA/PC 1.3 Bunch of Wires WG-MA/BW 1.4 Mains on GI Bare wire WG-MA/GB 1.5 Concealing of Conduits WG-MA/CC 1.6 PVC Flexible/Rigid

More information

Instructions for Door & Window and Patio Door Anchor Bars

Instructions for Door & Window and Patio Door Anchor Bars P.O. Box 3026 Sherwood Park, Alberta T8H 2T1 Phone: (780) 464-7139 Fax: (780) 464-7652 e-mail: inquiries@ safetydirect.ca Web site: www.safetydirect.ca Instructions for Door & Window and Patio Door Anchor

More information

TubeTrace, ThermoTube

TubeTrace, ThermoTube TubeTrace, ThermoTube and Custom CEMS Tubing Bundles INSTALLATION PROCEDURES English Units TubeTrace & ThermoTube Tubing Bundles Receiving, Storing and Handling... 1. Inspect materials for damage incurred

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

SECTION STANDING SEAM METAL ROOFING

SECTION STANDING SEAM METAL ROOFING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 41 13 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Use for roofing sloped 1 in 4 (3 in/ft) or greater. 3. Delete between // // if not applicable

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

SECTION PLASTIC LAMINATE PLASTIC LAMINATE

SECTION PLASTIC LAMINATE PLASTIC LAMINATE SECTION 06240 - PLASTIC LAMINATE 06240-1 PART ONE: GENERAL 1.1 Description PLASTIC LAMINATE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be

More information

SPECIFICATION STANDARD COMMUNICATIONS CABINETS, RACKS, FRAMES, and ENCLOSURES

SPECIFICATION STANDARD COMMUNICATIONS CABINETS, RACKS, FRAMES, and ENCLOSURES PART 1: GENERAL 1.01: SCOPE OF WORK A. The contractor, designated agent or employee is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification

More information