1 SECTION WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers, inserts for pre-cast concrete panels, removable pins, and all fasteners and anchorages as required or necessary for complete installation. B. Related Sections: 1. Section Cast-in-Place Concrete: Setting of anchor bolts and tie-backs. 2. Section Metal Fabrications: Setting of davit bases. 3. Division 15 - Plumbing: Water supply and faucets on roof. 4. Division 16 - Electrical: Power supply and outlets on roof. 1.2 SYSTEM REQUIREMENTS A. Design Requirements: Manufacturer is responsible for designing system, including anchorage to structural system and necessary modifications to meet specified requirements and maintain visual design concepts. 1. Employ registered professional engineer, licensed to practice structural engineering in jurisdiction where Project is located, to engineer each component of window washing system. 2. Comply with ANSI A39.1, A120.1, and OSHA and All Vertical Surfaces of Building Exterior: Accessible by means of powered platform or other means included as work of this Section. B. Performance Requirements: Installation: Withstand 50 MPH wind velocities while being used and remain fully operational at wind velocities up to 25 MPH. 1. Suspension Rope Angulation and Tie-In Lanyard System: Design to ensure minimum force of 10 pounds against face of building. C. Structural Requirements: Engineer structural assemblies, davits, sockets and socket bases and components to carry minimum load of 1000 pounds at extreme cable attachment point with minimum safety factor of 4 to 1 against failure. 1. Provide intermittent stabilization anchors capable of resisting 600 pound load perpendicular and parallel to face of building. 1.3 SUBMITTALS A. General: Submit in accordance with Division 1. B. Product Data: Include major equipment items. C. Shop Drawings: Stamp shop drawings with seal and signature of professional engineer responsible for design. 1. Submit plans, sections, elevations and details showing sizes, arrangements, materials, thicknesses, finishes, dimensions and other data to clearly explain character and nature of proposed equipment. 2. Include location diagrams for inserts, davits, outriggers, quick release stabilizer anchors, and other items to be built into structure. 3. Submit sequence drawings to illustrate cleaning of all exterior surfaces of building facade from platform; show intended operations can be accomplished in safe and unencumbered manner in conformance with codes and regulations having jurisdiction. BOKA Powell Project No February 2007
2 4. Provide large scale roof plans and elevations showing equipment in various positions at various launch points to ensure that clearances and space restrictions have been considered and accommodated. Show special details to allow placement of platforms at each washing position. 5. Verify Project conditions affecting work of this Section and obtain accurate measurements for incorporation into shop drawings. D. Submit changed condition drawings. E. Informational Submittals: Submit following packaged separately from other submittals: 1. Design Data: Submit following information with proposal for review by Architect. a. Indicate weights of major assemblies including davits. 2. Support reactions design data. 3. Test Reports: Field test reports signed by independent testing laboratory, verifying compliance with specified and regulatory requirements. 4. Certifications specified in Quality Assurance article. 5. Qualification Data: Manufacturer's, engineer's, and installer's qualification data. 6. Manufacturer's instructions. F. Closeout Submittals: Submit maintenance data in accordance with Division Include step-by-step operating procedure directions, parts list, equipment check list, schematic wiring diagrams, and procedure to be followed during emergency operations. 2. Provide maintenance checklist broken down on weekly, monthly and yearly basis, describing procedures to be followed, time intervals, and materials to be used. Include names, addresses, and telephone numbers of service firms in vicinity of building available to respond within 24 hours of service call. 1.4 QUALITY ASSURANCE A. Single Source Responsibility: Provide window washing components and systems from same manufacturer or approved by manufacturer. B. Engineer Qualifications: Registered professional engineer licensed to practice structural engineering in jurisdiction where Project is located, with minimum of five years experience in design of window washing systems. C. Manufacturer's Qualifications: Firm solely involved in design, manufacture, and installation of power operated window washing units, that has been actively engaged in this business for not less than 10 years. 1. Submit evidence when requested, indicating that firm has successfully installed at least three platform powered window washing units of similar type as proposed for use on this Project on buildings over 130 feet in height. Include one installation not less than five years old. 2. Submit with proposal, concept drawing which demonstrates manufacturer's proposed solution to building requirements showing aspects that may deviate from Drawings and Specifications. Show coordination with building structure, intermittent stabilization locations, layout, plumbing requirements, electrical requirements, and loads imposed on building structure along with description of proposed system operation. D. Installer Qualifications: Installer employed by manufacturer or approved in writing by manufacturer. E. Welder Qualifications: AWS certified within past 12 months for each type of weld required. F. Regulatory Requirements: 1. Electrical Components and Wiring: Comply with National Electrical Code (NEC) and National Electrical Manufacturer's Association (NEMA) standards. 2. Comply with federal, state and local codes, ordinances, and requirements pertaining to work of this Section. 3. Where requirements of governing codes, regulations, laws and rules conflict with these Specifications and are mandatory, comply with regulatory requirements. BOKA Powell Project No February 2007
3 G. Certifications: Submit following: 1. Engineering certifications. 1.5 PRE-INSTALLATION CONFERENCE A. Conduct pre-installation conference in accordance with Division Plan necessary coordination with structural, curtain wall, roofing, plumbing, and electrical trades. 1.6 DELIVERY, STORAGE, AND HANDLING A. Comply with Division Shop fabricate window washing equipment in sizes as large as practical. Deliver to Project properly packaged and crated to prevent damage during transit and handling. 2. Store materials under cover in dry, clean location, off ground. Remove materials which are damaged or otherwise not suitable for installation from Project and replace with acceptable materials. 1.7 MAINTENANCE A. Extra Materials: Furnish 10 extra intermittent stabilization inserts in accordance with Division 1. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturers: 1. Equicon, Inc., Mississaqua, Ontario. 2. HighRise Systems, Inc., Ft. Worth, TX. 3. Powered Platforms Mfg., Plymouth, MI. 4. Sky Climber, Inc., Stone Mountain, GA. 5. Spider Staging Corporation, Kent, WA. 6. Swingstage Inc., Scarborough, Ontario. 7. Pro-Bell, Foxborough, MA 2.2 MATERIALS A. Metals: 1. Aluminum Alloy: Alloy 6061-T6, Schedule 80, designed in accordance with ANSI A Steel Pipe: ASTM A53, Type E or S, Grade B. 3. Structural Steel Shapes, Bars and Plates: ASTM A Steel Tubing: ASTM A Stainless Steel Components: UNS S B. Connectors: Galvanized steel anchor bolts, ASTM A307 or A Fasteners Exposed to Weather and Carrying Calculated Stress: Galvanized or stainless steel. C. Non-Shrink Grout: Non-shrink, non-ferrous, equivalent to Masterflow 713 by Master Builders, Cleveland, OH. 2.3 WINDOW WASHING DAVIT AND SUPPORT ASSEMBLIES A. Davit Socket Bases: Permanently attached to structure at locations indicated in accordance with Drawings and manufacturer's recommendations. 1. Socket Bases: Fabricate from pipe of such size and wall thickness suitable for design requirements. Perform welding in compliance with AWS D Gussets or other protrusions that interfere with flashing or roofing membrane not allowed 3. Socket Bases: Design to accommodate bolts or pins for attachment of portable sockets. 4. Provide minimum of one anchor point for securing a safety line. 5. Hot-dip galvanize steel after fabrication. BOKA Powell Project No February 2007
4 B. Portable Davit Sockets: Fabricated from seamless mechanical steel pipe or tubing with 4:1 factor of safety. 1. Hinge to permanently attached socket bases by means of stainless steel pins or bolts to permit insertion of davit into socket and subsequent tilting into working position. 2. Make provisions to securely lock davit in upright position. 3. Provide pneumatic tires for portability on roof area. 4. Hot-dipped galvanized steel finishes unless otherwise indicated. C. Davits: Fabricated of Schedule 80, 6061-T6 aluminum alloy pipe and sized to fit into davit socket fixtures. 1. Rotatable type, designed to allow self-powered platform to be brought inboard over parapet to roof for transfer. 2. Close end of each assembly with aluminum cast thrust bearing to ensure easy rotation. Fit upper base section with steel bearing sleeve to protect davit from abrasion when rotating in davit socket. 3. Equip each davit with positive friction brake to prevent rotation of davit from desired work position. 4. Hanger Bar: Equip each davit with multiple pick-up hanger bar to provide for variable suspension radius and to allow use of Type F (four wire) and Type T (two wire) work platforms. a. Construct hanger bar to permit suspension radius of at least 1500 mm (5 feet) and minimum of approximately 1170 mm (46 inches). b. Provide at least three suspension points between maximum and minimum radii. D. Safety Tie-Backs: Position directly behind each davit base and at right angles to building face or integral with permanently supported socket base. 1. Where right angle spacing cannot be achieved, furnish two safety tie-backs for each davit location. 2. Determine design for safety tie-back on davit reactions. However, do not consider safety tie-back in davit design. 3. Hot dip galvanize safety tie-backs after fabrication. 2.4 ROPE STABILIZERS A. Wire Rope Stabilizers: No rope in excess of 300 feet long hangs between stabilizers or between davit attachment point and stabilizer. B. Stabilize power cord to building or support ropes at 100 foot intervals maximum. 2.5 PORTABLE OUTRIGGERS A. Size, PART 3 - EXECUTION 3.1 EXAMINATION A. Examine conditions and proceed with Work in accordance with Division INSTALLATION A. Window Washing Davits and Supports: Install in accordance with accepted shop and erection drawings and Division Coordinate with construction operations. B. Davit Socket Base Plates: Install plumb and level with non-shrink grout placed in accordance with manufacturer's instructions. 3.3 FIELD QUALITY CONTROL A. Tests and Inspections: BOKA Powell Project No February 2007
5 1. Inspections and tests of installation of anchors and bases permanently attached to structure will be performed by independent laboratory selected and paid by Owner. 2. Perform inspections and tests in accordance with ASTM E Inspect field bolted connections in accordance with AISC requirements. 4. For welding connections: a. Verify welders are qualified in accordance with American Welding Society requirements. b. Perform visual inspection of welds. c. Perform ultrasonic inspection of full penetration welds. d. Record types and locations of defects and work performed to correct defects. 5. Obtain local and state inspections and permits. Make tests as required for regulations of authorities having jurisdiction. 6. Conduct tests as required by regulation of state and local authorities having jurisdiction. B. Permits: After installation is complete, obtain city, state and other authority documents, permits, and licenses necessary to operate window washing system. Owner's approval, acceptance, and payment will not be forthcoming until necessary permits and documentation have been approved and issued. 3.4 DEMONSTRATION A. Demonstration and Instruction of Owner s Personnel: Provide in accordance with Division Manufacturer's Factory Trained Representative: After completion of installation, conduct full load and operation tests in accord with applicable standards under maximum design loading conditions and operate over full range (horizontally and vertically) of building surfaces to be maintained. 2. Manufacturer's Factory Trained Representative: Instruct Owner's designated personnel in complete operation and maintenance of installed system. 3. When necessary, make minor adjustments. Carefully document and submit adjustments to Owner. END OF SECTION BOKA Powell Project No February 2007
Davit Systems and Outriggers
Safety From The Top Down Davit Systems and Outriggers Suspended Access Systems and Fall Protection Davits Overview Standards in the United States and Canada require a building to provide certified anchorages
More informationSummit Anchor Company, Inc.
Summit Anchor Company, Inc. Safety From The Top Down Roof and Wall Safety/Tie-Back Anchors Suspended Access Systems and Fall Protection Overview National Safety Standards OSHA regulations specifically
More informationSECTION 03400 PRECAST CONCRETE STRUCTURES
SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for
More informationSECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationSECTION 05 42 16 COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex
(Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying cold-formed metal deck framing products and execution. The specifier needs to edit the guide
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More information2. Division 05 Structural Steel Framing for steel framework requirements
SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationSECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
More informationSECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
More informationS T A B I L I Z A T I O N S Y S T E M S
S T A B I L I Z A T I O N S Y S T E M S 03 11 24 23 MAINTENANCE EQUIPMENT 10 Window Washing Systems YOUR SUSPENDED EQUIPMENT & FALL PROTECTION EXPERTS (Head Office) 765 Westney Road S Ajax, ON L1S 6W1
More informationSECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS
1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
More informationSports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049
Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal
More informationCLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
More informationCONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
More informationA. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.
13310 FABRIC SHADE STRUCTURES FOR PLAYGROUND AREAS ************************************************************************************************************************ SPECIFIER: CSI Master Format
More informationPTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationCLEAR-DIVISIONS APERTO
CLEAR-DIVISIONS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS moveable glass wall system. The yellow highlighted areas in the
More informationMaterials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
More informationAIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):
SECTION 02832 AIRPORT SECURITY FENCING PART 1-GENERAL 1.1 SUMMARY A. Section includes: Construct airport security chain-link fence and gate at specified areas and conforming lines, grades, details indicated
More informationSapa: SECTION 05520 ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS
PART 1 GENERAL Sapa: SECTION 05520 ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS 1.1 SECTION INCLUDES A. Aluminum and Glass Handrails B. Aluminum Railings 1.2 RELATED SECTIONS A. Section 05700 - Ornamental
More informationELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
More informationInstallation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
More informationPreformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
More informationFall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.
SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationSECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
More informationSECTION 08 5656 GUARDA SECURITY WINDOW SCREENS
Page 1 of 5 SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Guarda Security Window Screens in this specification are appropriate for use in windows, storefronts, curtain walls, vents, and any other applications
More informationDENVER MODEL 30 X 30 SPECIFICATIONS
DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch
More information1.02 SYSTEM DESCRIPTION
1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall
More informationDESIGN CLARIFICATION (DC)
DESIGN CLARIFICATION (DC) Owner: Victor Valley Wastewater Reclamation Authority Date: 03/03/2015 Contractor: W M Lyles Carollo Project No.: 8299A.20 Project Name: Subregional WRPs DC No.: 001 DC Title:
More informationFixed Access Ladders. Table of Contents. 1. Legislative Requirements
Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms
More informationCity of San Diego, CWP Guidelines
PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationA D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
More informationSpecifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023
Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural
More informationHorizontal Cable Systems
Safety From The Top Down Suspended Access Systems and Fall Protection Overview Horizontal cable systems are generally installed as a permanent fall protection system, typically consisting of two terminating
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationMechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
More informationINSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.
More information-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
More informationPART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
More informationTOP RUNNING SINGLE GIRDER BRIDGE CRANE
SECTION 14630 TOP RUNNING SINGLE GIRDER BRIDGE CRANE 1.01 SUMMARY PART 1- GENERAL A. The work required under this section shall include the designing, manufacturing, shipping, installing and field testing
More informationSECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
More informationLOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.
LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and
More informationOne-third of all fatalities in the U.S. construction
Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations
More informationJames M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
More informationCLEAR-DIVISIONS VARIOFOLD
CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the
More informationSuper Slider ADJUSTABLE FROM 3.5-12 Model #HD26229
Super Slider ADJUSTABLE FROM 3.5-12 Model #HD26229 IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH. USERS
More information3-Part Specification Railing Cable Systems
3-Part Specification Railing Cable Systems GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST DESIGN PROFESSIONALS IN THE PREPARATION OF PROJECT OR OFFICE MASTER SPECIFICATIONS.
More informationScaffold Industry Association of Canada
Scaffold Industry Association of Canada CODES OF SAFCE PRACTICE ONTARIO 2011 www.scaffoldaccess.ca 1 CODE OF SAFE PRACTICE GENERAL -- ONTARIO - The following are some common sense rules designed to promote
More informationSTATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing
1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado
More informationDrew University Ladder Safety Program Policy and Inspection Procedure Draft 0412
PURPOSE To establish and define the procedures to ensure that ladders at Drew University are installed, used, inspected and maintained in accordance with applicable standards. REFERENCES OSHA Portable
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationCCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
More informationFACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00
211100_flexheadin_01_MS_0409 5/22/09 PTC 56 Lowland Street Holliston, MA 01746 Phone: (800) 829-6975 Phone: (508) 893-9596 Fax: (508) 893-6020 E-mail: sales1@flexhead.com www.flexhead.com This MANU-SPEC
More informationSECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.
SECTION 260536 - CABLE TRAYS PART 1 - GENERAL SECTION INCLUDES: A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. B. Cable tray systems are defined to include, but
More informationSAFE HANDLING OF PRECAST CONCRETE PRODUCTS
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge.
More information2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationB. Related Sections: 1. Section 26 05 33 - Raceway and Boxes for Electrical Systems.
SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes wall switches; wall dimmers; receptacles; multioutlet assembly; and device plates and decorative box covers. B. Related
More informationMANUFACTURED HOUSING USED AS DWELLINGS
MANUFACTURED HOUSING USED AS DWELLINGS SECTION AE101 SCOPE AE101.1 General. These provisions shall be applicable only to a manufactured home used as a single dwelling unit and shall apply to the following:
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationPivotLoc Ladder Systems
N25 ACCESS AND SAFETY EQUIPMENT SPECIFICATION CLAUSES PivotLoc Ladder Systems To be read with The Main Contract Preliminaries, General Conditions, Sub-Contract Preliminaries. MINIMUM CONTRACTOR STANDARD
More informationMEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as
More informationSolar Panel Installations
Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.
More informationSECTION 6. Glass Storefront Doors:
SECTION 6 Glass Storefront Doors: Table of Contents 3070 Storefront Door System Description & Dimensions 6070 Storefront Door System Description & Dimensions Door Leaf Detail Optional 10 Bottom Rail Detail
More informationSECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
More information3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
More informationCOLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
More informationSPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE
Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationSECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationChapter 10 - Scaffolding Systems
Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5
More informationVERTICAL / FIXED BEAM CLAMP I-BEAM ANCHOR ADJUSTABLE FROM 4-14 Model # HD26249
VERTICAL / FIXED BEAM CLAMP I-BEAM ANCHOR ADJUSTABLE FROM 4-14 Model # HD26249 IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS
More information`Fall Protection Guidelines in Construction
`Fall Protection Guidelines in Construction A Publication Provided by: 1681 Campus Delivery Fort Collins, Colorado 80523 (970) 491-6151 email: ohss@lamar.colostate.edu web: http://www.bernardino.colostate.edu/public/
More informationSTANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS
STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for providing metal fabricated items like castings, gratings, hatchways, ladders,
More informationRoped Hydraulic Residential Elevator Specifications
January 1, 2004 Roped Hydraulic Residential Elevator Specifications P.O. Box 749, 5191 Stump Rd., Plumsteadville, PA 18949 Toll Free: 888-443-2800, Phone: 215-766-3380, Fax: 215-766-3385 CONTENTS Part
More informationCertification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationRZ Guardrail System Installation Manual
TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand
More informationCONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
More informationSPECIFICATION Section 03410 - Structural Precast / Prestressed Concrete
Lafarge/CPCI Guide Specification SPECIFICATION Section 03410 - Structural Precast / Prestressed Concrete 1.0 General 1.1 Description.1 The General conditions of the Contract and Supplementary General Conditions
More informationChapter 7 Plumbing Connections
Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions
More informationConstruction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab
STATE OF NEW YORK DEPARTMENT OF HEALTH FATALITY ASSESSMENT AND CONTROL EVALUATION Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab Case Report: 07NY015 SUMMARY In February
More informationThis mount uses concrete parking bumpers and a Davis tripod to create a mounting solution for nonpenetrable
NON-PENETRATING FLAT ROOF MOUNT Application Note 18 For Any Davis Weather Station Installed on a Mounting Tripod Introduction This application note describes various mounting solutions for non-penetrable
More informationCity of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards
More informationSECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
More informationSTANDARD FOR NON-FIRE RATED ROLLING DOORS
ANSI/DASMA 203-2004 AMERICAN NATIONAL STANDARD STANDARD FOR NON-FIRE RATED ROLLING DOORS Door & Access Systems Manufacturers Association, International Sponsor: 1300 Sumner Ave Cleveland, Ohio 44115-2851
More informationROOF FLASHING SPRINGLOK FLASHING SYSTEM FEATURES & BENEFITS PRODUCT DESCRIPTION
SPRINGLOK SYSTEM PRODUCT DESCRIPTION FEATURES & BENEFITS Fry Reglet offers five flashing systems, each tailored for a particular type of substrate so you can get exactly what you need. SM Surface mounted
More informationChapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
More informationWorking at Heights and Fall Protection
Standard Operating Procedures Working at Heights and Fall Protection Last Modified: JAN 2013 1 of 6 Working at Heights and Fall Protection I Purpose Serious accidents can result from falls. All employees
More information7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS
ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS
More informationAcceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
More information09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
More information