Hybrid Planning Application for mixed use development at North West Cowbridge
|
|
- Susanna Ellis
- 8 years ago
- Views:
Transcription
1 Jane Crofts Development Management Vale of Glamorgan Council Civic Offices, Holton Road, Barry CF63 4RU. Helmont House Churchill Way Cardiff CF10 2HE nlpplanning.com Date 7 September 2015 Our ref 31131/02/GW/JMi/ v1 Your ref 2014/01505/OUT Dear Jane Hybrid Planning Application for mixed use development at North West Cowbridge On behalf of our client, Commercial Estates Group (the developer) and Mr JGR Homfray (the landowner ) (together the applicant ), we are pleased to enclose documents and plans in support of amendment to the current hybrid planning application (reference: 2014/01505/OUT) for residential-led mixed use development at North West Cowbridge. The amendments to the current application are proposed to address comments from Officers at VoGC/statutory consultees and in light of the Focused Changes to the Deposit Local Development Plan (LDP), which were published in July They are summarised as follows: 1 A reduction in the extent of built development; 2 An increase in the average net density from 25.5 dwellings per ha (dph) to 30 dph; 3 An increase in the maximum number of units that could be accommodated on the site from 390 to 475; 4 A proposed increase in the provision of affordable housing from 35% to 40%; 5 An increase in the amount of open space provided on site in order to meet policy requirements associated with the proposed increase in the number of residential units; and 6 The inclusion of a footpath within the site to the south of the safeguarded primary school site. The boundary of the application site remains unchanged. Furthermore, there is no change to the disposition of land uses across the site and provision is still made for a 2ha primary school site and a link road in accordance with emerging policy in the Deposit LDP. The proposal continues to demonstrate that the development will create a highly desirable environment and an attractive place to live. Nathaniel Lichfield & Partners Limited 14 Regent s Wharf All Saints Street London N1 9RL Registered in England No Regulated by the RICS Offices also in Leeds London Manchester Newcastle
2 The Amount of Housing The Focused Changes increase the area proposed to be allocated for housing from 17ha to 27ha such that the boundary of the proposed allocation more closely reflects the extent of built development proposed by the current application. Despite this 10ha increase in site area, the Focused Changes have not made a corresponding increase in site capacity which remains at 390 units. This presents a conflict with Policy MD7 (Housing Densities) of the Deposit LDP, which requires that residential developments should meet a minimum density requirement of 30 dwellings per hectare ( dph ), because the development of 390 units across a 27ha site would fall short of this target. The average net density of the residential development proposed within the current application is 25.5 dph. This is below the minimum net residential density of 30dph. Following discussions with Officers at VoGC, the application has been amended to increases the maximum number of units to 475 in order to meet density requirements. Whilst this exceeds the 390 units assumed in the Deposit LDP, it represents the most efficient use of land and assists in delivering much needed housing. The Planning Statement Addendum and the documents that accompany this submission confirm that the increase in the number of units will not undermine the acceptability of the proposal. Amended Plans and Addenda to Reports The following plans and documents are submitted in support of this submisison: 1 Amended Parameter Plans 2 ES Addendum (August 2015) 3 ES Non-Technical Summary (August 2015) 4 Planning Statement Addendum (August 2015) 5 Design and Access Statement Addendum, including revised Illustrative Masterplan (July 2015) A full list of the plans and documents that form part of this submission is attached at Appendix 1. Appendix 1 also confirms which previously submitted documents remain extant and those which have been superseded. Amendments to the Description of Development The proposed amendments to the current application mean that the description of development needs to be revised to reflect the proposed increase in the number of units. Amendments are highlighted below for ease of reference: 1 Detailed permission for the construction of a link road connecting the Cowbridge Bypass (A48) with Llantwit Major Road (B4270) and associated highway works including footpaths/cycleways, landscaping and associated engineering/ infrastructure works. 2 Outline permission for a mixed use residential-led development, including; 3 Preparatory works including demolition of existing farm buildings as necessary; P2/ v1
3 - Approximately 390 residential units Up to 475 residential units (Use Class C3, including affordable homes); - A minimum 2 hectare reserve site for a primary school with playing fields (Use Class D1); - Associated car parking, landscaping works and public realm; - Open space including parks, natural and semi-natural green spaces, amenity green spaces and facilities for children and young people; - Associated infrastructure works including internal access roads, public realm, footpaths/cycleways and vehicular accesses; and - Associated engineering, and landscape works including surface water drainage, SuDs, a pumping station and levelling/creation of earth bunds/mounds. The Outline Part of the Planning Application The Illustrative Masterplan, Parameter Plans and Landscape Framework Plan have been updated to reflect the proposed amendments. The revised Parameter Plans set a framework for the detailed design of the scheme and establish the following: 1 Development extents (and the extent of built development has reduced); 2 Land uses (there is no change to the disposition of land uses across the site and provision continues to be made for a 2ha primary school site and a link road in accordance with emerging policy in the Deposit LDP); 3 Maximum building heights (this submission does not propose and change to maximum building heights); 4 Principal pedestrian/cycle links (which have been improved through the introduction of an additional pedestrian footbath to the south of the primary school site); and 5 Strategic open spaces (which has been increased to reflect the increase in the number of residential units and the need for wider landscape buffers in certain locations). 6 The DAS Addendum explains how the revised Illustrative Masterplan and Parameter Plans respond more positively to the site s context, constraints, opportunities and other influences. 7 There has been no need to revise the detailed highway plans already submitted for approval at the outline stage. The Detailed Part of the Planning Application Plans relating to the detailed part of the application i.e. the new link road, which will run north to south providing a link between the A48 and Llantwit Major Road B4270, remain unchanged. Conclusion The amendments to the current application do not materially change the planning considerations relevant to its determination. The proposal is still a departure from the UDP but there continue to be other material considerations which should be afforded significant weight and which indicate P3/ v1
4 that the application can be determined otherwise than in accordance with the development plan. Notably: 1 The proposal still accords with PPW; 2 The proposal still accords with emerging LDP development management policies (accepting that that the number of units is now higher than that proposed by the site allocation in order to resolve the conflict with emerging policy on residential density); 3 The benefits that the proposed development will bring to the area are still significant and greatly outweigh any adverse impacts arising; and 4 The proposal will still amount to sustainable development and the scheme is acceptable in all other respects. In summary, the amendments to the current application needto be considered in the context of a time expired UDP, the sustainable nature of the development and the inclusion of the site as a housing allocation within the Deposit LDP. Moreover, given that the benefits of the development would significantly and demonstrably outweigh any adverse impacts, it is clear that that the scheme should be approved without delay. We look forward to receiving confirmation that the additional information has been received and consultation has begun. We will contact you shortly to discuss the progress of the planning application. Please do not hesitate to contact me or Sophie White should you require clarification on any aspect of the application. Yours sincerely Gareth Williams Senior Director Copy J Allen Commercial Estates Group P4/ v1
5 Appendix 1: Plan and Document List Enclosed Plans and Documents (August 2015) 1. Planning Statement Addendum (August 2015) 2. Design and Access Statement Addendum (August 2015) 3. Environmental Statement (ES) Addendum (August 2015), comprising: - ES Addendum Volume 1 Non-Technical Summary; - ES Addendum Volume 2 Technical Assessment; - ES Addendum Volume 3 Appendices and Figures; 4. Parameter Plan 1: Extent of Development and Land Uses (Drawing Reference PS Rev K) 5. Parameter Plan 2: Open Space and Accessibility (Drawing Reference PS Rev K) 6. Parameter plan 3: Heights (Drawing Reference PS Rev J) 7. Illustrative Masterplan (PS Rev F) 8. Landscape Framework Plan (Ref: 2147/P35a) Previously submitted plans and documents which remain extant 1. Design & Access Statement (December 2014) 2. Site Location Plan (Ref: IL ) 3. Application Boundary (Ref: IL Rev B) 4. Hybrid Application Boundaries (Ref: IL Rev A) 5. Statement of Community Involvement (December 2014) 6. Cowbridge Pattern Book Mapping the DNA of Place (July 2014) 7. Service Supply Statement (December 2014) 8. Waste Assessment (December 2014) 9. Planning Statement (December 2014) 10. Environmental Statement (ES) (December 2014), comprising: - Volume 1: Non-Technical Summary - Volume 2: Main Technical Studies P5/ v1
6 - Volume 3: Appendices to the Main Technical Studies (including): 11. Environmental Statement (ES) Addendum (June 2015), comprising: - ES Addendum Volume 1 Non-Technical Summary; - ES Addendum Volume 2 Technical Assessment; - ES Addendum Volume 3 Appendices and Figures; 12. Proposed Link Road Between A48 and Llantwit Major Road Sheet 1 (Ref: JNY Rev G) supersedes previously submitted plan ref: JNY Rev F; 13. Proposed Link Road Between A48 and Llantwit Major Road Sheet 2 (Ref: JNY Rev D) supersedes previously submitted plan ref: JNY Rev C; and 14. Overall Plan of Proposed Link Road between A48 and Llantwit Major Road (Ref: JNY Rev D) supersedes previously submitted plan ref: JNY Rev C. 15. Long Sections Sheet 1 (Ref: JNY ) 16. Long Sections Sheet 2 (Ref: JNY ) 17. Typical Cross Sections (Ref: JNY ) 18. Proposed Improvements at Llantwit Major Road and B2468 (Nash) Junction (Ref:JNY ) Superseded Plans 1. Parameter Plan 1 (Ref: PS Rev E) 2. Parameter Plan 2 (PS Rev E) 3. Parameter Plan 3 (PS Rev E) 4. Illustrative Masterplan (PS Rev E) 5. Landscape Framework Plan (Ref: 2147/P26b) 6. Proposed Link Road Between A48 and Llantwit Major Road Sheet 1 (Ref: JNY Rev F); 7. Proposed Link Road Between A48 and Llantwit Major Road Sheet 2 (Ref: JNY Rev C; and 8. Overall Plan of Proposed Link Road between A48 and Llantwit Major Road (Ref: JNY Rev C. P6/ v1
(Part 2 of 2) February 2016. 50511/JG/AJk
Kirklees Local Plan Representations in Support of site at Windy Bank Lane, Hightown (H596) (Part 2 of 2) KeyLand Developments Ltd February 2016 50511/JG/AJk Nathaniel Lichfield & Partners 3rd Floor 15
More informationVale of Glamorgan Local Development Plan 2011-2026. Contents. Page. 2. Infrastructure Requirements 2. 3. Site Viability 4
Vale of Glamorgan Local Development Plan 2011-2026 Contents Page 1. Introduction 2 2. Infrastructure Requirements 2 3. Site Viability 4 4. Community Infrastructure Levy 4 5. Update position on Residential
More informationJanuary 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH
January 2016 Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH Pre-planning application advice service The city council is committed
More informationAssessment of Site Deliverability in the Market Towns
East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of
More informationCOPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
More informationManchester City Council Planning and Highways Committee 2 June 2011
Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to
More informationFULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN
6 February 2015 Delivered by post and planning portal Planning and Building Control Nuneaton and Bedworth Borough Council Town Hall Coton Road Nuneaton Warwickshire CV11 5AA Dear Sirs, FULL APPLICATION
More informationDevelopment Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:
More informationSite Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
More informationAlternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
More informationMillennium Quarter Public Realm Guidance Manual 2008
Millennium Quarter Public Realm Guidance Manual 2008 Table of Contents Introduction Purpose of guide How to use this guide Background and Vision Studies Conservation and Heritage Biodiversity Strategic
More informationDEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
More informationMatthew Halstead. Alder King Planning Consultants
1. YOUR DETAILS Name Company/Organisation (if applicable) Matthew Halstead Alder King Planning Consultants Address Telephone Email We would like to include your contact details in a new consultation database
More informationWILTSHIRE CORE STRATEGY EXAMINATION - LAND AT STATION ROAD, WESTBURY.
30 July 2013 Delivered by email Mr. Andrew Seaman BA (HONS) MA MRTPI Planning Inspector c/o The Programme Officer 49 All Saints Place Bromsgrove Worcestershire B61 0AX 10 Queen Square Bristol BS1 4NT T:
More informationReference: 05/00928/FUL Officer: Mr David Jeanes
DEVELOPMENT CONTROL BOARD 5 January 2006 Reference: 05/00928/FUL Officer: Mr David Jeanes Location: Proposal: Applicant: Whiffens Farm Clement Street Sutton-At-Hone Kent BR8 7PQ Retrospective application
More informationDevelopment Brief Erskine Lodge Site, Great Whelnetham
Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities
More information4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
More informationSubject: WW Resp II 15/04430/FUL & 15/04715/FUL The Royal High School
Sammy Grimsby From: Mike Fox Sent: 10 February 2016 10:04 To: Cc: Kelly Brown; Sasha Berezina Subject: RE: WW Resp II 15/04430/FUL & 15/04715/FUL The Royal High School Thanks
More informationKey Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
More informationPre-Application Planning Advice
Pre-Application Planning Advice Guidance Note and Schedule of Fees Regeneration and Planning (Development Management) December 2014 The Development Management Service is responsible for the determination
More informationGuidance on Non-Material Amendments and Minor Material Amendments
Minerals and Waste Forum Implementation Planning Advisory Group Guidance on Non-Material Amendments and Minor Material Amendments April 2012 1 Non-Material Amendments and Minor Material Amendments 1) Non-material
More informationThe land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.
SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within
More informationMount Pleasant Sorting Office
Mount Pleasant Sorting Office LBI References: P2013/1423/FUL P2013/1425/CAC LBC Reference: 2013/3807/P GLA Reference: D&P/3032a&b/02 Update - Topics Scheme proposal Summary of key resident objections Mayoral
More informationDelivered by Email. Sian Waters Programme Officer PCC LDP Examination County Hall, Freemans Way, Haverfordwest, Pembrokeshire SA61 1TP.
5 High Street Cardiff CF10 1PZ Delivered by Email T: 029 2034 4445 F: 029 2022 0469 www.turleyassociates.co.uk Sian Waters Programme Officer PCC LDP Examination County Hall, Freemans Way, Haverfordwest,
More informationLEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION
1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)
More informationChapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
More informationTown and Country Planning Act 1990 Section 78 Summary Proof of Evidence
Town and Country Planning Act 1990 Section 78 Summary Proof of Evidence Mr Tony Clements BA (Hons) MCD MRTPI On behalf of Mr Edmund Bruegger Land South of Temple Inn Lane Temple Cloud APP/F0114/A/14/2228577
More informationRichmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More informationSite Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment
More informationSite Specific Policies Local Plan
A N E W V I S I O N F O R D E V E L O P I N G W A K E F I E L D D I S T R I C T Site Specific Policies Local Plan Local Development Framework www.wakefield.gov.uk/ldf Site Specific Policies Local Plan
More informationCarmarthenshire LDP Site Assessment Proforma
Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by
More informationRelevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.
P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes
More informationAGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.
APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height
More informationSustainability Appraisal of the Lichfield Local Plan: Strategy
Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd
More informationSt Athan. Aerospace Business Park. Sustainability statement
St Athan Aerospace Business Park Sustainability statement Aerospace Business Park, St. Athan Sustainability Statement May 2009 Atkins Ltd Longcross Court 47 Newport Road Cardiff CF24 0AD Telephone +44
More informationA Guide to the Fees for Planning Applications in England
A Guide to the Fees for Planning Applications in England These fees apply from 31 July 2014 onwards. This document is based upon The Town and Country Planning (Fees for Applications, Deemed Applications,
More informationSite Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable SALT 033 Former Mid Wales Hospital
More informationLANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
More informationThere are several options you can use to pay for your Planning and Building Control Fees or documents.
A Guide to Fees for Planning Applications in England from 22 November 2012 There are several options you can use to pay for your Planning and Building Control Fees or documents. 1. By Chip and Pin at the
More informationDraft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
More informationSite Specific Policies
Local Development Framework Site Specific Policies Development Plan Document 03450 450 500 www.scambs.gov.uk Local Development Framework Site Specific Policies Development Plan Document Published by South
More informationA23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS
s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationAdvice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
More informationThe Road to Growth Is transport the driver of local economic development?
Is transport the driver of local economic development? November 2014 Executive Summary The recent Growth Deals unveiled by the Government have set out how up to 12 billion will be invested in local economies
More informationLand at Cofton Lake Road Cofton Hackett
Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough
More informationA Guide to Pre-Application Advice and Fees and Planning Performance Agreements
A Guide to Pre-Application Advice and Fees and Planning Performance Agreements V3 Sept 2014 Contents 1. Introduction 2. The Benefits of Pre-Application Advice 3. How do I obtain pre-application advice?
More informationManchester City Council Item 6 Planning and Highways Committee 8 May 2014
Application Number 104843/FO/2014/N1 Date of Appln 28th Feb 2014 Committee Date 8th May 2014 Ward Moston Ward Proposal Location Applicant Agent Change of use of ground floor to a hot food takeaway (Fish
More informationSCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
More informationPLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT CINEMA PHARMACY BANK COFFEE SHOP +HOSPITAL LIBRARY SUPERMARKET POST OFFICE WELCOME TO OUR ENVIRONMENTAL IMPACT ASSESSMENT PORTFOLIO With environmental considerations and
More informationTHE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:
More informationSite Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
More informationWard: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns
More informationOVERARCHING SPATIAL POLICIES
3 OVERARCHING SPATIAL POLICIES 29 Overarching Spatial Policies 3.1 This chapter contains policies addressing the following policy themes: OSP 1: Optimising growth OSP 2: Land use OSP 3: Connections and
More informationDraft Site Development Brief: Land at HM Stanley Hospital, St Asaph
Draft Site Development Brief: Land at HM Stanley Hospital, St Asaph Strategic Planning and Housing September 2015 Content Page No. 1. Introduction 2 2. Document Status and Stages in Preparation 2 3. Site
More informationManchester City Council List Item 10 Planning and Highways Committee 15 March 2012
Application Number 097574/FO/2011/N1 Date of Appln 30th Jan 2012 Committee Date 15 th March 2012 Ward Cheetham Ward Proposal Location Applicant Agent Retrospective Application for the continued use of
More informationWELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
More informationCoventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
More informationKINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156
APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY
More informationDevelopment Management Officer Report Committee Application. Summary
Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey
More informationPLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570
PLANNING SUPPORT STATEMENT 29 Fernshaw Road, London SW10 0TG Prepared For MRS. GAIL TAYLOR & MRS. KAREN HOWES November 2012 Contents 1 INTRODUCTION 1 THE APPLICATION PROPERTY AND SURROUNDING AREA 1 RELEVANT
More informationThe Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
More informationSite Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable SALT 034 Ty Nant Groesffordd (Llanfrynach) Existing
More informationIn accordance with the provisions of the Town and Country Planning Act, 1990 and the Orders made thereunder, and with regard to your application at:
PLANNING APPROVAL Ref: P13-00986PLA PETER TWEMLOW, BARTON WILLMORE LLP Roger Tym & Partners 7 Soho Square London United Kingdom W1D 3QB In accordance with the provisions of the Town and Country Planning
More informationConstruction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.
planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Inquiry opened on 16 July 2013 Accompanied site visit made on 19 July 2013 by Philip Major BA(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local
More informationDevelopment Strategy Spatial Policy 7 Supporting the Location of New Development
Examination of the Plan for Stafford Development Strategy Spatial Policy 7 Supporting the Location of New Development Hearing Statement on behalf of St Modwen Developments The following sets out further
More informationWelcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
More informationOriginator: Tel: 0113 2474461. Report of the Chief Planning Officer CITY PLANS PANEL. Date: 7 th JULY 2016
Originator: Ian Cyhanko Tel: 0113 2474461 Report of the Chief Planning Officer CITY PLANS PANEL Date: 7 th JULY 2016 Subject: PREAPP/16/00272 Proposal for 215 Apartments, with ancillary ground floor commercial
More informationProposal for a Demonstration Exemplar at British Sugar, York
Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a
More informationNeil Taylor Programme Manager Royal Borough of Kingston
Neil Taylor Programme Manager Royal Borough of Kingston James Berry MP for Kingston and Surbiton Greg Hughes Chair, kingstonfirst Opportunity Area Planning Framework Eric Owens Group Manager
More informationHurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.
HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been
More informationMount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
More informationPage 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation.
Page 117 Agenda Item 10 DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010 Report of the Executive Head of Planning and Transportation. Ref: A2010/63099/ADV WARD: A03 / STONECOT Time Taken: 5 weeks,
More informationWEST OF WATERLOOVILLE FORUM. 10 April 2006. Councillors: Winchester City Council. Councillor Clohosey (Standing Deputy for Councillor Chamberlain)
1 WEST OF WATERLOOVILLE FORUM 10 April 2006 Attendance: Chamberlain Cooper Hiscock (P) Deputy Members: Councillors: Winchester City Council Collin (Chairman) (P) Rees Stallard (P) Councillor Clohosey (Standing
More informationDar es Salaam Masterplan 2012 2032 Ministry of Lands, Housing and Human Settlements Development
Dar es Salaam Masterplan 2012 2032 Ministry of Lands, Housing and Human Settlements Development Roma_22 April 2013 Dodi Moss Happold Group AfriArch QConsult CONTENTS PART I : MAIN REPORT Introduction FIRST
More informationCouncillor Richard Blunt 01530 454510 richard.blunt@nwleicestershire.gov.uk
NORTH WEST LEICESTERSHIRE DISTRICT COUNCIL POLICY DEVELOPMENT GROUP 19 MARCH 2013 Title of report EFFECTIVE ASSET MANAGEMENT ACCESS LICENCES Councillor Richard Blunt 01530 454510 richard.blunt@nwleicestershire.gov.uk
More informationThe subject matter of this report deals with the following Council Objectives
REGULATORY SERVICES COMMITTEE 4 JUNE 2015 Subject Heading: REPORT Revision to committee resolutions to grant planning permissions subject to S106 Planning Obligation requiring infrastructure contribution.
More informationRE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS MADE ON BEHALF OF SAFESTORE.
23 March 2015 Haringey Planning Policy River Park House 225 High Road London N22 8HQ Dear Sir RE: CONSULTATION ON THE DEVELOPMENT MANAGEMENT AND THE SITE ALLOCATIONS DPD CONSULTATION DOCUMENT REPRESENTATIONS
More informationBELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER
PUBLIC CABINET 7 APRIL 2009 BELVEDERE EMPLOYMENT AREA LINK ROAD SCHEME, ERITH COMPULSORY PURCHASE ORDER ISSUES The Belvedere Employment Area Link Road Scheme will require land not owned by the Council.
More information3.0 Planning Policies
3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The
More informationPlanning Brief for the Ashmount Primary School site. June 2012. Ashmount Primary School site planning brief June 2012 1
Planning Brief for the Ashmount Primary School site June 2012 Ashmount Primary School site planning brief June 2012 1 Ashmount Primary School site planning brief June 2012 2 1. Introduction 5 1.1 Purpose
More informationBasics of Sustainability. Environmental Impact Assessments (EIA)
Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6
More informationBASILDON BOROUGH COUNCIL
BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL
More informationA Guide to the Fees for Planning Applications in England
A Guide to the Fees for Planning Applications in England These fees apply from 15 April 2015 onwards. This document is based upon The Town and Country Planning (Fees for Applications, Deemed Applications,
More informationRural dwellings including bed and breakfast accommodation
MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including
More informationRoad Safety Auditor Certification Compliance with EC Directive 2008/96/EC
TRANSPORT SCOTLAND TRUNK ROAD & BUS OPERATIONS TS INTERIM AMENDMENT 40/11 Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC Summary This Interim Amendment provides guidance to ensure
More information05 AREA/SITE SPECIFIC GUIDELINES
05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.
More informationApplication No : 13/01609/FULL1 Ward: Cray Valley East. Applicant : Honda (UK) Ltd Objections : YES
SECTION 2 Applications meriting special consideration Application No : 13/01609/FULL1 Ward: Cray Valley East Address : 222 Cray Avenue Orpington BR5 3PZ OS Grid Ref: E: 546876 N: 167893 Applicant : Honda
More informationThere are access points readily available into the site.
Site Name Reference Number Settlement Land at Broughton Atterbury U4 Size (Ha) 4. Broughton Planning history/context This section provides a brief overview of any significant planning history on the site
More information1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.
ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0
More information73 MAIN STREET SHIRLEY SOLIHULL
2014/58/S 73 MAIN STREET SHIRLEY Application No: Ward/Area: Location: 2014/58/S BLYTHE 73 MAIN STREET SHIRLEY SOLIHULL Date Registered: 13/01/2014 Applicant: Proposal: WILLIAM HILL ORGANIZATION LTD CHANGE
More informationKelham Hall. Nottinghamshire NG23 5QX. To.: Agenda. South of
To.: Members of the Planning Committee Kelham Hall Kelham Newark Nottinghamshire NG23 5QX www.newark-sherwooddc.gov.uk Telephone: 01636 655247 Email: catharine.saxton@nsdc.info Your ref: Our ref: Dear
More informationCorporate Director Environment and Community Services
CABINET Meeting date: 27 November 2014 From: Corporate Director Environment and Community Services RESPONSE TO SOUTH LAKELAND DISTRICT COUNCILS COMMUNITY INFRASTRUCTURE LEVY REGULATION 16 CONSULTATION
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationLONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007
LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007 COUNCIL CHAMBER, 1ST FLOOR, TOWN HALL, MULBERRY PLACE, 5 CLOVE CRESCENT, LONDON, E14
More informationRecommendations That the Committee approve the North London Business Park draft Planning Brief for consultation
Policy and Resources Committee 16 December 2015 Title Report of Wards Status Urgent Key North London Business Park Draft Planning Brief Commissioning Director Growth and Development Brunswick Park Public
More informationPre Application Engagement A guide to best practice
Pre Application Engagement A guide to best practice 1 Introduction Early engagement has significant potential to improve the efficiency and effectiveness of the planning application system for all parties.
More information