Guide Specifications for Maple Flooring Systems
|
|
|
- Brianna Joseph
- 9 years ago
- Views:
Transcription
1 Guide Specifications for Maple Flooring Systems
2 MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. The information contained herein is based on best industry practices, however the Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these guide specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Always refer to MFMA s current list of position statements when writing any specification. Position statements can be found on our web site at Part 1-General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor retarder, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of +/- 1/8 in a 10 radius, subject to the approval of the MFMA Mill Accredited Installation Company*. Resilient Pre-Engineered Fixed Panel F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as per manufacturer s specifications. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. Subject to local conditions. 3. Sand-Poly-Sand slab construction is not acceptable. 4. Concrete shall be free of washed river gravel, pea gravel, flint or hardener additives. C. The MFMA Mill Accredited Installation Company* shall provide all tools and services to install a complete wood floor system from the concrete s surface polyethylene vapor retarder, when required, upward through the sanding and finishing, plus the installation of perimeter moldings. * Effective November 1, Quality Assurance A. The wood flooring shall be MFMA-RL, MFMA-FJ or MFMA-PQ maple. B. The flooring contractor shall be an MFMA Mill Accredited Installation Company* with MFMA Accredited Installer(s)* on-site for the duration of the wood floor installation. C. Flooring shall be delivered to the premises and acclimated, if necessary. D. All skids of flooring bundles should be opened and spread out to acclimate the flooring to environmental conditions in the building, when applicable. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating before, during and after installation, controlling a temperature range of 55 degrees to 75 degrees and a relative humidity range compatible with expected environmental conditions when the facility is occupied. (Maintaining a maximum 15 percent difference between high and low humidity levels). Expected minimum/maximum indoor relative humidity will depend upon building design, geographic location, HVAC systems and operating schedules. Consult your local MFMA Sport Floor contractor for specific information. 1.4 Warranty A. The MFMA Mill Accredited Installation Company* shall warrant the floor installation, and shall furnish a flooring materials warranty from the flooring manufacturer. B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions.
3 MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple, MFMA-FJ Northern Hard Maple; 25/32 or 1/2 thick x 3-1/4, 2-1/2, 2-1/4 or 1-1/2 wide; First, Second and Better, Third and Better, Third Grade or Utility Grade; T & G and EM; grade marked and stamped as produced by an MFMA member manufacturer or MFMA-PQ Northern Hard Maple; 5/16 to 7/16 thick panels; Second and Better or Third Grade; grade marked and stamped as produced by an MFMA member manufacturer. B. Concrete slab surface vapor retarder shall be minimum 6 mil. Polyethylene. C. The wooden subfloor shall be pre-engineered panels manufactured by and supplied by an MFMA flooring manufacturer. D. Cushioning pad(s) shall be supplied and installed per manufacturer s instructions. E. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by MFMA flooring manufacturer. F. Subfloor anchoring system shall be per MFMA flooring manufacturer design. G. Wall base shall be 4 x 3 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring manufacturer. H. Finish materials shall be selected from the most recent listing of MFMA tested and certified products, approved by MFMA flooring manufacturer and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete slab for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so the accredited installation company will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with surface vapor retarder, lapping joints a minimum of 6 or as specified by the flooring system manufacturer. B. Install pre-engineered subfloor panels per MFMA manufacturer s instructions, perpendicular or diagonal to the finished flooring in a brick pattern. Space subfloor panels according to MFMA flooring manufacturer s recommendation. If required by the flooring system manufacturer, install solid blocking under bleachers in the stacked position and where portable backstops or other areas subjected to high loads as shown on architectural drawings. If required by the flooring system manufacturer, install recommended blocking below bleachers in the extended position. Install subfloor system using concrete anchors per MFMA flooring manufacturer s instructions. Provide 2 expansion voids at the perimeter and at all vertical C. Install maple flooring parallel to main playing court by nailing or stapling per manufacturer s instructions. 1. Space joints between flooring strips to allow for intermediate expansion in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical 3.3 Floor Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even and uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust. B. Apply seal and finish per finish manufacturers instructions. C. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vented cove base by anchoring to walls with base cement, screws or anchors. B. Miter inside corners, and use premolded outside corners. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instructions of the MFMA and the flooring manufacturer are followed.
4 MFMA Guide Specifications for Resilient Fixed Plywood Sleeper with Continuous Subfloor System Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. The information contained herein is based on best industry practices however the Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these guide specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Always refer to MFMA s current list of position statements when writing any specification. Position statements can be found on our web site at Part 1-General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor retarder, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of +/- 1/8 in a 10 radius, subject to the approval of the MFMA Mill Accredited Installation Company.* Plywood Sleeper with Continuous Subfloor F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as per manufacturer s specifications. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. Subject to local conditions. 3. Sand-Poly-Sand slab construction is not acceptable. 4. Concrete shall be free of washed river gravel, pea gravel, flint or hardener additives. C. The MFMA Mill Accredited Installation Company* shall provide all tools and services to install a complete wood floor system from the concrete s surface vapor polyethylene retarder, when required, upward through the sanding and finishing, plus the installation of perimeter moldings. 1.2 Quality Assurance A. The wood flooring shall be MFMA-RL or MFMA-FJ. B. The flooring contractor shall be an MFMA Mill Accredited Installation Company* with MFMA Accredited Installer(s)* on-site for the duration of the wood floor installation. C. Flooring shall be delivered to the premises and acclimated, if necessary. D. All skids of flooring bundles should be opened and spread out to acclimate the flooring to environmental conditions in the building, when applicable. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating before, during and after installation, controlling a temperature range of 55 degrees to 75 degrees and a relative humidity range compatible with expected environmental conditions when the facility is occupied. (Maintaining a maximum 15 percent difference between high and low humidity levels). Expected minimum/maximum indoor relative humidity will depend upon building design, geographic location, HVAC systems and operating schedules. Consult your local MFMA Sport Floor contractor for specific information. 1.4 Warranty A. The MFMA Mill Accredited Installation Company* shall warrant the floor installation, and shall furnish a flooring materials warranty from the flooring manufacturer. B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions. Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple, MFMA-FJ Northern Hard Maple; 25/32 or 1/2 thick x 3-1/4, 2-1/2, 2-1/4 or 1-1/2 wide; First, Second and Better, Third and Better, Third Grade or Utility Grade; T & G and EM; grade marked and stamped as produced by an MFMA member manufacturer. B. Concrete slab surface vapor retarder shall be minimum 6 mil. Polyethylene. C. Subfloor sleepers shall be factory-drilled engineered sleepers with resilient pads spaced per MFMA flooring manufacturers design. * Effective November 1, 2007
5 MFMA Guide Specifications for Resilient Fixed Plywood Sleeper with Continuous Subfloor System D. Subfloor sleeper anchoring system shall be per MFMA manufacturer design. E. Subfloor panels shall be 15/32 x 4 x 8 APA (or flooring manufacturer approved equivalent) Rated Sheathing, Exposure 1, minimum 4 ply or per MFMA flooring manufacturer design. F. Cushioning pad(s) shall be supplied and attached per flooring manufacturer s instructions. G. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring manufacturer. H. Wall base shall be 4 x 3 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring manufacturer. I. Finish materials shall be selected from the most recent listing of MFMA tested and certified products, approved by MFMA flooring manufacturer and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete slab for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so the accredited installation company will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with surface vapor retarder, lapping joints a minimum of 6 or as specified by the vapor retarder manufacturer. B. Install subfloor sleepers perpendicular to the finished flooring staggering joints, spacing subfloor panels according to manufacturer s recommendation. Sleepers shall be spaced per MFMA floor manufacturers design. Install subfloor system using concrete anchors per maple flooring manufacturer s instructions. If required by the flooring system manufacturer, install solid blocking under bleachers in the stacked position and where portable backstops or other areas subjected to high loads as shown on architectural drawings. If required by the flooring system manufacturer, install recommended blocking below bleachers in the extended position. Attached subfloor panels to the sleepers using 1-1/4 nails or staples 12 o.c., spacing plywood 1/4 on all sides and edges, end joints staggered 4 and breaking on the sleepers. Provide 2 expansion voids at the perimeter and at all vertical C. Install maple flooring parallel to main playing court by nailing or stapling per manufacturer s instructions. 1. Space joints between flooring strips to allow for intermediate expansion in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical 3.3 Floor Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even and uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust. B. Apply seal and finish per finish manufacturers instructions. C. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vented cove base by anchoring to walls with base cement, screws or anchors. B. Miter inside corners, and use premolded outside corners. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instructions of the MFMA and the flooring manufacturer are followed.
6 MFMA Guide Specification for Double Plywood Floor System Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. The information contained herein is based on best industry practices however the Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these guide specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Always refer to MFMA s current list of position statements when writing any specification. Position statements can be found on our web site at Part 1-General 1.1 Description A. This document specifies a wood strip or parquet gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor retarder, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of +/- 1/8 in a 10 radius, subject to the approval of the MFMA Mill Accredited Installation Company*. Double Plywood System F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as per manufacturer s specifications. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. Subject to local conditions. 3. Sand-Poly-Sand slab construction is not acceptable. 4. Concrete shall be free of washed river gravel, pea gravel, flint or hardener additives. C. The MFMA Mill Accredited Installation Company* shall provide all tools and services to install a complete wood floor system from the concrete s surface vapor polyethylene retarder, when required, upward through the sanding and finishing, plus the installation of perimeter moldings. 1.2 Quality Assurance A. The wood flooring shall be MFMA-RL, MFMA-FJ or MFMA-PQ maple. B. The flooring contractor shall be an MFMA Mill Accredited Installation Company* with MFMA Accredited Installer(s)* on-site for the duration of the wood floor installation. C. Flooring shall be delivered to the premises and acclimated, if necessary. D. All skids of flooring bundles should be opened and spread out to acclimate the flooring to environmental conditions in the building, when applicable. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating before, during and after installation, controlling a temperature range of 55 degrees to 75 degrees and a relative humidity range compatible with expected environmental conditions when the facility is occupied. (Maintaining a maximum 15 percent difference between high and low humidity levels). Expected minimum/maximum indoor relative humidity will depend upon building design, geographic location, HVAC systems and operating schedules. Consult your local MFMA Sport Floor contractor for specific information. 1.4 Warranty A. The MFMA Mill Accredited Installation Company* shall warrant the floor installation, and shall furnish a flooring materials warranty from the flooring manufacturer. B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions. * Effective November 1, 2007
7 MFMA Guide Specification for Double Plywood Floor System Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 25/32 or 1/2 thick x 3-1/4, 2-1/2, 2-1/4 or 1-1/2 wide; First Grade, Second and Better, Third and Better, Third Grade or Utility Grade; T & G and EM; grade marked and stamped as produced by an MFMA member manufacturer or MFMA-PQ Northern Hard Maple; 5/16 to 7/16 thick panels; Second and Better or Third Grade; grade marked and stamped as produced by an MFMA member manufacturer. B. Concrete slab surface vapor retarder shall be minimum 6 mil. Polyethylene. C. Subfloor shall be 15/32 x 4 x 8, minimum 4 ply, APA (or flooring manufacturers approved rated equivalent) Rated Sheathing, Exposure 1, or per MFMA flooring manufacturer design. D. Cushioning pad(s) as supplied by flooring manufacturer. E. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring manufacturer. F. Wall base shall be 4 x 3 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring manufacturer. G. Finish materials shall be selected from the most recent listing of MFMA tested and certified products, approved by MFMA flooring manufacturer and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete slab for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so the accredited installation company will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with surface vapor retarder, lapping joints a minimum of 6 or as specified by the vapor retarder manufacturer. B. Install first layer of subfloor plywood opposite the direction of the maple flooring, 1/4 spacing all edges and breaking joints 4 - Provide 2 expansion voids at perimeter and all vertical If required by the flooring system manufacturer, install solid blocking under bleachers in the stacked position and where portable backstops or other areas subjected to high loads as shown on architectural drawings. If required by the flooring system manufacturer, install recommended blocking below bleachers in the extended position. The underside of the first layer shall have 32 cushion pads per sheet attached 12 o.c. and 6 from edges of subfloor material on all sides. Provide 2 expansion voids at the perimeter and at all vertical C. The second layer of subfloor material shall be laid diagonally (45 degrees) (option: Install both layers of plywood at 45 degree angles to finished flooring.) over the first layer 1/4 spacing all edges and breaking joints 4. Attach second layer of subfloor material with nails or staples 12 o.c. (When using Parquet, construction adhesive should also be used between the layers of plywood as recommended by the flooring system manufacturer). Provide 2 expansion voids at the perimeter and at all vertical D. Install maple flooring parallel with main playing court by nailing or stapling approximately 12 o.c. or as specified by the flooring manufacturer. 1. Space joints between flooring strips to allow for intermediate expansion in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical 3.3 Floor Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even and uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust. B. Apply seal and finish per finish manufacturers instructions. C. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vented cove base by anchoring to walls with base cement, screws or anchors. B. Miter inside corners, and use premolded outside corners. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instructions of the MFMA and the flooring manufacturer are followed.
8 MFMA Guide Specification for Sleeper and Sleeper with Plywood Floor Systems Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. The information contained herein is based on best industry practices however the Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these guide specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Always refer to MFMA s current list of position statements when writing any specification. Position statements can be found on our web site at Part 1- General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor retarder, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of +/- 1/8 in a 10 radius, subject to the approval of the MFMA Mill Accredited Installation Company.* Sleeper System Sleeper with Plywood System 1/2 F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as per manufacturer s specifications. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. Subject to local conditions. 3. Sand-Poly-Sand slab construction is not acceptable. 4. Concrete shall be free of washed river gravel, pea gravel, flint or hardener additives. C. The MFMA Mill Accredited Installation Company* shall provide all tools and services to install a complete wood floor system from the concrete s surface vapor polyethylene retarder, when required, upward through the sanding and finishing, plus the installation of perimeter moldings. 1.2 Quality Assurance A. The wood flooring shall be MFMA-RL or MFMA-FJ maple. B. The flooring contractor shall be an MFMA Mill Accredited Installation Company* with MFMA Accredited Installer(s)* on-site for the duration of the wood floor installation. C. Flooring shall be delivered to the premises and acclimated, if necessary. D. All skids of flooring bundles should be opened and spread out to acclimate the flooring to environmental conditions in the building, when applicable. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating before, during and after installation, controlling a temperature range of 55 degrees to 75 degrees and a relative humidity range compatible with expected environmental conditions when the facility is occupied. (Maintaining a maximum 15 percent difference between high and low humidity levels). Expected minimum/maximum indoor relative humidity will depend upon building design, geographic location, HVAC systems and operating schedules. Consult your local MFMA Sport Floor contractor for specific information. * Effective November 1, 2007
9 MFMA Guide Specification for Sleeper and Sleeper with Plywood Floor Systems 1.4 Warranty A. The MFMA Mill Accredited Installation Company* shall warrant the floor installation, and shall furnish a flooring materials warranty from the flooring manufacturer. B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions. Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple, MFMA-FJ Northern Hard Maple; 25/32 or 1/2 (requires plywood subfloor) thick x 3-1/4, 2-1/2, 2-1/4 or 1-1/2 wide; First, Second and Better, Third and Better, Third Grade or Utility Grade; T & G and EM; grade marked and stamped as produced by an MFMA member manufacturer. B. Concrete slab surface vapor retarder shall be minimum 6 mil. Polyethylene. C. Cushioned Sleepers shall be 2 x 3 x 4 nominal KD Hemlock, Spruce, Pine or Fir with pads as supplied by flooring manufacturer. D. Optional plywood subfloor shall be 15/32 x 4 x 8 APA (or flooring manufacturer approved equivalent) Rated Sheathing, Exposure 1, minimum 4 ply or per MFMA flooring manufacturer design. E. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring manufacturer. F. Wall base shall be 3 x 4 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring manufacturer. G. Finish materials shall be selected from the most recent listing of MFMA tested and certified products, approved by MFMA flooring manufacturer and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete subfloors for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so the accredited installation company will have adequate access to work surface. 3.2 Installation A. Cover entire concrete slab with surface vapor retarder, lapping joints a minimum of 6 or as specified by the vapor retarder manufacturer. B. Sleeper System: 1. Install sleepers end to end at right angles to the direction of the finished flooring with end joints staggered a minimum of 24. The sleepers shall be spaced 9 o.c. When Third and Better or Third Grade flooring is specified, sleepers should be spaced 8 o.c. If required by the flooring system manufacturer, install solid blocking under bleachers in the stacked position and where portable backstops or other areas subjected to high loads as shown on architectural drawings. If required by the flooring system manufacturer, install recommended blocking below bleachers in the extended position. Maintain a 2 expansion void at the walls and at all vertical C. Sleeper with Plywood System 1. Install sleepers end to end at right angles to the direction of the finished flooring with end joints staggered a minimum of 24. The sleepers shall be spaced 12 o.c. If required by the flooring system manufacturer, install solid blocking under bleachers in the stacked position and where portable backstops or other areas subjected to high loads as shown on architectural drawings. If required by manufacturer, install recommended blocking below bleachers in the extended position. Maintain a 2 expansion void at the walls and at all vertical 2. Install plywood over sleepers at 90 degree angle to direction of finished flooring, 1/4 spacing all edges and breaking joints 4. Attach with nails or staples 12 o.c. D. Install maple flooring parallel with the main playing court by nailing or stapling approximately 12 o.c. or as specified by the flooring manufacturer. 1. Space joints between flooring strips to allow for intermediate expansion, in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical 3.3 Flooring Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even, uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust. B. Apply seal and finish per finish manufacturers instructions. C. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vented cove base by anchoring to walls with base cement, screws or anchors. B. Miter inside corners, and use premolded outside corners. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instruction of the MFMA and the flooring manufacturer are followed. * Effective November 1, 2007
10 MFMA Guide Specification for Basket Weave Floor Systems Purpose This Guide Specification is designed to assist in the production of actual architectural specifications for maple athletic flooring installations. It is hoped that this Guide will be of particular value to those who do not have a detailed knowledge of the construction of athletic floors and that it will aid in maintaining high construction standards. The information contained herein is based on best industry practices however the Maple Flooring Manufacturers Association, Inc. (MFMA), its members and employees, do not warrant the information contained herein as proper under all conditions. The MFMA reserves the right to revise these guide specifications as necessary. Questions concerning information contained in this Guide should be directed to MFMA, attention Technical Director. Always refer to MFMA s current list of position statements when writing any specification. Position statements can be found on our web site at Part 1- General 1.1 Description A. This document specifies a wood strip gymnasium floor system consisting, in general, of maple flooring, wood subflooring, vapor retarder, sanding, sealers, finishes, game lines and wall base. B. The general contractor shall provide a concrete slab, troweled smooth and level to a tolerance of +/- 1/8 in a 10 radius, subject to the approval of the MFMA Mill Accredited Installation Company.* Basket Weave System Basket Weave with Pads System * Effective November 1, 2007 F-Numbers are not applicable for gymnasium slab applications. Labor and materials necessary to put the concrete slab in acceptable condition (high areas ground down and low areas filled with appropriate leveling compounds) shall be the responsibility of the general contractor. Installation shall not proceed until the concrete slab is in acceptable condition. 1. The general contractor shall provide slab depressions as per manufacturer s specifications. 2. Concrete subfloors shall have an adequate moisture barrier beneath and at the perimeter of the slab. Subject to local conditions. 3. Sand-Poly-Sand slab construction is not acceptable. C. The MFMA Mill Accredited Installation Company* shall provide all tools and services to install a complete wood floor system from the concrete s surface vapor polyethylene retarder, when required, upward through the sanding and finishing, plus the installation of perimeter moldings. 1.2 Quality Assurance A. The wood flooring shall be MFMA-RL or MFMA-FJ maple. B. The flooring contractor shall be an MFMA Mill Accredited Installation Company* with MFMA Accredited Installer(s)* on-site for the duration of the wood floor installation. C. Flooring shall be delivered to the premises and acclimated, if necessary. D. All skids of flooring bundles should be opened and spread out to acclimate the flooring to environmental conditions in the building, when applicable. 1.3 Working Conditions A. The floor system shall not be delivered or installed until all masonry, plastering/drywalling, tile work and overhead mechanical trades are complete. The building must be enclosed and weathertight. B. Permanent heat, light and ventilation shall be installed and operating before, during and after installation, controlling a temperature range of 55 degrees to 75 degrees and a relative humidity range compatible with expected environmental conditions when the facility is occupied. (Maintaining a maximum 15 percent difference between high and low humidity levels). Expected minimum/maximum indoor relative humidity will depend upon building design, geographic location, HVAC systems and operating schedules. Consult your local MFMA Sport Floor contractor for specific information. 1.4 Warranty A. The MFMA Mill Accredited Installation Company* shall warrant the floor installation, and shall furnish a flooring materials warranty from the flooring manufacturer. B. Refer to individual flooring manufacturers warranty for specific provisions and exclusions.
11 MFMA Guide Specification for Basket Weave Floor Systems Part 2-Products 2.1 Materials A. Flooring shall be MFMA-RL Northern Hard Maple or MFMA-FJ Northern Hard Maple; 25/32 thick x 3-1/4, 2-1/2, 2-1/4 or 1-1/2 wide; First, Second and Better, Third and Better, Third Grade or Utility Grade: T & G and EM; grade marked and stamped as produced by an MFMA member manufacturer. B. Vapor retarder shall be 6 mil. Polyethylene. (Specifier s option: For extra vapor protection or when installing padded system, cover entire concrete slab with 6 mil polyethylene, sealing joints a minimum of 6.) C. Subfloor 1. Basket Weave: Wooden subfloor shall be 1 x 6 nominal KD Gym Grade Hemlock, Spruce, Pine or Fir, S2S or S4S as supplied by flooring manufacturer. 2. Basket Weave with Pads: Wooden subfloor shall be 1 x 6 nominal KD Gym Grade Hemlock, Spruce, Pine or Fir, S2S or S4S as supplied by flooring manufacturer. D. Flooring fasteners shall be 2 barbed cleats or 15 gauge coated staples, unless otherwise specified by flooring manufacturer. E. Wall base shall be 3 x 4 x 4 heavy duty molded, vented, rubber or vinyl cove base with premolded outside corners as supplied by flooring manufacturer. F. Finish materials shall be selected from the most recent listing of MFMA tested and certified products, approved by MFMA flooring manufacturer and shall be applied according to finish manufacturer s instructions. Part 3-Execution 3.1 Inspection A. Inspect concrete subfloors for proper tolerance and dryness, and report any discrepancies in writing to the general contractor for correction. B. The concrete slab shall be cleaned of all debris by general contractor so the accredited installation company will have adequate access to work surface. 3.2 Installation A. Vapor Retarder 1. Cover entire concrete slab with 1/4 multi-cellular closed-cell foam with a density of PCF sealing joints with 2 duct tape, as supplied by flooring manufacturer. 2. Option: for extra vapor protection cover entire concrete slab with 6 mil. polyethylene, lapping joints a minimum of 4 or as specified by the vapor retarder manufacturer. B. Basket Weave System: 1. Install 1 x 6 subfloor diagonally to the long dimension of the room at a 25 degree angle or 45 degree angle. The ends of the 1 x 6 shall be butted or spaced per the flooring system manufacturer s instructions and side spacing 2 or 6 between adjoining 1 x 6. Maintain a 2 expansion void at the walls and at all vertical 2. The top layer of 1 x 6 subfloor shall be laid in the opposite direction to the first layer, at a 25 degree or 45 degree angle to the long dimension of the room so that no end joints fall over any end joints of the first layer. The ends of the second layer of 1 x 6 shall be butted or spaced per the flooring system manufacturer s instructions and side spacing 2 between adjoining 1 x 6. Secure the two layers at each intersection using nails or staples. Maintain a 2 expansion void at the walls and at all vertical C. Basket Weave with Pads System 1. Install 1 x 6 subfloor diagonally to the long dimension of the room at a 25 degree angle or 45 degree angle. The ends of the 1 x 6 shall be butted or spaced per the flooring system manufacturer s instructions and side spacing 2 or 6 between adjoining 1 x 6 with pads stapled and spaced per the flooring system manufacturer s instructions. Maintain a 2 expansion void at the walls and at all vertical 2. The top layer of 1 x 6 subfloor shall be laid in the opposite direction to the first layer, at a 25 degree or 45 degree angle to the long dimension of the room so that no end joints fall over any end joints of the first layer. The ends of the second layer of 1 x 6 shall be butted or spaced per the flooring system manufacturer s instructions and side spacing 2 between adjoining 1 x 6. Secure the two layers at each intersection using nails or staples. Maintain a 2 expansion void at the walls and at all vertical D. Install maple flooring parallel with the main playing court by nailing or stapling approximately 12 o.c. 1. Space joints between flooring strips to allow for intermediate expansion, in accordance with local humidity conditions. 2. Provide 2 expansion voids at the perimeter and at all vertical 3.3 Flooring Sanding A. Machine sand with coarse, medium and fine paper to a smooth, even, uniform surface. B. Remove sanding dust from entire surface by tack or vacuum. 3.4 Finishing A. Inspect entire area of floor to insure that surface is acceptable for finishing, completely free from sanding dust. B. Apply seal and finish per finish manufacturers instructions. C. Paint game lines as shown on drawings, between seal and first coat of finish. Game line paint shall be compatible with finish. 3.5 Base Installation A. Install vented cove base by anchoring to walls with base cement, screws or anchors. B. Miter inside corners, and use premolded outside corners. 3.6 Maintenance A. Upon completion of floor installation, the owners, attendants or individuals in charge are responsible for the upkeep of the building and are to see that the care and maintenance instruction of the MFMA and the flooring manufacturer are followed.
12 About MFMA Founded in 1897, the MFMA is the only authoritative source of technical information about hard maple flooring. The Association publishes grade standards, guide specifications for floor care, and a certified list of flooring sealers and finishes. MFMA also publishes a complete game line and court markings guide. Copies of all publications are available from MFMA Headquarters. MFMA and its members consult with architects, contractors, school officials, and maintenance personnel to answer questions about guide specifications and the use and care of MFMA maple flooring. When you need assistance or information, contact the MFMA Sport Floor Contractor Member contractor nearest you, or contact the Maple Flooring Manufacturers Association headquarters office at the address listed on the back of this booklet. 60 Revere Drive, Suite 500 Northbrook, IL USA Toll Free: 888/ / Fax: 847/ Web site: [email protected]
www.maplefloor.org INDUSTRY RECOMMENDATIONS for Sanding, Sealing Court Lining, Finishing & Resurfacing of Maple Gym Floors
www.maplefloor.org www.maplefloor.org INDUSTRY RECOMMENDATIONS for Sanding, Sealing Court Lining, Finishing & Resurfacing of Maple Gym Floors Introduction These recommendations are general in nature and
Division 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
Herringbone Pattern Flooring
Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove
Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation
Bella Cera Engineered Hardwood Flooring Installation Instructions Check for Proper Color Selection Prior to Installation 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully
How To Install Hardwood Flooring
phone: 1.855.Ludaire e-mail: [email protected] Solid Flooring Installation Instructions These Instructions and Guidelines are for the typical installation of ¾ Pre-finished Solid Hardwood Flooring manufactured
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Tip: Check for proper color selection and style prior to Installation. No claims will be accepted after installation Important Information before
SCHWARTZ WATER-BASE WOOD FLOOR SEALER AND WATER-BASE PREMIIUM WOOD FLOOR FINISH
!! SCHWARTZ WATER-BASE WOOD FLOOR SEALER AND WATER-BASE PREMIIUM WOOD FLOOR FINISH A Complete Guide for Preparation, Application, Curing and Maintenance for use with Schwartz H 2 O Water-base Floor Finish
ENGINEERED FLOORING INSTALLATION
ENGINEERED FLOORING INSTALLATION ATTENTION! INSTALLER/OWNER RESPONSIBILITIES Beautiful hardwood floors are a product of nature and, therefore, they will show variations in color, grain, texture, and appearance.
Hardwood Flooring. Urbania Flooring
Engineered Hardwood Flooring Installation Guide for Urbania Flooring BEFORE STARTING THE INSTALATION - Please take the time to read and ensure that you understand the information contained in this document.
RACQUETBALL, HANDBALL OR SQUASH COURTS AND GYMNASIUM WALL SURFACES
1807 Elmwood Avenue, Suite 275 Buffalo, New York 14207 (800) 543-5155 RACQUETBALL, HANDBALL OR SQUASH COURTS AND GYMNASIUM WALL SURFACES Fiberesin Wall System Provide materials and labor to complete courts
How to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
How To Level A Subfloor
Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse
BENTLEY ELEMENTS COLLECTION LVT
This document refers to the following products: Product Size Installation direction Seams treatment Elements Tiles See specifications 90 None Elements Planks See specifications Stair Step None Note: This
Renovating Your Basement
building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:
SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
Additions and Alterations
Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal
Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions
Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions Thank you for choosing ARK Floors Exotic Hardwood Flooring. In order to meet warranty
Carpet Tile Installation Guidelines
NOTICE FAILURE TO FOLLOW THESE GUIDELINES CAN RESULT IN VOIDING THE CARPET WARRANTY. Installation Guidelines The following instructions should be reviewed prior to installation. Shaw Industries will not
INSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS
IMPORTANT It is important that you read & understand the following information and instructions in their entirety before proceeding with installation. Please thoroughly inspect all Flooring products in
INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING
INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING Introduction Laminate flooring is designed to be a floating floor that may be installed over virtually any type of sub floor. It is not nailed or glued to
How To Install Hardwood Flooring
3/4" Solid Plank & Strip Products For Nail-Down Installation INSTALLER/OWNER RESPONSIBILITY Beautiful hardwood floors are a product of nature and therefore, not perfect. Our wood floors are manufactured
SOLID FLOORING 3/4 INSTALLATION GUIDELINES
SOLID FLOORING 3/4 INSTALLATION GUIDELINES Thank you for choosing Cikel Exotic Hardwood Flooring, a responsible choice. Please thoroughly review and adhere to the following installation instructions to
CLEAR-DIVISIONS APERTO
CLEAR-DIVISIONS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS moveable glass wall system. The yellow highlighted areas in the
INSTALLATION INSTRUCTIONS
INSTALLER/OWNER RESPONSIBILITIES Hardwood flooring is a product of nature and its inherent beauty stems from the fact that each piece is unique with no two pieces the same. Due to the fact that this flooring
Installation Instructions for staple/nail down applications
Installation Instructions for staple/nail down applications General Notes Inspect all materials carefully before installation. Warranties do not cover materials with visible defects once they are installed.
State of Connecticut Department of Public Health RADON PROGRAM
State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon
2. Division 05 Structural Steel Framing for steel framework requirements
SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division
Laminate Flooring T-Lock Angle-Drop Installation Instructions
TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most
Installation for Wood Flooring
Installation for Wood Flooring Tarkett wood flooring offers a beautiful variety of options from species and colour, to plank widths and finishes. We developed enhanced locking system, T-lock, and the best
Residential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
WOOD FLOORING MAINTENANCE MANUAL
10026 Talley Lane, Houston, TX 77041 Phone: 713-939-0157 Fax: 713-939-9621 WOOD FLOORING MAINTENANCE MANUAL REMEMBER: Your wood floor is new and is still acclimating to its new environment; HVAC controls
B. Related categories: The following categories contain requirements that relate to this section:
ORIENTED STRAND BOARD PART I. - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply
APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING
APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING Appendix C Moisture Guidelines Determining moisture content is an essential part of quality control within the flooring installation process. Flooring
Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)
Adhesive Recommendation for Altro Flooring Product Safety Sheet Flooring Smooth Sheet Flooring Porous (absorbent) subfloors (most wood subfloors and some concrete) Altrofix 30/31 (excessively heavy rolling
Comment Form on Proposed Gut Rehabilitation Alternatives
Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to [email protected] by October 10 th, 2012 with the subject line
Final inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
Foundation. Foundation
Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their
AMERICAN GOTHIC PLAYHOUSE
AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction
Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.
1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only
INSTALLATION GUIDE. Imago Installation Guide - January 2008 1
INSTALLATION GUIDE IMAGO Floors are very sensitive to ambient humidity conditions, since all wood flooring will expand and contract as relative humidity varies. In order to keep the flooring manufacturer
Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
Best Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
MUNICODE SERVICES LTD.
The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved
Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)
INSTALLATION INSTRUCTIONS FOR GTI CONNECT TILES This document refers to the following products: Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) 635 X 635 mm 25.5 x 25.5
CLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
Cupped Floor STEP 1. Flooring absorbing excessive moisture on the underside causes expansion and cupping with the edges raised.
BEHAVIOR OF FLOORING If it s not marked NOFMA, it s not certified. Cupping and Crowning Cupped Floor STEP 1. Flooring absorbing excessive moisture on the underside causes expansion and cupping with the
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Installation Guidelines
Installation Guidelines NWFA Information Available as of November 17, 2008 CONTENTS SECTION I GENERAL GUIDELINES CHAPTER 1 JOBSITE CONDITIONS CHAPTER 2 ACCLIMATION CHAPTER 3 MOISTURE REQUIREMENTS AND MOISTURE
Prestige Home Inspection LLC
Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
Question: Can a gymnasium floor be restored after being exposed to water damage?
Question: Can a gymnasium floor be restored after being exposed to water damage? Several techniques are used in order to dry hardwood flooring. The most popular of these techniques is tenting the area
12 POLYURETHANE ADHESIVE (PU 105)
12 POLYURETHANE ADHESIVE (PU 105) DISCLAIMER: Refer to page 5 of this document. 12.1 DESCRIPTION PU 105 is a high performance two-part polyurethane adhesive for both indoor installations of Mondo rubber
VINYL CLICK FLOORING INSTALLATION GUIDE
VINYL CLICK FLOORING INSTALLATION GUIDE Owner/Installer Responsibility Prior to installing a single board, you or the installer must determine that the job-site environment and the sub-surfaces meet the
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.
i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses
December 2013. J-Ply Roofing, Flooring and Decking
December 2013 J-Ply Roofing, Flooring and Decking Introduction J-Ply plywood is manufactured in New Zealand by Juken New Zealand Limited (JNL) and marketed by New Zealand Wood Products Limited. The J-Ply
Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY
Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded
Services Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and
2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS
2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam
About Aacer. To learn more, please contact us: [email protected] www.aacerflooring.com (877) 582-1181 TOLL FREE (715) 582-1181 PHONE
FIELD GUIDE Table of Contents About Aacer Types of Sports Floors Aacer Wood Sports Floors Floating Floors Fixed Floors Fixed Resilient Floors Synthetic Floors Accessories Selecting Your Aacer Floor Green
CHAPTER 3 MOISTURE TESTING
CHAPTER 3 MOISTURE TESTING Part I - Moisture Testing for Wood Subfloors A. Testing Requirements 1. Test for moisture at several locations in the room a minimum of 20 per 1,000 square feet and average the
B. Types of mechanical insulation specified in this section include the following:
SECTION 23 0700 HVAC INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Extent of mechanical insulation required by this section is indicated on drawings and schedules, and by requirements of this section. B.
Preformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
Armstrong Do-It-Yourself Tile Installation System
Armstrong Do-It-Yourself Tile Installation System What tools will I need to install my tile floor? You'll need just the basics: - floor tile (make sure you have enough tile to finish the job) - adhesive
Ver. 2. Guide to. Inspecting Residential Brick Veneer
Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan
FIRESTOPPING & SMOKE SEALS
SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of
K2 STONE NATURAL VENEER
INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Pergo Installation Essentials Guide For Laminate Flooring
Pergo Installation Essentials Guide For Laminate Flooring SECTION SECTION 1. Floating Floor Definition & Benefits 10. Other Subfloor Requirements 2. What You Need To Know Expansion/Contraction 11. New
A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
Shingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
Moisture and Resilient Floor Covering
Moisture and Resilient Floor Covering Moisture related failures of resilient floor coverings installed over concrete have focused unfairly over the years on the premise that the flooring product itself
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS
THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS
Daybreak Acacia. 25yr Residential Wear Warranty
- Wide Leaf Acacia - Handsculpted - Tongue & Groove - Random Lengths - 8 Layer Urethane Finish - High Color Variation JANUARY 2013 HARDWOOD - WIDE LEAF SOLID Daybreak Acacia 3/4 Solid Handsculpted, Tongue
Vinyl Composition Tile Installation System
Vinyl Composition Tile Installation System Product Gauge Size Vinyl No-Wax (Dry Back) Urethane No-Wax (Dry Back) 0.045" (1.1 mm) 0.080" (2.0 mm) IMPERIAL TEXTURE 0.094" (2.4 mm) STONETEX ChromaSpin COMPANION
CONSTRUCTION DETAILS & LOAD DESIGN CHARTS
Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description
HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
CLEAR-DIVISIONS VARIOFOLD
CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders
STANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist
Pergo Installation Essentials Guide For Laminate Flooring
Pergo Installation Essentials Guide For Laminate Flooring SECTION SECTION 1. Floating Floor Definition & Benefits 2. What You Need To Know Expansion/Contraction 3. Before Starting Estimates 4. A Basic
Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION
SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.
STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope
FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness.