Presentation. How to fill out a Log Frame
|
|
|
- Maria Stafford
- 9 years ago
- Views:
Transcription
1 Presentation How to fill out a Log Frame
2 Structure of a Logframe Matrix HORIZONTAL LOGIC VERTICAL LOGIC Intervention Logic Objectively verifiable indicators of achievement Sources and means of verification Assumptions and Risks Long-term Short-term Expected results Activities 1, 2, 3, 4 Means: Costs:
3 Why do we use LogFrame? Used by major Donors to design, implement and monitor projects Used for planning at all stages of the project cycle Clarifies expectations of stakeholders Standardises and systematises planning process Differentiates types of s Checks the logic of the project design Helps to assess project risks
4 Hierarchy of s Current Situation Long-term Short-term Expected results Activities Inputs Project
5 Terminology Long-term Why is the project relevant to society, in terms of the longer-term benefits to beneficiaries and the wider benefits to other groups? The long-term will not be achieved by the project alone, but will require the impacts of other programmes and projects as well. Example: Youth unemployment decreased by 20% Short-term A specific change in a situation to be achieved immediately (on short term) after the termination of the project. Defined in terms of the benefits to be received by the project beneficiaries or target group as a result of utilising the services provided by the programme. Example: A business college functioning
6 Terminology Expected results The specific results that can be expected to be produced by the project itself It should be possible for the project management to be held accountable for their delivery. Example: Business college renovated and equipped 30 trainers trained 10 business curricula developed 4 of the college's managers trained Activities The actions to be performed in order to transfer inputs into results Example: Train trainers Implement of Management training Identify and purchase of equipment Inputs The resources of the project Example: 6 work months of consultancy 12 months of training Resources for equipment and renovation
7 Confusing Words Long-term : Wider Objective Overall Objective General Objective Development Objective Short-term : Specific Objective Immediate Objective Project Purpose Expected results: Outputs Outcomes Activities: Actions Inputs: Resources Means
8 LogFrame - Objectives Narrative Long-term Short-term Expected results Activities
9 Writing Objectives and Results 1. The verb should show a completed state (Typically the past tense) 2. Objectives are positive 3. Put the word at the end of the sentence 4. Typical language for expressing s Reduced - Minimized Established - Improved - Enlarged - Maximized Strengthened - Achieved Functioning - Enhanced - Reinforced - Decreased Examples: - Unemployment decreased - Management capacity enhanced
10 Writing Activities 1. Be specific and show action 2. Use present tense 3.Put the verb at the front of the sentence 4. Typical language for expressing activities Set up -Determine Establish-Advise -Hold -Run Develop -Identify Select-Conduct - Train Examples: - Train 30 trainers - Select 30 potential trainers
11 LogFrame - Indicators Narrative Indicators of achievement Long-term Short-term Expected results Activities
12 How indicators are described Target group (for whom/what to be measured) Quantity (how much) Quality (how well) Time (by when) Location (where) Example Define - e.g. education status improved Define target group -e.g. graduates completing degree courses Specify quality -e.g. number of graduates completing degree courses increased Specify quantity -e.g. number of graduates completing degree courses increased from 500 to 1000 Specify timeframe -e.g. number of graduates increased from 500 to 1000 per year by the year 2004 Specify place -e.g. number of graduates from the Business College completing degree courses increased from 500 to 1000 per year by the year 2004
13 Some characteristics Indicators are quantitative Indicators let you know that something is changing or has changed Indicators are measurable Indicators are selected/created by people Indicators can be different from situation to situation
14 Indicators should be SMART S Specific - in terms of quantity, quality and time M Measurable - ly verifiable at acceptable costs A Achievable - from existing sources or with reasonable efforts R Realistic - to s and sensitive to change T Timely - to ensure usefulness to managers
15 LogFrame Sources of measurement Narrative Indicators of achievement Source of Measurement Long-term Short-term Expected results Activities
16 Sources of Measurement Specify Source of information Means of collection Specify Format Who How regularly
17 Assumptions and Risks Narrative Indicators of achievement Source of Measurement Assumptions and risks Long-term Short-term Expected results Activities Pre-conditions
18 The Role of Assumptions Long-term Short-term Expected results Activities contribute to together with achieve achieve together with produce together with allow Assumptions and Risks Assumptions and Risks Assumptions and Risks Pre-Conditions
19 Fourth Column: Assumptions Assumptions: factors outside project management s control that may impact on the purpose- linkage (e.g. change in Government policy; change in client attitude; change in labour market situation) Pre-conditions: Things that have to be met before the project can start (e.g. Government financing; new regulation) 19 November 2006 Project Management
20 Example Narrative Indicators of achievement Source of Measurement Assumptions and risks Long-term Decreased youth unemployment Over 10 years 5% per year national and regional statistics National economy recovers steadily Short-term Expected results Business College functioning 1. College renovated and equipped 2. Curricula developed 3. Trainers trained 300 students certified per year Balanced budgets *10 classrooms *General facilities *10 two-year curricula *30 trainers Yearbooks and other records Accounts Site visits Progress reports National vocational training strategy continues *College staff stays *State grants continue *Not more than normal drop-out rate Enough trainers can be identified Activities *Identification and renovation of buildings *Purchase and installation * Develop Training curriculum and train trainers Input Costs Building can be identified Pre-conditions All parties provide the agreed contributions No major changes in expert or purchasing prices
Il Project Cycle Management :A Technical Guide The Logical Framework Approach
European Institute of Public Administration - Institut européen d administration publique Il Project Cycle Management :A Technical Guide The Logical Framework Approach learning and development - consultancy
Using the logical framework matrix
Using the logical framework matrix Defining the M&E Strategy for a programme/project A logical framework Clearly defined results and risks Performance indicators and means of verification An M&E plan for
MONITORING AND EVALUATION WORKSHEETS SUPPLEMENTAL INFORMATION
MONITORING AND EVALUATION WORKSHEETS SUPPLEMENTAL INFORMATION I. Introduction to Results Based Monitoring HED will use its results-based monitoring and evaluation system to effectively manage partnership
The Logical Framework Approach An Introduction 1
The Logical Framework Approach An Introduction 1 1. What is the Logical Framework Approach? 1.1. The background The Logical Framework Approach (LFA) was developed in the late 1960 s to assist the US Agency
Introduction to Monitoring and Evaluation. Using the Logical Framework Approach
Introduction to Monitoring and Evaluation Using the Logical Framework Approach Developed and Presented by: Umhlaba Development Services Umhlaba Development Services Noswal Hall, Braamfontein, Johannesburg,
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
PARC. Evaluation Series No.1 The Logical Framework
PERFORMANCE ASSESSMENT RESOURCE CENTRE PARC Evaluation Series No.1 The Logical Framework By w PARC Evaluation Series No. 1: The Logical Framework Looking back over the last year and the conferences where
PROJECT MANAGEMENT TRAINING MODULES
PROJECT MANAGEMENT TRAINING MODULES KENYA PROJECTS ORGANIZATION < Projects Solutions Provider > Macjo Arcade, 4 th Flr., Suite 15E P.O Box, 3029 00200, Nairobi - Kenya Tel: 254 (0)202319748 Mob: 0725 788
Logical Framework: Making it Results-Oriented
1 of 11 2001-04-05 09:58 Logical Framework: Making it Results-Oriented Table of Contents 1. Introduction 2. Purpose of Guide 3. The LFA Process 4. The Logical Framework Structure 5. The Vertical Logic
6 Project Planning Matrix (PPM) - Overview (in brief)
COMIT: ZOPP - PPM (Overview) 76 6 Project Planning Matrix (PPM) - Overview (in brief) 6.1 What is a PPM? The PPM provides a one-page summary: Why What How Which How Where a project is carried out (= who/what
PLANNING UNIT PRIME MINISTER S DEPARTMENT
HANDBOOK For Logical Framework Analysis ECONOMIC PLANNING UNIT PRIME MINISTER S DEPARTMENT FOREWORD The Logical Framework Approach (LFA) will be used for formulating and preparing development programmes
Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual
Equal Rights and Treatment for Roma in Moldova and Ukraine Project Management Methodology Manual WELCOME TO THE COUNCIL OF EUROPE PROJECT MANAGEMENT METHODOLOGY In July 2001, the Council of Europe launched
Evaluability Assessment Template
Evaluability Assessment Template Evaluability Assessment Template An Evaluability Assessment examines the extent to which a project or a programme can be evaluated in a reliable and credible fashion. An
Organization for Security and Co-operation in Europe
Organization for Security and Co-operation in Europe Aide-Mémoire on Gender Mainstreaming Projects 1. Purpose This Aide-Mémoire aims to provide you with a practical tool to gender mainstream the OSCE programmes
Project Management and Proposal Writing
Training Material on Project Management and Proposal Writing For Palestinian Tertiary Education Institutions Quality Improvement Fund (QIF) Tertiary Education Project (TEP) Ministry of Education and Higher
Develop a strategic plan. A tool for NGOs and CBOs M
Develop a strategic plan A tool for NGOs and CBOs M Developing Strategic Plans: A Tool for Community- and Faith-Based Organizations Developed by the International HIV/AIDS Alliance and Davies & Lee: AIDS
4. PROJECT PREPARATION THE LOGICAL FRAMEWORK APPROACH AND LOGICAL FRAMEWORK MATRIX
4. PROJECT PREPARATION THE LOGICAL FRAMEWORK APPROACH AND LOGICAL FRAMEWORK MATRIX 4.1 Introduction The Logical Framework Approach (LFA) is a specific strategic planning methodology that can be used to
Logical Framework Analysis and Problem tree. 21 st March 2013
Logical Framework Analysis and Problem tree 21 st March 2013 Overview Explanation of purpose and benefits of Logical Frameworks Develop a problem tree analysis linking roots causes effects (exercise) Logic
Guidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
Checklist for Reviewing Scopes of Work for Performance Evaluations
Checklist for Reviewing Scopes of Work for Performance Evaluations Use the Evaluation Scope of Work (SOW) Checklist to review and strengthen SOW during the evaluation planning stage. In most cases you
To introduce Logical Framework Analysis (LFA) and its uses. To become familiar with the main steps involved in conducting an LFA
Adapted in part from Designing Projects and Project Evaluations Using The Logical Framework Approach by Bill Jackson Objectives To introduce Logical Framework Analysis (LFA) and its uses To become familiar
Narrative. Project title: Implementing organization: Legally registered address of the organization: Project duration: From: To: Thematic area:
Application form For Roma, with Roma promoting grassroots engagement, public and political participation, and enhancing security of Roma and Sinti communities Project title: Implementing organization:
Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism.
Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism. In 2013, the Directorate for Development Cooperation and
Method s Project/ Programme Cycle Management. By: Ayman K. Jarwan, MBA, PMP
Method s Project/ Programme Cycle Management By: Ayman K. Jarwan, MBA, PMP Contents 1 Program Value... 3 2 Target Audience... 4 3 Program Description... 5 4 Program Leader... 8 5 Why Method... 9 6 Fees
Module 2: Introduction to M&E frameworks and Describing the program
Module 2: Introduction to M&E frameworks and Describing the program Learning Objectives Understand the 4 basic steps required to develop M & E plans Learn to develop goals and objectives Learn to develop
EUROPEAN COMMISSION JOINT RELEX SERVICE FOR THE MANAGEMENT OF COMMUNITY AID TO NON-MEMBER COUNTRIES (SCR)
EUROPEAN COMMISSION JOINT RELEX SERVICE FOR THE MANAGEMENT OF COMMUNITY AID TO NON-MEMBER COUNTRIES (SCR) Resources, relations with the other institutions, evaluation, and information Evaluation Project
Strategic and Operational Planning
Strategic and Operational Planning Kigali, November 2010 Target group Executive secretaries of CSOs Program officers Planning officers 2 people from same organization General introduction Introduction
Designing Projects and Project Evaluations Using The Logical Framework Approach
Designing Projects and Project Evaluations Using The Logical Framework Approach written by Bill Jackson for the IUCN Monitoring and Evaluation Initiative October 1997 Founded in 1948 as the International
To introduce Logical Framework Analysis (LFA) and its uses. To become familiar with the main steps involved in conducting an LFA
Adapted in part from Designing Projects and Project Evaluations Using The Logical Framework Approach by Bill Jackson Objectives To introduce Logical Framework Analysis (LFA) and its uses To become familiar
Logical Framework Analysis
Logical Framework Analysis WHAT IS LOGICAL FRAMEWORK ANALYSIS (LFA)? A log frame (also known as a Project Framework) is a tool for planning and managing development projects. It looks like a table (or
AusGUIDE. AusGUIDElines. 1 The Logical Framework Approach. Australian Agency for International Development The Australian Government s
AusGUIDE AusGUIDElines 1 The Logical Framework Approach Copyright Commonwealth of Australia 2000 Australian Agency for International Development The Australian Government s Overseas Aid Program AusGUIDElines
ILO BEST PRACTICES FOR INTEGRATING ENTREPRENEURSHIP EDUCATION: ARAB STATES EXPERIENCE
ILO BEST PRACTICES FOR INTEGRATING ENTREPRENEURSHIP EDUCATION: ARAB STATES EXPERIENCE R A N I A B I K H A Z I E N T E R P R I S E D E V E L O P M E N T S P E C I A L I S T I N T E R N A T I O N A L L A
USAID PROGRAM CYCLE OVERVIEW
USAID PROGRAM CYCLE OVERVIEW USAID AUGUST 2012 CONTENTS Background... 3 Overview Summary... 3 Program Cycle Components:... 3 Agency Policies and Strategies:... 4 Country Development Cooperation Strategies:...
Triple Bottom Line Impact Guide for Projects
Triple Bottom Line Impact Guide for Projects 1. Background Information Clarifying the term Impact It is important to clarify the difference between project impacts and project outcomes: While the created
http://impact.zewo.ch/en/impact Stiftung Zewo Schweizerische Zertifizierungsstelle für gemeinnützige, Spenden sammelnde Organisationen
These guidelines are designed to help project managers to assess the outcomes of their projects and programmes. They demonstrate how development agencies can implement an appropriate outcome and impact
Project Number: INT0085. Title: Sharing best practices for the design and management of technical cooperation projects. Classification: Ongoing
Project Number: INT0085 Title: Sharing best practices for the design and management of technical cooperation projects Classification: Ongoing FOA: 0I - Education, Training and Nuclear Knowledge Management
How To Monitor A Project
Module 4: Monitoring and Reporting 4-1 Module 4: Monitoring and Reporting 4-2 Module 4: Monitoring and Reporting TABLE OF CONTENTS 1. MONITORING... 3 1.1. WHY MONITOR?... 3 1.2. OPERATIONAL MONITORING...
Competency-Based and Standards- Driven Curriculum Model
2012 Competency-Based and Standards- Driven Curriculum Model The National Training Agency of Trinidad and Tobago (NTATT) has developed National Curriculum based on the universally accepted Competency Based
Summary Project Fiche
Summary Project Fiche 1. Basic Information 1.1. Désirée Number: BG 0203.13 1.2. Title: Development and Implementation of VIES requirements and EU interoperability standards in the field of VAT within the
How To Write Project Management Guidelines
Project Management Guidelines July 2013 FOREWORD I have pleasure to present these BDT Project Management Guidelines 2013 that now supersedes the April 2008 version. These Guidelines are drawn up in accordance
Planning, Monitoring and Evaluating Programmes and Projects
Planning, Monitoring and Evaluating Programmes and Projects Introduction to Key Concepts, Approaches and Terms Working Draft Version 1 March 2000 Global Monitoring and Evaluation Initiative Jim Woodhill
PROJECT AUDIT METHODOLOGY
PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit
USING THE EVALUABILITY ASSESSMENT TOOL
USING THE EVALUABILITY ASSESSMENT TOOL INTRODUCTION The ILO is committed to strengthening the Office-wide application of results-based management (RBM) in order to more clearly demonstrate its results
Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013
EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco
TOOL. Project Progress Report
Purpose TOOL SUMMARY: LOGFRAME CHEAT SHEET The purpose of the is to compile information from the analysis done by project participants, partners and LWR country staff about the progress or advances the
Project Design, Monitoring and Evaluation
1201 Peachtree St. Suite 622 Atlanta GA 30362 [email protected] Project Design, Monitoring and Evaluation This course presents the principles of Design, Monitoring an Evaluation (DM&E) Cycle. DM&E is a critical
USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan
USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan January 2004 Contract Number: GDG-A-00-03-00006-00 Task Order Number: 165-00-03-00105-00 EQUIP1: Secondary Education Activity
Terms of Reference Baseline Assessment for the employment intensive project for youth in Lower Juba (Dhobley and Afmadow), Somalia
Terms of Reference Baseline Assessment for the employment intensive project for youth in Lower Juba (Dhobley and Afmadow), Somalia Organization African Development Solutions www.adesoafrica.org Project
INTRODUCTION TO PROJECT MANAGEMENT FRAMEWORKS
Economic Cooperation Organisation and United Nations in Iran INTRODUCTION TO PROJECT MANAGEMENT FRAMEWORKS Ali Farzin - United Nations Project Management Workshop February 24-25, 2010 Tehran WORKSHOP
The definition of stakeholders includes both winners and losers and those involved or excluded from decision-making processes.
Stakeholder analysis is the identification of (key) stakeholders in a planning or change process, an assessment of their interests and the way in which these interests are likely to affect the planning
Remarks. Ms. K. Anne Thompson. Human Resources Management Specialist. at the. National Career Showcase Media Launch
Remarks by Ms. K. Anne Thompson Human Resources Management Specialist at the National Career Showcase Media Launch University of the West Indies Cave Hill Campus School of Graduate Studies St. Michael,
How to Develop a Logic Model for Districtwide Family Engagement Strategies
How to Develop a Logic Model for Districtwide Family Engagement Strategies Helen Westmoreland, Consultant M. Elena Lopez, Senior Consultant Heidi Rosenberg, Senior Research Analyst November, 2009 For questions
As of 2010, an estimated 61 million students of primary school age 9% of the world total - are out of school vi.
YOUTH AND EDUCATION HIGHLIGHTS 10.6% of the world s youth (15-24 years old) are non-literate i. Data from 2011 indicates that in developing countries, the percentage of non-literate youth is 12.1%, with
MATERNAL HEALTH AND ACCESS TO SAFE ABORTION PROGRAM
MATERNAL HEALTH AND ACCESS TO SAFE ABORTION PROGRAM BACKGROUND AND PROBLEM STATEMENT Medical students and future health care professionals lack the information about maternal health and access to safe
Get Ready for IELTS Writing. About Get Ready for IELTS Writing. Part 1: Language development. Part 2: Skills development. Part 3: Exam practice
About Collins Get Ready for IELTS series has been designed to help learners at a pre-intermediate level (equivalent to band 3 or 4) to acquire the skills they need to achieve a higher score. It is easy
Performance Development and Review Template Guide
Performance Development and Review Template Guide 1. OVERVIEW This guide has been developed to assist both staff and supervisor in the use of the Performance Development & Review template (PD&R) for the
Evaluation Theory: Who Needs It? Jean A. King
Evaluation Theory: Who Needs It? Jean A. King An important question If evaluation is a field of practice, then what is an appropriate role for theory in evaluation? Theory? Practice?... there is nothing
Partnering for Project Success: Project Manager and Business Analyst Collaboration
Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,
Monitoring and Evaluation Plan Primer for DRL Grantees
Monitoring and Evaluation Plan Primer for DRL Grantees I. What is a monitoring and evaluation plan? A monitoring and evaluation plan (M&E plan), sometimes also referred to as a performance monitoring or
Project/programme planning Guidance manual
Project/programme planning Guidance manual strategy2020 Strategy 2020 voices the collective determination of the International Federation of Red Cross and Red Crescent Societies (IFRC) to move forward
Impact of youth business loan scheme on enterprise development: A case study from Pakistan
Impact of youth business loan scheme on enterprise development: A case study from Pakistan Asif Chowdhury Ross Mcintosh Akhtar Nadeem Javed Younas Group-6 Background Youth in Pakistan are the largest population
NATIONAL CERTIFICATES (VOCATIONAL)
NATIONAL CERTIFICATES (VOCATIONAL) ASSESSMENT GUIDELINES PROJECT MANAGEMENT NQF Level 3 September 2007 PROJECT MANAGEMENT LEVEL 3 CONTENTS SECTION A: PURPOSE OF THE SUBJECT ASSESSMENT GUIDELINES SECTION
Planning and the Online Health Program Planner (OHPP) 2.0
Planning and the Online Health Program Planner (OHPP) 2.0 Nimira Lalani, MSc Health Promotion Field Support Specialist: Policy and Planning February 2012 Learning objectives of the session By the end of
An Overview of Key Planning, Monitoring and Evaluation Concepts A Participatory Learning Approach
An Overview of Key Planning, Monitoring and Evaluation Concepts A Participatory Learning Approach - Training Materials - Version - March 2001 Developed by Jim Woodhill IUCN Facilitator for East and Southern
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
Step 1: Analyze Data. 1.1 Organize
A private sector assessment combines quantitative and qualitative methods to increase knowledge about the private health sector. In the analytic phase, the team organizes and examines information amassed
Joint conclusions of the Spanish Presidency EU Youth Conference youth employment and social inclusion, Jerez, Spain 13-15 April 2010
Joint conclusions of the Spanish Presidency EU Youth Conference youth employment and social inclusion, Jerez, Spain 13-15 April 2010 Youth Employment is the common theme of the three EU Youth Conferences
Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.
Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for
STRATEGIC PLANNING BACKGROUND AND PRACTICE
Module 2 STRATEGIC PLANNING BACKGROUND AND PRACTICE 1 John Glazebrook STRATEGIC PLANNING Introducing SWAp for Environment Belgrade, 24-25 July 2012 Today Look at Why do Strategic Planning? A mixture of
White Paper. Benefits and Value
Benefits and Value The only purpose of undertaking any business activity is to create value! If undertaking the work destroys value the activity should not be started. Any value proposition though is in
Ministry of Social Development: Changes to the case management of sickness and invalids beneficiaries
Ministry of Social Development: Changes to the case management of sickness and invalids beneficiaries This is the report of a performance audit we carried out under section 16 of the Public Audit Act 2001
Glossary Monitoring and Evaluation Terms
Glossary Monitoring and Evaluation Terms This glossary includes terms typically used in the area of monitoring and evaluation (M&E) and provides the basis for facilitating a common understanding of M&E.
Strategic Planning for the Alabama Community College System
Strategic Planning for the Alabama Community College System Department of Postsecondary Education Executive Retreat June 24-25, 2008 1 A Strategic Plan for the ACCS Developed under the guidance of the
Problem Tree Analysis
Problem Tree Analysis What is it? The Problem Tree method is a planning method based on needs, however it is not a mechanical translation of problems into objectives. While going through the process, taking
Essentials of Project Management
Institut de recherche en sciences psychologiques Essentials of Project Management Stephan Van den Broucke Université catholique de Louvain EAHC Workshop on Joint Actions Luxembourg, 10 December 2012 What
Practical Guide. NGOs Project Preparation and Management. International Experts: Andrei TRETYAK (France) Roberta MONACHELLO (Germany)
Practical Guide To NGOs Project Preparation and Management International Experts: Andrei TRETYAK (France) Roberta MONACHELLO (Germany) National Expert: Lina HAMAOUI March 2006 Assistance technique à l'omsar
Specific Measurable Achievable. Relevant Timely. PERFORMANCE MANAGEMENT CREATING SMART OBJECTIVES: Participant Guide PROGRAM OVERVIEW
Specific Measurable Achievable PERFORMANCE MANAGEMENT CREATING SMART OBJECTIVES: Participant Guide Relevant Timely PROGRAM OVERVIEW About the Training Program This session is designed to enable participants
Key Principles and Best Practice for Evaluation of RD&E programs and projects
Key Principles and Best Practice for Evaluation of RD&E programs and projects Research outputs need to be monitored and evaluated to determine whether research outcomes are being met. Feedback through
PJ 22/12. 7 February 2012 English only. Projects Committee/ International Coffee Council 5 8 March 2012 London, United Kingdom
PJ 22/12 7 February 2012 English only E Projects Committee/ International Coffee Council 5 8 March 2012 London, United Kingdom Sustainable input credit for financing the production end of the coffee value
A Guide for. Developing a Logical Framework
Centre for International Development and Training A Guide for Developing a Logical Framework Centre for International Development and Training University of Wolverhampton Gorway Road Walsall WS1 3BD UK
Project Fiche No. 8 Implementation and follow-up of the Small Business Act (SBA)
1. Basic information Project Fiche No. 8 Implementation and follow-up of the Small Business Act (SBA) 1.1 CRIS Number: 2010/XXXX 1.2 Title: Implementation and follow-up of the Small Business Act (SBA)
Quality Assurance Framework Draft Policy for the Quality Council for Trades and Occupations Department of Labour First Version 26.07.
Quality Assurance Framework Draft Policy for the Quality Council for Trades and Occupations Department of Labour First Version 26.07.2008 Department of Labour Quality Council for Trades and Occupations
PROPOSAL PREPARATION USING THE LOGICAL FRAMEWORK APPROACH DAY 4
PROPOSAL PREPARATION USING THE LOGICAL FRAMEWORK APPROACH DAY 4 Cook Islands Facilitators: Damien Sweeney & Martin Pritchard Pacific Research & Evaluation Associates 1 Recap Day 3 http://office.microsoft.com/en-au/images/?ctt=97
Five Training Modules on Values-Based Holistic Community Development
Five Training Modules on Values-Based Holistic Community Development Training Module 1: VBHCD, Cornerstones and PSRP Training To assist the participants to understand, internalize and apply Heifer Cornerstones,
VOCATIONAL EDUCATION AND TRAINING AUTHORITY (VETA) UNITED REPUBLIC OF TANZANIA
VOCATIONAL EDUCATION AND TRAINING AUTHORITY (VETA) UNITED REPUBLIC OF TANZANIA INTEGRATED TRAINING FOR ENTERPRENEURSHIP PROMOTION I N T E P REACHING THE TARGET GROUPS IN THE INFORMAL SECTOR Dar es Salaam,
ACTION PLAN FOR THE IMPLEMENTATION OF THE NATIONAL YOUTH STRATEGY 2009-2014
ACTION PLAN FOR THE IMPLEMENTATION OF THE NATIONAL YOUTH STRATEGY 29-214 The translation of the document was provided by the OSCE Mission to Serbia. 2 3 ACTION PLAN FOR THE IMPLEMENTATION OF THE NATIONAL