Backfill for Bench Stoping Operations

Size: px
Start display at page:

Download "Backfill for Bench Stoping Operations"

Transcription

1 Backfill for Bench Stoping Operations E. Villaescusa Professor of Mining Geomechanics, Western Australian School of Mines K. Kuganathan Senior Backfill Research Engineer, Mount Isa Mines ABSTRACT This paper describes a new methodology that can be applied to compare several bench extraction strategies requiring backfill. The method is applicable at the planning or operational stages and can be used to maintain dilution within design parameters and improve the overall economics of bench stoping operations. The parameters influencing bench performance have been empirically rated based on economical, geomechanical, operational and backfill properties. Four different extraction strategies have been considered and rated from most preferred to less preferred using an integrated approach to bench extraction. INTRODUCTION The success of mining by the bench stoping method largely depends upon the level of understanding of critical wall exposure, usually unsupported behaviour, the application of remote mucking technology, drilling and blasting optimization and the appropriate use of backfilling technology (Villaescusa et al, 1994). The economics are influenced by the effectiveness of the adopted bench design and also on having an extraction strategy that matches the site conditions. Bench design is controlled by the geometrical dimensions such as sublevel interval, and the exposed stable lengths likely to match the expected rockmass conditions. Stability charts such as the HSR method (Villaescusa et al, 1997) or the Modified Stability Graph (Potvin et al, 1989) can be utilized during the planning and design stages to calculate the required bench dimensions. An extraction strategy related to the maximum stable length that can be safely exposed, and the type of backfill to be used is usually identified during the design stages. In most cases, permanent infra-structure such as ramp access configurations are also fixed within an initial mine design stage, leaving the extraction strategy as the only flexible (and most important) parameter to be optimized during the subsequent production stage. THE ROLE OF BACKFILL Backfill can be generally described as any material that is placed underground to fill the voids created by the extraction process. In up-dip bench extractions, the backfill provides a working floor for mucking and also helps to stabilize the exposed spans by minimizing deformation and dynamic loading of the excavated walls from blasting. Following extraction of an economic

2 length of a steeply dipping orebody, the void created by a bench stope can be filled with hydraulic fill or dry fill (waste) to the floor of the drill drive which becomes the new extraction horizon on the next lift as indicated on Figure 1. Dry rockfill can be used to minimize deformations (and optimize stability) while the benches are being extracted, provided that the backfill can be kept sufficiently far away to minimize dilution of the broken ore by fill at the interface. Empirical stability charts such as the HSR (Villaescusa et al, 1997) and the Modified Stability Graph Method (Potvin et al, 1989) can be used to determine the maximum unsupported strike lengths which can be safely exposed during continuous backfilling operations. An optimal use of the 'critical strike length' concept would ensure that excessive dilution does not occur during production blasting, where the blasted material may be thrown on top of closely located backfill rills, contributing to contamination of the ore during mucking. Production Blasting Filling Maximum Unsupported Span (Critical Strike Length) Bench Limit Mucking ORE BACKFILL Backfill Previous Bench Figure 1. Schematic of continuous bench backfilling techniques. The beneficial support provided by the backfill is very important in order to minimize deformations experienced by the exposed unsupported s as the stope is being extracted or following bench completion. Hangingwall deformation data collected from properly located multiple point extensometers has shown that backfill effectively stops the large scale deformation of the unsupported layers during bench stoping (See Figure 2). Deformation (mm) stope 30 blastings FP1 Exto 1 Backfill introduced here anchor depth into H/ W A1-0.5m A2-1.5m A3-2.5m A4-3.5m A5-7.5m A6-Ref 0 2/ 22/ 93 3/ 14/ 93 4/ 3/ 93 4/ 23/ 93 5/ 13/ 93 6/ 2/ 93 6/ 22/ 93 Date

3 Figure 2. Influence of backfilling on deformations. Instrumentation has also been used to determine the dynamic response of the stope walls as a bench stope is extracted and filled progressively. Table 1 presents a frequency analysis of instrumented walls using triaxial arrays of geophones indicating that the wall of a filled stope (using dry fill) behaves like a closed wall (i.e., intact solid ground, where no void has been created). All the blast vibration data was collected at approximately 5, 9 and 13m into the of the stope (Villaescusa et al, 1997). The beneficial impact of backfill to stabilize the rockmass surrounding a stope void is very clear from the data presented in Table 1. Promptly placed backfill appears to reduce the dynamic loading caused by blasting, thus enhancing the overall regional rockmass stability. Table 1. Dynamic response of a rockmass as backfilling proceeds. Backfill Status Dominant Frequency (Hz) Average Frequency (Hz) Number of Data points None Closed walls (1.5m burden) None Closed walls (3m burden) None 6m open span None 9m open span None 15m open span stope empty 15m open span Stope ½ filled Stope 3/4 filled Stope 5/6 filled Stope filled Stope filled EXTRACTION STRATEGIES In mining operations where the bench heights are fixed during mine development, the extraction strategy is the only variable that can be used to optimize the economics of bench stoping. The extraction strategies considered within this study include: 1) Extraction using a continuous dryfill mass (waste rock having a rill angle between degrees) that follows an advancing bench brow at a fixed distance (not exceeding a critical unsupported strike length) along the entire bench length (as shown in Figure 1).

4 2) Extracting a bench to a maximum stable unsupported strike length, followed by backfill using hydraulic fill in conjunction with brick bulkheads. This is followed by pillar recovery and the process is repeated along entire bench length (See Figure 2). Although this strategy is primarily linked to hydraulic fill, the use of cemented fill would ensure that minimal fill dilution would be experienced following pillar recovery. Temporary pillar (drilled) New Slot Production recovered pillar Blasting hydraulic fill Maximum strike length (void filled) Bench Limit Mucking ORE Bulkheads Backfill Figure 2. Hydraulic fill and pillar recovery 3) Leaving (planned) permanent pillars between independent (unfilled) spans along the entire bench length. Backfilling is done at bench completion using either dry or hydraulic fill (See Figure 3). On this strategy, it is critical to establish the optimum distances between the pillars in order to minimize the number of pillars required, especially in high grade orebodies. Pillar dimensions are a function of the ground conditions, the expected stress levels and the optimum extraction of the adjacent long hole winzes. Blast monitoring programs can be implemented to determine optimum cut lengths to be taken during long hole winzing in order to minimize blast damage to the adjacent areas and specially the narrow pillars (Villaescusa et al, 1997). In weak rockmasses, the stability of un-filled spans may be affected by blasting in adjacent spans along the strike of the orebody. permanent pillar New Slot Production Blasting permanent pillar Mucking ORE Maximum unsupported strike length (void to be filled at bench completion) Permanent pillar Bench Limit Backfill Backfill Figure 3. Non recoverable permanent pillars in conjunction with backfill. 4) The introduction of full Avoca techniques, where the bench is extracted along the entire length by a repetitive process which requires the bench to be

5 extracted to a maximum stable length, the void tight filled to the brow, and the subsequent bench blasting to be taken with no free face (See Figure 4). Filling Filling Production blasting (no free face) Continuous AVOCA fill Bench Limit Mucking ORE BACKFILL Backfill Previous Bench Figure 4. Full Avoca extraction method. The option of extracting a bench beyond its stable limits and then leaving a (unplanned) pillar to arrest a failure has not been considered in this analysis, because it does not represent good design or operational practices. Option 3 above is related to extracting the bench using pillars that have been designed at the very early stages, and it is assumed that the spans between pillars are stable and independent (from a deformational point of view) of each other. In order to assess the effectiveness of each of the bench extraction strategies, several parameters were considered (See Figure 5). Geomechanics is related to the ability of a system to provide adequate support and to minimize dilution and the effects of blast damage to the adjacent rockmass. Fill performance is related to optimal selection of fill material and the placement method in order to reduce cycle time, dilution, ore losses and to enhance the stability of the fill itself as well as the surrounding rockmass. The economics of any of the selected strategies is controlled by factors such as cost of backfilling (materials and placement), dilution, ore loss, poor fragmentation, etc. all contribute to the success and applicability of each of the bench extraction strategies considered. Fill performance 1. Material selection 2. Placement & compaction 3. Cycle time 4. Stability/failure 5. Dilution/oreloss Bench Performance Economics 1. Cost of fill material 2 Cost of placement 3 Cost of dilution 4 Cost of ore loss 5 Cost of operational issues (mucking fragmentation, etc) Geomechanics 1. dilution 2. support 3. blast damage Figure 5. Parameters influencing bench performance

6 Optimization of any bench extraction strategy can only be achieved by analyzing the problem in an integrated manner. Any attempt to analyze benching based on a single, isolated issue could lead to erroneous and misleading conclusions. Effective, preventative measures to improve stability and reduce rock mass damage should be provided in the design stages to prevent fill mucking and ore contamination in the extraction stages. This will automatically minimise the problem of dilution. The best approach to dilution control is not the measurement of dilution, but to concentrate in prevention at its sources by due diligence at the design and extraction stages. Experience suggests that is very difficult to estimate the amount of waste or fill material mucked out either to gain access to broken ore or in the process of removing the ore. Any attempt to estimate dilution by relating it to a solid ore volume or bucket count in the mucking process may not quantify dilution with the required accuracy. Cavity monitoring using the Optech system may be the only way to quantify ore loss or fill dilution within single digits. Once an inadequate design has been implemented (for example an excessive bench height in poor rockmass conditions), it is very difficult to optimize any extraction strategy. Furthermore, when the excavations are extracted to instability due to indifferent or inefficient operational practices, excessive dilution to the ore stream is likely. Remedial measures such as arresting failures with unplanned pillars can be effective but this can lead to orelosses and blast damage to the surrounding rockmass. EMPIRICAL RATING OF EXTRACTION STRATEGIES The paper proposes an empirical selection procedure for bench and filling extraction strategies (See Table 2). The classification rates the most significant controlling parameters and can be used to determine the most suitable extraction strategy for a particular mine site. The preferred bench extraction strategies are linked to the use of conventional dry fill and hydraulic fill options. In mine sites where a hydraulic fill plant is not available, the classification would be limited to three extraction strategies (all linked to dry fill). The selection procedure presented in Table 2 can be used in conjunction with an economic model of backfill that accounts for stope dimensions, the cost of backfill material and transport to the stope, number of bulkheads, filling rate, etc. Figure 6 shows the results from a model developed by Mount Isa Mines and suggest that high lift benches should be filled using hydraulic fill. The strategy to fill short lift benches will depend upon the rockmass quality (maximum stable length) i.e., for short lift benches dry fill or wet fill may be recommended (See Figure 6). In high lift benches (24-45m high), adequate stabilization of the unsupported s is very difficult using continuous dry fill as shown in Figure 7. The shallow rill angle (38-42 degrees) of the dry fill means that a significant portion of the exposed walls remain unsupported, even if the rill reaches the

7 advancing bench brow. The backfill mass is likely to interact with the broken ore muckpile, thereby contributing to dilution. 50 One way tramming distance = 200m bench width = 7m Bench Height (m) high lift benches dry fill recommended most likely stable length hydraulic fill recommended short lift benches Bench Length (m) Figure 6. A conceptual model of backfill material and transport cost. Filling Production blasting Bench height > 24m Backfilled Unsupported Hangingwall area Most likely critical strike length ore mucking Figure 7. Schematic long section view of a high lift bench stope. The selection criteria presented in Table 2 suggest that full Avoca is the least recommended method of extraction. This is particularly true in high lift benches where blast damage, backfill stability and excess dilution are likely to become an issue. High lift benches require larger diameter blastholes, compared with short lift benches, in order to minimize hole deviation. However, the large blasthole sizes are likely to increase the level of blast damage, especially when the detonation occurs under full confinement from the Avoca backfill. Table 2 identifies seven key parameters (blast damage, support, fill stability, dilution, ore loss, material cost and operational issues) likely to control the economics and the performance of bench stoping operations. The total rating for each extraction strategy is simply calculated by adding the numbers on each column.

8 The results on Table 2 were calculated assuming that each of the controlling parameters had equal weighting. Alternatively, the most suitable extraction sequence can be determined by weighting the parameters in order of importance for a particular mining site. An example from the Lead Mine at Mount Isa Mines is used to illustrate the methodology (Table 3). The results indicate that hydraulic fill is the recommended option for that particular set of parameter weightings. Similar exercises can be undertaken for any mine site, provided the weighting of the parameters controlling bench performance is determined. In all cases, the chosen extraction strategy is the one with the maximum number of points. Table 2. Empirical rating of bench extraction strategies Strategy weight (most preferred = 4, least preferred = 1) Parameters Extraction Strategy to be optimized Hydraulic fill Permanent pillars Continuous Dry fill Minimize blast damage Maximize support Maximize fill stability and minimize fill dilution Control of dilution from failures Minimize ore loss at stope boundaries Minimize backfill (material & transport) cost Operational issues repeated Long Hole Winzing (LHW) to create pillars, but support provided by hydraulic fill (H/W) deformations minimized by tight filling moisture content in hydraulic fill likely to allow steep angle of exposure against recovered pillar potential for failure before hydraulic fill, repeated LHW detrimental, but rockmass supported by HF experience with cut&fill mining and during earlier benching indicates that minimal oreloss is expected lowest material cost, provided significnat runs can be achieved and the number of bulkheads minimized bulkhead & pipelines set-up, repeated longhole winzing, pillar recovery repeated LHWinzing to create pillars (unfilled while blasting) rockmass may continue to deform between pillars fill is not placed or exposed within extraction sequence potential for failure between pillars, repeated LHW detrimental, but failure arrested by the pillars ore left behind in pillars to enhance stability of independent unfilled spans. This ore will never be recovered less backfill material required due to pillars left in place. Hydraulic fill or dry fill can be used. repeated longhole winzing, backfill at bench completion conventional blasting with a free face along bench length H/W deformations arrested only on backfilled portion fill is not required to stand steeper than its natural angle in order to provide support, but close to blast (dilution) potential failures within the unsupported areas can not be arrested and likely to follow each blast ore left behind at the top of the fillmass, where is thrown by blasting. Ore left in any unfilled gaps near the bench more expensive than hydraulic fill, requires mucking units to be used. a single slot followed by a repetitive process of extraction and dry backfilling Full AVOCA repeated blasting without free face likely to create damage due to confinement H/W deformations arrested by earlier placement of backfill low moisture content fill required to stand at very steep angles close to confined blastings minimal H/W lengths exposed, but confined blastings may cause instability ore wedged into fillmass and ore left at the toe of the fill inorder to achieve a steep fill rill angle similar to conventional, but additional stop logs needed in filling horizon, spilling of material in blastholes a single slot followed by a repetitive process of extraction and tight dry backfilling General comments Blast damage likely to control up to 15% of overall behaviour Support to unsupported (not cabled) span is critical to overall bench stability Significant dilution may occur at the fill/muck rill interface during mucking operations Hangingwall material can not be easily separated from ore during horizontal mucking Broken ore loss (unmucked within the bench stope likely to be detrimental to stope economics (difficult to measure) The cost of fill productioin and reticulation likely to increase unit cost Distruption to routine operations likely to decrease extraction rate Recommended:

9 Total Rating 23 (most preferred) (least preferred) Table 3. Empirical rating of bench strategies, Mount Isa Mines Lead Mine. Parameter weight (most important = 7, least important = 1) Parameters Extraction Strategy to be optimized Hydraulic fill Permanent pillars Continuous Dry fill Full AVOCA minimize blast damage repeated Long Hole Winzing (LHW) to create pillars, but support provided by hydraulic fill repeated LHWinzing to create pillars (unfilled while blasting) conventional blasting with a free face along bench length repeated blasting without free face likely to create damage due to confinement 1). Conventional dryfill for short lift benches. 2). HF for high lift benches General comments Blast damage likely to control up to 15% of overall behaviour subtotal H/W rockmass may H/W deformations maximize deformations continue to deform arrested only on minimized by tight between pillars backfilled portion (H/W) filling support H/W deformations arrested by earlier placement of backfill subtotal maximize fill stability and minimize fill dilution subtotal (7) control of dilution from failures moisture content in hydraulic fill likely to allow steep angle of exposure against recovered pillar fill is not placed or exposed within extraction sequence fill is not required to stand steeper than its natural angle in order to provide support, but close to blast (dilution) low moisture content fill required to stand at very steep angles close to confined blastings potential for failure before hydraulic fill, repeated LHW detrimental, but rockmass supported by HF experience with cut&fill mining and during earlier benching indicates that minimal oreloss is expected potential for failure between pillars, repeated LHW detrimental, but failure arrested by the pillars ore left behind in pillars to enhance stability of independent unfilled spans. This ore will never be recovered potential failures within the unsupported areas can not be arrested and likely to follow each blast ore left behind at the top of the fillmass, where is thrown by blasting. Ore left in any unfilled gaps near the bench minimal H/W lengths exposed, but confined blastings may cause instability subtotal (6) minimize oreloss at stope boundaries ore wedged into fillmass and ore left at the toe of the fill inorder to achieve a steep fill rill angle subtotal less backfill material more expensive than minimize required due to hydraulic fill, backfill pillars left in place. requires mucking (material & Hydraulic fill or dry units to be used. transport ) fill can be used. cost lowest material cost, provided significnat runs can be achieved and the number of bulkheads minimized similar to conventional, but additional stop logs needed in filling horizon, spilling of material in blastholes subtotal (5) operational issues bulkhead & pipelines set-up, repeated longhole winzing, pillar recovery repeated longhole winzing, backfill at bench completion a single slot followed by a repetitive process of extraction and dry backfilling a single slot followed by a repetitive process of extraction and tight dry backfilling Support to unsupported (not cabled) span is critical to overall bench stability Significant dilution may occur at the fill/muck rill interface during mucking operations Hangingwall material can not be easily separated from ore during horizontal mucking Broken ore loss (unmucked within the bench stope likely to be detrimental to stope economics (difficult to measure) The cost of fill productioin and reticulation likely to increase unit cost Distruption to routine operations likely to decrease extraction rate

10 subtotal Global Rating (most preferred) (least preferred) Recommended: hydraulic fill or dry fill As explained earlier (See Figure 6), a model that accounts for the volume of material to be used, the cost of the material and the transport to the stope must also be considered. On that particular case in the Lead Mine, continuous dry fill is used for short lift benches, while hydraulic fill is used for high lift benches. CONCLUSIONS The most economical bench extraction strategy can be recommended by considering a series of seven controlling parameters that can be rated according to their local importance in a particular mine site. Geomechanical, economical and operational issues that can be linked to backfill are likely to influence the overall bench performance and economics. The methodology developed can be applied at the planning or during the operational stages of bench extraction. REFERENCES Potvin, Y., M. Hudyma, and H. Miller, Design Guidelines for open stope support. CIM Bulletin, 82. Villaescusa E., L.B. Neindorf, and J. Cunningham, Bench stoping of lead/zinc orebodies at Mount Isa Mines Limited. Proceedings of the MMIJ/AusIMM Joint Symposium, New Horizons in Resource Handling and Geo-Engineering, Yamaguchi University, Ube Japan, Villaescusa, E., C. Scott and I. Onederra, Near field blast monitoring at the Hilton Mine. Mount Isa Mines Technical Report, No. Res Min 78. Mining Research, Mount Isa Mines Limited. Villaescusa E., D. Tyler and C. Scott, Predicting underground stability using a stability rating. Proccedings of the 1 st Asian Rock Mechanics Symposium, Environmental and Safety Concerns in Underground Construction (H.K. Lee, H.S. Yang and S.K. Chung, Editors), Seoul Korea,

Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso

Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso Nuevas tendencias de la Minería Subterránea profunda Planeación, operación y estabilización del macizo rocoso By Ernesto Villaescusa, PhD Chair in Rock Mechanics WA School of Mines, CRC Mining & Curtin

More information

Mining with Paste Fill

Mining with Paste Fill Mining with Paste Fill Mehmet Yumlu, Principal Mining Engineer AMC Consultants Pty Ltd AusIMM Cobar Mining Seminar AMC Con nsultants Pty Ltd Outline Introduction ti What is Paste Fill? Why Using Paste

More information

SECTION 10 SHRINKAGE METHODS

SECTION 10 SHRINKAGE METHODS SECTION 10 SHRINKAGE METHODS Australian Mining Consultants May 2000 CONTENTS 10.1.1 INTRODUCTION...3 10.1.1.1 Disadvantages...3 10.1.2.1 Advantages...4 10.2.1 APPLICABILITY...4 10.2.1.1 Orebody Dip...4

More information

SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4

SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4 SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 4 ROCK MECHANICS PRACTICAL (SURFACE AND UNDERGROUND) SYLLABUS PREAMBLE... 5 TOPIC

More information

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation. Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,

More information

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground

More information

Mine Wide Risk Assessment What is the State of your Arteries. L.Human, J Doolan and L Potts Xstrata Zinc

Mine Wide Risk Assessment What is the State of your Arteries. L.Human, J Doolan and L Potts Xstrata Zinc Mine Wide Risk Assessment What is the State of your Arteries L.Human, J Doolan and L Potts Xstrata Zinc Abstract A geotechnical mine wide risk management approach is presented for the systematic inspection,

More information

Design the blast in low benches and some practical applications in Vietnam

Design the blast in low benches and some practical applications in Vietnam Design the blast in low benches and some practical applications in Vietnam Pham, Van Hoa HUMG, Vietnam C. Drebenstedt Technical University Bergakademie Freiberg, Germany Le, Van Quyen HUMG, Vietnam Nguyen,

More information

Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes

Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes Introduction When designing a shallow tunnel in a poor quality rock mass, the designer has to face a number of problems

More information

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

Long hole drilling for the platinum industry a mining perspective

Long hole drilling for the platinum industry a mining perspective RAPSON, G. and RUPPRECHT, S. Long hole drilling for the platinum industry a mining perspective. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy,

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material

More information

Safety Applications for GPS Systems in the Mining Industry

Safety Applications for GPS Systems in the Mining Industry Safety Applications for GPS Systems in the Mining Industry Introduction The Global Positioning System (GPS) has been available for civilian use for more than 20 years now. It has found many navigation,

More information

THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA

THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA THE TRANSITION FROM OPEN PIT TO UNDERGROUND MINING: AN UNUSUAL SLOPE FAILURE MECHANISM AT PALABORA Richard K. Brummer*, Hao Li* & Allan Moss *Itasca Consulting Canada Inc., Rio Tinto Limited ABSTRACT At

More information

Permits to Dig / Permits to Excavate / Permits to work near underground services

Permits to Dig / Permits to Excavate / Permits to work near underground services Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional

More information

UNDER DRAINAGE AND FILTER DESIGN

UNDER DRAINAGE AND FILTER DESIGN UNDER DRAINAGE AND FILTER DESIGN Tailings and HLP Workshop 28 April to 1 May 2010 INTRODUCTION The internal drainage is of crucial importance to the reliability and safety of a tailings dam throughout

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

COKE PRODUCTION FOR BLAST FURNACE IRONMAKING

COKE PRODUCTION FOR BLAST FURNACE IRONMAKING COKE PRODUCTION FOR BLAST FURNACE IRONMAKING By Hardarshan S. Valia, Scientist, Ispat Inland Inc INTRODUCTION A world class blast furnace operation demands the highest quality of raw materials, operation,

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Establishing the feasibility of your proposed mining venture

Establishing the feasibility of your proposed mining venture RUPPRECHT, S. Establishing the feasibility of your proposed mining venture. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy, 2004. Establishing

More information

Excavation & Trenching Procedure

Excavation & Trenching Procedure Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees

More information

Monitoring of Tunnel End Plug Performance in ONKALO

Monitoring of Tunnel End Plug Performance in ONKALO Monitoring of Tunnel End Plug Performance in ONKALO Erika Holt, VTT Technical Research Centre of Finland Presentation at IGDTP-Geodisposal 2014 Manchester, UK, 24th to 26th of June 2014 Co-authors: I.

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS

More information

Trench Rescue by Buddy Martinette

Trench Rescue by Buddy Martinette Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining

More information

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia

More information

Numerical analysis of boundary conditions to tunnels

Numerical analysis of boundary conditions to tunnels Global journal of multidisciplinary and applied sciences Available online at www.gjmas.com 2015 GJMAS Journal-2015-3-2/37-41 ISSN 2313-6685 2015 GJMAS Numerical analysis of boundary conditions to tunnels

More information

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water

More information

Understanding BS EN 771-3: Aggregate concrete masonry units

Understanding BS EN 771-3: Aggregate concrete masonry units 60 Charles Street, Leicester LE1 1FB Tel: 0116 253 6161 Fax: 0116 251 4568 Email: enquiries@cba-blocks.org.uk Website: www.cba-blocks.org.uk February 2006 Understanding BS EN 771-3: Aggregate concrete

More information

At the completion of this guide you should be comfortable with the following:

At the completion of this guide you should be comfortable with the following: This guide provides instructions and best practices for deployment of the Yealink W52P IP DECT phones and repeaters RT10, which is intended for qualified technicians (or administrator) who will deploy

More information

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals. SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation

Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation SITE INVESTIGATION REPORT NO. S1r1 PROJECT: The Mayfair Hotel PROJECT NO: 140565 ATTN: Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation PREPARED BY: Cory Zurell, PhD, P.Eng. DATE: 13 April

More information

A new approach to rail asset management.

A new approach to rail asset management. A new approach to rail asset management. Geotechnical and structural monitoring via satellite for the rail industry. With mounting pressures on the UK s ageing infrastructure networks from ever increasing

More information

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab, DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Optiffuser. High-performance, high bandwidth lightweight 1D diffuser.

Optiffuser. High-performance, high bandwidth lightweight 1D diffuser. Optiffuser High-performance, high bandwidth lightweight 1D diffuser. General product information The Optiffuser comes in packs of four panels. Two positives and two negatives (see page 5) per package.

More information

PVC PIPE PERFORMANCE FACTORS

PVC PIPE PERFORMANCE FACTORS PVC PIPE PERFORMANCE FACTORS PVC pipe, like all flexible pipe products, is very dependent on the surrounding soil for its structural capacity, in addition, the pipe material must have sufficient inherent

More information

NFPA 30-2008: Basic Requirements for Storage Tanks

NFPA 30-2008: Basic Requirements for Storage Tanks NFPA 30-2008: Basic Requirements for Storage Tanks New York City Metro Chapter Society of Fire Protection Engineers New York, NY February 22, 2011 NFPA 30, Flammable and Combustible Liquids Code Storage

More information

How To Design A 3D Print In Metal

How To Design A 3D Print In Metal DMLS / SLM Metal 3D Printing. An introductory design guide for our 3d printing in metal service. v2.2-8th July 2015 Pricing considerations. Part Volume. One of the biggest factors in the price for DMLS

More information

Fire Alarm system Installation Guide

Fire Alarm system Installation Guide Fire Alarm system Installation Guide Fire Alarm System Categories Systems designed for Protection of Property only, fall into two classifications P1 or P2. but a manual system is also needed, then this

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Raise boring equipment

Raise boring equipment Raise boring equipment Special gauge saddle system Segmented reaming heads Extendable reaming heads All components are bolted together Optimum button design Flexible spacing raise boring equipment Reaming

More information

COSMOS 2012: Earthquakes in Action COSMOS 2012

COSMOS 2012: Earthquakes in Action COSMOS 2012 COSMOS 2012 What is SFSI and why is it important? Soil issues in Earthquakes Structures where SFSI important Retaining structures (lateral earth pressure) Foundations (spread and pile footings, bearing

More information

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDELINE FOR HAND HELD SHEAR VANE TEST GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular

More information

Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System

Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System Virtual Reality Scientific Visualisation - A Solution for Big Data Analysis of the Block Cave Mining System James Tibbett, Fidelis Suorineni, Bruce Hebblewhite and Alex Colebourn What is Block Caving?

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

Descriptive statistics Statistical inference statistical inference, statistical induction and inferential statistics

Descriptive statistics Statistical inference statistical inference, statistical induction and inferential statistics Descriptive statistics is the discipline of quantitatively describing the main features of a collection of data. Descriptive statistics are distinguished from inferential statistics (or inductive statistics),

More information

IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring

IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring International Progress Report IPR-02-64 Äspö Hard Rock Laboratory Temperature Buffer Test Report for retaining plug and anchoring Richard Bäck Äspö HRL September 2002 Svensk Kärnbränslehantering AB Swedish

More information

Guidelines for Rights of Way

Guidelines for Rights of Way Guidelines for Rights of Way Guidelines for Statutory Rights of Way for Engineering and Public Works Infrastructure Rights of Way (Drainage, Sanitary, Water & Electrical Utilities) A Statutory Right of

More information

Supporting document to NORSOK Standard C-004, Edition 2, May 2013, Section 5.4 Hot air flow

Supporting document to NORSOK Standard C-004, Edition 2, May 2013, Section 5.4 Hot air flow 1 of 9 Supporting document to NORSOK Standard C-004, Edition 2, May 2013, Section 5.4 Hot air flow A method utilizing Computational Fluid Dynamics (CFD) codes for determination of acceptable risk level

More information

Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan

Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan Advanced Natural Gas Storage (ANGAS) Project and Verification Tests of Experimental Lined Rock Cavern in Japan Toru Komatsubara THE JAPAN GAS ASSOCIATION Taku Watanabe TOKYO GAS CO.,LTD. Satoshi Murase

More information

GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE

GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE Growth Contract No. GRD2-2000-30024 GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE Principal author: G. DE SCHUTTER September 2005 European Research Project: MEASUREMENT OF PROPERTIES OF FRESH SELF-COMPACTING

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

Standard the the Raising

Standard the the Raising Raising the Standard Introduction to BS 5839-1:2013 An Overview of the BS 5839 1:2013 for professionals who are responsible for the provision of fire detection and alarm systems for buildings Agenda Introduction

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

2007 American WJTA Conference and Expo August 19-21, 2007 Houston, Texas Paper DRILLING AND SLOTTING OF HARD ROCK WITH ABRASIVE SUSPENSION WATER JET

2007 American WJTA Conference and Expo August 19-21, 2007 Houston, Texas Paper DRILLING AND SLOTTING OF HARD ROCK WITH ABRASIVE SUSPENSION WATER JET 2007 American WJTA Conference and Expo August 19-21, 2007 Houston, Texas Paper DRILLING AND SLOTTING OF HARD ROCK WITH ABRASIVE SUSPENSION WATER JET Song S. Han Div. of Eng. and Construction, Samsung Corporation

More information

Development of Tunnel Electrical Resistivity Prospecting System and its Applicaton

Development of Tunnel Electrical Resistivity Prospecting System and its Applicaton Development of Tunnel Electrical Resistivity Prospecting System and its Applicaton HEE-HWAN RYU 1, GYE-CHUN CHO 2, SUNG-DON YANG 3 and HYUN-KANG SHIN 4 1 Professor, Korea Advanced Institute of Science

More information

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance 02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW

More information

OMCL Network of the Council of Europe QUALITY MANAGEMENT DOCUMENT

OMCL Network of the Council of Europe QUALITY MANAGEMENT DOCUMENT OMCL Network of the Council of Europe QUALITY MANAGEMENT DOCUMENT PA/PH/OMCL (12) 77 7R QUALIFICATION OF EQUIPMENT ANNEX 8: QUALIFICATION OF BALANCES Full document title and reference Document type Qualification

More information

CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING DEVELOPMENT WITH OPEN SPACE PROVISION

CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING DEVELOPMENT WITH OPEN SPACE PROVISION 1 General NPARKS-0-DCS03 CHECKLIST FOR DC SUBMISSION - CONVENTIONAL HOUSING (a) The following plans are provided: Key and location plans of scale 1 : 10,000 or 1 : 5,000 showing access to the site from

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Highly flexible couplings

Highly flexible couplings Construction and operation 8.03.00 Instructions for installation 8.03.00 Types of stress 8.04.00 Diagrams for static deformation of the coupling ring 8.05.00 Coupling size 8.07.00 Examples of combinations

More information

Recommended Practices Associated with Hydraulic Fracturing Operations

Recommended Practices Associated with Hydraulic Fracturing Operations Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Types of Mining - Expert Table

Types of Mining - Expert Table See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining

More information

TRENCHING AND SHORING EXCAVATIONS PROGRAM

TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM The purpose of this program is to provide information to our company employees and to interested persons that Northern

More information

Procedure for Working in or around Excavations

Procedure for Working in or around Excavations RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...

More information

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35 Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Construction Specifications for Keyhole Pavement Coring and Reinstatement F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October

More information

Guide for SOLID CONCRETE BLOCK SEALS

Guide for SOLID CONCRETE BLOCK SEALS Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid

More information

DITCH WITCH MT12 MICROTRENCHER. ditchwitch.com

DITCH WITCH MT12 MICROTRENCHER. ditchwitch.com DITCH WITCH MT12 MICROTRENCHER ditchwitch.com Rule With An Iron Fist. ditchwitch.com DITCH WITCH MT12 MicroTrencher Throughout the world, demand is increasing for faster broadband communications, necessitating

More information

SECTION 25. Excavation and Trenching

SECTION 25. Excavation and Trenching SECTION 25 Excavation and Trenching 25.A General. The requirements of this Section are applicable to all Government and contractor work forces when their employees are performing excavation or trenching

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

CIVIL ENGINEERING Vol. II - Surface Mining Methods and Equipment - J. Yamatomi and S. Okubo SURFACE MINING METHODS AND EQUIPMENT

CIVIL ENGINEERING Vol. II - Surface Mining Methods and Equipment - J. Yamatomi and S. Okubo SURFACE MINING METHODS AND EQUIPMENT SURFACE MINING METHODS AND EQUIPMENT J. Yamatomi and S. Okubo University of Tokyo, Japan Keywords: Mining method, surface mining, open pit mining, open cast mining, placer mining, solution mining, leaching,

More information

Investment Projects - Health Safety & Environment Good Practice Guide

Investment Projects - Health Safety & Environment Good Practice Guide Introduction In the absence of a Network Rail standard covering remedial work to existing cable routes, this document is to provide guidance on the standard of refurbishment required when undertaking the

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015

DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015 DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015 CONTENT GLOBAL OPERATIONS WHERE WE VE COME FROM REVERSING THE TREND TRANSFORMATION

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN Research & Development Division RD/GN/012 August 1990 HIGHWAYS DEPARTMENT GUIDANCE NOTES (RD/GN/012) SOIL TEST FOR PAVEMENT DESIGN Prepared

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

PART TWO GEOSYNTHETIC SOIL REINFORCEMENT. Martin Street Improvements, Fredonia, Wisconsin; Keystone Compac Hewnstone

PART TWO GEOSYNTHETIC SOIL REINFORCEMENT. Martin Street Improvements, Fredonia, Wisconsin; Keystone Compac Hewnstone GEOSYNTHETIC SOIL REINFORCEMENT Martin Street Improvements, Fredonia, Wisconsin; Keystone Compac Hewnstone DESIGN MANUAL & KEYWALL OPERATING GUIDE GEOSYNTHETIC SOIL REINFORCEMENT Keystone retaining walls

More information