1 CITY CENTER REDEVELOPMENT PROJECT PROPOSED FIVE-YEAR IMPLEMENTATION PLAN FY2002 FY2007 [Health & Safety Code Section 33490] ADOPTED May 15, 2002 A. INTRODUCTION AND BACKGROUND The City Council and the Agency Board of Commissioners established the City Center Redevelopment Project on May 8, The 879 acre project is generally bounded by Second and Third Streets on the north; San Pedro Street, Stanford Avenue and Griffith Avenue to the east; 1-10 Freeway to the south; and Figueroa Street and the I-110 Freeway to the west. The project area incorporates three major sub-areas within the downtown Los Angeles area. These include: the Historic Downtown Sub-area; South Park Sub-area; and the City Markets Sub-area. The project area is comprised of portions of the former Central Business District (CBD) Redevelopment Project area, which was amended on May 1, 2002 allowing these areas to become part of the City Center Project Area. A number of the objectives listed here are objectives that were initiated under the CBD Project and have been carried over into City Center. Section (c) of the Community Redevelopment Law of the State of California ("CRL") requires that every redevelopment plan submitted by the Agency to the City Council be accompanied by an implementation plan which describes the specific goals and objectives of the Agency for the proposed Project Area, the specific projects proposed by the Agency, including a program of actions and expenditures proposed to be made within the first five years of the plan, and a description of how these projects will improve or alleviate the physical and economic conditions causing blight found within the Project Area ("Implementation Plan") A five-year work program was established by the Project Area Committee to address the wide variety of blight in the project area. Several new objectives are being initiated in FY03 to address issues of importance. A number of the work objectives listed here were initiated in the CBD Redevelopment Project and are being funded with a Finding of Benefit for that Project Area. The City Center Redevelopment Project area is not expected to generate tax increment resources until FY The recently adopted project is comprised of portions of the former CBD Redevelopment Project, which was adopted in 1975, and adjacent areas, which were not part of the original CBD Project area. In 1977 following a legal challenge, the Agency entered into a stipulated judgment, which capped the tax increment that could be received from the CBD Project. While the CBD Plan does not expire until 2010, the tax increment cap has been reached and, as a result, the Agency s ability to address remaining blight in the CBD has been severely limited. The Agency Five-Year Implementation Plan (FY ) Page 1

2 explored various avenues to seek relief from the tax increment cap, and ultimately determined that the most effective approach was to adopt two new redevelopment project areas, the City Center Redevelopment Project and the proposed Central Industrial Redevelopment Project, scheduled for adoption in Fall Although progress has been made toward eliminating blight in the former CBD Project Area, recent surveys indicate significant blight remained in the areas incorporated into the new redevelopment project areas. Numerous old and obsolete structures, a lack of sites for business expansion and major new development, substandard and overcrowded housing, a shortage of affordable housing, small and oddly shaped parcels, complex and sometimes absent ownership entities that complicate or stifle revitalization and redevelopment of the area, and other conditions of blight prevail. CONDITIONS AT TIME OF ADOPTION Historic Downtown Sub-area The Historic Downtown Sub-area includes major portions of Main Street, Spring Street and Broadway. The portions of these streets between First Street and Eighth Street were developed as the City s original downtown. Many of the buildings along these streets were constructed between 1900 and 1930, when Spring Street housed many of the banking and financial institutions in Los Angeles and Broadway was a main shopping destination. However, by the 1970 s, retail activity had declined in the area, as major retailers had followed area residents to the suburbs. Similarly, the financial core of the City began to migrate to the west with the development of modern high-rise office buildings. Business activity has also become more dispersed throughout the greater Los Angeles Area. As a result, business activity in the area declined and vacancies soared, especially in the older office buildings, including ground floor space previously devoted to banking or to retail uses. Due to the high cost of retrofitting the buildings to comply with modern building standards, along with a low demand for the space, many of the upper floors of buildings stood (and continue to stand) vacant for many years. Broadway evolved into a major Latino discount, shopping district, with a relatively low vacancy rate for the ground floor retail space along the street. However, Broadway has been negatively impacted by the problems associated with crime and the presence of a large of homeless population. As a result, many former patrons are now shopping in suburban communities with strong Latino shopping districts such as Huntington Park, Whittier and Montebello. South Park Sub-area The South Park Sub-area has a mix of multi-family residential, commercial, industrial and semi-public uses. Major landmark buildings and uses include the California Hospital Medical Center, and the multi-story Transamerica office complex. There are also a large number of low-density commercial and industrial properties and parking lots. The South Park area is generally considered an inferior location in Downtown and less desirable locations for businesses associated with the Fashion District located to the east. As a result, the area exhibits high building vacancies and low levels of business activity relative Five-Year Implementation Plan (FY ) Page 2

3 to other parts of Downtown. Property sales prices in the area are also generally lower than those for the City as a whole. The South Park Sub-area is planned for high-density market rate and affordable housing to serve the downtown workforce. Neighborhood serving amenities are planned including parks, childcare facilities and educational facilities. The South Park Sub-area is also the location of a proposed sports and entertainment district to be developed in connection with Staples Center. This contemplated development is to be located on 23 acres of property acquired by the Agency, which is currently being used for surface parking to serve Staples Center. The 23-acre master planned development is a mixed-use project that, subject to financing, will include a major convention hotel, ballroom and banquet facilities and meeting rooms; affordable and market rate housing; a major cultural facility; a live performance theater; and retail, entertainment, restaurant and office uses. Independent studies have demonstrated that the master planned development is not feasible without financial assistance from the Agency. The critical components of the project requiring public assistance include the convention hotel, the cultural facility and the performance theater. The City Markets Sub-area At the turn of the century, the area east of what later would become the Historic Downtown Sub-area included a mix of residential, commercial and industrial uses. A portion of this area gradually became a major industrial and manufacturing core, with convenient access to the major rail lines. The area also included a large number of residential hotels, which were ideal for the large number of single and transient workers employed by the railroads and other businesses. Over time, as the demand for industrial space grew, large manufacturers moved out of the area; smaller businesses that were less dependent upon railroad access moved to adjacent and competing cities. The City Markets Sub-area now houses a manufacturing and warehouse sector serving the garment, toy and flower industries. These businesses suffer from an adequate circulation system that can accommodate trucks; lack of available land for expansion; insufficient parking for employees and customers; and a negative image from the large transient and homeless population. B. SPECIFIC GOALS AND OBJECTIVES OF THE AGENCY FOR THE PROJECT AREA The goals and objectives for the City Center Redevelopment Project are set forth in the Redevelopment Plan as follows: 1. To assist in the development of Downtown as a major center in the Los Angeles metropolitan region, within the context of the Los Angeles General Plan as envisioned by the General Plan Framework, Concept Plan, Citywide Plan portions and the Central City Community Plan. Five-Year Implementation Plan (FY ) Page 3

4 2. To create a climate, which will prepare and allow the Central City to accept that share of regional growth and development which is appropriate, and which is economically and functionally attracted to it. 3. To organize growth and development, reinforce viable functions, and facilitate the redevelopment, revitalization or rehabilitation of deteriorated or underutilized areas. 4. To create a modern, efficient and balanced urban environment for people, including a full range of around-the-clock activities and uses such as recreation and housing. 5. To create a symbol of pride and identity which gives Central City a strong image as a major center of the Los Angeles region. 6. To facilitate the development of an integrated transportation system which will allow for efficient movement of people and goods into, through and out of the Central City. 7. To achieve excellence in design, based on how the Central City is to be used by people, giving emphasis to parks, green spaces, street trees, and places designed for walking and sitting. 8. To preserve key landmarks, which highlight the history and unique character of the City, blending old and new in an aesthetic realization of change or growth with distinction, and facilitating the adaptive reuse of structures of architectural, historic or cultural merit. 9. To provide a full range of employment opportunities for persons of all income levels. 10. To provide high and medium density housing close to employment and available to all ethnic, social and economic groups, and to make an appropriate share of the City s low- and moderate-income housing available to residents of the area. 11. To provide the public services and facilities necessary to the solution of the various social, medical and economic problems of Central City residents, especially the Skid Row population 12. To establish an atmosphere of cooperation among business, special interest groups and public agencies in the implementation of this Plan. 13. To support an encourage the development of social services with special consideration given to participating in projects involving community-based organizations that serve runaways, the homeless Five-Year Implementation Plan (FY ) Page 4

5 and senior citizens, and provide child care services and other social services. C. SPECIFIC PROJECTS AND PROGRAMS PROPOSED BY THE AGENCY, INCLUDING A PROGRAM OF ACTIONS AND EXPENDITURES PROPOSED TO BE MADE WITHIN THE FIRST FIVE YEARS OF THE REDEVELOMENT PLAN The Agency has put forth a plan of redevelopment that includes programs and specific projects as examples of expenditures currently anticipated by the community and the Agency to meet the articulated goals and objectives of the Redevelopment Plan. The specific details of the Implementation Plan are subject to update and/or change as the Redevelopment Plan is implemented. All of the projects are subject to available financing and other resources, and adjustments may be required in response to changing market conditions. The Agency's estimated costs to implement these programs derived from projected tax increment financing total $111,205,400, which includes the issuance of tax allocation bonds in FY05 and FY06. In addition, the Housing Development Program reflects the Agency's intent to carry out the Mayor's Directive to voluntarily set aside not less than 25% of the gross lax increment for low- and moderate-income housing rather than just the 20% mandated by State law. 1. HOUSING PRODUCTION A. Projects and Expenditures The housing production program for the City Center Redevelopment Project will provide housing for low- and moderate-income households as well as additional market rate housing. Several projects initiated under the FY Five-Year Implementation Plan for the CBD Redevelopment Plan that are now located in the City Center Redevelopment Project will be completed and several new projects will be initiated. The primary focus of this housing effort will be in South Park Sub-area and the Historic Downtown Sub-area. In the Historic Downtown Sub-area, the Agency will continue to provide technical assistance to the owners of historic buildings with adaptive reuse plans for live/work or artist housing. Funding for this effort will be provided under CT2080, Historic Core Revitalization. Under this work objective, the Agency will assist the owners of several buildings, such as the Rowan, Security, Bartlett, Arcade, Irvine, Byrne, in converting the buildings to loft-style housing with the ground floors converted to neighborhood-serving retails uses. The success of these building conversions will depend on the Agency assisting with the provision of adequate off-street parking for the residents. Total Agency funding for this work objective during the term of the Five-Year Plan is $4,440,200. Five-Year Implementation Plan (FY ) Page 5

6 In the South Park Sub-area, the Agency will continue to assist with the development of the Grand Avenue Apartments (CT1020), a 62-unit affordable family housing project with childcare. The project will be located at the northeast corner of Venice Boulevard and Grand Avenue. The project will be funded from multiple sources including tax credits and the City of Industry Affordable Housing Project; the Agency will provide a total of $4.3 million in gap financing. A second phase of development is anticipated requiring additional Agency financing for site assemblage and construction financing for a total expenditure, including staffing, for the next five years in the amount of $8,046,800. The development of new housing developments will be pursued and is funded under Downtown Housing Opportunities (CT1090). The Agency has historically acquired property for the development of housing with related neighborhood services and amenities such as childcare. In keeping a goal of the City Center Redevelopment Plan to create a balanced urban environment, the continued acquisition of sites for the construction of housing projects will be pursued as well as providing financing assistance to developers that have secured sites for housing. The Agency anticipates providing a full range of housing including mixed-income market rate housing (20% affordable; 80% market rate), affordable family, special needs and senior housing, and adaptive reuse of vacant or underutilized building into live/work or loft-style housing. Total funding for this effort for the next five years is $28,981,300. Other work objectives with planned housing components include 11 th Street Lofts (CT2190), Mixed Use Opportunities (CT2490) and South Park Elementary School (CT3000), with a combined total funding for the next five years in the amount of $18,828,700, which includes funding for the housing planned to be built in conjunction with the school. B. Elimination of Blight A housing construction and rehabilitation program will help to eliminate blight by providing much needed housing for low- and moderate-income households, much of it by furthering the adaptive reuse of vacant, underutilized and blighted buildings. By providing a full range of housing types, the Agency furthers a number of revitalization goals for the Redevelopment Project including the provision of housing for downtown employees, increasing the support for retail and entertainment uses, and creating a vibrant, 24-hour downtown community. The production of a full range of housing for all income groups is a priority of the Redevelopment Plan. During the first five years of the Redevelopment Plan, it is anticipated that Agency activities will include providing high and medium density housing Five-Year Implementation Plan (FY ) Page 6

7 close to centers of employment and available to all ethnic, social and economic groups, and making an appropriate share of the City's low- and moderate-income housing available to residents of the area. 2. ECONOMIC DEVELOPMENT A. Projects and Expenditures Commercial development projects approved or initiated under the CBD Redevelopment Project and now located in the City Center Redevelopment Project will be continued in Five-Year Plan for City Center. These projects include Broadway Spring Center (CT2030) and Grand Central Square (CT2070) with total funding provide over the next five years in the amount of $203,500 and $100,600 respectively. Agency activities will include monitoring compliance with executed agreements, funding the Agency's annual parking obligation and monitoring the tax-exempt bonds issued for Grand Central Square. The Historic Core Entertainment District (CT2020), a new economic development work objective, will be initiated in FY2003 for the Historic Downtown Sub-area. Under this work objective, the Agency will seek new uses for Broadway's historic theaters. The goal of the "Entertainment District Project", a program initiated in cooperation by the Mayor's Office, Council Office and Los Angeles Conservancy, is to renovate and convert former cinema theaters into entertainment venues including live performance theaters and the presentation of art and vintage films. The Agency will assist this effort by identifying potential developers and operators, sources of funding and spearheading the construction of public parking. Total funding for this program for the next five years is $2,649,600. In the South Park Sub-area, the Agency will continue to monitor the Disposition and Development Agreement (DDA) with the LA Arena Company (Developer) for the construction of Staples Center. The Agency's primary role involved the acquisition and clearance of 23 acres of property surrounding Staples Center for parking. In accordance with the DDA, the Developer of Staples Center prepared a master plan for the future development of these properties. The DDA required the Developer to include in the master plan a major convention center hotel and address the future expansion needs of the Los Angeles Convention Center. In September 2001, the master plan was officially approved by City Council and included the following major components: a 1200-room convention hotel; a 600-room luxury hotel; a cultural facility, up to 800 units of housing; up to one million square feet of entertainment, retail, restaurants and a 7,000-seat live performance theater, an expansion of the West Hall of the Convention Center, and structured parking for the project and Staples Center. During the FY Five- Year Implementation, the Agency will complete acquisition activities initiated Five-Year Implementation Plan (FY ) Page 7

8 in prior years, monitor the development of projects in accordance with the approved master plan, and identify sources of funds for the development of the convention hotel and the cultural facility (CT3080). Total funding available over the next five years is $1,787,000. Additional financing for the convention hotel may be available under New Economic Development Opportunities (CT2110) with a total funding allocation for the next five years in the amount of $7,500,000. The New Economic Development Opportunities (CT2110) work objective may also fund other planned economic development activities including facade improvements for commercial storefronts and adaptive reuse projects, the development of parking facilities for commercial districts such as the Toy and Fashion Districts, and land assemblage for the expansion of industrial and commercial businesses and the creation of new employment opportunities. B. Elimination of Blight Mixed-use, hotel and commercial projects are fundamental to reversing both physical and economic conditions of blight. The planned economic development projects for the City Center Redevelopment Project will reverse negative economic conditions such as stagnant property values and high office vacancies, reverse business flight out of the downtown area, and provide the economic incentive to rehabilitate vacant and deteriorated historic buildings. Commercial projects carry out many of the goals of the Redevelopment Plan including providing a full range of employment opportunities for persons of all income levels; creating a modern, efficient and balance urban center including a full range of around-the-clock activities; preserving key landmarks that highlight the history and unique character of the City by blending old and new in an aesthetic realization of change or growth with distinction; and facilitating the adaptive reuse of structures or architectural, historic and cultural merit. A strong industrial base manufacturing, wholesale and distribution offers economic vitality and job growth in such industries as cold storage, apparel, produce, fish, toys, and flowers. An objective of the Plan is to recognize Downtown's importance as a regional employment opportunity through the retention and expansion of existing industries while developing new industries that solidify the City's position as the hub of the Pacific Rim and the center of U.S.-Mexico Trade. Five-Year Implementation Plan (FY ) Page 8

9 3. PUBLIC INFRASTRUCTURE AND IMPROVEMENTS A. Projects and Expenditures A number of projects initiated in the previous Five-Year Plan will be continued and completed under the new Plan and several new projects and programs will be initiated. Continued projects carried forward from the CBD Redevelopment Project include Broadway Sidewalk Reconstruction (CT4100) and Grand Hope Park (CT3020). New Projects include the realignment of Venice Boulevard (CT3060) and City Market Traffic Circulation (CT3010) In FY1998, the City initiated the reconstruction of Broadway with federal, State, MTA and Agency funds. The project involves the reconstruction of the roadway to better accommodate buses, to provide improved lighting and pedestrian crosswalks, and the reconstruction of the sidewalks from Temple to Ninth Streets. The reconstruction of the roadway was completed in FY2001. The first phase of the reconstruction of the sidewalks between 2 nd and 5 th Streets will be completed in FY2003. Funding for subsequent phases of the sidewalk reconstruction involving 5 th to 9 th and 2 nd to Temple Streets will depend on additional State and federal funding commitments. Total Agency funding over the next five years for all phases not including matching State or federal grants for future phases of the sidewalk reconstruction is $5,317,000. The Agency will continue to provide gap funding for the maintenance of Grand Hope Park (CT3020) for a total $1,191,900 (this includes the funds setaside in the Grand Hope Park Maintenance Trust Fund). Located adjacent to Fashion Institute of Design and Merchandising (FIDM), the 2.5-acre Grand Hope Park, designed by Lawrence Halprin, was completed in An association of property owners currently maintains the Park under a ground lease with the Agency and with funding provided by a special assessment and the Agency. In FY2003, the Agency will begin to address the significant jog in the alignment of Venice Boulevard at Hope Street, which causes significant traffic congestion during major events at the Los Angeles Convention Center and Staples Center. A realignment of the street would greatly improve the flow of traffic through the intersection and improve pedestrian safety. The immediate neighborhood has benefited from a number of Agency financed improvements including Venice Hope Park, Villa del Pueblo, an 81-unit affordable family housing development, and Villa Esperanza, a 90-unit senior housing project. The realignment of the street will require the removal of 60 units of substandard housing. The Grand Avenue Apartments Project (CT1020) will provide the requirement replacement units; additional replacement units may also be provided as required to accommodate the families displaced by the project. The project is expected to done in Five-Year Implementation Plan (FY ) Page 9

10 conjunction with the construction of the Venice Hope Community Center located at the southeast corner of the intersection. Total Agency funding for this project for the next five years is $5,161,100. Under the City Market Traffic Circulation work objective (CT3010) the Agency will initiate the preparation of studies to identify traffic and parking conflicts and needs within the City Markets and Historic Downtown Sub-areas of the City Center Redevelopment Project Area. A high priority project identified as a catalytic project in the Downtown Strategic Plan is the realignment of Olympic Boulevard. This catalytic project includes linking the disconnected east and west segments of Olympic Boulevard and the refurbishment of the old produce market into an indoor/outdoor market selling specialty foods, produce, fish, meat and flowers to downtown residents and tourists. Total Agency funding over the next five years for the realignment of Olympic Boulevard and other needed traffic and parking improvements is $18,191,700. Additional Agency activities will include identifying opportunities for the development of parks and open space, the feasibility of constructing a fixedrail "Heritage Trolley" reminiscent of the former "Red Car" transit system, and a feasibility study for placing the segment of the MTA Blue Line between the Santa Monica Freeway and 11 th Street below grade. The Agency will also pursue opportunities to provide additional open space in the South Park and the Historic Downtown Sub-areas in connection with new housing and mixeduse developments. Funding for these activities will be carried under Response to Development Opportunities (CT6990); total funding available for the next five years is $5,294,900. B. Elimination of Blight Public improvements eliminate blight by providing much needed improvements to the vehicular and pedestrian infrastructure. These projects further a number of the goals for the City Center Redevelopment Project such as facilitating the development of an integrated transportation system and providing much need public parking in underserved areas. A goal of the Plan is make improvements that allow for the efficient movement of people and goods into, through, and out of the Central City, and achieving excellence of design based on how the Central City is to be used by residents and employees, giving emphasis to parks, green spaces, street trees and districts designed for walking and sitting. Upgrading the public infrastructure improves pedestrian and vehicular linkages between the various districts throughout the City Center and reinforces economic revitalization efforts of the Agency. Five-Year Implementation Plan (FY ) Page 10

11 4. COMMUNITY AND PUBLIC FACILITIES A. Projects and Expenditures A several projects initiated in the previous Five-Year Plan for the CBD Redevelopment Project will be continued and completed under the new City Center Plan and several new projects and programs will be initiated in FY2003. Projects carried forward from the CBD Redevelopment Project include the Venice and Hope Community Center (CT3030), the Museum of Neon Art (CT2100), and St. Vibiana's (CT3040). New initiatives include South Park Elementary School (CT3000), Childcare (CT3040) and projects developed under Response to Development Opportunities (CT6990). The Venice and Hope Community Center (CT3030) will be constructed on property acquired by the Agency at the southeast corner of Venice Boulevard and Hope Street. During FY2003, the Agency will initiate the preparation of plans and identify other sources of matching funds for the project. Total Agency funding for the project over the next five years is $1,012,900. The Agency will continue to assist the Museum of Neon Art (MONA) (CT2100) with its effort to locate a permanent home in the downtown area. The Downtown Cultural Trust Fund may be used to assist with the cost of securing a permanent home for MONA. While engaged in its search, the Agency will provide funding to assist with the annual operating cost of the Museum in its temporary home located in the ground floor of the Renaissance Tower Apartments located at Hope Street and Olympic Boulevard. Agency financial assistance is being provided in exchange for services provide by MONA to the community. Total Agency funding over the next five years for CT2100 is $303,900. St. Vibiana's (CT3040) involves providing technical assistance for the adaptive reuse of the historic Cathedral into a performing arts center and school. The project has received a $4 million commitment from the State and the developer continues with efforts to identify additional sources of financing. Total Agency funding for the next five years is $139,800. The South Park Elementary School (CT3000) will be developed in cooperation with the Los Angeles Unified School District (LAUSD). The project will include a new elementary school, open space and 50 to 60 units of affordable housing with childcare. During FY2003, the Agency and LAUSD will identify alternative sites for the development of the project and formulate an intergovernmental cooperation agreement that outlines the responsibilities of the Agency and LAUSD for the financing and construction of the project. Total Agency funding for the project inclusive of the financing requirements for the housing and childcare center is $10,157,500. Five-Year Implementation Plan (FY ) Page 11

12 Childcare initiatives will include providing funding for the construction of childcare facilities in conjunction with family housing projects. Total funding for the next five years is $507,300. Finally, the Agency may assist with the improvement and expansion of pediatric and medical facilities in response to increased demands for services resulting from the anticipated growth in the downtown residential population. The Agency may also explore the feasibility of establishing a community court to address many of the minor violations committed by transients and juveniles that are more effectively addressed through rehabilitation and community service. These activities will be funded under Response to Development Opportunities (CT6990). B. Elimination of Blight The development of community and public facilities furthers a number of the goals for the City Center Redevelopment Project including providing important services and facilities necessary for the creation of a healthy downtown community. The development of cultural and educational facilities and open space will eliminate blight by bringing into productive use underutilized or vacant parcels and buildings, and by providing amenities currently lacking in the Project Area. The goals for the Project call for the creation of additional "parks, green spaces, and street trees, and places designed for walking and sitting" and the preservation of "key landmarks that highlight the history and unique character of the City". The development of cultural centers, childcare facilities and open space will make Downtown a more attractive and inviting environment for both businesses and residents, reinforcing efforts to attract tenants to existing office buildings and retail space, and new private investment in housing and commercial developments. 5. HOMELESSNESS REDUCTION AND SERVICES A. Projects and Expenditures In FY2003, the Agency will initiate an assessment of programs that provide services and housing for the homeless population in the City Center Redevelopment Project. This effort will be done in cooperation with the Los Angeles Homeless Services Authority and the non-profit service providers in the downtown. The assessment will attempt to address the unmet needs of the homeless community and provide recommendations that would address these needs and attempt to reduce the negative impact homelessness has on efforts to revitalize the Project Area. This effort may involve the relocation, modernization and expansion of existing homeless service providers. Total funding for this work objective (CT2000, Homeless Reduction Program) over the next five years is $8,175,800. Five-Year Implementation Plan (FY ) Page 12

13 B. Elimination of Blight The provision of much needed services and facilities to assist the homeless population will help improve the social and physical environment of the Redevelopment Project Area. In addition, expanded facilities and services will also make it possible for some of the homeless to re-enter the job market and find suitable housing opportunities. 6. RESPONSE TO DEVELOPER OPPORTUNITES A. Projects and Expenditures The operation of a Redevelopment Project entails expenditures not linked to specific projects enumerated in this Implementation Plan including administration costs, permit and CEQA processing costs, statutory or other legal obligations of the Agency, and programs and projects necessary to implement the Redevelopment goals and objectives for property acquisition and disposition, and assistance in the development and construction of industrial, commercial, residential, and public facilities and public improvements. Also included are project operations and technical staff costs, site office facility costs, supplies, equipment, materials, insurance and maintenance of Agency-owned properties, community meeting costs and general legal costs. Staff will continue to review permit applications for CEQA clearance and conformance with the Redevelopment Plan and provide technical assistance to property owners or developers proposing market rate housing, commercial or mixed-use developments. These proposals will sometimes require entering into an Owner Participation Agreement with the Agency. Nevertheless, they will be reviewed to ensure conformance with appropriate municipal building and planning code requirements, and where appropriate, to ensure that the development will carry out Redevelopment Plan objectives. Agency labor is needed to respond to developer requests, review permit applications, conduct analyses of planning, financial, real estate and environmental issues related to such proposals, and monitor projects which may or may not require Agency agreements. The total funding for this work objective over the next five years is $5,294,900. B. Elimination of Blight The Agency staff activities outlined above will help to eliminate blight by ensuring that development in the Project Area meets the goals and objectives of the Redevelopment Plan and is being carried out in conformance with the Redevelopment Plan. The staff functions will also further efforts to reverse the physical and economic decline of downtown. Five-Year Implementation Plan (FY ) Page 13

14 7. PROJECT GENERAL A. Projects and Expenditures Administering a Redevelopment Project necessarily entails costs that are not directly related to a specific work objective, but rather are related to the administration of the project including technical, legal, and administrative services and other community related services. Agency staff will administer the Project's ongoing activities, including complying with public notification requirements, providing public information, monitoring compliance with the Agency's Public Art Program and expenditures from the Downtown Cultural Trust Fund, and responding to inquiries from developers, property owners and others. These services are funded under Project General (CT9990); total funding available for the next five years is $1,438,500 B. Elimination of Blight Administering a Redevelopment Project necessarily entails the Agency staff activities and other administrative costs enumerated above. Administration of the Project ensures that redevelopment activities are carried out in compliance with the Community Redevelopment Law and in furtherance of the physical, economic and social revitalization of the Project Area. 8. PROJECT FINANCING A. Projects and Expenditures Tax Allocation Bonds are projected to be issued in FY2005 and FY2006, with the total net proceeds of $93,280,000 of which not less than 25% will be allocated to low- and moderate-income housing development in conformance with the Mayor's Policy on affordable housing. Estimated debt service payment on these bonds in FY2006 and FY2007 total $2,936,600 of which a proportionate share will be paid from the low- and moderate-income housing trust fund account. B. Elimination of Blight Administering a Redevelopment Project necessarily entails the Agency staff activities enumerated above. Administration of the Project's financial resources ensures that such resources are used in compliance with the Community Redevelopment Law and in furtherance of the physical and economic revitalization of the Project Area. Five-Year Implementation Plan (FY ) Page 14

15 9. AFFORDABLE HOUSING COMPLIANCE PLAN Section 33413(b)(4) of the Community Redevelopment Law (CRL) addresses the Agency's adoption and periodic update of a plan to ensure compliance with certain criteria regarding the mix of affordable new or rehabilitated housing units with the Project Area ("Housing Compliance Plan"). This Housing Compliance Plan should be consistent with the City's housing element and must also be reviewed and, if necessary, amended at least every five years wit either the housing element cycle or the Implementation Plan cycle. The following narrative addresses the following provisions of 33490(a)(2)(A) and (B) of the CRL. A. The estimated amount of tax increment revenue that will be deposited in the Low and Moderate Income Housing Fund during each of the next five years. The estimated amount of tax increment that will be deposited in the Low and Moderate Income Housing Fund during the each of the next five years is provided in Table I and Table II. Additionally, Table III, attached thereto, provides the project overall housing program of the Agency from all sources including the Low and Moderate Income Housing funds and other nonhousing trust fund sources. B. The following are projects and expenditures planned by the Agency for the City Center Redevelopment Project Area over the five-year period covered by this plan that will implement the affordable housing requirements: 1. The Agency will assist the adaptive reuse of vacant, historic building in the Historic Downtown Sub-area. Projects receiving financial assistance from the Agency will include at least 20% of the units reserved for low- and moderate-income households. This effort will be carried out under CT2080, Historic Core Revitalization, with a total funding allocation of $4,440,200 for the next five years. 2. The Agency will finalize negotiations on the 11 th Street Loft project (CT2190), a 240-unit, mixed-income housing project with 20% of the units reserved for low- and moderate-income households. Total funding allocated for this project is $1,171, The Agency will continue to assist the Grand Avenue Apartments (CT1020) project. This affordable family housing project with a childcare facility on the ground level will be located at the northeast corner of Venice Boulevard and Grand Avenue in the South Park Sub-area. A second phase of the project is planned for an adjacent parcel located at the northwest Five-Year Implementation Plan (FY ) Page 15

16 corner of Venice Boulevard and Olive Street. Total funding for this project over the next five years is $8,046, The Agency will proceed with the acquisition of land for the development of new affordable housing projects in the South Park Sub-area. The projected expenditure to complete the acquisition of new sites in South Park under CT1090 (Downtown Housing Opportunities) during the term of the Five-Year Plan is $28,981, The Agency will continue to work with LAUSD on the development of a new elementary school for the downtown area. The project will include an affordable housing component with 50 to 60 units of family housing and a childcare facility to serve the residents. Total funding for this project for the next five years is $10,157, The Agency will pursue opportunities for the development of mixed-use projects with affordable housing. Both new construction and adaptive reuse of vacant historic buildings will be considered. Agency activities are funded under CT2490, Mixed Use Opportunities, with a total allocation of $7,500,000 over the next five years. C. Estimates of the number of new, rehabilitated, or income restricted units to be assisted during each of the five years and estimates of the housing expenditures form the Low and Moderate Income Housing Fund during each of the five years. The estimates of the number of new, rehabilitated, or income restricted units to be assisted during each of the five years in provided in Table I and Table II. D. An estimate of the number of units of very low, low-, and moderateincome households required to be developed within the Project Area in order to meet the requirements of Section 33413(b)(2) of the CRL, both over the life of the Redevelopment Plan and during the next ten years. At the time housing units are developed, the Agency will comply with Section 33413(b)(2) of the CRL, which states that a least fifteen percent (15%) of all new and substantially rehabilitated dwelling units developed with the Project Area shall be available at affordable housing cost to low and moderate income households; and not less than forty percent (40%) of these dwelling units shall be available to very low income households. E. The number of units of very low, low- and moderate-income household which have been developed within the Project Area which meet the requirements of Section 33413(b)(2) of the CRL. Five-Year Implementation Plan (FY ) Page 16

17 Since the proposed Redevelopment Plan is in the process of being adopted and the Project Area is not yet been officially created, this requirement does not apply. F. An estimate of the number of Agency-developed residential units which will be developed during the next five years, if any, which will be governed by Section 33413(b)(1). The Agency does not anticipate developing or substantially rehabilitating any residential units itself during the next five years. G. An estimate of the Agency-developed units for very low, low- and moderate-income households which will be developed by the Agency during the next five years to meet the requirements of Section 33413(b)(1) of the CRL. The Agency does not anticipate developing any residential units itself during the next five years. H. The following discussion contains the components described in Section 33490(a)(3) of the CRL. Pursuant to Section 33490(a)(3) of the CRL, if the Implementation Plan contains a project that will result in the destruction or removal of dwelling units that will have to be replaced pursuant to Section 33414(a) of the CRL, the Implementation Plan shall identify proposed locations suitable for those replacement dwelling units. The Agency anticipates the removal of 60 dwelling units that will have to be replaced pursuant to Section 33414(a) of the CRL. The Agency proposes replacing these units within the Project Area at a site located at the northeast corner of Venice Boulevard and Grand Avenue, or at an alternative site appropriate for housing within the Project Area. The proposed replacement housing project is the Grand Avenue Apartments (CT1020). A Replacement Housing Plan will be approved by the Agency prior to the removal of the units as required by the CRL. Five-Year Implementation Plan (FY ) Page 17

18 Five-Year Implementation Plan (FY ) Page 18

19 Five-Year Implementation Plan (FY ) Page 19

20 Five-Year Implementation Plan (FY ) Page 20

21 Five-Year Implementation Plan (FY ) Page 21

Philadelphia County. Land Use and Growth Management Profile

Philadelphia County. Land Use and Growth Management Profile Philadelphia County is located in the southeastern corner of Pennsylvania and is bordered by the Pennsylvania counties of Delaware, Montgomery, and Bucks, and the New Jersey counties of Burlington, Camden,

More information

Historic Preservation in Housing and Community Development. Linking Historic Preservation to Community Development Block Grant Objectives

Historic Preservation in Housing and Community Development. Linking Historic Preservation to Community Development Block Grant Objectives U.S. Department of Housing and Urban Development Office of Community Planning and Development Office of Environment and Energy Historic Preservation in Housing and Community Development Linking Historic

More information

Downtown Core Sub-district

Downtown Core Sub-district 3-10 Land Use Downtown Core Sub-district District development will be most intense and most urban in character in the Downtown Core. The objective is to establish this area as a citywide and regional retail

More information

Downtown Los Angeles Streetcar Economic Analysis

Downtown Los Angeles Streetcar Economic Analysis Downtown Los Angeles Streetcar Economic Analysis Executive Briefing Prepared for: Los Angeles Streetcar, Inc. 550 S. Hope Street, Ste. 2300 Los Angeles, CA 90071 Prepared by: AECOM 515 S. Flower Street,

More information

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD

Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD Boundaries The Near West Side Comprehensive Plan covers a broad area immediately west of Milwaukee s downtown.

More information

ECONOMIC DEVELOPMENT. in this chapter. 8.1 Overview of Economic Conditions. 8.2 Priority Economic Development Needs

ECONOMIC DEVELOPMENT. in this chapter. 8.1 Overview of Economic Conditions. 8.2 Priority Economic Development Needs 8 ECONOMIC DEVELOPMENT in this chapter 8.1 Overview of Economic Conditions 8.2 Priority Economic Development Needs 8.3 Economic Development Goals and Policies chapter 8 economic development Creating new

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

KALAMAZOO DOWNTOWN DEVELOPMENT AUTHORITY BUILDING REHABILITATION PROGRAM

KALAMAZOO DOWNTOWN DEVELOPMENT AUTHORITY BUILDING REHABILITATION PROGRAM KALAMAZOO DOWNTOWN DEVELOPMENT AUTHORITY BUILDING REHABILITATION PROGRAM PURPOSE As a fundamental goal of the Downtown Development Plan and Tax Increment Financing Plan (Plan), the Kalamazoo Downtown Development

More information

Envision Venice Strategic Plan for Fiscal Year Ending. September 30, 2016. Preserving and Enhancing the Venice Quality of Life.

Envision Venice Strategic Plan for Fiscal Year Ending. September 30, 2016. Preserving and Enhancing the Venice Quality of Life. Adopted April 28, 2015 October 1, 2015 through September 30, 2016 Envision Venice Strategic Plan for Fiscal Year Ending September 30, 2016 Preserving and Enhancing the Venice Quality of Life Table of Contents

More information

Market Summary. prepared by FXM Associates 6.1. North River Canal Corridor

Market Summary. prepared by FXM Associates 6.1. North River Canal Corridor Market Summary prepared by FXM Associates North River Canal Corridor 6.1 6.2 North River Canal Corridor Introduction In order to provide a context for planning within the North Canal Neighborhood Corridor,

More information

S. BLOCK 68 REDEVELOPMENT PROJECT AREA

S. BLOCK 68 REDEVELOPMENT PROJECT AREA S. BLOCK 68 REDEVELOPMENT PROJECT AREA 1. Revitalization Project Description The Block 68 Redevelopment Project Area is located on the block bounded by 10 th, 11 th, M, and N Streets, and is comprised

More information

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012 Project Review: DCAC Meeting #2 March 8, 2012 Reviewed stakeholder meetings Online survey findings Market Assessment Macro Market Factors,

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01

More information

BEACON AVENUE URBAN RENEWAL PROJECT

BEACON AVENUE URBAN RENEWAL PROJECT BEACON AVENUE URBAN RENEWAL PROJECT City of Jersey City Adopted May, 1976 Block and Lot Updates August 6, 2012 Amended September 13, 2012 DIVISION OF CITY PLANNING Beacon Avenue Urban Renewal Project Table

More information

Borough of Glassboro, New Jersey May 2010. Redevelopment Plan for Rehabilitation In the Borough of Glassboro May 2010

Borough of Glassboro, New Jersey May 2010. Redevelopment Plan for Rehabilitation In the Borough of Glassboro May 2010 Borough of Glassboro, New Jersey May 2010 Redevelopment Plan for Rehabilitation In the Borough of Glassboro May 2010 Table of Contents Page Number I. Introduction 3 II. Designation of Area and Plan Development

More information

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN

PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department PREDEVELOPMENT PLAN REVIEW OF ART CENTER COLLEGE OF DESIGN MASTER PLAN RECOMMENDATION: This report is for

More information

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street 9-10. Market Street 11-14

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street 9-10. Market Street 11-14 TABLE OF CONTENTS Executive Summary 1-3 Introduction 4-6 Illustrative Site Plan 7 East-West Streets 8 Cooper Street 9-10 Market Street 11-14 Federal Street 15-16 MLK Boulevard 17-20 North-South Streets

More information

Community Investment Plan (CIP) 2014-2016

Community Investment Plan (CIP) 2014-2016 Community Investment Plan (CIP) 2014-2016 SECTION 1: Community or constituency to be served by the organization The Downtown Taunton Foundation (DTF) is a place-based nonprofit Community Development Corporation

More information

Appendix C Related Studies

Appendix C Related Studies Appendix C Related Studies Intermodal Transit Village Concept Plan Appendix C Related Studies This appendix summarizes studies that are current at the time of this Plan. Intermodal Transit Village Concept

More information

FOR MORE INFORMATION, PLEASE CONTACT

FOR MORE INFORMATION, PLEASE CONTACT Major Properties, as the exclusive listing agent, is pleased to present this rare opportunity to acquire S. Central Avenue, located in the Downtown Los Angeles Produce District. This site is just two blocks

More information

Incentives for Historic Preservation

Incentives for Historic Preservation Incentives for Historic Preservation Historic places help define the character of our communities by providing a tangible link with the past. Today, historic districts around the country are experiencing

More information

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY. DEVELOPMENT and RELOCATION INCENTIVE PROGRAM OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY DEVELOPMENT and RELOCATION INCENTIVE PROGRAM DEVELOPMENT AND RELOCATION INCENTIVE PROGRAM I. Introduction The Development/Relocation Incentive program is designed

More information

The Urban Renewal Authority of Pueblo

The Urban Renewal Authority of Pueblo The Urban Renewal Authority of Pueblo The Urban Renewal Plan for the Saint Charles Industrial Park Urban Renewal Project Area Page 1 I. DEFINITIONS The terms used in this Urban Renewal Plan shall have

More information

Residential Market. Downtown Houston

Residential Market. Downtown Houston Downtown Houston The Houston Market Houston s residential market represents one of the best values in the United States. The city ranks third in the 2010 Forbes list of best housing markets, and second

More information

ECONOMIC RECOVERY BOARD FOR CAMDEN

ECONOMIC RECOVERY BOARD FOR CAMDEN ECONOMIC RECOVERY BOARD FOR CAMDEN GUIDE TO PROGRAM FUNDS April 2012 The Economic Recovery Board for Camden ( ERB ) is a subsidiary of the New Jersey Economic Development Authority. For further information

More information

DOWNTOWN AND NEIGHBORHOODS

DOWNTOWN AND NEIGHBORHOODS DEVELOPMENT DOWNTOWN AND NEIGHBORHOODS There is no doubt that our Downtown is the heart of Litchfield County. It is vital that we begin to restore and renew the vibrancy of Torrington s center. The City

More information

Frederick. Frederick. Maryland. Smart Growth Successes. Frederick. Maryland Department of Planning

Frederick. Frederick. Maryland. Smart Growth Successes. Frederick. Maryland Department of Planning Frederick Frederick Maryland Smart Growth Successes Frederick Maryland Department of Planning Smart, Green & Growing Martin O Malley Governor Anthony G. Brown Lt. Governor Maryland Department of Planning

More information

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN

More information

Submittal Requirements for Development Projects

Submittal Requirements for Development Projects Submittal Requirements for Development Projects 2004 Mission Statement: The Denver Urban Renewal Authority is a full-service redevelopment agency engaged in neighborhood and downtown revitalization, economic

More information

Understanding Value Capture as a Transportation Finance Strategy in Massachusetts. March 15, 2013

Understanding Value Capture as a Transportation Finance Strategy in Massachusetts. March 15, 2013 Understanding Value Capture as a Transportation Finance Strategy in Massachusetts March 15, 2013 Background The Massachusetts Legislature will soon explore options to increase transportation revenue. One

More information

STRATEGIC PLAN 2015 2020 2030

STRATEGIC PLAN 2015 2020 2030 STRATEGIC PLAN 2015 2020 2030 Boca Raton, Florida May 2015 Lyle Sumek Associates, Inc. Phone: (386) 246-6250 9 Flagship Court Fax: (386) 246-6252 Palm Coast, FL 32137 E-mail: sumekassoc@gmail.com Table

More information

IV. Market Analysis. A. Executive Summary. The Economy. The Site

IV. Market Analysis. A. Executive Summary. The Economy. The Site IV. Market Analysis A. Executive Summary The Economy The St. Louis metropolitan area population has grown at the moderate annual rate of 4.4% over the last eight years while employment (the best measure

More information

WEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution 2003-166-R)

WEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution 2003-166-R) WEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution 2003-166-R) Section 1. Purpose and Intent The goal of the West Mission Specific Plan is to facilitate the revitalization efforts

More information

WHEREAS, Santa Monica is a coastal city in a prime location, being bordered by the City of Los Angeles to the north, east and south; and

WHEREAS, Santa Monica is a coastal city in a prime location, being bordered by the City of Los Angeles to the north, east and south; and City Council Meeting / /2013 ORDINANCE NUMBER (CCS) (City Council Series) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA AMENDING SANTA MONICA MUNICIPAL CODE SECTIONS 9.56.020, 9.56.030,

More information

G. Syracuse RESTORE III The Connective Corridor: Building Upwards (W828) June 24, 2010. General Project Plan

G. Syracuse RESTORE III The Connective Corridor: Building Upwards (W828) June 24, 2010. General Project Plan General Project Plan Grantee: City of Syracuse (the City or Syracuse ) Beneficiary Company: 215 West Fayette Street Associates, LLC ESD Investment: Project Locations: A grant of up to $1,300,000, pending

More information

COMMUNITY DEVELOPMENT PROGRAM. Development Services Department

COMMUNITY DEVELOPMENT PROGRAM. Development Services Department Community Development Program includes the services and activities of two City departments: and Public Works Department. Programs: Administration Community Development Community Development Block Grants

More information

1. The area including Tiger Stadium, one of Michigan's cultural icons. 2. The area around Harridon Terminal, on the Rouge River.

1. The area including Tiger Stadium, one of Michigan's cultural icons. 2. The area around Harridon Terminal, on the Rouge River. Executive Summary: City of Detroit Renaissance Zone Introduction The City of Detroit is seeking the designation of two additional subzones for its successful Renaissance Zone project, which began in 1996

More information

How To Improve Housing In Seminole County

How To Improve Housing In Seminole County ELEMENT Introduction Issues and Concerns Goals, Objectives and Policies Exhibits 2020 ELEMENT INTRODUCTION Since populations group themselves into households, the socioeconomic makeup of those households

More information

Appendix N: Bicycle Parking Ordinance

Appendix N: Bicycle Parking Ordinance Appendix N: Bicycle Parking Ordinance ORDINANCE NO. #1-13. AN ORDINANCE AMENDING CHAPTER 40 OF THE MUNICIPAL CODE OF THE CITY OF DAVIS TO ADD ARTICLE 40.25A ESTABLISHING BICYCLE PARKING STANDARDS WHEREAS,

More information

Convention Center Expansion & Headquarters Hotel Feasibility Study for the Washington Convention Center. Summary of Study Findings

Convention Center Expansion & Headquarters Hotel Feasibility Study for the Washington Convention Center. Summary of Study Findings Convention Center Expansion & Headquarters Hotel Feasibility Study for the Washington Convention Center In March 2003, the new $850 million Washington Convention Center (WCC) opened to the public. The

More information

METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL

METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL METROPOLITAN REDEVELOPMENT PLAN II OLD ALBUQUERQUE HIGH SCHOOL Preface This revised plan for redevelopment of the Old Albuquerque High School Metropolitan Redevelopment Area has been prepared pursuant

More information

Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m.

Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m. Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m. Meeting Agenda 1. Background Information 2. Policy Framework 3. Plan Development Process 4. Public Input Results 5. Vision Statement 6. Group

More information

Revitalizing. Tulsa.

Revitalizing. Tulsa. Revitalizing Tulsa. The Tribune Lofts Fabulous luxury apartment living in the inner-city. Community. Commerce. Lifestyle. Tulsa Development Authority Improving the quality of life while preserving neighborhoods.

More information

Understanding the tax base consequences of local economic development programs

Understanding the tax base consequences of local economic development programs Understanding the tax base consequences of local economic development programs Gsottschneider, Richard K It is generally accepted by economic development professionals and municipal officials that new

More information

March 13, 2006. Hon. Scott M. Stringer Manhattan Borough President 1 Centre Street New York, NY 10007. Dear Borough President Stringer:

March 13, 2006. Hon. Scott M. Stringer Manhattan Borough President 1 Centre Street New York, NY 10007. Dear Borough President Stringer: THE CITY OF NEW YORK INDEPENDENT BUDGET OFFICE 110 WILLIAM STREET, 14 TH FLOOR NEW YORK, NEW YORK 10038 (212) 442-0632 FAX (212) 442-0350 EMAIL: ibo@ibo.nyc.ny.us http://www.ibo.nyc.ny.us Hon. Scott M.

More information

Tashman Johnson LLC Consultants in Policy, Planning & Project Management

Tashman Johnson LLC Consultants in Policy, Planning & Project Management Tashman Johnson LLC Consultants in Policy, Planning & Project Management AN OVERVIEW OF URBAN RENEWAL Tashman Johnson LLC Jeffrey Tashman 503.245.7828 Nina Johnson 503.245.7416 Fax 503.245.3171 6585 S.W.

More information

Lower Manhattan Development Corporation. World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003

Lower Manhattan Development Corporation. World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003 1. Introduction Lower Manhattan Development Corporation World Trade Center Memorial and Cultural Program Amended General Project Plan September 16, 2003 The Lower Manhattan Development Corporation ( LMDC

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 The Planning and Development Department hereby forwards

More information

" e ChllG VACATION OF A PORTION OF JULIAN STREET WEST OF TERRAINE STREET

 e ChllG VACATION OF A PORTION OF JULIAN STREET WEST OF TERRAINE STREET CITY OF C *2 SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 6/14/16 ITEM: Memorandum FROM: Barry Ng SUBJECT: SEE BELOW DATE: Approved D " e ChllG COUNCIL DISTRICT:

More information

Financing Options for the Ford Highland Park Project

Financing Options for the Ford Highland Park Project Financing Options for the Ford Highland Park Project Prepared for: Woodward Heritage 5401 Woodward Avenue Detroit, Michigan 48202 Prepared by: 76 East Forest Avenue Detroit, Michigan 48201 December 2005

More information

STANFORD WHOLESALE MART

STANFORD WHOLESALE MART FOR SALE LEASEHOLD INTEREST STANFORD WHOLESALE MART LOS ANGELES FASHION DISTRICT 807 East 12th Street For more information please contact: Laurie Lustig-Bower Executive Vice President +1 310 550 2556 Laurie.Lustig-Bower@cbre.com

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

City of Tampa Zoning Districts

City of Tampa Zoning Districts City of Tampa Zoning Districts The city is divided by chapter 2 into zoning districts, the boundaries and designations of which are shown in a series of maps, covering in combination the entire land and

More information

Chapter 13: Implementation Plan

Chapter 13: Implementation Plan Chapter 13: 13.1. INTRODUCTION The purpose of the implementation chapter of the Comprehensive Plan is to set forth the actions that the City will take to ensure that the plans, programs and policies set

More information

ECONOMIC DEVELOPMENT MOTION

ECONOMIC DEVELOPMENT MOTION MOTION ECONOMIC DEVELOPMENT The Los Angeles Streetcar project will benefit economic development, transit accessibility and neighborhood connectivity. The project will be a great benefit to Downtown L.A.

More information

1. Land Use. Chapter 1: Land Use 1-1 Adopted 10/2/09 Amended 3/22/11, 8/16/11

1. Land Use. Chapter 1: Land Use 1-1 Adopted 10/2/09 Amended 3/22/11, 8/16/11 1. Land Use Minneapolis will develop and maintain a land use pattern that strengthens the vitality, quality and urban character of its downtown core, commercial corridors, industrial areas, and neighborhoods

More information

315 First Ave NE Minneapolis, MN 55413

315 First Ave NE Minneapolis, MN 55413 View Neighborhood View Project Details 315 First Ave NE Minneapolis, MN 55413 22,000 SF of Retail and Restaurant Space Available for Lease View Renderings View Maps View Area Plans Contact NORTHEAST MINNEAPOLIS

More information

Policy No.: F-7 CITY OF OLATHE COUNCIL POLICY STATEMENT. Date Issued: 12-15-15. Effective Date: 1-1-16. Cancellation Date: 12-31-17

Policy No.: F-7 CITY OF OLATHE COUNCIL POLICY STATEMENT. Date Issued: 12-15-15. Effective Date: 1-1-16. Cancellation Date: 12-31-17 CITY OF OLATHE COUNCIL POLICY STATEMENT Policy No.: F-7 Date Issued: 12-15-15 General Scope: Specific Subject: Finance Tax Increment Financing Policy Effective Date: 1-1-16 Cancellation Date: 12-31-17

More information

COMPREHENSIVE PLAN HOUSING ELEMENT

COMPREHENSIVE PLAN HOUSING ELEMENT COMPREHENSIVE PLAN HOUSING ELEMENT Policy Document CHAPTER 3: HOUSING ELEMENT TABLE OF CONTENTS Chapter 3: HOUSING ELEMENT... 1 INTRODUCTION... 2 GOALS, OBJECTIVES AND POLICIES... 3 Goal: Housing... 3

More information

Community Engagement for Preservation Rental Housing: Preservation and Rehabilitation

Community Engagement for Preservation Rental Housing: Preservation and Rehabilitation Rhode Island Housing Page 1 of 3 Opting Out is Not an Option The preservation of our scarce inventory of affordable apartments has always been a priority for Rhode Island Housing. Faced with record-high

More information

BUSINESS TECHNOLOGY CENTER REDEVELOPMENT PLAN SUMMARY

BUSINESS TECHNOLOGY CENTER REDEVELOPMENT PLAN SUMMARY BUSINESS TECHNOLOGY CENTER REDEVELOPMENT PLAN SUMMARY F rom autumn 2014 through spring 2015, HBDi worked closely with its consultant team to create a redevelopment vision for the Palm Center Business Technology

More information

CENTRAL BUSINESS DISTRICT IMPROVEMENTS DEVELOPMENT PLAN AND TAX INCREMENT FINANCING PLAN Mt. Pleasant, Michigan DEVELOPMENT PLAN

CENTRAL BUSINESS DISTRICT IMPROVEMENTS DEVELOPMENT PLAN AND TAX INCREMENT FINANCING PLAN Mt. Pleasant, Michigan DEVELOPMENT PLAN I. General CENTRAL BUSINESS DISTRICT IMPROVEMENTS DEVELOPMENT PLAN AND TAX INCREMENT FINANCING PLAN Mt. Pleasant, Michigan DEVELOPMENT PLAN This report is intended to describe the methodology involved

More information

Block A-24 REDEVELOPMENT PLAN

Block A-24 REDEVELOPMENT PLAN Block A-24 REDEVELOPMENT PLAN TABLE OF CONTENTS I. Introduction II. Description of Project Area A. Existing Uses and Conditions B. Boundary Description III. Goals and Objectives IV. Redevelopment Activities

More information

CRA HOUSING POLICY THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA AUGUST 4, 2005

CRA HOUSING POLICY THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA AUGUST 4, 2005 CRA HOUSING POLICY THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA AUGUST 4, 2005 1 THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA HOUSING POLICY TABLE

More information

FUTURE LAND USE ELEMENT

FUTURE LAND USE ELEMENT GOALS, OBJECTIVES AND POLICIES FUTURE LAND USE ELEMENT GOAL A THE CITY OF FORT WALTON BEACH WILL PLAN FOR AND PROVIDE A HIGH QUALITY OF LIFE TO MEET THE NEEDS OF THE CURRENT AND FUTURE POPULATION, PROVIDING

More information

LONG-RANGE PROPERTY MANAGEMENT PLAN

LONG-RANGE PROPERTY MANAGEMENT PLAN LONG-RANGE PROPERTY MANAGEMENT PLAN CITY OF MODESTO REDEVELOPMENT SUCCESSOR AGENCY OCTOBER 2013 Prepared By: KOSMONT COMPANIES 865 S. Figueroa Street, #3500 Los Angeles, CA 90017 Telephone: (213) 417-3300

More information

7.0 GOALS, OBJECTIVES & POLICIES

7.0 GOALS, OBJECTIVES & POLICIES 7.0 GOALS, OBJECTIVES & POLICIES The following Goals, Objectives and Policies specific to Housing are organized into broad categories including: 7.1: Housing Availability 7.2: Protection of Existing Neighborhoods

More information

21.04 LAND USE. Managing amenity through land use strategies

21.04 LAND USE. Managing amenity through land use strategies 21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and

More information

Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan

Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan STAFF REPORT ACTION REQUIRED Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan Date: June 8, 2010 To: From: Wards: Community Development and Recreation Committee

More information

S U S TA I N A B L E C O M M U N I T I E S : EAST NEW YORK

S U S TA I N A B L E C O M M U N I T I E S : EAST NEW YORK S U S TA I N A B L E C O M M U N I T I E S : EAST NEW YORK REGIONAL ACCESS MIDTOWN 30 40 mins (A) LOWER MANHATTAN 18 25 mins (A) JAMAICA 9 Mins (LIRR) NASSAU CENTER 32 mins (LIRR) DOWNTOWN BROOKLYN 15-20

More information

Economic Impact and Development Analysis. Proposed Sports Entertainment District

Economic Impact and Development Analysis. Proposed Sports Entertainment District THE LONDON GROUP Economic Impact and Development Analysis Proposed Sports Entertainment District Prepared For: The City of Escondido November 2010 The London Group 2010 Report Prepared by: Gary H. London,

More information

Strategic Planning. Frequently Asked Questions. Member Services

Strategic Planning. Frequently Asked Questions. Member Services The SID is proactively working to combat these challenges and is poised to take the necessary steps to ensure downtown transitions from these difficult times to a vibrant and active center Strategic Planning

More information

Land Banks and Affordable Housing

Land Banks and Affordable Housing September 2008 Volume 7 Issue 5 Land Banks and Affordable Housing You can hardly turn on the news today without hearing a report that the number of foreclosed properties continues to rise nationwide. In

More information

Tom Larkin, EDAW, Inc. Bill Anderson, ERA Amitabh Barthakur, ERA Judy Taylor, ERA. Preliminary Fiscal Analysis for the Navy Broadway Complex

Tom Larkin, EDAW, Inc. Bill Anderson, ERA Amitabh Barthakur, ERA Judy Taylor, ERA. Preliminary Fiscal Analysis for the Navy Broadway Complex Memorandum Date: November 11, 2005 To: From: RE: Tom Larkin, EDAW, Inc. Bill Anderson, ERA Amitabh Barthakur, ERA Judy Taylor, ERA Preliminary Fiscal Analysis for the Navy Broadway Complex ERA No. 16330

More information

C. Owego RESTORE III Historic Central Business Restoration (W846) August 16, 2010. General Project Plan. Village of Owego ( Owego or the Village )

C. Owego RESTORE III Historic Central Business Restoration (W846) August 16, 2010. General Project Plan. Village of Owego ( Owego or the Village ) General Project Plan Grantee: Beneficiaries: ESD Investment: Project Locations: NYS Empire Zone: Village of Owego ( Owego or the Village ) Field Afar Properties, LLC (2 Court Street) Gerald Arbes (20 Church

More information

PADMA VENKATACHALAM March 2001 Washington, D.C.

PADMA VENKATACHALAM March 2001 Washington, D.C. A STUDY OF THE ECONOMIC IMPACT OF THE RELOCATION OF THE NEWSEUM IN THE DISTRICT OF COLUMBIA PADMA VENKATACHALAM March 2001 Washington, D.C. 2. INTRODUCTION 2.1 Background The key objective of the Newseum

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Deep Ellum Crossroads Redevelopment Project

Deep Ellum Crossroads Redevelopment Project Deep Ellum Crossroads Redevelopment Project Deep Ellum TIF District Economic Development Committee September 15, 2014 Office of Economic Development Overview Discuss the redevelopment and site improvements

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M DATE: APRIL 15, 2004 HO2020

THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M DATE: APRIL 15, 2004 HO2020 THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M 8 DATE: APRIL 15, 2004 HO2020 TO: FROM: RESPONSIBLE: PARTIES AGENCY COMMISSIONERS ROBERT R. OVROM, CHIEF EXECUTIVE

More information

CITY OF NEWARK SECTION 108 LOAN PROGRAM. DRAFT PROGRAM GUIDELINES As approved on 7/28/13 by HUD and written on 9/15/14

CITY OF NEWARK SECTION 108 LOAN PROGRAM. DRAFT PROGRAM GUIDELINES As approved on 7/28/13 by HUD and written on 9/15/14 CITY OF NEWARK SECTION 108 LOAN PROGRAM DRAFT PROGRAM GUIDELINES As approved on 7/28/13 by HUD and written on 9/15/14 A Program Financed Under the U.S. Department of Housing & Urban Development Section

More information

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING

CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING CITY OF FLORENCE NEIGHBORHOOD REVITALIZATION STRATEGY SECOND PUBLIC MEETING Prepared for: City of Florence July 7th, 2014 AGENDA Review Feedback from First Community Meeting Present Catalytic Project Areas

More information

Legacy Crossing Urban Renewal District Redevelopment Plan

Legacy Crossing Urban Renewal District Redevelopment Plan Legacy Crossing Urban Renewal District Redevelopment Plan Prepared for the Moscow Urban Renewal Agency by Consultants & Staff to the Urban Renewal Agency June 2, 2008 City Council Resolution 2007-24 Adopted

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals: Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota Land Use Goals: 1. Growth in Wadena will be undertaken in such a manner as to create a full range of living, working, shopping,

More information

Welcome to Auburn, NY

Welcome to Auburn, NY CAPITAL FINANCING Need help financing your business? Public lending programs were created to help small businesses access the capital they need to achieve their business goals. Locally administered programs

More information

INVESTMENT OFFERING. Peter Pan Motel. 110 N. 13th Street Las Vegas, Nevada 89101. Peter Pan Motel Las Vegas, Nevada

INVESTMENT OFFERING. Peter Pan Motel. 110 N. 13th Street Las Vegas, Nevada 89101. Peter Pan Motel Las Vegas, Nevada INVESTMENT OFFERING Peter Pan Motel 110 N. 13th Street Las Vegas, Nevada 89101 Table of Contents Section I Section II Section III Section IV Section V Section VI Summary Business Description Property Description

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

MARKET OPPORTUNITIES. Incentives for Food Retailers

MARKET OPPORTUNITIES. Incentives for Food Retailers MARKET OPPORTUNITIES Incentives for Food Retailers South : Opportunity for Growth... Increasing healthy eating options by locating new grocery stores, sit-down restaurants and fresh food markets in the

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT OBJECTIVES The project applicant seeks to develop three different underutilized sites in Downtown Los Angeles, including the careful rehabilitation of an important City

More information

Opal Service District Plan

Opal Service District Plan 8 The Opal Service District includes a variety of planned land uses including commercial, mixed-use, flex office, industrial, and hospitality. This Plan seeks to simplify the land use categories to allow

More information

VANDERBILT COMPARISON

VANDERBILT COMPARISON Village of Vanderbilt Comparison One County, One Vision Master Plan (2000) 1 15 Improve recreation in Otsego County by assessing the availability and need to improve bike paths, county recreation facilities,

More information

Tampa Brownfields Program. Prepared for: FBA Improving Access to Health and Health Care Workshop

Tampa Brownfields Program. Prepared for: FBA Improving Access to Health and Health Care Workshop Tampa Brownfields Program Prepared for: FBA Improving Access to Health and Health Care Workshop October 29, 2012 Tampa EPA Brownfields History EPA Brownfields Funding 1992: $200,000 EPA Brownfields Pilot

More information

BEFORE THE PHOENIX PLANNING COMMISSION CITY OF PHOENIX, STATE OF OREGON

BEFORE THE PHOENIX PLANNING COMMISSION CITY OF PHOENIX, STATE OF OREGON BEFORE THE PHOENIX PLANNING COMMISSION CITY OF PHOENIX, STATE OF OREGON In the matter of an application for a ) PLANNING COMMISSION Demolition Permit for a property ) Commonly known as Furry House ) RECOMMENDATION

More information

Land Use Element. Introduction 2.3. A Citywide Land Use Policies 2.3. A-1 The Future Land Use Map & the Location of Zones 2.3. A-2 Uses 2.

Land Use Element. Introduction 2.3. A Citywide Land Use Policies 2.3. A-1 The Future Land Use Map & the Location of Zones 2.3. A-2 Uses 2. Seattle s Comprehensive Plan Toward a Sustainable Seattle 2.1 Land Use Element Table of Contents Introduction 2.3 A Citywide Land Use Policies 2.3 A-1 The Future Land Use Map & the Location of Zones 2.3

More information

THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M DATE: FEBRUARY 17, 2005 HW1220 AGENCY COMMISSIONERS

THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M DATE: FEBRUARY 17, 2005 HW1220 AGENCY COMMISSIONERS THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M 10 DATE: FEBRUARY 17, 2005 HW1220 TO: FROM: RESPONSIBLE PARTY: SUBJECT: AGENCY COMMISSIONERS ROBERT R. OVROM,

More information

City of North Miami NSP 3 Substantial Amendment

City of North Miami NSP 3 Substantial Amendment City of North Miami NSP 3 Substantial Amendment 1. NSP3 Grantee Information NSP3 Program Administrator Contact Information Name (Last, First) Calloway, Maxine Email Address mcalloway@northmiamifl.gov Phone

More information

ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation (CCR Title 25 6202 )

ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation (CCR Title 25 6202 ) page 1 of 9 (CCR Title 5 6 ) Reporting Period 7-1 Table A Annual Building Activity Report Summary - New Construction Very Low-, Low-, and Mixed- Multifamily Projects Housing Development Information Housing

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in

More information