1 Green Plan DFB Waste initiative Project for Dublin Fire Brigade Stations F/F Neil McCabe

2

3 Green Plan: Waste Initiative Project for DFB Stations Contents: Executive Summary Vision Context Cost Pilot project Conclusions Appendix Executive Summary This waste initiative project gives Dublin Fire Brigade a realistic opportunity to take actual actions to tackle waste production at source. In line with the Waste theme of the Green Plan for Dublin Fire Brigade, a Recycle bay project and a cavity wall insulation project are both proposed for No. 3 Fire Station. All research and thinking follows the three pillars of the Green Plan: 1) Low Capital Out lay 2) Quick payback period 3) Replicability

4 Green Plan: Waste Initiative Project for DFB Stations Vision: In the future DFB will have one of the most sustainable waste management systems in a Fire Brigade in the world. Prevention, reduction of waste and the recovery of materials will be a priority. Removal of waste to land fill shall be a last call. Goal: To reduce waste by introducing recycling at local level to each Fire Station, lessening our carbon foot print, reducing our impact on the environment and the amount of waste going to landfill. Context: In 2010 DFB sent 59,400 litres of waste to land fill from its 12 Fire Stations. This involved over 54 x 1100 litre Euro bins being collected per week. All of this waste was sent to landfill. This does not include the DFB workshop or Ambulance waste. DFB will remove initially 40 % waste prior to landfill by recycling waste products with the public private partnerships that have been set up under the umbrella of the Green Plan waste theme for DFB. This will include the removal of 1100 litre Euro bins from all Fire Stations. Objective: To construct a solid recycle bay raft using, green cement that can accommodate various recycling receptacles of different weights and sizes. DFB intend to be recycling 60% of all Fire Station waste by This will include organic waste recycling that has been made compulsory in all public places since Plan: After construction of each recycling bay: to recycle; monitor; record and document Station Waste. To then remove at least Nr 1 x Euro Bin per Station If ten stations have Nr 1 x 1100 litre Euro bin removed permanently from the Fire Station grounds then the immediate saving will be 10,000 per annum. Many stations should have at least Nr. 2 x 1100 litre euro bins removed. This will yield a higher saving and reduction in waste to landfill. A study needs to be taken to obtain the individual Fire Station requirements. To then ring fence the original cost of running the service of that Euro bin for investment in the Fire Station on projects similar to those under taken in No. 6 Fire Station. A pilot project is listed below.

5 Indicator: In Kilbarrack Fire Station the behavioural change of the Stations Crew lead to a reduction of 60% waste removal prevented from going to land fill. In glass bottle recycling alone No. 6 Fire Station reduced over 1,200 tons of CO2 emissions from the making of glass. The Fire Stations Crew are gladly taking part in recycling as much waste as is possible. This is a working example of behavioural change in the work place. The construction and upkeep of the recycle bay in Kilbarrack Fire Station is named as a Dublin City Council backed action under the Waste them in the Sustainability Report Recycling : The bay will include: Glass bottle recycling Organic waste composting Lead acid Battery recycling Battery recycling Fluorescent tube recycling DFB Uniform recycling Used Cooking Oil Recycling Mobile phone and games console Recycling WEEE Waste Recycling Electronic Media Recycling Consumerable Waste Green Bin Recycling Cost: Dublin City Council Housing Department have agreed to construct a recycle bay similar to the one in No. 6 Fire Station, this will include a ramp and a shutter to house the recycling receptacles on. As an all in cost including supply of materials, all construction work and labour, will be 2,000 per Fire Station. There will be no cost for the installation and regular collection of all recycling units mentioned above. Total Recycle bay construction cost: 2,000 Pay back period: 1 year

6 Pilot Project: After several meetings with S/O Mick O Connell from No.3 Fire Station I would suggest this Station as a pilot for the recycle Bay project first. The combined Fire Crew and Officers have shown a keen interest in this project taking place. If No. 2 x 1100 Litre Bins were removed from No 3 Fire Station this would amount to a total yearly saving of 2,000. If the savings were to be reinvested in the No.3 Fire Station I would suggest the following project: Injection moulding of the cavity walls. This work should meet the criteria of part L of the building regulations. for improvements in energy efficiencies. This action also complies with the Green Plan under the criteria for the Waste Theme. Cavity Wall Insulation The annual cost of using gas to make heat in Phibsboro Fire Station for 2010 was 16,675. This is a total of 380,503 KWhr of energy consumed. The boiler demand would lessen by a conservative 35% if the Fire Station was to benefit from injection moulding to its cavity spaces in the walls using a closed bead system. Ref SEAI building regs L L By improving the thermal conductivity of the Fire Stations walls, as per best practice.27 U value from the Building regs 2007 part L, L1.3.2 for fabric insulation, the U Value would improve. The current wall area of No. 3 Fire Station is 972m2. The wall area at best will have a U value of 1.5. Working off a temperature difference of 15 o C per day x 8760 hours per year x 1.5 U value x 972m2 would equate to 204,998 kwhr per m2 lost per year from the Fire Station. Allowing for distribution air losses X 1.5 would produce the total figure of 256,250kWhr lost per annum. The new figures from the injection moulding of the Station will bring the stations cavity insulation wall U value to.27. This will equate to a new kwhr reading and create a saving of 217,144 kwhr per year per m2. The original consumption figures were 380,505kWhr the estimated saving of 217,144 kwhr = 163,361 kwhr. However a full U Value assessment of the Station would be required first so as to have accurate figures. This would include an Air Tightness Test (already commissioned) and a thermography recording of the Station (also commissioned) as part of the window replacement project. The total cost of insulating the wall cavities in No. 3 Fire Station is 29,991. A 35% reduction in Boiler demand would reduce gas consumption by 217,144 KWhr, this would equate to an estimated monitory reduction of 5,836. This figure plus the initial 2,000 euro saving from the recycle bay project would, total an estimated 7,836 saving per annum and yield a pay back period of 3.8 years for the project. This is based on today s fuel costs and not allowing for fuel price rises or fuel inflation. If allowing for a fuel inflation of 9% then the total saving per annum would be 8,541. This would demonstrate a payback of 3.5 years. Total Cavity Wall insulation Cost 29,991 Payback Period 3.5 years

7 Potential estimated savings on pilot recycle bay project Potential savings in No.3 Fire Station: The removal of Nr. 2 x 1100 Litre Bins: 2,000 p.a. 35% reduction on boiler demand: 5,836 p.a. Estimated yearly total saving of: 7,836 Estimated yearly total allowing for fuel inflation of 9%= 8,541 Projected pay back period: 3.5 years Potential pay back period using all ten 1100 litre euro bins removed from the Nr. 10 x Fire Stations: 1.8 years Conclusions The above calculations are replicable across all DFB stations. The DCC Housing Department are available to roll out the new recycle bays across all Stations. The companies in partnership with DFB are ready to deliver the new receptacles to each Fire Station. In most cases the U values will be the same or worse and the new best practice standards for building performance will result in the same kwhr savings. This project has a very quick pay back period. Finally a report should be generated to show transparent Station readings for waste reduction and heat loss on the pilot project Station. This report should show all calculations and include all data from the U Value report. On foot of this report a recycling bay and cavity wall insulation should be rolled out across all of DFB. This is in keeping with sections A and B of the Green Plan Waste theme. This whole project adheres to the three pillars of the Green Plan for Dublin Fire Brigade: 4) Low Capital Out lay 5) Quick payback period 6) Replicability F/F Neil McCabe

8 APPENDIX (i) Actual Domestic waste costs for 2010 to DFB 2010 WASTE DISPOSAL COSTS. Donnybrook 4, Dolphins Barn 4, Phisboro 5, North Strand 5, Finglas 3, Kilbarrack 5, Tallaght 2, Nutgrove 4, Blanchardstown 3, Fire Brigade HQ 11, Dun Laoghaire 7, Skerries Swords 3, Training Centre 4, Workshop 22, Administration 4, Fire Stations General 6, Ambulance 35, , *Workshop probably includes disposal of oils * Ambulance waste is the clinical waste.

9 (ii) Bord Gáis Calculations Dublin Corporation Phibsboro Road Phibsborough Dublin 7 Medium Business User Tariff 08/01/ /02/ /03/ /04/ /05/ /06/ /02/ /03/ /04/ /05/ /06/ /07/ ,860 60,772 37,426 33,344 29,510 8,743 1, , , , , , , , , , /07/ /08/ /09/ /10/ /11/ /12/ /08/ /09/ /10/ /11/ /12/ /01/ ,444 12,962 3,481 42,671 62,063 13,227 1, , , , , ,

10 (iii) Recycle bay collection template. Fire Station Recycle Bay As soon as any of the bins in our Recycle Bay become full please phone from the list below to have them emptied. If there are any problems please contact Neil McCabe Service Company Contact Person Phone No. WEEE Waste Bins Rehab Recycling Sarah Lead Acid Batteries The recycling Village Kevin Ordinary Batteries The Recycling Village Kevin Luminescence tubing Irish lamp Recycling Aaron Cooking Oil M.T. Oils Mitchell Green Bins Dublin City Council John Clothes Bank Oxfam International Noel Bottle Bank Zeki Glassco David CDs DVDs Books Bank Oxfam International Noel Mobile phones & Games Equipment Jack & Jill Foundation Jason

11

Carbon Management Plan

Carbon Management Plan E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open

More information

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669

Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669 Report Date: 04/03/2014 Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669 About this Advisory Report Energy use in our homes is responsible for almost

More information

glyndwr.ac.uk/sustainability environmental sustainability strategy

glyndwr.ac.uk/sustainability environmental sustainability strategy glyndwr.ac.uk/sustainability environmental sustainability strategy 2012-2014 overview of the environmental sustainability strategy 2012-2014 Glyndŵr University s Environmental Sustainability Strategy 2012-2014

More information

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Carbon emissions (kgco2) Page 1 PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 1. INTRODUCTION

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

Options for Financing Retrofits in Ireland. Brendan Nevin Director of Consumer Banking Bank of Ireland

Options for Financing Retrofits in Ireland. Brendan Nevin Director of Consumer Banking Bank of Ireland Options for Financing Retrofits in Ireland Brendan Nevin Director of Consumer Banking Bank of Ireland The potential for retrofit in the Irish market looks significant Almost 2 million dwellings in Ireland

More information

How To Improve The Environment At The Royal Flying Doctor Service (Rfds) Of Qld

How To Improve The Environment At The Royal Flying Doctor Service (Rfds) Of Qld Network Demand Management Case Study Royal Flying Doctor Service Townsville Base June 2011 Network demand Management Case Study - Royal Flying Doctor Service Townsville Base Key Challenge: The Royal Flying

More information

CORPORATE RESPONSIBILITY AND ENVIRONMENTAL MANAGEMENT SYSTEM

CORPORATE RESPONSIBILITY AND ENVIRONMENTAL MANAGEMENT SYSTEM CORPORATE RESPONSIBILITY AND ENVIRONMENTAL MANAGEMENT SYSTEM Introduction REI Systems (REI) supports industry efforts toward having more accountability and transparency regarding management actions. In

More information

We make rational and conscientious use of our

We make rational and conscientious use of our 28 Fraser and Neave, Limited & Subsidiary Companies Sustainability Report 2015 Environment Focus on Conservation Environmental conservation remains a key focus area for the Group. As one of the region

More information

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY Paul Stokes Kevin Munford Asset & Facilities Manager Energy Officer 01/03/2006 THE COUNCIL S ENERGY POLICY FOR PUBLIC BUILDINGS AND TRANSPORT

More information

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6

More information

Menzies Distribution Carbon Reduction. Overview Utilities Transport Waste Management

Menzies Distribution Carbon Reduction. Overview Utilities Transport Waste Management Menzies Distribution Carbon Reduction Overview Utilities Transport Waste Management 44.00 42.00 40.00 38.00 36.00 34.00 KG/CO2 per tonne delivered 2001 PPA Supply chain work commenced 2006 David Morton

More information

ENERGY EFFICIENCY AUDITING

ENERGY EFFICIENCY AUDITING GUIDANCE NOTE ON ENERGY EFFICIENCY AUDITING July 2003 ENVIRONMENTAL PROTECTION AGENCY An Ghníomhaireacht um Chaomhnú Comhshaoil PO Box 3000, Johnstown Castle, Co.Wexford, Ireland Telephone: +353-53-60600

More information

Energy saving at home

Energy saving at home Code of Practice on the efficient use of electricity Energy saving at home Energy saving information and advice from Power NI www.powerni.co.uk /savingenergy Energy saving Running costs Insulation Heating

More information

Assessing the indirect impacts of energy efficiency improvements in the UK building stock

Assessing the indirect impacts of energy efficiency improvements in the UK building stock Assessing the indirect impacts of energy efficiency improvements in the UK building stock Niall Kerr n.kerr@leeds.ac.uk I-Build Infrastructure business models, valuation and innovation for local delivery

More information

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT During the last century, concern about the environment increased, as issues such as global warming and the Greenhouse Effect convinced us that the

More information

Case Study: Wood Gasification Boiler Heating for an Exposed Rural Family Home Fuel cost assessment following thirty six months of operation

Case Study: Wood Gasification Boiler Heating for an Exposed Rural Family Home Fuel cost assessment following thirty six months of operation Case Study: Wood Gasification Boiler Heating for an Exposed Rural Family Home Fuel cost assessment following thirty six months of operation Simple solutions for greener heating Summary Objective: Deliver

More information

Environmental Achievements Volvo Trucks North America New River Valley Plant Dublin, VA

Environmental Achievements Volvo Trucks North America New River Valley Plant Dublin, VA Environmental Achievements Volvo Trucks North America New River Valley Plant Dublin, VA Overview The New River Valley (NRV) Plant, located in Dublin, Va., manufactures and assembles Volvo brand trucks.

More information

A COST EFFECTIVE SOLUTION TO MANAGING BIOHAZARD WASTE

A COST EFFECTIVE SOLUTION TO MANAGING BIOHAZARD WASTE A COST EFFECTIVE SOLUTION TO MANAGING BIOHAZARD WASTE INTRODUCTION As of 2011, 7.8 billion syringes are used every year in the U.S. This number excludes veterinarian care which generates almost another

More information

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

Carbon Footprint of CMC Hospital for 2013

Carbon Footprint of CMC Hospital for 2013 Carbon Footprint of CMC Hospital for 2013 Carbon footprint of CMC Hospital campus was estimated for the year 2011 and 2012 and the total CO2e emission was estimated at 15271.74 CO2e tons and 15456.61 CO2e

More information

Setting the Scene. Fuelling the Future, Heat Pumps and more. What are the Drivers? Have we reached Peak Oil? Heating Technologies.

Setting the Scene. Fuelling the Future, Heat Pumps and more. What are the Drivers? Have we reached Peak Oil? Heating Technologies. Setting the Scene Fuelling the Future, Heat Pumps and more Ireland s Import Dependence in 2013 was 89% Energy Flow Thermal Uses 2013 Oil is the dominant fuel accounting for 44% of fuel inputs Renewable

More information

Sustainable Plastics with Reduced Carbon Footprint & Reduced Waste

Sustainable Plastics with Reduced Carbon Footprint & Reduced Waste Sustainable Plastics with Reduced Carbon Footprint & Reduced Waste Joseph P. Greene California State University, Chico Chico, CA 95929-0789 Abstract Plastic products can be made more sustainable by reducing

More information

14 AUGUST 2007 NOT EXEMPT LOWER POLMAISE - WASTE TRANSFER STATION REINVESTMENT OF FIRE DAMAGE INSURANCE SETTLEMENT

14 AUGUST 2007 NOT EXEMPT LOWER POLMAISE - WASTE TRANSFER STATION REINVESTMENT OF FIRE DAMAGE INSURANCE SETTLEMENT STIRLING COUNCIL THIS REPORT RELATES TO ITEM ON THE AGENDA EXECUTIVE ENVIRONMENT SERVICES 14 AUGUST 2007 NOT EXEMPT LOWER POLMAISE - WASTE TRANSFER STATION REINVESTMENT OF FIRE DAMAGE INSURANCE SETTLEMENT

More information

EXECUTIVE SUMMARY INTRODUCTION

EXECUTIVE SUMMARY INTRODUCTION EXECUTIVE SUMMARY INTRODUCTION Bottled water offers consumers a clean, portable supply of drinking water for consumption at home or away from home. Some disposable water bottles are recyclable, and lightweighting

More information

Riga Smart City Concept. Timurs Safiuļins Riga Energy Agency

Riga Smart City Concept. Timurs Safiuļins Riga Energy Agency Riga Smart City Concept Timurs Safiuļins Riga Energy Agency City development pillars Riga long-term development objectives Riga smart city Sustainable energy action plan 2014-2020 SEAP includes an initial

More information

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS Dr Petri Kouvo Helsinki Region Environmental Services Authority THIRD INTERNATIONAL SYMPOSIUM ON ENERGY FROM BIOMASS AND WASTE Venice, Italy 8-11

More information

LEGAL FRAMEWORK, POTENTIAL AND OUTLOOK FOR BIOENERGY SECTOR IN VIETNAM

LEGAL FRAMEWORK, POTENTIAL AND OUTLOOK FOR BIOENERGY SECTOR IN VIETNAM Conference on Bioenergy in Viet Nam October 6 th, 2014, HCM City LEGAL FRAMEWORK, POTENTIAL AND OUTLOOK FOR BIOENERGY SECTOR IN VIETNAM By Nguyen Duc Cuong Director of Center for Renewable Energy & CDM,

More information

What is Energy? Session 1

What is Energy? Session 1 What is Energy? Session 1 1 A word about multiplication factors Kilo (k) = 1,000 Mega (M) = 1,000,000 Giga (G) = 1,000,000,000 e.g. 1kW = 1,000W 1kWh = 1,000Wh etc 3 Converting J to kwh 1 kilowatt-hour

More information

SUSTAINABILITY CHARTER. May 2012. 1 R&CA Sustainability Charter V1

SUSTAINABILITY CHARTER. May 2012. 1 R&CA Sustainability Charter V1 SUSTAINABILITY CHARTER May 2012 1 R&CA Sustainability Charter V1 Introduction By their very nature, restaurant and catering businesses are significant users of energy, water and raw materials. Cooking

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

WASTE MANAGEMENT APPROACH IN THE EMIRATES OF ABU DHABI (Focus Waste to Energy) Dr. Udayan Banerjee Center of Waste Management Abu Dhabi

WASTE MANAGEMENT APPROACH IN THE EMIRATES OF ABU DHABI (Focus Waste to Energy) Dr. Udayan Banerjee Center of Waste Management Abu Dhabi WASTE MANAGEMENT APPROACH IN THE EMIRATES OF ABU DHABI (Focus Waste to Energy) Dr. Udayan Banerjee Center of Waste Management Abu Dhabi National Regulatory Framework UAE Federal Law # 24 of 1999 - Protection

More information

Archant London Environmental Awards

Archant London Environmental Awards Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has

More information

The London Waste and Recycling Board business plan 2015-2020. November 2014. London Waste and Recycling Board 169 Union Street London SE1 0LL

The London Waste and Recycling Board business plan 2015-2020. November 2014. London Waste and Recycling Board 169 Union Street London SE1 0LL The London Waste and Recycling Board business plan 2015 2020 November 2014 London Waste and Recycling Board 169 Union Street London SE1 0LL info@lwarb.gov.uk www.lwarb.gov.uk 2015 2020 Business Plan Contents

More information

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings Duchy Homes Site: Cantley Lane Doncaster Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings 22 nd February 2013 Leanne Brooksbank Accredited Energy & Code

More information

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management A. AIR POLLUTION: Air Pollution sources are Transportation, Industries and

More information

Fuel Poverty: 2014 update

Fuel Poverty: 2014 update Westgate House 2a Prebend Street London N1 8PT 020 7359 8000 pedro@ukace.org Fuel Poverty: 2014 update 1 Introduction In early 2013, ACE Research and the Energy Bill Revolution published a fact-file on

More information

APPENDIX 1: 8-DIGIT SIC CODES COMPRISING THE GREEN ECONOMY

APPENDIX 1: 8-DIGIT SIC CODES COMPRISING THE GREEN ECONOMY APPENDIX 1: 8-DIGIT SIC CODES COMPRISING THE GREEN ECONOMY SIC8 SIC8DESC GRSECTOR 1810103 Mats, preseeded: soil erosion, growing of Green building 8510102 Reforestation services Environmental services

More information

Introduction to the London Energy Efficiency Fund (LEEF)

Introduction to the London Energy Efficiency Fund (LEEF) Executive Summary Introduction to the London Energy Efficiency Fund (LEEF) 1. The London Green Fund (LGF) is a 100m Fund comprising of 50m from the London 2007-13 European Regional Development Fund (ERDF)

More information

ENERGY MANAGEMENT SERVICE LEVEL AGREEMENT. 1.2 The Governing Body of School: the School. Main contact:, Headteacher

ENERGY MANAGEMENT SERVICE LEVEL AGREEMENT. 1.2 The Governing Body of School: the School. Main contact:, Headteacher 1234567 ENERGY MANAGEMENT SERVICE LEVEL AGREEMENT 1. PARTIES TO THIS AGREEMENT 1.1 The Energy Management Team: the Service Provider. Main contacts: Kevin Palmer, Energy Manager 024 7683 2713. Tanjee Virdi,

More information

Environmental Performance Report April 2011 March 2012

Environmental Performance Report April 2011 March 2012 Essex County Fire & Rescue Service Our Values: Respect, Accountability, Openness and Involvement Environmental Performance Report April 2011 March 2012 Contents Executive summary...3 Introduction...4 Environmental

More information

Policy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises

Policy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises Policy document on the provision of waste & recycling collection and storage facilities Includes both domestic and commercial premises Introduction This document is intended to help relevant parties who

More information

Stora Enso Fors Ltd Sweden

Stora Enso Fors Ltd Sweden THE ANALYSIS REPORT OF PLANT NO. 3 Cofiring of biomass - evaluation of fuel procurement and handling in selected existing plants and exchange of information (COFIRING) - Part 2 Stora Enso Fors Ltd Sweden

More information

Waste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY.

Waste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY. Waste & Recycling Planning Guidance on Waste & Recycling Storage and Collection October 2011 Development & Enterprise FOR INTERNAL USE ONLY Contents 01 Introduction 3 02 General guidelines 3 03 Individual

More information

Waste Management Guidance

Waste Management Guidance Waste Management Guidance 1 Contents Page 1. Introduction 3 2. Legislation 3 3. How to use this guide 4 4. Effective use of resources 4 5. Waste categories 5 6. Waste to be recycled A to Z 5 7. Non hazardous

More information

PLANT LOCATION AND LAYOUT

PLANT LOCATION AND LAYOUT PLANT LOCATION AND LAYOUT The Location Of The Plant Can Have A Crucial Effect On The Profitability Of A Project, And The Scope For Future Expansion. Many Factors Must Be Considered When Selecting A Suitable

More information

Connolly Hospital Blanchardstown makes rapid recovery on energy technology investment

Connolly Hospital Blanchardstown makes rapid recovery on energy technology investment Connolly Hospital Blanchardstown makes rapid recovery on energy technology investment Connolly Hospital, Blanchardstown (CHB) is a major teaching hospital and provides medical, surgical and support services

More information

main heating: pre1998 ducted warm air system main heating fuel: mains gas main heating SAP efficiency: 70.0% main heating controls: programmer

main heating: pre1998 ducted warm air system main heating fuel: mains gas main heating SAP efficiency: 70.0% main heating controls: programmer Archetype: 3250330 Archetype Description: 1965-1975, semi / end terraced dwelling, timber frame walls, oil / gas / electric warm air heating, E This archetype represents 823 dwellings, which accounts for

More information

AffaldVarme Aarhus. AffaldVarme Aarhus. Teknik og Miljø Aarhus Kommune

AffaldVarme Aarhus. AffaldVarme Aarhus. Teknik og Miljø Aarhus Kommune x The Municipality of Aarhus City Council 7 committees Municipal Authority Mayor s Dept. Dept. for Social Affairs and Employment Dept. for Technology and Environmental Issues Dept. for health and Care

More information

Solar Thermal Systems

Solar Thermal Systems Solar Thermal Systems Design and Applications in the UAE Murat Aydemir Viessmann Middle East FZE General Manager (M.Sc. Mech.Eng., ASHRAE) Dubai Knowledge Village Congress Centre, Dubai 20.4.2009 Viessmann

More information

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s Babcock & Wilcox Canada TSSG TM - SAGD-MC a n d I n d u s t r i a l A p p l i c a t i o n s w i t h M u l t i - C

More information

Energy Efficiency in Steam Systems

Energy Efficiency in Steam Systems Energy Efficiency in Steam Systems Fundamentals of Energy Efficiency: An Introductory Workshop April 2008 John S. Raschko, Ph.D. Mass. Office of Technical Assistance www.mass.gov/envir/ota (617) 626-1093

More information

The Environment Team. A-Z Guide. to Waste & Recycling. www.le.ac.uk/environment

The Environment Team. A-Z Guide. to Waste & Recycling. www.le.ac.uk/environment The Environment Team A-Z Guide to Waste & Recycling www.le.ac.uk/environment 2 UNIVERSITY OF LEICESTER ENVIRONMENT TEAM Welcome...to the University of Leicester s A-Z Guide to Waste and Recycling. Over

More information

PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS

PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS Regione Lombardia ALER Bergamo Lecco Sondrio Treviglio via Dei Mulini n. 10/20 via Filzi n. 11/13 Prospectus Template provided by TEH-Ambrosetti.

More information

energy in education promoting energy efficiency in schools

energy in education promoting energy efficiency in schools The DART Energy Research Programme Recognising that the programme should be as much about people and changing cultures while delivering service the approach was developed initially through the four different

More information

GREENHOUSE GAS EMISSIONS INVENTORY

GREENHOUSE GAS EMISSIONS INVENTORY GREENHOUSE GAS EMISSIONS INVENTORY The first step in developing a plan to reduce greenhouse gases was to identify sources and quantities of greenhouse gases emitted in Fort Collins. An emissions inventory

More information

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing

More information

Sea Water Heat Pump Project

Sea Water Heat Pump Project Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum

More information

D5.3 Energy audit report

D5.3 Energy audit report Project Acronym: EPLACE Project Title: Eco public PLAtform for smart green CityzEn s living labs Call identifier: CIP-ICT-PSP Call 6 Theme 1: ICT for SMART CITIES Objective1.1: Smart Urban digital services

More information

Penwithick Green Deal Pilot project: Final report

Penwithick Green Deal Pilot project: Final report Penwithick Green Deal Pilot project: Final report Prepared for: Cornwall Council & The BRE Trust Date: 25 th February 2014 Report Number: 278 621 BRE Wales & South West Ethos Kings Road Swansea Waterfront

More information

L-ENZ The dryer for bulk solids

L-ENZ The dryer for bulk solids L-ENZ The dryer for bulk solids Utilisation of water heat Biogas plants Biomass CHP plants Cogeneration of heat and power Lauber-EnergieNutzZentrale: Lauber dryer L-ENZ for bulk solids The Lauber dryer

More information

MUNICIPAL SOLID WASTE MANAGEMENT IN ITALY

MUNICIPAL SOLID WASTE MANAGEMENT IN ITALY MUNICIPAL SOLID WASTE MANAGEMENT IN ITALY L. Rigamonti DIIAR Environmental Section - Politecnico of Milan (Italy) (Sept.-Nov. 2006 Visiting Scholar WTERT, Columbia University; Advisor: Prof. N.J. Themelis)

More information

Ener ficiency. Corporate Energy and Greenhouse Gas Inventory. Consulting. Squamish-Lillooet Regional District. Prepared For: Prepared by:

Ener ficiency. Corporate Energy and Greenhouse Gas Inventory. Consulting. Squamish-Lillooet Regional District. Prepared For: Prepared by: Ener ficiency Consulting Corporate Energy and Greenhouse Gas Inventory Prepared For: Prepared by: Enerficiency Consulting 458 Abbs Road Gibsons, BC V0N 1V0 604-886 - 9864 October, 2009 1. Introduction

More information

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility RECOVERING RESOURCES FOR ALL Integra North Energy Recovery Facility Integra North Energy Recovery Facility (ERF) was the first of its kind to be built in Hampshire and one of the leading examples of best

More information

Activity- The Energy Choices Game

Activity- The Energy Choices Game Activity- The Energy Choices Game Purpose Energy is a critical resource that is used in all aspects of our daily lives. The world s supply of nonrenewable resources is limited and our continued use of

More information

Quantifying the energy and carbon effects of water saving summary report

Quantifying the energy and carbon effects of water saving summary report Quantifying the energy and carbon effects of water saving summary report Domestic water use in the UK is around 150 litres per person per day. Taking water from the environment, treating it, distributing

More information

ISLE OF ANGLESEY COUNTY COUNCIL WASTE MANAGEMENT SECTION HOUSEHOLD WASTE COLLECTION POLICY

ISLE OF ANGLESEY COUNTY COUNCIL WASTE MANAGEMENT SECTION HOUSEHOLD WASTE COLLECTION POLICY ISLE OF ANGLESEY COUNTY COUNCIL WASTE MANAGEMENT SECTION HOUSEHOLD WASTE COLLECTION POLICY 21 January 2011 CONTENTS Page Number 1.0 Legislation 3 2.0 Waste Collection Eligibility 3 3.0 Collection Frequency

More information

Energy efficiency for small business. 19 February 2015

Energy efficiency for small business. 19 February 2015 Energy efficiency for small business 19 February 2015 Webinar Facilitator Andrew Chamberlin ecobiz Program Associate Australian Centre for Sustainable Business and Development (ACSBD), University of Southern

More information

ENERGY EFFICIENT WINDOWS & DOORS A GUIDE TO THERMAL PERFORMANCE. www.rehau.co.uk. Building Solutions Automotive Industry

ENERGY EFFICIENT WINDOWS & DOORS A GUIDE TO THERMAL PERFORMANCE. www.rehau.co.uk. Building Solutions Automotive Industry ENERGY EFFICIENT WINDOWS & DOORS A GUIDE TO THERMAL PERFORMANCE www.rehau.co.uk Building Solutions Automotive Industry INTRODUCTION IMPROVING THE ENERGY EFFICIENCY OF WINDOWS AND DOORS Background Environmental

More information

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019

STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019 STRATEGIC ENERGY MANAGEMENT PLAN ENGLEHART AND DISTRICT HOSPITAL 2014-2019 TABLE OF CONTENTS Introduction Energy Management Vision Guiding Principles for Energy Management Business Case for Strategic Energy

More information

Domestic energy consumption in Barnet has reduced but remains higher than the British average:

Domestic energy consumption in Barnet has reduced but remains higher than the British average: HOME ENERGY EFFICIENCY ACT (HECA) RETURN LB BARNET 31ST MARCH 2013 The following report sets out the energy conservation actions being or proposed to be taken by London Borough of Barnet that it considers

More information

UTILISE Project SHARE. Winchester Military Museums 27th March 2014

UTILISE Project SHARE. Winchester Military Museums 27th March 2014 UTILISE Project SHARE Winchester Military Museums 27th March 2014 Agenda Cutting Costs & Engaging Visitors Rowan Wallis, Sustainable Business Partnership CIC LED Lighting for Museums Paul Daly, Energy

More information

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility RECOVERING RESOURCES FOR ALL Integra South East Energy Recovery Facility Integra South East Energy Recovery Facility (ERF) is the third of its kind to be built in Hampshire and is a leading example of

More information

KIRKLEES. Visions and Strategies related to Energy and Climate Issues

KIRKLEES. Visions and Strategies related to Energy and Climate Issues KIRKLEES Visions and Strategies related to Energy and Climate Issues In recognition of the urgency of climate, the UK Government has committed to take action now and has introduced the Climate Change Act

More information

ENVIRONMENTAL POLICY STATEMENT

ENVIRONMENTAL POLICY STATEMENT ENVIRONMENTAL POLICY STATEMENT COMPANY NAME ADDRESS COMPANY ACTIVITIES TRACKYOU LTD BLACKWOOD BUSINESS PARK, ASH ROAD SOUTH, WREXHAM, LL13 9UG Telematics Provider of Vehicle Tracking Units to Local Authorities

More information

Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire.

Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire. Mapping and geolocation technology for waste collection services West Suffolk and Northamptonshire. Summary In the face of budget cuts, increased tax burdens for landfill, and challenging targets to improve

More information

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration Waste a source of energy Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow Garbage School 301: Waste to Energy All organic materials contains energy Plant or animal based Plastics

More information

Green Guide for Businesses Strategy: Energy

Green Guide for Businesses Strategy: Energy Green Guide for Businesses Strategy: Energy Reduce Energy Use in New and Existing Businesses - In the United States buildings account for: o 72% of electricity consumption, o 39% of energy use, o 38% of

More information

A Resident s Guide to Recycling

A Resident s Guide to Recycling A Resident s Guide to Recycling We understand. We re competing for attention with everything else in your life. Recycling may not be exciting but it s important and easy, and recycling right benefits the

More information

Solar and heat recovery hybrid system

Solar and heat recovery hybrid system Solar and heat recovery hybrid system The Listel Hotel is the first hotel in Vancouver to install a cutting-edge renewable energy system. The hotel is reducing its carbon footprint -- and annual energy

More information

BIOMASS: BIOGAS GENERATOR. Curriculum: Biomass Power (organic chemistry, chemical/carbon cycles, plants, energy resources/transformations)

BIOMASS: BIOGAS GENERATOR. Curriculum: Biomass Power (organic chemistry, chemical/carbon cycles, plants, energy resources/transformations) BIOMASS: BIOGAS GENERATOR Curriculum: Biomass Power (organic chemistry, chemical/carbon cycles, plants, energy resources/transformations) Grade Level: Middle School (6-8) Small groups (3 to 4) Time: 90

More information

Working with. Carbon Management Board (CMP) 18 September 2009. William Stephens. Cranfield Executive

Working with. Carbon Management Board (CMP) 18 September 2009. William Stephens. Cranfield Executive Working with Carbon Management Plan (CMP) Date: Version: 18 September 2009 2.2 Owner: Approval route: Approval status: John Street William Stephens Carbon Management Board Cranfield Executive Approved

More information

How To Run A Power Plant In Celje

How To Run A Power Plant In Celje VRANSKO, May 2009 Waste Management Strategy Waste management strategy in accordance with European directive 91/156/EEC: 1. Reduction at source 2. Reuse 3. Recycle 4. Energy recovery 5.Disposal Celje Regional

More information

Your guide to the Energy Company Obligation (ECO) How we can make it work for you. A5_ECOguide_AW.indd 2 24/10/2012 16:04

Your guide to the Energy Company Obligation (ECO) How we can make it work for you. A5_ECOguide_AW.indd 2 24/10/2012 16:04 Your guide to the Energy Company Obligation (ECO) How we can make it work for you A5_ECOguide_AW.indd 2 24/10/2012 16:04 Energy Company Obligation guide 2 Your ECO Partner The current Carbon Emissions

More information

Table of Contents. 1.0 Introduction... 1. 2.0 Environmental Policy Statement... 2. 3.0 Environmental Management Programme... 5

Table of Contents. 1.0 Introduction... 1. 2.0 Environmental Policy Statement... 2. 3.0 Environmental Management Programme... 5 Table of Contents 1.0 Introduction... 1 2.0 Environmental Policy Statement... 2 3.0 Environmental Management Programme... 5 3.1 Roles and Responsibilities.....5 3.2 Procurement.....6 3.3 Training and Awareness....6

More information

FAS Training Course on Energy Efficiency / Renewable Energy

FAS Training Course on Energy Efficiency / Renewable Energy Among the Implemented to date include: Waterford Renewable Energy Cooperative Society Ltd WEB coordinated the formation of Waterford Renewable Energy Cooperative Society Ltd, which is an energy cooperative,

More information

Principles of municipal waste management in Finland and their applications in Helsinki ja Tampere Regions

Principles of municipal waste management in Finland and their applications in Helsinki ja Tampere Regions Principles of municipal waste management in Finland and their applications in Helsinki ja Tampere Regions FORUM OF MUNICIPALITIES November 28, 2014, Tallinn, Estonia Simo Isoaho Senior Advisor JLY Finnish

More information

U.S. Best Practices in College Sustainability/ Top 5 Careers Hiwassee College 4-4-14. Troy Williamson University of Tennessee

U.S. Best Practices in College Sustainability/ Top 5 Careers Hiwassee College 4-4-14. Troy Williamson University of Tennessee U.S. Best Practices in College Sustainability/ Top 5 Careers Hiwassee College 4-4-14 Troy Williamson University of Tennessee Small-scale Energy Efficiency Initiatives By implementing lower cost efficiency

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

Fleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN

Fleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN Fleet Services CORPORATE SERVICES Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN Table of Contents INTRODUCTION Our Branch 60 CONTRIBUTION TO THE CITY S VISION The Way Ahead 62

More information

Asset Management Strategy

Asset Management Strategy Greater Manchester Fire and Rescue Service Asset Management Strategy 2013-2015 Appendix 1 Document Version Control Document Version Date Written by 0.1 June 2012 Andrea Heffernan 0.2 December 2012 Andrea

More information

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns Energy Saving Strategy for Tunnel & Shuttle Kilns SANITARY WARE 1 Introduction The application of the Kyoto protocol and the effects of the recent energy crisis, have highlighted just how important it

More information

GRID NEUTRAL CALIFORNIA SCHOOLS

GRID NEUTRAL CALIFORNIA SCHOOLS We are committed to achieving grid neutrality (i.e. zero net energy) in all new schools in California, a concept that means schools will not only self-generate all the energy they need, but will also put

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Energy Performance Certificates (EPCs) and renting homes: A landlord s guide

Energy Performance Certificates (EPCs) and renting homes: A landlord s guide Energy Performance Certificates (EPCs) and renting homes: A landlord s guide From 1 October 2008 landlords are required to provide an Energy Performance Certificate when they rent out a home. An Energy

More information

Property Tax. 3. An alternative Building Energy Rating (BER) based Property Tax Proposal.

Property Tax. 3. An alternative Building Energy Rating (BER) based Property Tax Proposal. Property Tax Problem Statement : Find an equitable way of applying a Property Tax that is both palatable to the homeowner and cost efficient in terms of administration costs. This document will look at:

More information

Council Member agencies are listed in bold italics.

Council Member agencies are listed in bold italics. Council Member agencies are listed in bold italics. CONSTITUTIONAL OFFICES Office of the Auditor General Office of the Comptroller Office of the Governor Office of the Lt. Governor STATE AGENCIES Arts

More information

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS. GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS. This leaflet provides guidance on how to attain compliance with The Building (Amendment) Regulations (Northern Ireland) 2006, Part

More information

A Digester for the 125 Cow Dairy: Fact or Fiction?

A Digester for the 125 Cow Dairy: Fact or Fiction? A Digester for the 125 Cow Dairy: Fact or Fiction? M. Charles Gould Extension Educator-Bioproducts and Bioenergy Agriculture and Agribusiness Institute Michigan State University Midwest Manure Summit Green

More information