1 SECTION GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein or required by Engineer. B. Unless otherwise directed, the guardrail shall be replaced with W-beam guardrail or timber guardrail, as required by the Town SUBMITTALS A. Submit to the Engineer, in accordance with Section 01300, shop drawings showing layout and details of construction and erection REFERENCE STANDARDS A. Massachusetts Highway Department. Standard Specification for Highways and Bridges. B. ASTM A 47 - Ferritic Malleable Iron Castings C. American Wood Preservers Association (AWPA) standard C14 - Wood for Use in Highway Construction. D. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. PART 2 - PRODUCTS 2.01 W-BEAM GUARDRAIL A. Guard rail posts shall be constructed using a hardwood with a stress grade of 1000 psi or greater, extreme fiber in bending. Testing for stress grade shall be in accordance with Northeastern Lumber Manufacturer's Association, Inc., or Northern Hardwood and Pine Manufacturer's Association, Inc. Post shall be pressure treated with an approved preservative. If necessary, surfaces damaged by cutting, drilling or other method shall be field tested with a hot preservative. B. Guard rail shall be W- beam Type SS and shall be made of weathering steel rails. C. All splice bolts and nuts, washers and other accessories shall be made of weathering steel rails. D. Terminal sections shall be installed at both ends of guardrail section. CPW MASTER /27/2008

2 2.02 CABLE GUARDRAIL A. Cable guardrail shall be 2-cable (Type C-2-C) or 3-cable (Type C-3-S) cable guardrail furnished in accordance with Massachusetts DPW Construction Standards with wooden posts. If the existing guardrail is to be replaced, the H-beams shall be replaced with wooden posts, except otherwise required by the Engineer. B. Cable shall be 19 mm (3/4 inch) wire rope meeting the requirements of AASHTO M 30, Type I Class coating. C. Compensating devices shall have a spring rating of 78.8 kn/m ± 220 N (450 psi ± 50 psi) and have a total available throw of 150 mm (6 inches). The spring shall develop a minimum compressed strength of 120 kn (27,000 pounds) and be made from 14 mm (9/16 inch) diameter steel wire with a minimum breaking strength of 111 kn (25,000 pounds). D. All fittings shall be designed to develop 445 kn (100,000 pounds) tensile strength for 3 cable assemblies. Wedge type cable socket fittings shall be of the open end type and permit visual inspection of the cable end and wedge after installation. Hook bolts shall develop an ultimate pull open strength of from 2.2 kn to 4.4 kn (500 pounds to 1,000 pounds) applied in the direction normal to the longitudinal axis of the post. Malleable steel fittings shall conform to ASTM A 47 or ASTM A 47M and be Grade POSTS A. All new posts shall be of timber. No concrete or steel posts would be allowed, except otherwise required by the Engineer. B. The bottom of the posts shall be sawed square, and the tops shall be rounded to a hemisphere. This sawing and rounding shall be performed at the source of supply, and not in the field. All posts shall be peeled by removing all of the rough bark and at least 80 percent of the inner bark. All knots and projections shall be shaved smooth and flush with the surrounding wood. C. The posts shall be pressure treated after the sawing and rounding have been performed. Post shall be pressure treated with an AWPA-approved preservative. If necessary, surfaces damaged by cutting, drilling or other method shall be field tested with a hot preservative TIMBER GUARDRAIL A. All new posts shall be of timber. No concrete or steel posts would be allowed, except otherwise required by the Engineer. B. Furnish timber conforming to AASHTO M 168. Fabricate the 6 by 10 inches timber rail and (if required) 4x9 inches blockouts, from dry, well seasoned, and dressed rough sawn Douglas fir, southern pine, or similar. CPW MASTER /27/2008

3 C. Treat the timber rail and blockout elements with CCA, ACZA, or ACA preservative treatment conforming to AWPA C14 except the minimum retention shall be 9.6 kilograms per cubic meter. D. If required, fabricate the steel backing elements from structural steel and fastener hardware conforming to AASHTO M 222M. PART 3 - EXECUTION 3.01 GUARDRAIL REMOVAL The guardrail shall be removed so that all material considered suitable by the Engineer for future use shall be salvaged. Posts having salvage value shall be removed without damage and those having no salvage value shall be pulled, or cut off at least 6 inches (150 mm) below the ground surface. All holes shall be filled and tamped. The salvaged material shall be stored at locations and in a manner approved by the Engineer. Any of this material having salvage value and which has been damaged by the Contractor shall be replaced at his/her own expense with new material of the same kind POSTS A. When pavement is within 3 feet of the guardrail, set posts before placing the pavement. B. Do not shorten guardrail posts unless the cut end is set in concrete. Do not shorten posts in terminal sections. C. If an impenetrable object is encountered while placing posts, enlarge the hole to provide not less than 6-inch-clearance on all sides, and to a minimum depth of 30 inches. Set the post in concrete to within 6 inches of the top of the hole. Backfill and compact the remaining 5 inches with acceptable material. D. Posts may be driven by an approved mechanical device. When, in the opinion of the Engineer, driving operations are producing unsatisfactory results, the posts shall be set in dug or bored holes. Drive posts into pilot holes that are punched or drilled. The dimensions of the pilot hole shall not exceed the dimensions of the post by more than 5/8 inch. Set posts plumb, backfill, and compact. E. When longer posts are specified, do not use them in the terminal sections. Stamp the post length on the top of all wood posts. Re-stamp numbers disturbed during installation W-BEAM GUARDRAIL INSTALLATION A. Wood Posts: 1. See paragraph 3.02 for posts installation requirements. 2. Posts may also be driven by an approved mechanical device. When, in the opinion of the Engineer, driving operations are producing unsatisfactory results, the posts shall be set in dug or bored holes. CPW MASTER /27/2008

4 3. Posts shall be spaced as shown on the Drawings or in accordance with manufacturer recommendations. 4. Do not use a wood guardrail post that has a through check, shake, or end split in the same plane as, or a plane parallel to the bolt hole and extending from the top of the post to within 3 inches of the bolt hole. B. W- Beam Rails: The rail shall be erected so as to form a smooth continuous rail conforming to the required line and grade as shown on the Contract Drawings and controlled by the grade of the finished roadway. The rail element shall be spliced by lapping in the direction of the traffic or by other approved methods. The holes in the rail element nearer the posts shall be slotted to facilitate erection and to permit expansion. The rail shall make full contact at each splice. C. Standard Highway Delineators: Standard white, reflective highway delineators will be installed every 12 feet at post locations, unless otherwise requested by the Engineer CABLE GUIRDRAIL INSTALLATION A. Cable Guardrail Tensioning - Properly seat the spring compensation devices then permanently mark the unloaded position. Complete assembly of the cable guardrail and set the compensating devices to a spring compression of 88 mm (3 1/2 inches). Leave the springs at this setting according to the following: METRIC ENGLISH Temperature Spring Temperature Spring Range Compression Range Compression 49 C to 43 C 25 mm 120 F to 110 F 1 inch 43 C to 38 C 32 mm 109 F to 100 F 1 1/4 inches 38 C to 32 C 38 mm 99 F to 90 F 1 1/2 inches 32 C to 27 C 44 mm 89 F to 80 F 1 3/4 inches 27 C to 21 C 50 mm 79 F to 70 F 2 inches 21 C to 16 C 57 mm 69 F to 60 F 2 1/4 inches 16 C to 10 C 63 mm 59 F to 50 F 2 1/2 inches 10 C to 4 C 69 mm 49 F to 40 F 2 3/4 inches 4 C to - 1 C 75 mm 39 F to 30 F 3 inches No work shall be done during lower temperatures. B. At all locations where the cable is connected to a cable socket with a wedge type connection, crimp one wire of the wire rope over the base of the wedge to hold it firmly in place. CPW MASTER /27/2008

5 C. Anchor Placement - Place the concrete anchors and backfill them at least two weeks prior to tensioning the cables. Set the concrete anchors into the excavation as shown. Set the bottom of the anchor so it has full and even bearing in the surface under it. Excavate and backfill according to Section EARTHWORK 3.05 TIMBER GUARDRAIL A. Equally space bolts along the front face of the timber rail to match the holes in the steel backing. Align timber guardrail along the top and front edges of the rail. B. Field cut timber rails to produce a close fit at joints. Treat field cuts with 2 coats of chromated copper arsenate. END OF SECTION CPW MASTER /27/2008

The Manitoba Water Services Board SECTION 027110 Standard Construction Specifications September 2013 Page 1 of 12

The Manitoba Water Services Board SECTION 027110 Standard Construction Specifications September 2013 Page 1 of 12 September 2013 Page 1 of 12 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work shall consist of the supply and construction of a chain link fence, barb wire fences or mesh fences as shown on the Plans or

More information

HIGH TENSION CABLE BARRIER

HIGH TENSION CABLE BARRIER Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 23 DIMENSIONAL STRUCTURAL LUMBER AND PILING General Standards...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 23 DIMENSIONAL STRUCTURAL LUMBER AND PILING General Standards... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 23 DIMENSIONAL STRUCTURAL LUMBER AND PILING TABLE OF CONTENTS 23.1 General...23-1 23.2 Standards...23-1 23.3 Material Specification...23-1 23.3.1 Planking

More information

SKT-SP Tangent Terminal

SKT-SP Tangent Terminal Assembly Instructions for SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435

More information

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 31 13 CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Fence framework, fabric, and accessories. 2. Excavation for post bases. 3. Concrete foundation for posts

More information

Economic Evaluation of Treated Wood and Galvanized Steel Guardrail Posts November 28, 2012 Revised May 13, 2013

Economic Evaluation of Treated Wood and Galvanized Steel Guardrail Posts November 28, 2012 Revised May 13, 2013 Stephen T. Smith, P. E. 7080 Landmark Place Helena, MT 59601 Phone and FAX: (406)449-6216 Email: stephentsmith@wildblue.net Economic Evaluation of Treated Wood and Galvanized Steel Guardrail Posts November

More information

These specifications shall apply to all high strength bolts and anchor bolts.

These specifications shall apply to all high strength bolts and anchor bolts. BOLTS (New Section) 972 972.1 REQUIREMENTS These specifications shall apply to all high strength bolts and anchor bolts. 972.2 SPECIFIC REQUIREMENTS A. General: All bolts, nuts, and washers shall have

More information

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions 11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment

More information

SECTION 710 GUARDRAIL MATERIALS

SECTION 710 GUARDRAIL MATERIALS 710.08 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SECTION 710 GUARDRAIL MATERIALS 710.01 General. Metal beam

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

SECTION VALVE BOXES AND METER VAULTS

SECTION VALVE BOXES AND METER VAULTS SECTION 03 48 20 VALVE BOXES AND METER VAULTS PART 1: GENERAL 1.01 SECTION INCLUDES A. Valve boxes for water and cleanout boxes for wastewater service. B. Meter boxes for water service. C. Meter vaults

More information

MATERIAL SPECIFICATIONS

MATERIAL SPECIFICATIONS FENCING - 1 2-11-1 CHAIN LINK FENCE AND GATE(S) A. SCOPE MATERIAL SPECIFICATIONS This section covers the work necessary for the chain link fence gate(s), complete. General Like items of materials provided

More information

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

1. Galvanized fence framework, fabric, and accessories. 2. Excavation for post bases, and concrete for post footings.

1. Galvanized fence framework, fabric, and accessories. 2. Excavation for post bases, and concrete for post footings. SECTION 32 31 13 CHAIN LINK FENCES PART 1 GENERAL 1.1 SUMMARY A. This Section includes: 1. Galvanized fence framework, fabric, and accessories. 2. Excavation for post bases, and concrete for post footings.

More information

SECTION 02832 CHAIN LINK FENCE AND GATES

SECTION 02832 CHAIN LINK FENCE AND GATES SECTION 02832 CHAIN LINK FENCE AND GATES PART 1 GENERAL 1.01 SECTION INCLUDES A. Fabrication, furnishing and installation of chain link fence, chain link gates, and extension brackets with barbed wire.

More information

SECTION 63 CHAIN-LINK FENCES (FAA F-162) ITEM F-162 CHAIN-LINK FENCES DESCRIPTION MATERIALS

SECTION 63 CHAIN-LINK FENCES (FAA F-162) ITEM F-162 CHAIN-LINK FENCES DESCRIPTION MATERIALS SECTION 63 CHAIN-LINK FENCES (FAA F-162) 63-1 GENERAL This specification covers the furnishing and installation of chain link fencing and gates, both permanent and temporary, at the locations shown on

More information

A. Extent of steel joists is shown on drawings, including basic layout and type of joists required.

A. Extent of steel joists is shown on drawings, including basic layout and type of joists required. SECTION 05 21 00- STEEL JOIST FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-01 Specification

More information

1 of 6. PRECAST CONCRETE PAVEMENT SLAB SYSTEMS (Tollway) Effective: March 30, 2009

1 of 6. PRECAST CONCRETE PAVEMENT SLAB SYSTEMS (Tollway) Effective: March 30, 2009 PRECAST CONCRETE PAVEMENT SLAB SYSTEMS (Tollway) Effective: March 30, 2009 DESCRIPTION This specification covers material and fabrication requirements for precast concrete pavement slab systems. The precast

More information

A. This Section includes wood roof, and floor trusses and truss accessories.

A. This Section includes wood roof, and floor trusses and truss accessories. SECTION 06176 - METAL-PLATE-CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SPECIFICATIONS FOR ERECTION OF STRUCTURAL STEEL

SPECIFICATIONS FOR ERECTION OF STRUCTURAL STEEL SPECIFICATIONS FOR ERECTION OF STRUCTURAL STEEL 1.0 DESCRIPTION The Work shall consist of:.1 Unloading and erecting structural steel components (e.g. girders, diaphragms, jacking beams, stiffeners, girder

More information

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM): SECTION 02832 AIRPORT SECURITY FENCING PART 1-GENERAL 1.1 SUMMARY A. Section includes: Construct airport security chain-link fence and gate at specified areas and conforming lines, grades, details indicated

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

Revised March 2007 TRINITY HIGHWAY PRODUCTS

Revised March 2007 TRINITY HIGHWAY PRODUCTS Revised March 2007 TRINITY HIGHWAY PRODUCTS 1 The following is an installation guide to assist contractors, filed inspectors and maintenance personnel to insure proper installation and maintenance of WY-BET

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

X-Tension TM Guardrail End Terminal

X-Tension TM Guardrail End Terminal Installation and Maintenance Manual X-Tension TM Guardrail End Terminal Step by Step Instructions for the Tangent, Flared and Median Applications Barrier Systems Sales and Service 3333 Vaca Valley Pkwy,

More information

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector galvznized steel bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

5/16 Flange nut. Bolt Keeper Plate (8 Sq. SYS.) (3) 1/2 x 3 Hex head connector galvznized steel bolt w/ washers and nut. Anchor 3 sq. 7 Ga. 2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector galvznized

More information

SECTION PRECAST CONCRETE UTILITY STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION PRECAST CONCRETE UTILITY STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 03400-1 of 8 SECTION 03400 PRECAST CONCRETE UTILITY STRUCTURES 03400.01 GENERAL A. Description Precast concrete utility structures shall include, but not necessarily be limited to, furnishing and installing

More information

DECKS/PORCHES. 2. Final inspection required 2. Framing inspection required 3. Insulation inspection if requested 4. Final inspection required

DECKS/PORCHES. 2. Final inspection required 2. Framing inspection required 3. Insulation inspection if requested 4. Final inspection required DECKS/PORCHES Building Department 507-437-9950 Fax: 507-437-7101 City of Austin 500 4 th Ave NE Austin, MN 55912 PERMITS: A building permit is required for construction of deck or porch that is more than

More information

Project Specifications For Prefabricated Steel Truss Bridge

Project Specifications For Prefabricated Steel Truss Bridge Project Specifications For Prefabricated Steel Truss Bridge General: These specifications are for a fully engineered clear span bridge of welded steel construction and shall be regarded as minimum standards

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Sign Posts and Supports

Sign Posts and Supports Sign Posts and Supports To address various signing needs and agency preferences, several types of supports are available. Small signs (less than 50 square feet) are commonly supported with either wood

More information

SECTION 02824 EXPANDED METAL MESH FENCE

SECTION 02824 EXPANDED METAL MESH FENCE SECTION 02824 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for expanded metal mesh fence on the right-of-way. 1.02 REFERENCE STANDARDS A. ASTM International (ASTM): 1.03 SUBMITTALS

More information

1. Division-5 Section Metal Fabrications for material and welding requirements related to wrought iron fencing.

1. Division-5 Section Metal Fabrications for material and welding requirements related to wrought iron fencing. SECTION 02835 SITE FENCES AND GATES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

DIVISION 4 TABLE OF CONTENTS

DIVISION 4 TABLE OF CONTENTS DIVISION 4 TABLE OF CONTENTS SECTION SUBJECT PAGES 406 REINFORCING STEEL I II III GENERAL 406-2 406-2 414 RIPRAP I II III GENERAL 414-1 414-1 414-1 to 414-2 414-2 414-2 414-3 June 2016 400A - 1 SECTION

More information

1. Division 2 Section "Earthwork" for filling and for grading work. 2. Division 3 Section "Cast-in-Place Concrete" for concrete

1. Division 2 Section Earthwork for filling and for grading work. 2. Division 3 Section Cast-in-Place Concrete for concrete SECTION 02821 - FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

SECTION POLYVINYL CHLORIDE PIPE, AWWA C900/C905

SECTION POLYVINYL CHLORIDE PIPE, AWWA C900/C905 SECTION 02670 POLYVINYL CHLORIDE PIPE, AWWA C900/C905 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Furnish and install AWWA C900 PVC, DR 18 for 4 through 12 size and AWWA C905 PVC, DR 25 for 14

More information

SECTION ANCHOR BOLTS. A. Provide bolts and nuts that meet the standards given in Table 1.

SECTION ANCHOR BOLTS. A. Provide bolts and nuts that meet the standards given in Table 1. SECTION 16449 PART 1 DESCRIPTION A. Fabricate and install anchor bolts to be embedded in or attached to concrete. PART 2 MATERIALS 2.01 BOLTS AND NUTS A. Provide bolts and nuts that meet the standards

More information

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications Section 06600 Fiberglass Reinforced Plastic Grating and Structural Fabrications Part 1. General 1.01 Related documents: A. Contract drawings, including general drawings and addenda drawings. B. General

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 816 STEEL PIPE INSTALLATION

San Antonio Water System Standard Specifications for Construction ITEM NO. 816 STEEL PIPE INSTALLATION ITEM NO. 816 STEEL PIPE INSTALLATION 816.1 DESCRIPTION: This item shall consist of steel pipe installation in accordance with these specifications and as directed by the Engineer. 816.2 SUBMITTALS: Contractor

More information

R e q u e s t f o r Q u o t e s H a r d w o o d S w i t c h T i e s 15-15 2 0 1 3, 2 0 1 4, 2 0 1 5 C a p i t a l M a i n t e n a n c e P r o g r a m

R e q u e s t f o r Q u o t e s H a r d w o o d S w i t c h T i e s 15-15 2 0 1 3, 2 0 1 4, 2 0 1 5 C a p i t a l M a i n t e n a n c e P r o g r a m R e q u e s t f o r Q u o t e s H a r d w o o d S w i t c h T i e s 15-15 2 0 1 3, 2 0 1 4, 2 0 1 5 C a p i t a l M a i n t e n a n c e P r o g r a m The Northern New England Passenger Rail Authority (NNEPRA),

More information

WOOD DECKING SECTION PART 1-GENERAL 1.01 RELATED DOCUMENTS

WOOD DECKING SECTION PART 1-GENERAL 1.01 RELATED DOCUMENTS PART 1-GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.02

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

RPS - sales@rpssolar.com - 858 755 4505-12478 San Bruno Cove, San Diego, CA 92130

RPS - sales@rpssolar.com - 858 755 4505-12478 San Bruno Cove, San Diego, CA 92130 RPS - sales@rpssolar.com - 858 755 4505-2478 San Bruno Cove, San Diego, CA 9230 SWH Solar Mount Rail R-MR-SW-SR-0.5, R-MR-SW-SR-2, R-MR-SW-SR-4, R-MR-SW-SR-4B, R-MR-SW-SR-7 Part No. MR-SW-SR-0.5, MR-SW-SR-2,

More information

ET-31 Guardrail End Treatment. Product Description Assembly Manual

ET-31 Guardrail End Treatment. Product Description Assembly Manual ET-31 Guardrail End Treatment Product Description Assembly Manual Part No. 620182B ET-31 Guardrail End Treatment Product Description Assembly Manual 2525 Stemmons Freeway Dallas, Texas 75207 Important:

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

CAST IRON DETECTABLE/TACTILE WARNING SURFACE INDICATOR PLATE

CAST IRON DETECTABLE/TACTILE WARNING SURFACE INDICATOR PLATE CAST IRON DETECTABLE/TACTILE WARNING SURFACE INDICATOR PLATE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division

More information

SECTION CHAIN LINK FENCE AND GATES

SECTION CHAIN LINK FENCE AND GATES SECTION 02830 CHAIN LINK FENCE AND GATES PART 1 GENERAL 1.01 SCOPE OF WORK The work covered in this section shall include all materials, labor, and equipment necessary for a complete installation of the

More information

ENERGY ABSORPTION SYSTEMS

ENERGY ABSORPTION SYSTEMS SRT-350 8 POST Guardrail End Treatment Assembly Manual Part No. 620296B Revised June 24, 2008 ENERGY ABSORPTION SYSTEMS SRT-350 8 POST System Guardrail End Treatment Installation, Maintenance, and Repair

More information

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 31 13 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.1 DESCRIPTION SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTES: 1. Delete or add information between //---// and any other items applicable to project. Cover any item added

More information

The City of Winnipeg Section Turtle Island Community Centre Renovation Page 1 of 5

The City of Winnipeg Section Turtle Island Community Centre Renovation Page 1 of 5 Turtle Island Community Centre Renovation Page 1 of 5 Part 1 General 1.1 SECTION INCLUDES.1 Shop fabricated ferrous metal items..2 Shop fabricated aluminum items..3 Steel pipe handrails balusters, and

More information

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications

Section Fiberglass Reinforced Plastic Grating and Structural Fabrications Section 06600 Fiberglass Reinforced Plastic Grating and Structural Fabrications Part 1. General 1.01 Related documents: A. Contract drawings, including general drawings and addenda drawings. B. General

More information

Prescriptive Residential Wood Deck Construction Guide

Prescriptive Residential Wood Deck Construction Guide Bellevue Bothell Burien Issaquah Kenmore Kirkland Mercer Island 2009 Codes Prescriptive Residential Wood Deck Construction Guide Based on 2009 International Residential Code This tip sheet provides building

More information

SECTION R507 DECKS R507.1

SECTION R507 DECKS R507.1 SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 02720 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for hot-mix asphalt concrete (HMAC) track underlayment and asphalt concrete (AC) paving. Track underlayment includes all

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.19-Reinforcing Steel Introduction Because concrete has a low tensile strength, reinforcing steel is embedded in the concrete to resist the applied loads causing

More information

Residential Decks Information Sheet

Residential Decks Information Sheet City of Zimmerman 12980 Fremont Avenue Telephone 763-856-4666 * Fax 763-856-4787 Zimmerman, MN 55398 www.zimmerman.govoffice.com Residential Decks Information Sheet Building Permits Building permits are

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Summary of ET Plus Guardrail End Treatment Inspections

Summary of ET Plus Guardrail End Treatment Inspections Summary of ET Plus Guardrail End Treatment Inspections 12/16/2015 Maine Department of Transportation Prepared by Brian Burne, Atlee Mousseau, Clark Sulloway, Doug Gayne, Ulrich Amoussou Guenou & Dale Peabody

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

CalMod Design-Build Electrification Services

CalMod Design-Build Electrification Services SECTION 34 32 38 ASPHALT PAVING PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for hot-mix asphalt concrete (HMAC) track underlayment and asphalt concrete (AC) paving. Track underlayment

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Climbing Frame Accessories. Climbing Frame Accessories. Swing Seats. Hardware. 26

Climbing Frame Accessories. Climbing Frame Accessories. Swing Seats. Hardware. 26 Climbing Frame Accessories Hardware All of the nuts and bolts you will need are already included with each play unit of your climbing frame. Our swing arms come with 5 swing hooks ready to hang your seats

More information

SERIES NG 1800 STRUCTURAL STEELWORK

SERIES NG 1800 STRUCTURAL STEELWORK MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General

More information

Code of Standard Practice for Timber Frame Structures

Code of Standard Practice for Timber Frame Structures TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within

More information

Flexbeam Guardrail. Product Manual. Roadside Safety Barrier. Release 08/14

Flexbeam Guardrail.  Product Manual. Roadside Safety Barrier. Release 08/14 Flexbeam Guardrail Roadside Safety Barrier Product Manual Release 08/14 www.ingalcivil.com.au Flexbeam Guardrail Roadside Safety Barrier 1.0 Introduction Roadside barriers have been developed over the

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.

1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated. CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications

More information

SECTION 02563 SANITARY SEWER FORCE MAINS

SECTION 02563 SANITARY SEWER FORCE MAINS SECTION 02563 SANITARY SEWER FORCE MAINS 1.0 GENERAL A. Description Sanitary sewer force main installation shall include, but not necessarily be limited to, furnishing and installing pressure rated pipe,

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

PART 2 SECTION 11 PAVEMENT DELINEATION

PART 2 SECTION 11 PAVEMENT DELINEATION 11-1 Marking of Surfaces PART 2 SECTION 11 PAVEMENT DELINEATION 11.1.1 General - The Contractor shall apply all traffic striping, markings and all other directional information or pavement delineation

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

(B) Reinforcing and Tie Bars shall conform to the requirements of Mn/DOT 3301 unless otherwise shown on the Contract Drawings.

(B) Reinforcing and Tie Bars shall conform to the requirements of Mn/DOT 3301 unless otherwise shown on the Contract Drawings. S-1 (2301) FABRICATION AND PLACEMENT OF PRECAST CONCRETE PAVEMENT PANELS This work consists of furnishing and installing reinforced precast concrete highway pavement slabs as shown on the Plans and in

More information

SECTION 32 31 00 EXPANDED METAL FENCING Meets Buy American Procurement

SECTION 32 31 00 EXPANDED METAL FENCING Meets Buy American Procurement PART 1 GENERAL SECTION 32 31 00 EXPANDED METAL FENCING Meets Buy American Procurement 1.1 SUMMARY A. Section Includes 1. Supply and install all materials and accoutrements required for the installation

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

SECTION METAL STAIRS, LADDERS, AND WALKWAYS

SECTION METAL STAIRS, LADDERS, AND WALKWAYS SECTION 05510 METAL STAIRS, LADDERS, AND WALKWAYS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Technical requirements for metal stairs, ladder, and walkways. 1.2 REFERENCES A. General: References to

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

CHAPTER IV DECKS. (b) Attached Deck: Any deck which is physically connected to the principal building or accessory structure.

CHAPTER IV DECKS. (b) Attached Deck: Any deck which is physically connected to the principal building or accessory structure. CHAPTER IV DECKS SECTION 30.30 GENERAL REQUIREMENTS 1. DEFINITIONS: (a) Deck: Any structure which serves as a raised horizontal platform on floor constructed of wood or other materials, without enclosing

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

GUARDRAIL INNOVATION FLOWS FROM HERE

GUARDRAIL INNOVATION FLOWS FROM HERE INNOVATION FLOWS FROM HERE ENSURING SAFETY ON CANADIAN HIGHWAYS The economics, versatility, and performance of Guardrail surpass all other roadside barrier systems. Guardrail provides highly-visible protection

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Wire Rope Clips. Applications. Range. Design. Finish. Certification. Instructions for use

Wire Rope Clips. Applications. Range. Design. Finish. Certification. Instructions for use Wire Rope Clips Applications Wire rope clips are used on wire rope eye-loop connections or complete loops, end-to-end connections where socketing or splicing is not feasible or when a temporary joint is

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

Wire Rope Clips. Applications. Range. Design. Finish. Certification. Instructions for use

Wire Rope Clips. Applications. Range. Design. Finish. Certification. Instructions for use Applications Wire rope clips are used on wire rope eye-loop connections or complete loops, end-to-end connections where socketing or splicing is not feasible or when a temporary joint is required. Range

More information

THE CORPORATION OF THE TOWN OF MIDLAND DECK PERMIT GUIDELINES

THE CORPORATION OF THE TOWN OF MIDLAND DECK PERMIT GUIDELINES THE CORPORATION OF THE TOWN OF MIDLAND DECK PERMIT GUIDELINES BUILDING DEPARTMENT Planning and Building Services 575 Dominion Avenue Midland, ON L4R 1R2 Tel: 705 526 4275 Fax: 705 526 9971 www.midland.ca

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Preliminary Investigation Caltrans Division of Research and Innovation

Preliminary Investigation Caltrans Division of Research and Innovation Preliminary Investigation Caltrans Division of Research and Innovation Produced by CTC & Associates LLC Life Cycle Analysis of Galvanized Metal Guardrail Elements Requested by Randy Hiatt, Caltrans Office

More information

SECTION 206 EXCAVATION FOR STRUCTURES

SECTION 206 EXCAVATION FOR STRUCTURES SECTION 206 EXCAVATION FOR STRUCTURES 206.1 Description. This work shall consist of the necessary excavation for the foundations of all structures, removal and disposal of all excavated material, backfilling

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Picnic Table. Plan No. 900B-14

Picnic Table. Plan No. 900B-14 M A T E R I A L S L I S T Picnic Table Plan No. 900B-14 MATERIALS LIST PICNIC TABLE PLAN NO. 900B-14 Unit Order Framing Material 2x4x8' S4S treated material ea 3 2x4x10' S4S treated material ea 2 2x6x6'

More information