CITY COUNCIL AGENDA REPORT
|
|
- Asher Newman
- 8 years ago
- Views:
Transcription
1 CITY COUNCIL AGENDA REPORT Subject: LACOMBE RESERVOIR FILL LINE Recommendation(s) That Administration be authorized to spend up to $200,000 from the Utility Water Reserve to investigate the source of a water leak in the Lacombe Reservoir Fill Line and the impacts that leak may have had on the adjacent retaining wall. Purpose of Report The purpose of this report is to request spending of funds in order to allow Administration to complete further testing to investigate the source of the water leak in the Lacombe Lake Fill Line and the impacts of the suspected leak on surrounding infrastructure. Council Direction Background and Discussion As shown in Attachment 1 there are two large diameter waterlines that share a common trench located in a 6-metre Utility Right of Way (URW), the waterlines are between 4 and 11-metres deep. The URW is bordered to the West by the Odyssey Point condominiums and to the South by the residences of Oak Vista Drive. There is a large grade differential between the condos and the houses which is why there is also a private retaining wall that spans approximately 120 metres and is between 4 and 7 metres in height as shown in Attachment 2. On July 1, 2015, Utilities was made aware of a retaining wall that was showing signs of water infiltration that the resident thought was the cause of their sump pump running continually. At the time, there was no obvious reason for the water infiltration such as major rain event. For this reason, Utilities began to look at the possibility of a water leak in one of the two waterlines located in the URW. Utilities determined there was likely a water leak in the 500mm line that fills the Lacombe Reservoir and brought Engineering in to help determine solutions. To date, efforts have not revealed the location of the leak, therefore Administration is requesting funds to complete additional acoustic testing on the line that will determine most accurately, where the leak is located. In addition, Administration is August 24, 2015 / Page 1
2 requesting that funds be available to conduct seismic testing which will map out any potential void areas that may have developed behind the retaining wall. Given the age of the infrastructure, the development that has occurred around the waterlines, and the depth and location of these waterlines, the possibility that rehabilitation can be completed once the leak is found is remote. For these reasons and due to the risk of further leaks occurring in either of the two lines, Administration will be bringing forward a project charter in 2016 to address the relocation of these two lines as a permanent solution for Councils consideration. Currently the Lacombe Reservoir is being filled by the distribution system through a smaller sized main, which although not ideal, is sustainable with changes in the operations procedures in the short term. Administration has completed a risk analysis and the risk is manageable to continue on this back up line until a 2016 project can be approved. Stakeholder Communications or Engagement Administration will work closely with all residents that will be impacted by this work. Implications of Recommendation(s) If Council does not support this request, Administration may not be able to identify the possible cause and effect of this suspected water leak putting both residents and the city at risk. a) Financial: If approved this will become a part of the utility model and there will be an associate rate increase. b) Legal / Risk: If this work is not completed, the legal risks are potentially large and include damage to property and physical injury if the retaining wall were to fail. c) Program or Service: Until the water lines are relocated Utilities will need to revise their operating procedures to accommodate for possible fire flows or to mitigate effects of breaks on the same line at another location. d) Organizational: None at this time August 24, 2015 / Page 2
3 Alternatives and Implications Considered If Council does not wish to support the recommendation, the only alternative is to allocate funds to complete the water line relocation. Strategic Connections a) Council s Strategic Outcomes and Priorities (See Policy C-CG-02) CULTIVATE A GREEN COMMUNITY: A healthy natural environment for future generations that preserves and promotes enjoyment, conservation and responsible development. CULTIVATE EXCELLENCE IN GOVERNMENT: A responsive, accountable government that delivers value to the community. CULTIVATE SUSTAINABLE INFRASTRUCTURE AND SERVICES: A growing community that has balanced development and management of civic facilities, transportation networks and related services. CULTIVATE A SAFE, HEALTHY AND INCLUSIVE COMMUNITY: A community that provides opportunities for everyone to realize their potential in a thinking, caring and connected way. b) Long Term Plans (e.g. MDP, Social Master Plan, Cultural Master Plan, etc.) c) Corporate Objectives (See Corporate Business Plan) Deliver programs and services that meet or exceed our standards Exercise strong fiscal management Ensure our customers are very satisfied d) Council Policies e) Other Plans or Initiatives (Business Plans, Implementation Strategies, etc.) Attachment(s) 1. Site Map 2. Pictures of the retaining wall Originating Department(s): Author(s): General Manager Approval: City Manager Signature: Planning & Engineering Sue Howard, Capital Projects Manager Gilles Prefontaine, Chief Community Development Officer Date: August 24, 2015 / Page 3
4 ATTACHMENT 1 Retaining Wall (Location of Photo 1) Location of Photo 2
5 Waterlines 4-10m below fence line ATTACHMENT 2
Case Study: The History of the San Juan Headwaters Forest Health Partnership
Case Study: The History of the San Juan Headwaters Forest Health Partnership Introduction: Wildfire is a part of life in Southwest Colorado. It plays an integral role in ecosystem health and management.
More informationINDONESIA - LAW ON WATER RESOURCES,
Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in
More informationMandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding May 26, 2011 Kyle Chambers, P.Eng. Environmental and Engineering Services Department City of London kjchambe@london.ca 519-661-2500
More informationACMO/CCI London One Day Conference Water Damage to Condominiums
ACMO/CCI London One Day Conference Water Damage to Condominiums Presented by: Bart K. Porter, CIP April Pittendreigh, BA, CAIB, CIP July 17, 2015 Objectives of Presentation to ACMO/CCI Review of various
More informationTREE PERMIT APPLICATION Private Property- Section 10.52.120 MBMC COMMUNITY DEVELOPMENT DEPARTMENT
Permit No.: TREE PERMIT APPLICATION Private Property- Section 10.52.120 MBMC COMMUNITY DEVELOPMENT DEPARTMENT City Hall 1400 Highland Avenue Manhattan Beach, CA 90266-4795 Telephone (310) 802-5500 FAX
More informationAgenda CONTRACT AWARD TO COGENT COMMUNICATIONS, INC. FOR DATA CENTER COLOCATION AND NETWORK SERVICES
Agenda eport Honorable Mayor and City Council FROM: SUBJECT: Department of Information Technology CONTRACT AWARD TO COGENT COMMUNICATIONS, INC. FOR DATA CENTER COLOCATION AND NETWORK SERVICES RECOMMENDATION:
More informationHow To Get A Flood Risk Reduction Rebate
1. Address Number of Property 2. Street Name of Property 3. Last Name 4. First Name 5. Phone Number 6. Preferred time to be contacted o Morning o Afternoon o Evening preference 7. Email Address 8. Are
More informationFINDINGS OF FACT. 1. Complainant Cheryl A. Prentice is a unit owner in the condominium known as
MONTGOMERY COUNTY, STATE OF MARYLAND Cheryl A. Prentice, : Complainant : COMMISSION ON COMMON : OWNERSHIP COMMUNITIES vs. : Case No. 15-08 : : Panel Hearing Date: October 15, 2008 : Decision Issued: February
More informationBEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationTAKE FOR SAFETY. 1. Stop, step back, observe 2. Think through the task 3. Identify any hazards 4. Control the hazards 5. Complete the task safely
TAKE 5 FOR SAFETY 1. Stop, step back, observe 2. Think through the task 3. Identify any hazards 4. Control the hazards 5. Complete the task safely The purpose of Take 5 is to ensure that all work activities
More informationTOWN OF DAVIE TOWN COUNCIL AGENDA REPORT
TOWN OF DAVIE TOWN COUNCIL AGENDA REPORT TO: Mayor and Councilmembers FROM/PHONE: Mark Kutney, AICP, Development Services Director/(954) 797-1101 Prepared by Annie Feng, Planner II SUBJECT: Resolution
More informationAn extraordinary launching point for nationally recognized programs
Imagine preserving 40 acres of pristine water in the heart of Fairmount Park for future generations creating a sanctuary for learning about the wonders of nature in an urban setting challenging young people
More informationBASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationCavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationREPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015
REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 SUBJECT COST ESTIMATE FOR A PROPOSED ELECTRICAL CABLE CONNECTION FOR PORTABLE GENSET ISSUE To conceptualize and
More informationPART 4: SITE INFORMATION
TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY
More informationMoving Small Mountains Vesuvius Dam Rehab
Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,
More informationBOARD OF ADJUSTMENT STAFF REPORT. BOA File No. 3786 1515 West Avenue- Multifamily Building
MIAMI BEACH PLANNING DEPARTMENT FROM: DATE: RE: BOARD OF ADJUSTMENT STAFF REPORT Thomas R. Mooney, AIC~ Planning Director December 4, 2015 Meeting BOA File No. 3786 1515 West Avenue- Multifamily Building
More informationMILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014
MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from
More informationGreater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
More informationQUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE
GA Insurance House, Ralph Bunche Road, P O Box 42166-00100 Nairobi, Kenya. Telephone: 2711633 Fax 2714542 E-mail: insure@gakenya.com QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE AGENT:
More informationCouncil Strategic Plan 2015-2018. squamish.ca
Council Strategic Plan 2015-2018 squamish.ca 2 Summary Our Council began their 2014 2018 term with a strategic planning exercise. The exercise identified a number of areas of focus for Council and directed
More informationTown of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
More informationEXHIBIT CONSTRUCTION GUIDELINES
EXHIBIT CONSTRUCTION GUIDELINES STANDARD BOOTH DEFINITIoN: Exhibit consisting of one or more standard units in a straight line. be permitted to a maximum height of 8 3 (2.5m). INTENT If a portion of an
More informationFast Track A Successful Redevelopment: The Palm Beach Outlets Story
Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening
More informationWhere life interacts with infrastructure.
Where life interacts with infrastructure. Nu Flow Technologies began as a new technology company in 1998, manufacturing and installing trenchless drain and sewer lining solutions. Today, Nu Flow Technologies
More informationCity of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005
City of Edmonton Page 1 of 5 This guideline will apply to all new developments involving singledetached, semi-detached or duplex houses in the City of Edmonton effective January 1, 2006. Preamble: This
More informationALBEMARLE COUNTY SERVICE AUTHORITY
ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA ITEM EXECUTIVE SUMMARY AGENDA TITLE: All Saints Anglican Church Request Turn Lane Project STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director Jeremy
More informationFlood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG
Flood Risk Assessment For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Contents 1. Introduction 2. The Site 3. Flood Risk 4. Existing drainage 5. Proposed Development
More informationDESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD
DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD Introduction Utility meters are a necessary component for any building. When older buildings were originally provided with utility
More informationCHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014
CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 Fenton Township receives numerous inquiries regarding the relatively high sewer use fees that Township residents have been paying
More informationTEMPORARY AND PERMANENT SUPPORT OF HYDRO OTTAWA DUCT BANKS WHEN UNDERCUT BY AN EXCAVATION
TITLE: Engineering Specification RECOMMENDED: C. Proulx APPROVED: C. Malone REV. DATE: 2002-09-12 NO: UDS0013 1 OF 5 REV: 0 TEMPORARY AND PERMANENT SUPPORT OF HYDRO OTTAWA DUCT BANKS WHEN UNDERCUT BY AN
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationCity of Kingston Information Report to Municipal Heritage Committee Report Number MHC-15-067
To: From: Resource Staff: Date of Meeting: November 2, 2015 Subject: Executive Summary: City of Kingston Information Report to Municipal Heritage Committee Report Number MHC-15-067 Chair and Members of
More informationBasement Flooding: Preventing Future Damage
Basement Flooding: Preventing Future Damage 1 Mitigation Mitigation is Measures taken now to reduce losses in the future. 2 Protecting Your Property Staying Above Water There are many low-cost options
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More information9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing
More informationDecision Due Date: 18 April 2015
App.No: 150195 Decision Due Date: 18 April 2015 Ward: Devonshire Officer: Richard Elder Site visit date: 8 May 2015 Site Notice(s) Expiry date: 27 March 2015 Neighbour Con Expiry: 27 March 2015 Press Notice(s):
More informationBASEMENT FLOODING. Prevention Guide for. Homeowners
BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
More informationMAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION
Oxford Hills Bus Garage 36 Brown St, Norway, ME Oil Storage Inspection 2/20/14 CONDITIONS OBSERVED Underground Oil Storage: 12,000 gallon underground oil storage tank (split 10,000 gallon diesel/2,000
More informationAlternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
More informationWeeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario
Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario September 19, 2013 Kyle Chambers, P.Eng. City of London Environmental and Engineering Services Department Today s presentation
More informationPROPOSAL FOR CONTRACTORS ALL RISKS
PROPOSAL FOR CONTRACTORS ALL RISKS 1. Title of contract (If project consist of several sections, specify section(s) to be insured) 2. Location of site Country/Province/district City/town/village 3. Name
More informationHow to secure your property after a disaster
How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,
More informationPIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
More informationMinistry of the Environment Decree on accessible building
F1 THE FINNISH BUILDING REGULATIONS 1 Barrier-free Building Regulations and 2005 Ministry of the Environment Decree on accessible building adopted in Helsinki on the 1 st of October 2004 In accordance
More informationB. Improve the appearance and character of areas surrounding new development.
Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote
More informationWET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.
WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:
More informationSANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa
More informationCITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN
CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN Adopted October 5, 2009 Table of Contents Chapter Description Page 1 Facility Descriptions... 3 1.1 Municipal Power Plant, 1001 Park
More informationCITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG
CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG WHY IS THERE WATER IN MY BASEMENT? There are two major sources of water in a basement as the
More informationBuilding over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
More informationTECHNICAL RECOMMENDATION
TECHNICAL RECOMMENDATION NO: 9 DESIGN OF LIGHT TIMBER FRAMED WALLS AND FLOORS FOR FIRE RESISTANCE Peter Collier Contents Design of Light Timber Framed Walls and Floors for Fire Resistance Relevance Acceptance
More information1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
More informationThe checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
More informationRESIDENTIAL WOOD DECKS
RESIDENTIAL WOOD DECKS 1 A Building Permit is required for the construction of a wood deck where the deck is more than 600 mm above grade at any point. Definition: For the purposes of this pamphlet, a
More informationProposed Planning Incentives to Support the Replacement of Office Space in New Mixed Use Developments Draft Zoning By-law Amendments
PG12.5 STAFF REPORT ACTION REQUIRED Proposed Planning Incentives to Support the Replacement of Office Space in New Mixed Use Developments Draft Zoning By-law Amendments Date: April 18, 2016 To: From: Wards:
More informationbuilding on success Trees and Basements Partial Review of the Core Strategy February 2014
building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...
More informationVestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]
Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration
More informationReceived the 9th Award for Power Load Leveling Equipment and Systems from the chairman of the Heat
エコキュート For R Heat pump unit 120 70 9 20 8.5 6.5 R2.5 83.5 14.3 Installation clearance R2.5 Remote control chord 700mm 900mm 2,500mm 3m 900mm 700mm 500mm 500mm 500mm 700mm 2,700mm 3,300mm 3,000mm
More informationMembers, Utah State Board of Education. Marlies Burns, Executive Director. Charter School Revolving Loans
MEMORANDUM TO: FROM: Members, Utah State Board of Education Marlies Burns, Executive Director DATE: June 9-10, 2016 ACTION: Charter School Revolving Loans Background: Statute (UCA 53A-1a-522) created a
More information9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
More informationFederal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM
Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar Initial Risk Flood Risk = Probability of Flooding x Consequences Zoning Building Codes Outreach Evacuation Planning Risk
More informationProject Management Topics
S E C T I O N II T W O Project Management Topics SECTION II: PROJECT MANAGEMENT TOPICS TABLE OF CONTENTS Introduction 3 1. PROJECT TRIAGE 5 1.1 Gather the Data 7 1.2 Review and Analyze the Data 10 1.3
More informationProtection of unoccupied or void properties
Real Estate Issue one Protection of unoccupied or void properties Introduction The current economic downturn has lead to a greatly increased number of vacant properties. In some countries rates of unoccupancy
More informationCapacity Planning and Management. School Board Work Session March 16, 2011
Planning and Management School Board Work Session March 16, 2011 Agenda Revisions to Management Schedule Functional and Projections Trigger Metrics Purpose of Metrics Sample Metrics Sample Outcomes of
More informationTake the right steps 9 principles for building the Risk Intelligent Enterprise
Take the right steps 9 principles for building the Risk Intelligent Enterprise Contents 9 principles for building a Risk Intelligent Enterprise 2 The Risk Intelligent Framework 4 1. Is risk a threat or
More informationEDUCATION * ENERGY * ENVIRONMENT GUIDELINES AND PROCEDURES FOR CONSTRUCTION OF SCHOOL LANDSCAPE PROJECTS
EDUCATION * ENERGY * ENVIRONMENT GUIDELINES AND PROCEDURES FOR CONSTRUCTION OF SCHOOL LANDSCAPE PROJECTS Table of Contents Construction of School Landscape Projects 2 1. Foreward.......................................................................
More informationNational Alliance of Preservation Commissions Sample Guidelines for Solar Panels in Historic Districts
National Alliance of Preservation Commissions Sample Guidelines for Solar Panels in Historic Districts Kimberly Kooles, Program Associate, Center for State and Local Policy, National Trust for Historic
More informationA Safe and Healthy Workplace
Section 1 A Safe and Healthy Workplace Why is Health and Safety Important? Health and Safety is the subject of many laws and regulations, failure to comply with the law renders companies and individuals
More informationFirst Nation Mold Remediation Case Study Tsartlip First Nation
First Nation Mold Remediation Case Study Tsartlip First Nation Canada Mortgage and Housing Corporation (CMHC) has a number of mold remediation and repair case studies that draw on the experiences of First
More informationEMERGENCY PREPAREDNESS
EMERGENCY PREPAREDNESS Page 1 SECTION 11 EMERGENCY PREPAREDNESS CONSIDERATIONS FOR APPROPRIATE EMERGENCY PREPAREDNESS...3 EMERGENCY PREPAREDNESS POLICY Emergency Preparedness Policy - Sample...5 EMERGENCY
More informationThe Town of Lakeshore Basement Flooding Information to Residents
The Town of Lakeshore Basement Flooding Information to Residents The following information is intended for residents that have homes connected to Municipal storm and sanitary sewers. However, rural residents
More informationStrategic Plan 2015-2017. Executive Summary
Strategic Plan 2015-2017 Executive Summary about westwind Westwind was founded in 1937 by the YWCA of Greater Portland and is now operated by the Westwind Stewardship Group. Founded in 2004, the Westwind
More informationHEAVY DUTY STORAGE GAS
Multi-Fin flue technology Flue damper saves energy Electronic controls HEAVY DUTY STORAGE GAS Dependability The Rheem heavy duty gas range is the work horse of the industry having proved itself over many
More informationPAINTER EXECUTIVE SEARCH
PAINTER EXECUTIVE SEARCH Position Description Painter Executive Search is supporting the in a search for an experienced to lead a broad regional coalition of Bay Area land conservation agencies and organizations
More informationWINDOW AND DOOR REPLACEMENT REQUIREMENTS
WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.
More informationSwannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
More informationPROPOSAL FORM FOR CONTRACTORS ALL RISKS INSURANCE. 1. Title of contract (if project consists of several sections, specify section(s) to be insured)
Lumen Insurance, a trade name on of GasanMamo Insurance Ltd. Regulated by the Malta Financial Services Authority. Registered in Malta, Msida Road, Gzira GZR 1405, Malta www.gasanmamo.com Cyprus Agents
More informationPenn-America Insurance Company Contractors General Liability Application
Penn-America Insurance Company Contractors General Liability Application Applicant s Name Agent Name Address Mailing Address PROPOSED EFFECTIVE DATE: From To 12:01 A.M., Standard Time at the address of
More informationResponse, Reliability and Results in the delivery of leak detection services
Response, Reliability and Results in the delivery of leak detection services Response, Reliability and Results Polygon is a global provider of property damage restoration, property performance services
More informationSOLAR. Energizer Systems NEW S10 ENERGIZER NOW AVAILABLE
SOLAR Energizer Systems NEW S10 ENERGIZER NOW AVAILABLE Your step by step guide to selecting the right Solar set up. Gallagher Solar Energizer Systems are the ideal choice for remote areas that have unreliable
More informationChesapeake Bay Preservation Ordinance Waiver and Exception Process Guidance for Activities in the Resource Protection Area (RPA)
Chesapeake Bay Preservation Ordinance Waiver and Exception Process Guidance for Activities in the Resource Protection Area (RPA) Property owners interested in working in the Resource Protection Area (RPA)
More informationDevelopment Variance Permit Application Package
When do I need a Development Variance Permit? Development Variance Permit Application Package If my proposed development does not meet the standards set out in the Zoning Regulation Bylaw on matters that
More informationInformation Governance Policy
Information Governance Policy REFERENCE NUMBER IG 101 / 0v3 May 2012 VERSION V1.0 APPROVING COMMITTEE & DATE Clinical Executive 4.9.12 REVIEW DUE DATE May 2015 West Lancashire CCG is committed to ensuring
More informationDAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS
DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS J. David Rogers, Robert Olshansky, and Robert B. Rogers Expansive soils in many parts of the United States pose a significant hazard to foundations for light
More informationI.S. 3218 :2013 Fire Detection & Alarm Systems
I.S. 3218 :2013 Fire Detection & Alarm Systems Overview of significant changes 26 th March 2014 FPS Ltd Today s Programme Commencement Transition Competence & Qualifications System Certification System
More informationSECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
More informationSan Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m.
San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. Needs Assessment and Recommendation - Wholesale Water Utility Billing and Information Management Software Application
More informationCENTURY INSURANCE GROUP CONTRACTORS QUESTIONNAIRE AND WARRANTY General Agency
Notice: This application becomes part of the policy and must be signed in ink by the President or Owner of the Named Insured. Any coverage we issue is due to the reliance of the truth and accuracy of the
More informationSOME COMMON QUESTIONS ABOUT FLOODPROOFING
SOME COMMON QUESTIONS ABOUT FLOODPROOFING WHEN DOES FLOODING OCCUR? Although flooding can occur at any time of the year, the risks of high floods are greatest in the spring and summer. Spring floods are
More informationExploration for natural gas
FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with
More informationFrequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life