Coalburst Control Methods
|
|
|
- Earl McBride
- 9 years ago
- Views:
Transcription
1 University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2016 Coalburst Control Methods Justine Calleja University of Wollongong Ian Porter University of Wollongong Publication Details Justine Calleja and Ian Porter, Coalburst Control Methods, in Naj Aziz and Bob Kininmonth (eds.), Proceedings of the 16th Coal Operators' Conference, Mining Engineering, University of Wollongong, February 2016, Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library:
2 COALBURST CONTROL METHODS Justine Calleja 1 and Ian Porter 2 ABSTRACT: Coalburst (also known as coal bump) is a well known phenomenon in underground coal mines internationally, however, it was not recognised as a risk for Australian coal mines until the recent double fatality at Austar Coal Mine in the Hunter Valley in This paper reviews the international knowledge base from research and practice to provide Australian mining professionals with an understanding of the basics of coalburst control methods in order to allow mine operators to address the risk of coalburst in mining safety management plans. This is the second of two companion papers to be read with the first paper, Coalburst causes and mechanisms (Calleja and Nemcik 2016). INTRODUCTION There are many different methods available to manage coalburst risk. The approaches can be broadly categorised into predictive, preventative, mitigating and protective control measures. Control measures range from very simple rules of thumb to highly sophisticated technology and engineering. The most effective coalburst management systems are likely to include a mix of both approaches. PREDICTIVE CONTROL METHODS Predictive control methods can be used to identify coalburst risk prior to mining in order to allow mine planning and design changes to be implemented in order to reduce or eliminate the risk (planning prediction or strategic controls). Predictive measures can also be used during mining where coalburst risk has not been eliminated, in order to minimise the hazard through the implementation of mitigating and protective control measures (operational or real time prediction). Planning Prediction The first and most important predictive control measure, which will determine the need for other control measures is risk assessment. Site specific empirical risk assessment has been used successfully at the Lynch No. 37 Mine in Kentucky where the key risk indicators were found to be depth greater than 460 m, sandstone thickness greater than 10 m and sandstone in contact with the top of the coalbed (Iannacchione and Tadolini 2015). However, these risk factors and values may not be appropriate for use at other mines as they are a function of the specific geotechnical and mining environment present at this particular site. Mark and Gauna (2015) recognised that a universal quantitative risk rating scale has not been developed, but suggested rating the individual factors which are known to be important, based on existing cases, on a site by site basis with regard to existing experience at the site. The risk analysis factors suggested for pillar recovery which would be considered high risk include depth of cover greater than 450 m, multiple seam workings with remnants surrounded by goaf, strong thick and massive strata (e.g. a Coal Mine Roof Rating Unit Rating > 50 (Calleja 2006, 2008) within 15 m of the seam, presence of geological features (such as sandstone channels, faults, fracture zones, seam dips or rapid topographic changes), panel width larger than 150 m, full extraction and a burst history at the mine. 1 Lecturer Mining Engineering, School of Civil, Mining and Environmental Engineering, University of Wollongong, NSW, Australia. [email protected] Tel: , 2 Associate Professor, School of Civil, Mining and Environmental Engineering, University of Wollongong, NSW, Australia. [email protected] Tel: , February
3 As there are currently no risk assessment guidelines applicable for use in Australia, empirical risk assessment can be conducted based on the risk factors described by Calleja and Nemcik (2016). The most important risk indicator is a history of coalbursts in the seam and at the mine, as many of the other factors associated with coalburst can be present at mine sites which do not ever experience coalbursts (e.g. seismicity, high depth of cover, presence of thick massive strata in proximity to the seam). Mark and Gauna (2015) provided evidence from eleven mines that a past history of bursts is an important indicator of burst risk, Major bursts have often been preceded by a pattern of increasing coalburst activity. The development of Australian coalburst risk assessment guidelines is currently of critical importance. Until such guidelines are developed, it is recommended that the principal indicator to use to determine the presence of coalburst risk should be a past history of coalbursts, and the Mine Safety and Health Administration (MSHA) (2012) guidelines for reporting coalbursts are a reasonable criteria to use. In the Czech Republic, risk assessment is based on both regional risk and local risk factors (Ptacek, 2015). Regional risk factors include tectonic features, seismic and microseismic monitoring, stratigraphic sequence, mechanical properties of the coal and rock, depth, seam thickness and dip. Local risk factors are used to determine specific areas within a mine which may be at risk and include depth, seam thickness and mine layout (mining next to goaf or under remnant pillars). Dou and Gong (2014) described the zoning and levelling forecasting method of predictive control (see Figure 1) which is used in Chinese coal mines. It is an integrated approach which involves early regional risk assessment combined with real time local and point forecasting of coalburst. This predictive system uses the comprehensive index method, the multi-factor coupling method, microseismic monitoring, the electromagnetic radiation method and the drilling cuttings method. Figure 1: Zoning Spatio-Temporal forecast method of prediction (Dou and Gong 2014) Operational Real-Time Prediction A great deal of research effort has been focused on developing methods to predict the location and timing of coalburst. Traditional methods of prediction have involved the use of test drilling and incident history recording. More technologically advanced systems under current investigation include the use of seismic monitoring, seismic tomography, electromagnetic radiation (EMR), stress and strain monitoring and numerical modelling. Tan et al., (2014) described a method of coalburst risk monitoring which was used at Yangcheng Mine in China. Three different monitoring strategies were employed concurrently and indicated that a silence period in the microseismic monitoring, combined with increasing electromagnetic radiation could be used to predict a coalburst. Once the risk was identified, face drilling with fines monitoring could be conducted to identify the location of high burst risk in the face and allow targeted de-stressing measures to be implemented February 2016
4 Traditional Methods Observation, Rock Noise Reporting and Test Drilling Traditional techniques are often inherently simple and inexpensive. The value of these approaches, such as rock noise reporting and event histories, should not be overlooked as useful methods of assessing coalburst risk. The use of qualitative (observational) seismic monitoring is still an important component of seismic management systems. Mt Isa Mines initially relied on Rock Noise Reporting by underground operators to monitor seismicity in their Deep Lead orebody (Thin et al., 2005). Similarly, seismic rock fall reporting and rock noise reporting (a tick and flick form) were introduced for seismic management when Beaconsfield first encountered mining seismicity in 2003 (Hills 2013). In both cases the level of seismicity increased and required an instrumented seismic monitoring system to be installed. In the Czech Republic, Ptacek (2015), recommends that the data necessary for continuous coalburst prediction includes personal monitoring, by miners, of rock strata and coal seam behaviour. High static stress conditions have been proven to be capable of causing coalbursts even without external seismic events (Brauner 1994). As such, being able to identify high in-situ stress areas and the development of high stress in the coal close to the excavation boundary is a key tool for identifying areas of coalburst risk. Regular stress mapping by trained geotechnical personnel can be conducted to identify and predict high stress areas. It is very difficult and expensive to measure triaxial in-situ stress and stress change in coal with existing instruments. Whilst such stress measurements are very important and valuable for geotechnical design they do not provide the level of areal coverage required to identify coalburst risk zones. Test drilling is a traditional, proven, simpler and cheaper method of identifying high stress areas with better areal coverage in coal, in advance of mining, and it is used widely in China and the Czech Republic (Ptacek 2015; Konicek 2013 and Li et al., 2007). When a borehole is drilled in highly stressed coal, it will burst during drilling and a significantly larger volume of coal cuttings will be washed out than would occur when the coal is not highly stressed. This process is often accompanied by the observation of a bumping noise in the coal while drilling and shocks on the drill rods. Brauner (1994) provided an example of drill cuttings from a 46 mm hole which produced 2-4 l/m cuttings under normal conditions and which increased to l/m at the beginning of a high stress zone beyond 4 m into the rib line where dynamic effects occurred. It is also possible to identify high stress zones from the axial forces required to be applied during drilling. High stress areas prone to bursting can be identified when the drill rod is pulled into the hole and axial forces on the rods go into tension (Figure 2). Figure 2: Yield of cuttings in boreholes approaching a high-stress zone and the axial forces on the drill in coal under normal (above) and high stresses (below) (Brauner 1994) February
5 This approach could be applied to the longhole drilling which is conducted for gas drainage in order to identify coalburst risk areas after gas drainage has occurred, however, the application of this approach will need to be developed based on underground trials in Australia. The level of static stress can change as a result of mining and new areas of high risk can develop after initial test drilling has been conducted. As a result repeated test drilling is sometimes required. Seismic Monitoring Ortlepp (2005) recognised that whilst seismic monitoring and numerical modelling could not provide real-time prediction of rockbursts, it would be likely to allow prognosis (risk identification). However, this would require adequate staffing of a sophisticated monitoring and analysis system by a dedicated experienced professional for mining operations experiencing bursting. Mendecki et al., (1999), describe the applications of seismic monitoring. It can be used to identify the location of possible coalbursts and can help guide rescue operations. It can be used to identify the location of important geological features such as faults and dykes ahead of mining. It can be used to identify unexpected changes in the location and timing of seismicity in the mine which can indicate increased risk and allow management to implement safety management and strategic controls. It can also be used to allow characteristic patterns of seismicity which precede coalbursts to be identified and used to help predict the potential triggers, location and timing of future incidents. It is a useful input to review the effectiveness of planned mine designs and production methods in managing seismicity. Li et al., (2007) highlighted the importance of seismic monitoring systems for managing mining seismicity in underground coal mines in China: We find that the key problems of rockburst (coalburst) hazard mitigation in China are the lack of mine seismicity-monitoring networks in most mines, and the need for improvement of the accuracy of monitoring systems for mines that have been equipped with such systems. A seismic monitoring system consists of transducers, data acquisition hardware and processing software. Geophones are useful sensors for larger spacing (e.g. 1 km) and surface installation whereas piezoelectric uniaxial or triaxial accelerometers are ideal for more closely spaced networks (e.g. 100 m). A single short period earthquake monitoring instrument should be installed in a mine network to allow data recovery of the largest events, which are not well recorded by geophones or piezoelectric sensors. A Global Positioning System (GPS) is employed to time-link regional and local systems (Urbancic and Trifu 2000). The type of monitoring system required to manage mining seismicity is different from the approach applied both for monitoring earthquake seismicity and microseismic rock fracturing research investigations. In Australian and Canadian hard rock mines the inter-sensor spacing of seismic monitoring systems is mostly less than 200 m and the layout of these systems is substantially different to the systems used in South African gold mines which have sensors at m spacing (Potvin and Wesseloo 2013). In order to manage mining seismicity the seismic monitoring data needs to be collected and analysed continuously in real time. The microseismic monitoring systems which have been used regularly in the coal industry to understand rock fracturing associated with mining would need to be modified to be used for seismic risk management. Electromagnetic Radiation It has been found that the deformation and failure process of coal generates both acoustic emission and EMR. Dou et al., (2001 and 2004) demonstrated that the EMR intensity increased sharply in the case of burst failure of coal. Wang et al., (2012) found that the EMR signal was linearly related to the applied loads. It was thus inferred that monitoring the EMR signal could be used to reflect the stress state of the coal rock mass. EMR intensity was monitored in a longwall from 10 locations in the tailgate and ten locations in the maingate in The monitored mean of maximum daily EMR intensity measured at February 2016
6 two points in the tailgate located 200 m and 220 m from the longwall face was more than double the background levels 10 days before a coalburst occurred, and peaked at 5 times the background level one day prior to a burst which occurred at a distance of 178 m from the longwall face (Figure 3). This data was consistent with previous research results which indicated that EMR monitoring can be used to assist in predicting bursting. (Dou and Gong 2014) Figure 3: Variation of measured EMR intensity in the tailgate of a longwall face before and after a coalburst on June 26 th, 2012 (Dou and Gong 2014) Seismic Velocity Tomography The seismic p-wave velocity in rock is known to vary as a function of the in-situ stress conditions (amongst other factors, such as density and porosity). Geophones can be used to monitor the arrival times of seismic waves and then calculate the velocity of seismic waves through the coal between the seismic source and the geophones. When multiple geophones are used, areas in the seam with higher and lower seismic wave velocities can be determined by using Computed Tomography (CT) and seismic CT plans can be generated. Areas of higher coalburst risk were shown to occur in high velocity or high velocity gradient areas, by Lurka (2008), in Zabrze Bielszowice Coal Mine in Poland. This method has since been applied in more than ten coal mines in China with useful results (Dou and Gong 2014). Wang et al., (2015) used Seismic Velocity Tomography (SVT) at Xingan Coal Mine in China and found that the development of high velocity regions in the coal, when located close to the coal face was a predictor for coalbursts. PREVENTATIVE AND MITIGATING CONTROL METHODS The most effective method of addressing risk is through elimination. In many cases where severe levels of coalburst risk have been recognised, the risk has been eliminated by avoiding mining in the high risk area, or by modifying the mine plan or extraction method. The Lynch No. 37 Mine in Kentucky chose to avoid longwalling through areas they had identified as high risk (Iannacchione and Tadolini, 2015). In other cases, bursting risk has been reduced through mine design by avoiding mining underneath remnant pillars, by using barrier pillars, by using yield - abutment gateroad pillar combinations, by avoiding the creation of goaf corners or by reducing the mined panel width. Numerical modelling and stress analysis are valuable tools that assist in identifying mine designs that will create high risk stress concentrations which may cause coalburst and assess the potential improvements available through alternative design approaches. Other measures to reduce coalburst risk, such as de-stress drilling, blasting and water infusion have been used in Europe and China February
7 Provocative Blasting (Pre-Conditioning) Provocative blasting (pre-conditioning) is a technique which has been used primarily in hard rock mines, where blasting is the normal excavation method, to reduce the risk of development face bursts and was very successful in hard rock at Mponeng, South Africa (McGill 2005). It involves drilling and loading a number of holes which are longer than the production holes, and blasting them prior to the production holes so that the new face created will be fractured and unable to store the necessary elastic strain energy required for bursting. De-stress blasting in coal is one of the oldest methods of coalburst prevention. Blast holes are drilled around the development face or into the longwall face and are designed to fracture the coal and seam contacts in place rather than throw it. However it is not as effective as de-stress drilling and it is not amenable to routine application in high productivity longwall mines as holes need to be blasted every 2.5 m advance (Brauner 1994). It is currently used in The Czech Republic. Konicek et al., (2013) describe a case where 42 mm holes m long and at 5 m spacing were drilled and charged with 7-9 kg of explosives at the Lazy Colliery. Long Term Water infusion Long term water infusion is used to increase the moisture content of the coal which reduces its liability to bursting. During borehole - bursting laboratory tests it was found that fully saturated coal samples would not burst (Figure 4). In practice a 1-2% increase in moisture content may be sufficient to eliminate burst danger. The limitation on this method is that infusion may need to be conducted for between a few days and several months with fluid pressure between 1-40 MPa, and it may not work at all in existing highly stressed areas where it is difficult to drill and where the coal permeability is very low. However, the method is significantly more amenable to high productivity longwalling than roadway de-stress blasting and de-stress drilling and it has been used successfully in the past to prevent coalbursts (Brauner 1994). It is currently used as a standard technique to prevent coalbursts in the Czech Republic (Konicek et al., 2013). Figure 4: Different modes of stress decrease in coal specimens during drilling In Figure 4 the Curve I sample was air dried coking coal and experienced six borehole bursts. Curve II was the same coal, but saturated with 2.4% moisture content. The Curve III sample was anthracite. No bursting occurred for the Curve II and Curve III samples (Brauner 1994) February 2016
8 Hydrofracking Hydrofracking involves the injection of water into strata at high pressure to induce fracturing. Hydrofracking can be used to create fractures in the coal, to prevent it from being able to store sufficient elastic strain energy to burst. For example, 10 m long holes at 5 m spacing are drilled into the face and injected with water at 40 MPa for 20 minutes. A decrease in water pressure of 10 MPa or more can be indicative of adequate de-stressing. This method is suggested by Brauner (1994) to be the most economical de-stressing technique. Hydrofracking can also be used to fracture the strong stiff strata which is required to develop high stress concentrations and transmit seismic energy to the coal to trigger coalburst. De-Stress Blasting De-stress blasting of stiff, massive overburden strata over the longwall block is an important coalburst control technique which has been used successfully in the Czech Republic since the 1990s and internationally. Konicek et al., (2013) described its application at Lazy Colliery where 43 mm boreholes were drilled at a 10 m spacing along the gateroads into the longwall overburden strata for a length of m. De-Stress Drilling De-stress drilling is a very successful method of coalburst prevention which has been used in Germany and Russia mm diameter holes are drilled into the area of highly stressed coal at a spacing of between 0.5 m and 10 m and in the order of 6-10 m long depending on conditions. The holes will burst and fines are removed during drilling until the stress has reduced below bursting levels. It has to be repeated every 5 m or so of advance, so although it is effective, it is a slow process and is not amenable for high productivity mining. PROTECTIVE CONTROL METHODS Protective control measures have been used to prevent coalbursts from causing injuries. Some examples of these include the use of flippers and rubber mats on longwall shields, and the use of blast proof barriers on continuous miners (Mark and Gauna 2015). However, these measures are only useful for protecting miners against small coalbursts, and given the difficulty in predicting when and where a coalburst will occur, let alone whether it could be a large one or a small one, such measures should not be relied on to prevent injuries and fatalities. If a coalburst is anticipated then a much more reliable approach is to remove people from the area at risk through the use of remote mining methods such as remote control cutting or drill and blast mining (grunching). The practice of specifying re-entry times is a common and successful method to separate miners from the area of risk after production blasts, cuts or de-stressing measures which can be developed based on seismic monitoring data (Hills 2013). Dynamically rated (yielding) support systems can be used to minimise excavation and machinery damage, but the engineering design approach is not sufficiently advanced at this time for support systems to be adequate to protect people from coalbursts (Heal 2010). Dynamic support systems are designed to absorb high levels of kinetic energy and maintain support load whilst allowing large deformation (e.g. 200 mm). Yielding integrated support systems are composed of surface confinement (mesh, steel fibre reinforced shotcrete, laced cables), high strength anchoring bolts (fully encapsulated rebar and cables) and displacement capable bolts such as split sets, cone bolts and de-bonded cables (Heal 2010 and Hebblewhite et al., 1998). Heal (2010) dynamically tested thirteen yielding support systems and found the support system is only as strong as its weakest link which is usually the surface support (e.g. mesh), or connections between the surface support and bolts or cables February
9 CONCLUSIONS Extensive research work and application of coalburst control methods has been undertaken internationally, however the applicability of these approaches will need to be tested in Australian conditions. Additional work will also be required to modify existing techniques to be amenable to the high productivity longwall mining which is conducted in Australia. The existing coalburst control methods can be broadly categorised into predictive, preventative, mitigating and protective measures. Ultimately successful coalburst management will require the ongoing development and refinement of operational seismic management plans which take a holistic approach to risk identification, risk monitoring and the application of risk management control measures. ACKNOWLEDGEMENTS The first author would like to acknowledge A/Prof Jun Han, Liaoning University, China and Dr Jan Nemcik, University of Wollongong, for their dedicated efforts in reviewing this paper. REFERENCES Brauner, G, Rockbursts in Coal Mines and Their Prevention. ISBN X, 144 p (A A Balkema, Rotterdam Netherlands). Calleja, J, Rapid Rating using coal mine roof rating to provide rapid mine roof characterisation from exploration drilling. Proceedings of the 2006 Coal Operators Conference Wollongong, Australia. Illawarra Branch, The Australian Institute of Mining and Metallurgy, pp (Ed. Aziz, N), Calleja, J, CMRR practical limitations and solutions. Proceeding of the 2008 Coal Operators Conference, Feb, Wollongong, Australia. Illawarra Branch, The Australian Institute of Mining and Metallurgy, pp (Ed. Aziz, N), Calleja, J and Nemcik, J, Coalburst causes and mechanisms.. Proceedings of the 2016 Coal Operator's Conference, Feb, Wollongong, Australia. Illawarra Branch, The Australian Institute of Mining and Metallurgy, (Ed. Aziz, N), Dou, L and Gong, S, Research progress on monitoring, forecasting, and prevention of rockburst in underground coal mining in China. International Journal of Coal Science and Technology, 1(3), pp doi: /s z Dou, L, He, X Q and Wang, E Y, Electromagnetic emission technique of monitoring rock burst and its application. J China Coal Soc, 29(4), pp Dou, L, He, X Q, Wang, E Y and Gu, D Z, Electromagetic emissions in rock and coal burst failures. J Tsinghua Univ (Sci Technol), 41(12), pp Heal, D, Observations and analysis of incidences of rockburst damage in underground mines. PhD Thesis, University of Western Australia, Western Australia. Hebblewhite, B, Galvin, J, Lin, B, Walker, R and Drew (Calleja), J, Coal mine rib mechanics An improved understanding of rib behaviour and support requirements. In proceedings of the International Conference on Geomechanics/Ground Control in Mining and Underground Constuction, July, Wollongong, Australia. Illawarra Branch, The Australian Institute of Mining and Metallurgy, (Ed. Aziz, N and Indraratna, B), pp , Hills, P, Managing mining-induced seismicity [online]. The AUSIMM Bulletin (August, 2013). Available from < > [Accessed: 18 January 2016] Iannacchione, A T and Tadolini, S C, Occurrence, prediction, and control of coal burst events in the U.S.. In proceedings of the 34th International Conference on Ground Control in Mining, Morgantown, West Virginia. pp 1-11 (Ed. Peng, S S) Konicek, P, Soucek, K, Stas, L and Singh, R, Long-Hole destress blasting for rockburst control during deep underground coal mining. International Journal of Rock Mechanics and Mining Sciences, 61, pp Li, T, Cai, M F and Cai, M, A review of mining-induced seismicity in China. International Journal of Rock Mechanics and Mining Sciences 44(2007), pp (Ed. Zimmerman R) doi: /j.ijrmms February 2016
10 Lurka, A, Location of high seismic activity zones and seismic hazard assessment in Zabrze Bielszowice coal mine using passive tomography. J China Univ Mining & Technol, 18 (2008) pp Mark, C and Gauna, M, Evaluating the risk of coal bursts in underground coal mines. In proceedings of the 34th International Conference on Ground Control In Mining, Morgantown West Virginia. pp 1-7 (Ed. Peng, S S) McGill, R B, Strategies to manage seismicity in a deep VCR environment on Mponeng. In proceedings of the 6th International Symposium on Rockbursts and Seismicity in Mines, 9-11 March, Perth, Western Australia, Australia. (Eds Potvin, Y and Hudyma, M) pp (Australian Centre for Geomechanics). Mendecki, A J, Aswegen, G V and Mountfort, P, A guide to routine seismic monitoring in mines. In A Handbook on Rock Engineering Practice for Tabular Hard Rock Mines (Eds: Jager, A J and Ryder, J A) pp 35, (Safety in Mines Research and Advisory Committee Department of Minerals and Energy of South Africa, Creda Communications, Cape Town, South Africa). Mine Safety and Health Administration (MSHA), Program policy letter no. P12-v-03 [online]. Available from [Accessed: 12 January 2016] Ortlepp, W D, RaSiM Comes of Age A Review of the contribution to the understanding and control of mine rockbursts SRK Consulting. In proceedings of the 6th International Symposium on Rockburst and Seismicity in Mines, 9-11 March Perth, Western Australia, Australia. (Eds Potvin, Y and Hudyma, M) pp 3 20 (Australian Centre for Geomechanics). Potvin, Y and Wesseloo, J, Keynote Lecture: Improving seismic risk management in hardrock mines. In proceedings of the 8th International Symposium on Rockbursts and Seismicity in Mines (Rasim8), 1-7 September, Saint Petersburg, Moscow, Russia. (Eds Malovichko, A and D M) pp , Ptacek, J, Rock bursts prevention system in Ostrava - Karvina Coalfield (OKR). Institute of Geonics of the Czech Academy of Sciences. Tan, Y, Yin, Y, Gu, S and Tian, Z, Multi-index monitoring and evaluation on rock burst in Yangcheng Mine. Shock and Vibration. Volume 2015, Article ID , 5 pages Thin, I G T, Edkins, N S, Jeschke, L J and Winchester, A P, The evolution of seismicity and subsequent learning experiences in Deep Lead Mount Isa Mines. In proceedings of the 6th International Symposium on Rockbursts and Seismicity in Mines, 9-11 March, Perth, Western Australia. (Eds Potvin, Y and Hudyma, M) pp (Australian Centre for Geomechanics). Urbancic, T I and Trifu, C, Recent advances in seismic monitoring technology at Canadian mines. Journal of Applied Geophysics, , 18. pp Wang, E Y, He, X Q, Liu, X F and Xu, W Q, Comprehensive monitoring technique based on electromagnetic radiation andits applications to mine pressure. Safety Science 50(4), Wang, G, Gong, S, Dou, L, Cai, W and Mao, Y, Evolution of stress concentration and energy release before rock bursts: Two case studies from Xingan Coal Mine, Hegang China. Rock Mechanics and Rock Engineering. Dec 2015, DOI: /s x February
Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso
Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso By Ernesto Villaescusa, PhD Chair in Rock Mechanics WA School of Mines, CRC Mining & Curtin
Rock Support and Reinforcement Practice in Mining
PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON GROUND SUPPORT KALGOORLIE/WESTERN AUSTRALIA/15-17 MARCH 1999 Rock Support and Reinforcement Practice in Mining Edited by Ernesto Villaescusa Western Australian
The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines
Geophysics 165 Troy Peters The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines This paper discusses how mine staff from a number
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves
Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2
Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design
Backfill for Bench Stoping Operations
Backfill for Bench Stoping Operations E. Villaescusa Professor of Mining Geomechanics, Western Australian School of Mines K. Kuganathan Senior Backfill Research Engineer, Mount Isa Mines ABSTRACT This
Mine Wide Risk Assessment What is the State of your Arteries. L.Human, J Doolan and L Potts Xstrata Zinc
Mine Wide Risk Assessment What is the State of your Arteries L.Human, J Doolan and L Potts Xstrata Zinc Abstract A geotechnical mine wide risk management approach is presented for the systematic inspection,
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4 ROCK MECHANICS PRACTICAL (SURFACE AND UNDERGROUND) SYLLABUS PREAMBLE... 5 TOPIC
INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode
INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance
FAN group includes NAMVARAN UPSTREAM,
INTRODUCTION Reservoir Simulation FAN group includes NAMVARAN UPSTREAM, FOLOWRD Industrial Projects and Azmouneh Foulad Co. Which of these companies has their own responsibilities. NAMVARAN is active in
Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System
Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System James Tibbett, Fidelis Suorineni, Bruce Hebblewhite and Alex Colebourn What is Block Caving?
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 1 ROCK MECHANICS THEORY
SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 1 ROCK MECHANICS THEORY SYLLABUS Copyright 2006 SANIRE CONTENTS PREAMBLE... 3 TOPICS
Geothermal. . To reduce the CO 2 emissions a lot of effort is put in the development of large scale application of sustainable energy.
Geothermal Energy With increasing fossil fuel prices, geothermal energy is an attractive alternative energy source for district heating and industrial heating. In recent years the use of geothermal energy
Cone Penetration Test (CPT)
Cone Penetration Test (CPT) The cone penetration test, or CPT in short, is a soil testing method which will provide a great deal of high quality information. In the Cone Penetration Test (CPT), a cone
Investing in an Underground Coal Mine in Indonesia
Coal Supplying Key Resources into expanding Asian markets Investing in an Underground Coal Mine in Indonesia Disclaimer Forward Looking Statements This presentation includes certain forward looking Statements.
Numerical Simulation on Supporting of Large Section Open-off Cut and Its Stability
Numerical Simulation on Supporting of Large Section Open-off Cut and Its Stability Weijian Yu Hunan Provincial Key Laboratory of Safe Mining Techniques of Coal Mines,Hunan University of Science and Technology,iangtan,Hunan
PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany
ABSTRACT: PIPELINE INSPECTION UTILIZING ULTRASOUND TECHNOLOGY: ON THE ISSUE OF RESOLUTION By, M. Beller, NDT Systems & Services AG, Stutensee, Germany Today, in-line inspection tools are used routinely
Exploration. Exploration methods
Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological
By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc.
Why Surface Mine? By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc. Why do we surface mine in Central Appalachia? It s certainly not because we like the public attention
Mechanical Properties of Metals Mechanical Properties refers to the behavior of material when external forces are applied
Mechanical Properties of Metals Mechanical Properties refers to the behavior of material when external forces are applied Stress and strain fracture or engineering point of view: allows to predict the
Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED
WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED The Hydrocarbon E & P Process In the exploration process, a most probable hydrocarbon bearing rock structure is defined based on seismic
Rock Bolt Condition Monitoring Using Ultrasonic Guided Waves
Rock Bolt Condition Monitoring Using Ultrasonic Guided Waves Bennie Buys Department of Mechanical and Aeronautical Engineering University of Pretoria Introduction Rock Bolts and their associated problems
Pekka Bergström Senior Geotechnical Consultant
Pekka Bergström Senior Geotechnical Consultant Education GradCert.Eng in Mine Design & Planning, West Australian School of Mines, Australia MSc in Geology and Mineralogy, Oulu University, Finland Diploma
Mining with Paste Fill
Mining with Paste Fill Mehmet Yumlu, Principal Mining Engineer AMC Consultants Pty Ltd AusIMM Cobar Mining Seminar AMC Con nsultants Pty Ltd Outline Introduction ti What is Paste Fill? Why Using Paste
How To Monitor Deep Co2
International Monitoring Updates from IEAGHG Monitoring Network US DOE Carbon Storage R&D Project Review Meeting 12 th 14 th August 2014 Pittsburgh Panel Don White, Geological Survey of Canada, NRCAN Katherine
hs2 Ground A non-technical guide
hs2 Ground Investigations A non-technical guide Contents HS2 ground investigations 1 Essential Q&A 2 2 In-ground investigation techniques 9 2.1 Cable percussion borehole 10 2.2 Rotary core borehole 12
The detection of blast damage by borehole pressure measurement
The detection of blast damage by borehole pressure measurement by G.F. Brent and G.E. Smith* This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM Synopsis
On the Impact of Oil Extraction in North Orange County: Overview of Hydraulic Fracturing
On the Impact of Oil Extraction in North Orange County: Overview of Hydraulic Fracturing California State University Fullerton, September 23, 2014 Steve Bohlen, Senior Scientist, Lawrence Berkeley National
Why measure in-situ stress?
C. Derek Martin University of Alberta, Edmonton, Canada Why measure in-situ stress? Engineering analyses require boundary conditions One of the most important boundary conditions for the analysis of underground
KWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
GAS WELL/WATER WELL SUBSURFACE CONTAMINATION
GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services [email protected] And ye shall know the truth and the truth shall make you free.
SYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN
Robert Bertuzzi Pells Sullivan Meynink, Unit G3 56 Delhi Road, North Ryde NSW 2113, Australia 1 BACKGROUND Inherent in any set of rock mass parameters are various assumptions regarding, amongst other things
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS
THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS Dr Andrew Pollard Principal Engineer GKN Technology UK INTRODUCTION There is a wide choice of flexible couplings for power transmission applications,
DIMENSIONING TUNNEL SUPPORT BY DESIGN METHODOLOGY
DIMENSIONING TUNNEL SUPPORT BY DESIGN METHODOLOGY "INTERACTIVE STRUCTURAL DESIGN" Diseno Estructural Activo, DEA) Benjamín Celada Tamames, Director General, Geocontrol, Madrid Translated from: Taller sobre
7.2.4 Seismic velocity, attenuation and rock properties
7.2.4 Seismic velocity, attenuation and rock properties Rock properties that affect seismic velocity Porosity Lithification Pressure Fluid saturation Velocity in unconsolidated near surface soils (the
COAL, OIL SHALE, NATURAL BITUMEN, HEAVY OIL AND PEAT Vol. I - Coal Exploration and Mining - Lixun Kang
COAL EXPLORATION AND MINING Lixun Kang College of Mining Engineering, Taiyuan University of Technology, China Keywords: Surface Geophysics, Drilling, Surface Mining, Underground Mining, Coal Exploration,
Research Article Warning Method of Coal Bursting Failure Danger by Electromagnetic Radiation
Shock and Vibration Volume 215, Article ID 583862, 9 pages http://dx.doi.org/1.1155/215/583862 Research Article Warning Method of Coal Bursting Failure Danger by Electromagnetic Radiation Guang-Jian Liu,
METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by
METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE Prepared by Infratech ASTM CO., LTD. Contents Chapter Description Page Contents...... 1 List of Appendix. 1 1. Introduction.. 2 2. Test Method..2 3.
RISKS POSED BY LARGE SEISMIC EVENTS IN THE GOLD MINING DISTRICTS OF SOUTH AFRICA
RISKS POSED BY LARGE SEISMIC EVENTS IN THE GOLD MINING DISTRICTS OF SOUTH AFRICA R. J. Durrheim 1 *, R. L. Anderson 2, A. Cichowicz 3, R. Ebrahim-Trollope 4, G. Hubert 5, A. Kijko 6, A. McGarr 7, W. D.
3D Model of Carbon Relief in the Czech Part of Upper Silesian Coal Basin
3D Model of Carbon Relief in the Czech Part of Upper Silesian Coal Basin Vladimír Mandrla Green Gas DPB, a.s. tř. Rudé armády 637 739 21, Paskov [email protected] Abstract. Coal mining in the Czech
Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan
Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan Toru Komatsubara THE JAPAN GAS ASSOCIATION Taku Watanabe TOKYO GAS CO.,LTD. Satoshi Murase
Deep geological disposal of radioactive waste in Switzerland - overview and outlook
Deep geological disposal of radioactive waste in Switzerland - overview and outlook Michael Schnellmann (Section Head Geosciences) Annual Convention 2015 Baden 20 th June 2015 Nagra Mandate from the Swiss
1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
Blast management plan template
Guidance note Blast management plan template Information for shotfirers on what a blast management plan may look like. April 2012 Background A blast management plan (BMP) is a risk control plan used in
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS
Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope
Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope Rakesh Sidharthan 1 Gnanavel B K 2 Assistant professor Mechanical, Department Professor, Mechanical Department, Gojan engineering college,
Deep and High Stress Mining Deformation and Seismicity
Deep and High Stress Mining Deformation and Seismicity S. Arndt a, D. Beck b, F. Reusch a, I. Thin c, C. Stone c, M. Heap d & D. Tyler e a Beck Arndt Engineering, Perth, Australia b Beck Arndt Engineering,
Thin, Spray-On Lining Applications for Rockburst, Blast and Fire Damage Mitigation
ARMA/USRMS 6-15 Thin, Spray-On Lining Applications for Rockburst, Blast and Fire Damage Mitigation Archibald, J. F. and Dirige, P. A. Queen s University, Kingston, Ontario, Canada Copyright 25, ARMA, American
SUPPORT IN UNDERGROUND HARD ROCK MINES
SUPPORT IN UNDERGROUND HARD ROCK MINES Evert Hoek, NSERC Industrial Research Professor, Department of Civil Engineering, University of Toronto, Toronto, Canada. David. F. Wood, Senior Engineer, Golder
The ever increasing importance of reservoir geomechanics
SPE special Interest Reservoir Group, Calgary March 26, 2014 The ever increasing importance of reservoir geomechanics Antonin (Tony) Settari TAURUS Reservoir Solutions Ltd., Calgary Professor Emeritus,
Monitoring of Natural Hazards With the ImpactSentinel Alarming System An Intelligent Solution
Monitoring of Natural Hazards With the ImpactSentinel Alarming System An Intelligent Solution ImpactSentinel Natural Hazard Sensors und Systems hazard signalization in protection fences overstress, shock
London STOCK EXCHANGE
London STOCK EXCHANGE 16 March 2006 For the attention of the Nominated Advisers/ Finance Directors/ Company Secretaries, all AIM Companies 10 Paternoster Square London EC4M 7LS Telephone 020 7797 1000
SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA
NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA VANCOUVER, British
REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale
REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report
Risk oriented design and construction of tunnels
Risk oriented design and construction of tunnels Wulf Schubert Graz University of Technology 3G-Gruppe Geotechnik Graz ZT GmbH INTRODUCTION Risk in engineering commonly is understood as the product of
INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
4 SENSORS. Example. A force of 1 N is exerted on a PZT5A disc of diameter 10 mm and thickness 1 mm. The resulting mechanical stress is:
4 SENSORS The modern technical world demands the availability of sensors to measure and convert a variety of physical quantities into electrical signals. These signals can then be fed into data processing
Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502
Pavement Design Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION ENGINEERS,, INC. I 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Topics Introduction Design Factors Pavement Types Fundamentals
NUMERICAL SIMULATION OF THE RELEASED ENERGY IN STRAIN- SOFTENING ROCK MATERIALS AND ITS APPLICATION IN ESTIMATING SEISMIC HAZARDS IN MINES
NUMERICAL SIMULATION OF THE RELEASED ENERGY IN STRAIN- SOFTENING ROCK MATERIALS AND ITS APPLICATION IN ESTIMATING SEISMIC HAZARDS IN MINES Vladislav Levkovitch, David Beck, Frederik Reusch Beck Engineering,
Structural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel Lining Segments
International Journal of Scientific and Research Publications, Volume 5, Issue 7, July 2015 1 Structural Design Criteria & Design Loads on Delhi Metro Rail and Checking of Safety of Radial Joints in Tunnel
Full Professor, Department of Geotechnical Engineering, Tongji University
TC304: Engineering Practice of risk assesment and management Prof. Hongwei Huang, Department of Geotechniacl Engineering Tongji University, 1239 Siping Road, Shanghai 200092,P.R. China Tel:86-21-65982986(O)
PART IV DATA ANALYSIS & RISK ASSESSMENT (Chapters 9-11)
PART IV DATA ANALYSIS & RISK ASSESSMENT (Chapters 9-11) Australian Centre for Geomechanics 50 9. SEISMIC MONITORING SYSTEM DATA ANALYSIS This chapter describes the analysis, interpretation and presentation
Civil Engineering Graduate Studies at Colorado School of Mines
Message from Dr. Terry Parker, Engineering Division Director Engineering has historically been a field that applies scientific knowledge to the needs of society by producing technological devices and systems.
Hardened Concrete. Lecture No. 14
Hardened Concrete Lecture No. 14 Strength of Concrete Strength of concrete is commonly considered its most valuable property, although in many practical cases, other characteristics, such as durability
BLAST MONITORING Solutions
BLAST MONITORING Solutions INTEGRATED BLAST MONITORING SOLUTIONS Our Blast Monitoring System has been used to measure blasting activity from mine sites for more than ten years, with more than 100 sites
Assist. Prof. Dr. Gokhan Aydin
Assist. Prof. Dr. Gokhan Aydin Karadeniz Technical University (KTU), Faculty of Engineering Department of Mining Engineering, Trabzon, Turkey Tel.: + 90 (462) 377 40 98 Fax: + 90 (462) 325 74 05 [email protected]
How To Compare Support To A Can Roof
MISTAKES, MISCONCEPTIONS, AND KEY POINTS REGARDING SECONDARY ROOF SUPPORT SYSTEMS Thomas M. Barczak, Research Physicist National Institute for Occupational Safety and Health Pittsburgh Research Laboratory
ENVIRONMENTAL AND SAFETY ACCIDENTS RELATED TO BLASTING OPERATION
American Journal of Environmental Science, 2012, 8 (4), 360-365 ISSN: 1553-345X 2012 Science Publication doi:10.3844/ajessp.2012.360.365 Published Online 8 (4) 2012 (http://www.thescipub.com/ajes.toc)
COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2
(PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals
Deep geothermal FAQ s
What is geothermal energy? Deep geothermal FAQ s What is the deep geothermal resource in Cornwall? What are the benefits for Cornwall? What are Engineered/Enhanced Geothermal Systems (EGS) or Hot Dry Rocks?
Calculation of Electromagnetic Radiation Criterion for Rockburst Hazard Forecast in Coal Mines
Pure appl. geophys. 158 (2001) 931±944 0033 ± 4553/05/060931 ± 14 $ 1.50 + 0.20/0 Ó BirkhaÈuser Verlag, Basel, 2001 Pure and Applied Geophysics Calculation of Electromagnetic Radiation Criterion for Rockburst
What we know: shale gas as a promising global energy resource for the future. What we need to know: the scientific challenges.
Laboratory of Soil Mechanics,Chair Gaz Naturel - Petrosvibri LMS-EPFL Prof. L. Laloui Gas Opportunities, Challenges and Achievements - «EFFICIENCE 21», Automne 2013... Geomechanics: a one-way road toward
Electromagnetic surveying
Electromagnetic surveying Dr. Laurent Marescot [email protected] 1 Introduction Electrical surveying Resistivity method Induced polarization method (IP) Self-potential (SP) method Higher frequency
THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA
THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA Richard K. Brummer*, Hao Li* & Allan Moss *Itasca Consulting Canada Inc., Rio Tinto Limited ABSTRACT At
Matt Harris, Golder Associates (NZ) Ltd. The value of geophysics as a non-intrusive method for site characterisation
Matt Harris, Golder Associates (NZ) Ltd. The value of geophysics as a non-intrusive method for site characterisation Presentation Outline What is geophysics and how can it help me? Electrical Resistivity
How To Design A Foundation
The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural
Simulating Aftershocks for an On Site Inspection (OSI) Exercise
LLNL-TR-677873 Simulating Aftershocks for an On Site Inspection (OSI) Exercise J. J. Sweeney, S. R. Ford October 5, 2015 Disclaimer This document was prepared as an account of work sponsored by an agency
STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION
STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION JANUARY 2016 THE COMPANY Privately owned Geothermal Energy Company Headquartered in Jersey, Channel Islands, with global operations Highly experienced
Geotechnical Testing Methods II
Geotechnical Testing Methods II Ajanta Sachan Assistant Professor Civil Engineering IIT Gandhinagar FIELD TESTING 2 1 Field Test (In-situ Test) When it is difficult to obtain undisturbed samples. In case
DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)
DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) COURSE DESCRIPTION PETE 512 Advanced Drilling Engineering I (3-0-3) This course provides the student with a thorough understanding of
Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns
1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.
Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
Graduate Courses in Petroleum Engineering
Graduate Courses in Petroleum Engineering PEEG 510 ADVANCED WELL TEST ANALYSIS This course will review the fundamentals of fluid flow through porous media and then cover flow and build up test analysis
GESTCO final report. Work Package 2, Study area F: Storage in deep coal beds : Germany
GESTCO final report Work Package 2, Study area F: Storage in deep coal beds : Germany compiled by Franz May, Bundesanstalt für Geowissenschaften und Rohstoffe, Hannover 1 Principle...2 2 Estimate of maximal
vulcanhammer.net This document downloaded from
This document downloaded from vulcanhammer.net since 1997, your source for engineering information for the deep foundation and marine construction industries, and the historical site for Vulcan Iron Works
DEVELOPMENT OF AN AUTOMATED PC-NETWORK-BASED SEISMIC MONITORING SYSTEM 1
DEVELOPMENT OF AN AUTOMATED PC-NETWORK-BASED SEISMIC MONITORING SYSTEM 1 Peter L. Swanson, geophysicist National Institute for Occupational Safety and Health Spokane Research Laboratory 315 E. Montgomery
Caltrans Geotechnical Manual
Cone Penetration Test The cone penetration test (CPT) is an in-situ sounding that pushes an electronic penetrometer into soil and records multiple measurements continuously with depth. Compared with rotary
CIVIL ENGINEERING Vol. II - Surface Mining Methods and Equipment - J. Yamatomi and S. Okubo SURFACE MINING METHODS AND EQUIPMENT
SURFACE MINING METHODS AND EQUIPMENT J. Yamatomi and S. Okubo University of Tokyo, Japan Keywords: Mining method, surface mining, open pit mining, open cast mining, placer mining, solution mining, leaching,
Overview of Topics. Stress-Strain Behavior in Concrete. Elastic Behavior. Non-Linear Inelastic Behavior. Stress Distribution.
Stress-Strain Behavior in Concrete Overview of Topics EARLY AGE CONCRETE Plastic shrinkage shrinkage strain associated with early moisture loss Thermal shrinkage shrinkage strain associated with cooling
How To Calculate Tunnel Longitudinal Structure
Calculation and Analysis of Tunnel Longitudinal Structure under Effect of Uneven Settlement of Weak Layer 1,2 Li Zhong, 2Chen Si-yang, 3Yan Pei-wu, 1Zhu Yan-peng School of Civil Engineering, Lanzhou University
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL