USING THE EVALUABILITY ASSESSMENT TOOL

Size: px
Start display at page:

Download "USING THE EVALUABILITY ASSESSMENT TOOL"

Transcription

1 USING THE EVALUABILITY ASSESSMENT TOOL INTRODUCTION The ILO is committed to strengthening the Office-wide application of results-based management (RBM) in order to more clearly demonstrate its results in the world of work. The Office s capacity to manage for results depends to a great extent on having programmes and projects that feature the minimum characteristics needed in order for outcomes to be measured, as well as an understanding of the process by which they are generated. This can be determined by a set of design-specific aspects that allow these projects and programmes to be evaluated, and is therefore defined as evaluability. OECD DAC Evaluability definition: the extent to which an activity or a program can be evaluated in a reliable and credible fashion 1 Evaluability assessments are an established means for evaluators to review the coherence and logic of a project or programme, as well to clarify data availability and adequacy of this data in reflecting progress towards results. The assessments makes a judgment on whether interventions are designed such that, once they are complete, they will be able to demonstrate their effectiveness in achieving established outcomes. In 2007, a methodology was developed by EVAL based on best practices among OECD/DAC members, especially those of multilateral development assistance agencies, and with the participation of ILO staff. This document explains the methodology and sets down the guidelines for the effective application of evaluability assessment tool developed by EVAL to assess the evaluability of DWCP and Technical Cooperation projects. It should be used in conjunction with the evaluability concept note available on request from EVAL. EVALUABILITY METHODOLOGY EVAL designed a conceptual framework and an evaluability instrument which can be applied to both ILO Decent Work Country Programmes (DWCPs) and projects. The evaluability instrument scores individual projects and programmes based on the following six criteria: Objectives Indicators Baselines Milestones Risks and assumptions Monitoring and Evaluation 1 OECD/DAC. Glossary of Key Terms in Evaluation and Results Based Management Available at: DECEMBER 20,

2 HOW DOES THE EVALUABILITY TOOL WORK? Each of the tool s criterions is composed of a number of criteria questions that sets quality standards requirements. Each of the six criteria listed above are therefore assigned a specific weight 2 in the overall rating based on the relative priorities given to each criterion. In order to determine the level of performance, the evaluability tool also assigns criterion value on the basis of the following score: Fully Evaluable (Score 3.5) Mostly Evaluable: can improve ( 2. 5 Score <3.5); Limited Evaluability: needs substantial improvement (1. 5 Score <2.5) and; Not Evaluable (Score <1.5). 2 The weight/ratio defined by the tool is based on the expertise, experiences, and best practices of EVAL. DECEMBER 20,

3 APPLICATION OF TOOL Scoring The application of the tool consists of a scoring process of the defined criteria. The set of questions under each evaluability criterion are given a raw score based on the following assessment: Raw Score Performance level Performance requirements 4 Very good content Criteria are fully met with a degree of details that outmatches the criteria requirements. 3 Good content Criteria are fully met. 2 Relatively good content Corresponds to an identification that partly meets the corresponding criteria and that can be subject to further improvements. 1 Poor content Corresponds to an insufficient identification of a criteria 0 No content Corresponds to the non- identification of the criteria assessed The scoring process requires careful examination of the overall structure and component of the programme/project. The exercise can become complex when the information sought is not well organized in the programme/project document being assessed. It should also be noted that the quality of the assessment is strongly correlated to the expertise and experiences of the user. Although the tool attempts to set a level of standard to limit subjectivity, acknowledgment is necessary to the level of expertise and experience that could influence the outcome of the evaluability exercise. To mitigate this, the tool requires that justification be provided to the raw score assigned for each criterion question in the comments section of the tool. Additionally, the triangulation of results is strongly recommended in order to address potential subjective incidences in the overall assessment. The weighted score section of the tool simply multiplies the raw score and the weight for each criterion. The sum total of the weighted score gives us the composite score. The composite score which is linked to the criterion value (performance rating) provides information on whether a decent work country programme and its components (TC projects, technical advice, and advocacy) are defined such that, once they are complete, they can be evaluated and demonstrate their effectiveness in achieving the established goals and outcome objectives. DECEMBER 20,

4 Example: The assessment table below has a project that has a composite weighted score of Since this score is greater than or equal to 1.5, but less than 2.5, the project is given a performance rating of Limited Evaluability: needs substantial improvement Raw score Weight Weighted score Objectives Score Indicators Score Baselines Score Milestones Score Risk Assumptions Scores M&E plans Composite Score Score Limited Evaluability: needs substantial improvement ELEMENTS TO BE TAKEN INTO CONSIDERATION FOR EACH CRITERIA This section explains the various criteria the assessment process takes into consideration. It should be noted that, due to the diverse nature of programme and project document contents, the criteria questions listed highlight essential information the document must contain in order to determine the level of performance. The six criteria are associated with a set of questions and elements related to these criteria questions. The assessment process verifies the presence or absence of these elements in the programme/project documents and determines the level of performance by allocating a raw score. Criteria 1: Objectives/Outcomes Clarity of the definition of objectives, including outcomes that can be comprehended as a major focus of management for results Criteria questions 1. Are the long-term ILO priorities and outcomes clearly identified and are the proposals and actions towards achieving outcomes through chosen strategy clearly defined? Elements related to criteria question Recognizes and addresses tripartism, social dialogue, and international standards, Contributes towards achieving these priorities. Identifies ILO capacity to carry out programme objectives. DECEMBER 20,

5 2. Have the areas of agreement and disagreement with the Constituents priorities and strategy clearly been identified? 3. Is there consistency with the objectives of the international development frameworks such as poverty reduction strategies, the United Nations Development Assistance Framework (UNDAF), national MDG strategies and other integrated development plans? 4. Established partnerships with national and international actors and institutions. Are there established partnerships with national and international actors and institutions? Or: Were partnerships established... Evidence of consultation with constituents in the process of establishing CP priorities and outcomes. Description of areas of agreements and disagreements on priorities and outcomes among constituents Clear alignment to national development framework, UN country programmes, UNDAF, MDGs, or PRS, and identify areas in which ILO has a given advantage. Provides means to collaborate with national and international actors in engaging ILO constituents. Criteria 2: Indicators The selection of SMART indicators that are quantitative or qualitative and include comparison points of levels, quality and grade. Outcome indicators effectively facilitate the observation of change, while output indicators measure whether the right outputs are produced 1. Are indicators specific? 2. Are indictors measurable? 3. Are indicators attainable? 4. Are indicators relevant? 5. Are indicators time-bound? 6. Do indicators have a means of verification? Clear definition of what is being measured. Indicators measure the intended result Data is disaggregated where appropriate Does it measure the result it is intended to measure; data disaggregated where appropriate? Ability to count or otherwise quantify data in an accurate manner. Availability of adequate mechanisms to document verifiable changes. Indicator s target must be feasible with the available resources given a reasonable timescale, and that it is within the project s control and influence. There is an obvious relationship between the indicator and the objective and goals it is seeking to measure. Data can be collected frequently enough to inform the progress and influence the decisions. Data sources are known. Data is available at reasonable cost and effort. DECEMBER 20,

6 Criteria 3: Baseline The existence of sufficient baseline data to establish a starting point for comparisons and future measurements of outputs and outcomes 1. Are baselines explicitly stated for each indicator? Are they implicit in the stated objectives? 2. Are baselines specific to the programme/project? 3. Are baselines unambiguous and do they clearly describe the situation prior to the intervention? 4. Will baselines permit to compare and measure results? Data is available for performance to be tracked relative to baseline. Meet the needs and interests of key stakeholders. The level of quality of data primary/secondary provides reasons for intervention. Provide an adequate basis for judging development results. Measure the degree and quality of change during implementation. Criteria 4: Milestones A set of time-bound milestones that provide a clear sense of the intended path towards achieving established outputs and outcomes 1. Do milestones provide clear sense of the time frame for achievement of results? 2. Do milestones help identify the path toward outputs or outcomes? 3. Do milestones provide a clear sense of progress towards development goal? Indicates expected time frame for deliverables. Provide the means to validate project is progressing as planned. Indicates completion of a set of deliverables. Criteria 5: Risks and assumptions Assessment of factors, namely risks and assumptions, likely to affect the achievement of an intervention s objectives, and related contingency measures 1. Have the principal restrictions to achieving outcomes been identified? The quality of the analysis of the identification of the assumptions and risks. Conditions necessary for the execution of programme and its project and the achievement of the objectives are identified. DECEMBER 20,

7 2. Have the risks associated with each strategy option /with achieving project outcomes been identified? 3. Are the risk mitigation measures clearly defined, and are they supported by theory, logic, empirical evidence and/or past ILO experience? The presence or not of risk evaluation, meaning the quantification and gradation of the risks. Articulate for each strategy/ outcome fundamental risks that will pose a threat to overall programme success. The adoption or not of risk mitigation or incentive measures including the action that are required to carry this out. Criteria 6: Monitoring and Evaluation M&E system to identify problems during project and programme implementation and facilitate the measurement of progress 1. Is the results framework clearly defined (complete with objectives, indicators, baselines and targets), including actions to be undertaken to achieve appropriate evaluation and monitoring? 2. Has a progress monitoring system been defined for objectives and strategy, including actions to be undertaken to record progress? Logical framework complete with all key elements. A data gathering system to generate information on indicators has been defined. Resources have been identified and committed to ensure that predefined data will be collected and analysed. Sources of information are specified for all indicators. Social partners and beneficiaries are expected to participate in monitoring and evaluation. 3. Risks monitoring system defined, including actions to be undertaken to achieve this. Has a risks monitoring system been defined, including the actions to be undertaken to achieve this? Follow-up actions for mitigating the impact of the risks and for monitoring the validity of the assumptions and risks are identified DECEMBER 20,

Results-based Management in the ILO. A Guidebook. Version 2

Results-based Management in the ILO. A Guidebook. Version 2 Results-based Management in the ILO A Guidebook Version 2 Applying Results-Based Management in the International Labour Organization A Guidebook Version 2 June 2011 Copyright International Labour Organization

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

GLOSSARY OF EVALUATION TERMS

GLOSSARY OF EVALUATION TERMS Planning and Performance Management Unit Office of the Director of U.S. Foreign Assistance Final Version: March 25, 2009 INTRODUCTION This Glossary of Evaluation and Related Terms was jointly prepared

More information

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,

More information

OUTLINE OF PRINCIPLES OF IMPACT EVALUATION

OUTLINE OF PRINCIPLES OF IMPACT EVALUATION OUTLINE OF PRINCIPLES OF IMPACT EVALUATION PART I KEY CONCEPTS Definition Impact evaluation is an assessment of how the intervention being evaluated affects outcomes, whether these effects are intended

More information

Logical Framework Analysis and Problem tree. 21 st March 2013

Logical Framework Analysis and Problem tree. 21 st March 2013 Logical Framework Analysis and Problem tree 21 st March 2013 Overview Explanation of purpose and benefits of Logical Frameworks Develop a problem tree analysis linking roots causes effects (exercise) Logic

More information

PROJECT MANAGEMENT TRAINING MODULES

PROJECT MANAGEMENT TRAINING MODULES PROJECT MANAGEMENT TRAINING MODULES KENYA PROJECTS ORGANIZATION < Projects Solutions Provider > Macjo Arcade, 4 th Flr., Suite 15E P.O Box, 3029 00200, Nairobi - Kenya Tel: 254 (0)202319748 Mob: 0725 788

More information

Checklist for Operational Risk Management

Checklist for Operational Risk Management Checklist for Operational Risk Management I. Development and Establishment of Comprehensive Operational Risk Management System by Management Checkpoints - Operational risk is the risk of loss resulting

More information

Governing Body 310th Session, Geneva, March 2011 TC FOR DECISION

Governing Body 310th Session, Geneva, March 2011 TC FOR DECISION INTERNATIONAL LABOUR OFFICE Governing Body 310th Session, Geneva, March 2011 Committee on Technical Cooperation GB.310/TC/1 TC FOR DECISION FIRST ITEM ON THE AGENDA Operational strategies for capacity

More information

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department New JICA Guidelines for Project Evaluation First Edition Japan International Cooperation Agency (JICA) Evaluation Department June 2010 Contents 1 OVERVIEW OF AID EVALUATION AND JICA'S PROJECT EVALUATION...

More information

UPDATED RESULTS-BASED MANAGEMENT FRAMEWORK FOR

UPDATED RESULTS-BASED MANAGEMENT FRAMEWORK FOR LDCF/SCCF Council Meeting November 18, 2010 GEF/LDCF.SCCF.9/Inf.4 October 20, 2010 UPDATED RESULTS-BASED MANAGEMENT FRAMEWORK FOR THE LEAST DEVELOPED COUNTRIES FUND (LDCF) AND THE SPECIAL CLIMATE CHANGE

More information

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development

More information

Evaluability Assessment Template

Evaluability Assessment Template Evaluability Assessment Template Evaluability Assessment Template An Evaluability Assessment examines the extent to which a project or a programme can be evaluated in a reliable and credible fashion. An

More information

Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund

Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund EUROPEAN COMMISSION AGRICULTURE DIRECTORATE-GENERAL Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund

More information

MONITORING AND EVALUATION WORKSHEETS SUPPLEMENTAL INFORMATION

MONITORING AND EVALUATION WORKSHEETS SUPPLEMENTAL INFORMATION MONITORING AND EVALUATION WORKSHEETS SUPPLEMENTAL INFORMATION I. Introduction to Results Based Monitoring HED will use its results-based monitoring and evaluation system to effectively manage partnership

More information

UNICEF Evaluation Report Standards

UNICEF Evaluation Report Standards UNICEF Evaluation Report Standards The UNICEF Evaluation Report Standards have been created as a transparent tool for quality assessment of evaluation reports. This document outlines what the Standards

More information

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual Equal Rights and Treatment for Roma in Moldova and Ukraine Project Management Methodology Manual WELCOME TO THE COUNCIL OF EUROPE PROJECT MANAGEMENT METHODOLOGY In July 2001, the Council of Europe launched

More information

Chapter 3 Data Interpretation and Reporting Evaluation

Chapter 3 Data Interpretation and Reporting Evaluation Chapter 3 Data Interpretation and Reporting Evaluation Results This chapter explains how to interpret data and how to bring together evaluation results. Tips! - Evaluation does not end with data collection

More information

Monitoring and Evaluation Plan Primer for DRL Grantees

Monitoring and Evaluation Plan Primer for DRL Grantees Monitoring and Evaluation Plan Primer for DRL Grantees I. What is a monitoring and evaluation plan? A monitoring and evaluation plan (M&E plan), sometimes also referred to as a performance monitoring or

More information

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template UNICEF Global Evaluation Report Oversight System (GEROS) Review Template Colour Coding CC Dark green Green Amber Red White Questions Outstanding Yes t Applicable Section & Overall Rating Very Confident

More information

QUALITY ASSURANCE POLICY

QUALITY ASSURANCE POLICY QUALITY ASSURANCE POLICY ACADEMIC DEVELOPMENT & QUALITY ASSURANCE OFFICE ALPHA UNIVERSITY COLLEGE 1. BACKGROUND The Strategic Plan of 2003-2005 E.C of Alpha University s defines the direction Alpha University

More information

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Contents Page 7.0 MONITORING, REPORTING AND EVALUATION See the New M & E Framework. 7.1 Policy framework 7.1.1 General policy statements 7.1.2 Coverage

More information

The Transport Business Cases

The Transport Business Cases Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business

More information

DAC Guidelines and Reference Series. Quality Standards for Development Evaluation

DAC Guidelines and Reference Series. Quality Standards for Development Evaluation DAC Guidelines and Reference Series Quality Standards for Development Evaluation DAC Guidelines and Reference Series Quality Standards for Development Evaluation DEVELOPMENT ASSISTANCE COMMITTEE ORGANISATION

More information

Checklist for Reviewing Scopes of Work for Performance Evaluations

Checklist for Reviewing Scopes of Work for Performance Evaluations Checklist for Reviewing Scopes of Work for Performance Evaluations Use the Evaluation Scope of Work (SOW) Checklist to review and strengthen SOW during the evaluation planning stage. In most cases you

More information

Competencies for Canadian Evaluation Practice

Competencies for Canadian Evaluation Practice The Canadian Evaluation Society Competencies for Canadian Evaluation Practice V 11.0 4 16 2010 Page 1 of 15 Introduction This document provides a suite of competencies for evaluation work in Canada. Competencies

More information

Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development.

Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development. Effective objective setting provides structure and direction to the University/Faculties/Schools/Departments and teams as well as people development. The main purpose of setting objectives is to reflect

More information

Purpose: Content: Definition: Benefits: outputs outcomes benefits Business Case dis-benefit Key Responsibilities: Approach: Executive Developed

Purpose: Content: Definition: Benefits: outputs outcomes benefits Business Case dis-benefit Key Responsibilities: Approach: Executive Developed Key Learning Points The Swirl Logo is a trade mark of the AXELOS Limited. Is used by the Project Board throughout the project to verify its continued viability:- Is the investment in this project still

More information

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013. Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for

More information

Project Management Guidebook

Project Management Guidebook METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

FOREIGN AFFAIRS PROGRAM EVALUATION GLOSSARY CORE TERMS

FOREIGN AFFAIRS PROGRAM EVALUATION GLOSSARY CORE TERMS Activity: A specific action or process undertaken over a specific period of time by an organization to convert resources to products or services to achieve results. Related term: Project. Appraisal: An

More information

ILO Decent Work Country Programmes A Guidebook

ILO Decent Work Country Programmes A Guidebook ILO Decent Work Country Programmes A Guidebook Version 3 Copyright International Labour Organization 2011 First published 2005 Second edition 2008 Third edition 2011 Publications of the International

More information

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT

THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive

More information

Operationalizing the Strategic Plan 2015-2017 Defining projects & programmes

Operationalizing the Strategic Plan 2015-2017 Defining projects & programmes Operationalizing the Strategic Plan 2015-2017 Defining projects & programmes 1 Introduction ITC has a new Strategic Plan for 2015-2017 that centres on thematic focus areas and programmes. In this plan,

More information

Glossary Monitoring and Evaluation Terms

Glossary Monitoring and Evaluation Terms Glossary Monitoring and Evaluation Terms This glossary includes terms typically used in the area of monitoring and evaluation (M&E) and provides the basis for facilitating a common understanding of M&E.

More information

Solvency II Own Risk and Solvency Assessment (ORSA)

Solvency II Own Risk and Solvency Assessment (ORSA) Solvency II Own Risk and Solvency Assessment (ORSA) Guidance notes September 2011 Contents Introduction Purpose of this Document 3 Lloyd s ORSA framework 3 Guidance for Syndicate ORSAs Overview 7 December

More information

Part 1. MfDR Concepts, Tools and Principles

Part 1. MfDR Concepts, Tools and Principles Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international

More information

Sales & Operations Planning Process Excellence Program

Sales & Operations Planning Process Excellence Program Chemical Sector We make it happen. Better. Sales & Operations Planning Process Excellence Program Engagement Summary November 2014 S&OP Excellence Robust discussions creating valuable ideas Engagement

More information

Guidance for the development of gender responsive Joint Programmes. MDG Achievement Fund

Guidance for the development of gender responsive Joint Programmes. MDG Achievement Fund Guidance for the development of gender responsive Joint Programmes MDG Achievement Fund This guidance is elaborated to provide practical recommendations on how to incorporate the gender perspective when

More information

Lessons Learned International Evaluation

Lessons Learned International Evaluation 2012 Reusing lessons i-eval THINK Piece, No. 1 i-eval THINK Piece, No. 1 i-eval THINK Piece, No. 3 Lessons Learned Rating Lessons Systems Learned in International Evaluation Utilizing lessons learned from

More information

Managing for Results: Monitoring and Evaluation in UNDP

Managing for Results: Monitoring and Evaluation in UNDP . Evaluation Office Managing for Results: Monitoring and Evaluation in UNDP.......... A Results-Oriented Framework 16 November 2001 Introduction This paper presents the key changes to the UNDP monitoring

More information

DRAFT EBRD Evaluation Department Guidance Introductory Notes

DRAFT EBRD Evaluation Department Guidance Introductory Notes DRAFT EBRD Evaluation Department Guidance Introductory Notes Evaluation Performance Rating These guidelines will apply to all evaluation in EBRD Version Date: 07Apr15 Effective date: 1 January 2015 (pilot

More information

Terms of Reference for LEAP II Final Evaluation Consultant

Terms of Reference for LEAP II Final Evaluation Consultant UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan

More information

1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2

1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2 ADDENDUM june 2011 evaluation Updated guidance on EvalUAtion in the Handbook on Planning, Monitoring and EvalUAting for Development Results(2009) Table of Contents 1. Background and Overview 1 1.1 Why

More information

CULTURE PROGRAMME (2007-2013) Guidance Notes for Experts. Strand 1.3.5

CULTURE PROGRAMME (2007-2013) Guidance Notes for Experts. Strand 1.3.5 Education, Audiovisual and Culture Executive Agency Culture CULTURE PROGRAMME (2007-2013) Guidance Notes for Experts Strand 1.3.5 Version January 2012 Education, Audiovisual & Culture Executive Agency

More information

1. Background and business case

1. Background and business case 1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons

More information

Overview. EU Energy Focus. Key aspects of Horizon 2020. EU Energy Focus. Funding Actions eligibility and funding rates

Overview. EU Energy Focus. Key aspects of Horizon 2020. EU Energy Focus. Funding Actions eligibility and funding rates Overview Addressing the evaluation criteria 12 th March 2015 Introduction Topics covered by May deadline Evaluation criteria Key messages Evaluator comments Common feedback services Funded by the Department

More information

Level: 3 Credit value: 5 GLH: 28 Relationship to NOS:

Level: 3 Credit value: 5 GLH: 28 Relationship to NOS: Unit 341 Implement UAN: Level: 3 Credit value: 5 GLH: 28 Relationship to NOS: Assessment requirements specified by a sector or regulatory body: Aim: T/506/1929 Management & Leadership (2012) National Occupational

More information

Manual. The South African Management Development Institute (SAMDI) M&E Orientation Course Manual

Manual. The South African Management Development Institute (SAMDI) M&E Orientation Course Manual Manual Monitoring and Evaluation: Orientation Course Manual The South African Management Development Institute (SAMDI) Developed by Insideout: M&E Specialists for the South African Management Development

More information

KEY PERFORMANCE INFORMATION CONCEPTS

KEY PERFORMANCE INFORMATION CONCEPTS Chapter 3 KEY PERFORMANCE INFORMATION CONCEPTS Performance information needs to be structured to demonstrate clearly how government uses available resources to deliver on its mandate. 3.1 Inputs, activities,

More information

Governing Body 319th Session, Geneva, 16 31 October 2013

Governing Body 319th Session, Geneva, 16 31 October 2013 INTERNATIONAL LABOUR OFFICE Governing Body 319th Session, Geneva, 16 31 October 2013 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.319/PFA/2 PFA Date:

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

TOOL D14 Monitoring and evaluation: a framework

TOOL D14 Monitoring and evaluation: a framework TOOL D14 Monitoring and evaluation: a framework 159 TOOL D14 Monitoring and evaluation: a framework TOOL D14 For: About: Purpose: Use: Resource: Commissioners in primary care trusts (PCTs) and local authorities

More information

INTERNSHIP ANNOUNCEMENT

INTERNSHIP ANNOUNCEMENT Ref. Internship Date: 9 June 2015 Announcement No. BKK/INTERNSHIP/2015/04 INTERNSHIP ANNOUNCEMENT Post Title: Monitoring, Evaluation and Research Intern Organization Unit: Decent Work Team in Bangkok Duration:

More information

United Nations Development Group Results-Based Management Handbook Strengthening RBM harmonization for improved development results

United Nations Development Group Results-Based Management Handbook Strengthening RBM harmonization for improved development results United Nations Development Group Results-Based Management Handbook Strengthening RBM harmonization for improved development results The Handbook is spearheaded by the RBM/Accountability Team, UNDG WGPI

More information

Using the logical framework matrix

Using the logical framework matrix Using the logical framework matrix Defining the M&E Strategy for a programme/project A logical framework Clearly defined results and risks Performance indicators and means of verification An M&E plan for

More information

Fiscal Year 2015-16 Accountability Report Technical Assistance

Fiscal Year 2015-16 Accountability Report Technical Assistance Fiscal Year 2015-16 Accountability Report Technical Assistance June 13, 2016 DEVELOPING AGENCY GOALS, STRATEGIES AND OBJECTIVES The focus of agency s goals, strategies and objectives should be future-looking

More information

The New Programming Period 2007-2013. Working Document No.1

The New Programming Period 2007-2013. Working Document No.1 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 INDICATIVE GUIDELINES

More information

Governance, Risk and Best Value Committee

Governance, Risk and Best Value Committee Governance, Risk and Best Value Committee 2.00pm, Wednesday 23 September 2015 Internal Audit Report: Integrated Health & Social Care Item number Report number Executive/routine Wards Executive summary

More information

HUMANITARIAN. Food 11. Health 4 Shelter 4 Other 7 OECD/DAC

HUMANITARIAN. Food 11. Health 4 Shelter 4 Other 7 OECD/DAC #094 DENMARK Group 1 PRINCIPLED PARTNERS OFFICIAL DEVELOPMENT ASSISTANCE HRI 2011 Ranking 2nd 0.90% AID of GNI of ODA P4 6.2% US $32 6.95 P5 7.62 7.12 7.49 P3 7.90 P1 5.35 P2 Per person AID DISTRIBUTION

More information

Having undertaken a general discussion on the basis of Report IV, Small and medium-sized enterprises and decent and productive employment creation,

Having undertaken a general discussion on the basis of Report IV, Small and medium-sized enterprises and decent and productive employment creation, International Labour Conference Provisional Record 104th Session, Geneva, June 2015 11-1 Fourth item on the agenda: Small and medium-sized enterprises and decent and productive employment creation Reports

More information

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template EVALUATION ID 1430-2015/003 UNICEF Global Evaluation Report Oversight System (GEROS) Review Template Colour Coding CC Dark green Green Amber Red White s Outstanding Satisfactory No Not Applicable Section

More information

7, Avenue Bourguiba, BP 48- cp18523- Dakar SENEGAL Tel 221 869 96 18 Fax 221 869 96 31 secoraf@coraf.org www.coraf.org

7, Avenue Bourguiba, BP 48- cp18523- Dakar SENEGAL Tel 221 869 96 18 Fax 221 869 96 31 secoraf@coraf.org www.coraf.org Conseil Ouest et Centre Africain pour la Recherche et le Développement Agricoles West and Central African Council for Agricultural Research and Development CORAF/WECARD MONITORING AND EVALUATION STRATEGY

More information

evaluation outcome-level

evaluation outcome-level outcome-level evaluation a companion guide to the handbook on planning monitoring and evaluating for development results for programme units and evaluators december 2011 Table of Contents Acronyms and

More information

Development of a coherent monitoring framework for post-2015 water targets

Development of a coherent monitoring framework for post-2015 water targets Development of a coherent monitoring framework for post-2015 water targets PROGRAMME SUMMARY Lead At the conclusion of the Millennium Development Goal (MDG) process water sector monitoring is uncertain

More information

TIPS SELECTING PERFORMANCE INDICATORS ABOUT TIPS

TIPS SELECTING PERFORMANCE INDICATORS ABOUT TIPS NUMBER 6 2 ND EDITION, 2010 PERFORMANCE MONITORI NG & EVALUATION TIPS SELECTING PERFORMANCE INDICATORS ABOUT TIPS These TIPS provide practical advice and suggestions to USAID managers on issues related

More information

Frequently Asked Questions in Project Management

Frequently Asked Questions in Project Management Frequently Asked Questions in Project Management 1. Question: What is Project Management? Answer: Project Management is the collection and application of skills, knowledge, processes, and activities to

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT INTERNATIONAL LABOUR ORGANIZATION DECENT WORK FOR ALL The ILO is a Specialised Agency of the United Nations devoted to the promotion of social justice and human rights in the world of work. The primary

More information

http://impact.zewo.ch/en/impact Stiftung Zewo Schweizerische Zertifizierungsstelle für gemeinnützige, Spenden sammelnde Organisationen

http://impact.zewo.ch/en/impact Stiftung Zewo Schweizerische Zertifizierungsstelle für gemeinnützige, Spenden sammelnde Organisationen These guidelines are designed to help project managers to assess the outcomes of their projects and programmes. They demonstrate how development agencies can implement an appropriate outcome and impact

More information

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT) 3 DAY COURSE INTRODUCTION The principles of project management are generic and therefore can be applied to all projects regardless of business sector.

More information

ownership We increase return on investment by We deliver reliable results by engaging

ownership We increase return on investment by We deliver reliable results by engaging Software Engineering Institute Capability Maturity Model Integrated Product and Process Development (Continuous) Project Management Process areas Project planning Establish estimates Develop a project

More information

March 2002. Version 2.0

March 2002. Version 2.0 EUROPEAN COMMISSION EuropeAid Co-operation Office General Affairs Evaluation Project Cycle Management Handbook a March 2002 Version 2.0 Prepared by: PARTICIP GmbH Hildastrasse 66 D-79102 Freiburg, Germany

More information

METHODOLOGY FOR ASSESSMENT OF NON-FORMAL AND INFORMAL LEARNING ACHIEVEMENTS IN A STUDY PROCESS

METHODOLOGY FOR ASSESSMENT OF NON-FORMAL AND INFORMAL LEARNING ACHIEVEMENTS IN A STUDY PROCESS TIMA-Balt Leonardo da Vinci programme project TRANSFER OF INNOVATIVE METHODOLOGY FOR ASSESSMENT OF VET TEACHERS PRIOR LEARNING LLP-LdV-TOI-2007-LT-0004 Contents: Introduction I. Principles II. Prerequisites

More information

TDR Performance Assessment Framework

TDR Performance Assessment Framework TDR Performance Assessment Framework REVISION 2012 2017 Measuring for improvement For research on diseases of poverty UNICEF UNDP World Bank WHO TDR Performance Assessment Framework REVISION 2012 2017

More information

INTERAGENCY GUIDANCE ON THE ADVANCED MEASUREMENT APPROACHES FOR OPERATIONAL RISK. Date: June 3, 2011

INTERAGENCY GUIDANCE ON THE ADVANCED MEASUREMENT APPROACHES FOR OPERATIONAL RISK. Date: June 3, 2011 Board of Governors of the Federal Reserve System Federal Deposit Insurance Corporation Office of the Comptroller of the Currency Office of Thrift Supervision INTERAGENCY GUIDANCE ON THE ADVANCED MEASUREMENT

More information

Risk Workshop Overview. MOX Safety Fuels the Future

Risk Workshop Overview. MOX Safety Fuels the Future Risk Workshop Overview RISK MANAGEMENT PROGRAM SUMMARY CONTENTS: Control Account Element Definition ESUA Form Basis of Estimate Uncertainty Calculation Management Reserve 1. Overview 2. ESUA Qualification

More information

Il Project Cycle Management :A Technical Guide The Logical Framework Approach

Il Project Cycle Management :A Technical Guide The Logical Framework Approach European Institute of Public Administration - Institut européen d administration publique Il Project Cycle Management :A Technical Guide The Logical Framework Approach learning and development - consultancy

More information

Scheduling and Review of Project Activities

Scheduling and Review of Project Activities Project Implementation Manual Scheduling and Review of Project Activities 1. INTRODUCTION 2. UNDERSTANDING CONTRACTUAL OBBLIGATIONS 3. PLANNING, MONITORING & AUDITING 4. PROCUREMENT 5. REPORTING 1.1 Purpose

More information

SOFTWARE REQUIREMENTS

SOFTWARE REQUIREMENTS SOFTWARE REQUIREMENTS http://www.tutorialspoint.com/software_engineering/software_requirements.htm Copyright tutorialspoint.com The software requirements are description of features and functionalities

More information

Technology and Cyber Resilience Benchmarking Report 2012. December 2013

Technology and Cyber Resilience Benchmarking Report 2012. December 2013 Technology and Cyber Resilience Benchmarking Report 2012 December 2013 1 Foreword by Andrew Gracie Executive Director, Special Resolution Unit, Bank of England On behalf of the UK Financial Authorities

More information

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire

More information

Include a baseline and a results framework/log frame with each final project submission; 3 and

Include a baseline and a results framework/log frame with each final project submission; 3 and BACKGROUND At its tenth, the Adaptation Fund Board adopted the approach to implementing results based management (RBM), contained in Annex IV of the report of the 10th meeting of the Adaptation Fund Board.

More information

Concept Note on Business Operations Strategy (BoS) Operations Management Team (OMT) December 2012

Concept Note on Business Operations Strategy (BoS) Operations Management Team (OMT) December 2012 Concept Note on Business Operations Strategy (BoS) Operations Management Team (OMT) December 2012 UN General Assembly as well as Economic and Social Council (ECOSOC) resolutions have consistently called

More information

Submission by India. On the work of the Ad-hoc Working Group on the Durban Platform for Enhanced Action. Work-stream I

Submission by India. On the work of the Ad-hoc Working Group on the Durban Platform for Enhanced Action. Work-stream I Submission by India On the work of the Ad-hoc Working Group on the Durban Platform for Enhanced Action Work-stream I 1. The Government of India welcomes the opportunity to submit inputs on the work of

More information

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

Space project management

Space project management ECSS-M-ST-80C Space project management Risk management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards

More information

PROJECT AUDIT METHODOLOGY

PROJECT AUDIT METHODOLOGY PROJECT AUDIT METHODOLOGY 1 "Your career as a project manager begins here!" Content Introduction... 3 1. Definition of the project audit... 3 2. Objectives of the project audit... 3 3. Benefit of the audit

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

Data quality and metadata

Data quality and metadata Chapter IX. Data quality and metadata This draft is based on the text adopted by the UN Statistical Commission for purposes of international recommendations for industrial and distributive trade statistics.

More information

Guidelines for Gender Sensitive Programming Prepared by Brigitte Leduc and Farid Ahmad

Guidelines for Gender Sensitive Programming Prepared by Brigitte Leduc and Farid Ahmad Guidelines for Gender Sensitive Programming Prepared by Brigitte Leduc and Farid Ahmad November 2009 What is a Gender-Sensitive Programming Process? Gender is a critical factor that determines an individual

More information

EIOPACP 13/09. Guidelines on Forward Looking assessment of own risks (based on the ORSA principles)

EIOPACP 13/09. Guidelines on Forward Looking assessment of own risks (based on the ORSA principles) EIOPACP 13/09 Guidelines on Forward Looking assessment of own risks (based on the ORSA principles) EIOPA Westhafen Tower, Westhafenplatz 1 60327 Frankfurt Germany Tel. + 49 6995111920; Fax. + 49 6995111919;

More information

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection

More information

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK Annex C PROGRESS REPORT ON MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK PREPARED FOR THE SECOND INTERNATIONAL ROUNDTABLE ON MANAGING FOR DEVELOPMENT RESULTS FEBRUARY 2004 Annex C CONTENTS

More information

GEF/LDCF.SCCF.17/05/Rev.01 October 15, 2014. 17 th LDCF/SCCF Council Meeting October 30, 2014 Washington, DC. Agenda Item 5

GEF/LDCF.SCCF.17/05/Rev.01 October 15, 2014. 17 th LDCF/SCCF Council Meeting October 30, 2014 Washington, DC. Agenda Item 5 17 th LDCF/SCCF Council Meeting October 30, 2014 Washington, DC GEF/LDCF.SCCF.17/05/Rev.01 October 15, 2014 Agenda Item 5 UPDATED RESULTS-BASED MANAGEMENT FRAMEWORK FOR ADAPTATION TO CLIMATE CHANGE UNDER

More information

Solvency II Own risk and solvency assessment (ORSA)

Solvency II Own risk and solvency assessment (ORSA) Solvency II Own risk and solvency assessment (ORSA) Guidance notes MAY 2012 Contents Introduction Page Background 3 Purpose and Scope 3 Structure of guidance document 4 Key Principles and Lloyd s Minimum

More information

Framework for Managing Programme Performance Information

Framework for Managing Programme Performance Information Framework for Managing Programme Performance Information Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Managing

More information

Lessons Learned from MDG Monitoring From A Statistical Perspective

Lessons Learned from MDG Monitoring From A Statistical Perspective Lessons Learned from MDG Monitoring From A Statistical Perspective Report of the Task Team on Lessons Learned from MDG Monitoring of the IAEG-MDG United Nations March 2013 The views expressed in this paper

More information

PLAN OF ACTION PARTNERSHIP FOR SUSTAINABLE TEXTILES

PLAN OF ACTION PARTNERSHIP FOR SUSTAINABLE TEXTILES PLAN OF ACTION PARTNERSHIP FOR SUSTAINABLE TEXTILES CONTENTS A. PREAMBLE 3 B. Objectives 5 C. Implementation strategy 6 D. Cooperation structures 8 E. Conditions of participation 9 ANNEX 13 A. PREAMBLE

More information

The Role of Policy in Supporting Value Chain Development and Value Chain Partnership

The Role of Policy in Supporting Value Chain Development and Value Chain Partnership Joint 2016 PanAfrican Grain Legume and World Cowpea Conference 28 February to 4 March 2016 Sustaining Legume Value-Chains through Value Added Processing and Public-Private Partnerships The Role of Policy

More information