1 To: From: Resource Staff: Date of Meeting: November 2, 2015 Subject: Executive Summary: City of Kingston Information Report to Municipal Heritage Committee Report Number MHC Chair and Members of Municipal Heritage Committee Lanie Hurdle, Commissioner, Community Services Paige Agnew, Director, Planning, Building & Licensing Services Application for Heritage Permit under the Ontario Heritage Act 218 Green Bay Road File Number P At the October 5, 2015 meeting of the Municipal Heritage Committee, a recommendation regarding heritage permit application File Number P was deferred and a peer review was requested of the structural engineering reports prepared in support of the proposed demolition of the existing structure. The City retained Ian Fuller, P.Eng. of JP2G Consultants Inc. to fulfill the MHC s peer review request. A site visit was held on October 19, 2015 and a roundtable discussion was held at City offices with Mr. Fuller and Mr. Pelow, the applicant s structural engineer, and André Scheinman, the City s heritage preservation consultant. Following the site visit and roundtable discussion, Mr. Fuller provided a peer review report to City staff which is included as Exhibit A. Mr. Fuller s report concludes that the condition of the brick walls does not appear to be abnormal for a late 19 th century structure; however, the original foundation walls are in need of a significant repair. Although there is a technical solution that could be advanced to undertake the required repair, the unforeseen cost associated with this repair would be approximately $200,000 - $250,000, in his professional opinion. The report also acknowledges that there is an element of risk when underpinning reinforced masonry structures. Recommendation: This report is for information purposes only. 21
2 Information Report to Municipal Heritage Committee Report Number MHC November 2, 2015 Page 2 of 4 Authorizing Signatures: Lanie Hurdle, Commissioner, Community Services Gerard Hunt, Chief Administrative Officer Consultation with the following Members of the Corporate Management Team: Cynthia Beach, Corporate & Strategic Initiatives Denis Leger, Transportation, Facilities & Emergency Services Jim Keech, President and CEO, Utilities Kingston Desiree Kennedy, Chief Financial Officer & City Treasurer Not required Not required Not required Not required 22
3 Information Report to Municipal Heritage Committee Report Number MHC November 2, 2015 Page 3 of 4 Options/Discussion: Proposal/Background At the October 5, 2015 meeting of the Municipal Heritage Committee, a recommendation regarding heritage permit application File Number P was deferred and a peer review was requested of the structural engineering reports prepared in support of the proposed demolition of the existing structure. The City retained Ian Fuller, P.Eng. of JP2G Consultants Inc. to fulfill the MHC s peer review request. A site visit was held on October 19, 2015 where Mr. Fuller, André Scheinman, the applicant s structural engineer (John Pelow, P.Eng), Todd Hataley (property owner), the applicant s builder (Bill Maas), and City staff (Stacey Forfar, Manager of Development Approvals and Amy Didrikson, Planner - Heritage) were in attendance and reviewed site conditions. Mr. Fuller and Mr. Pelow returned with City staff and Mr. Scheinman to City offices to discuss the technical issues identified in the previous reports and the costing. Following the site visit and roundtable discussion, Mr. Fuller provided a peer review report to City staff which is included as Exhibit A. Mr. Fuller s report concludes that the condition of the brick walls does not appear to be abnormal for a late 19 th century structure; however, the original foundation walls are in need of a significant repair. Although there is a technical solution that could be advanced to undertake the required repair, the unforeseen cost associated with this repair would be approximately $200,000 - $250,000, in his professional opinion. The report also acknowledges that there is an element of risk when underpinning reinforced masonry structures. Conclusion The report included as Exhibit A is intended to address a motion of the Municipal Heritage Committee at their October 5 th meeting, and to assist in the review of heritage permit application File Number P Existing Policy/By-Law: Ontario Heritage Act, R.S.O. 1990, C. O.18. (Province of Ontario) By-Law Number Procedural By-Law for Heritage By-Law Number (OHA designation by-law for the Barriefield Heritage Conservation District) Notice Provisions: Not applicable Accessibility Considerations: Not applicable 23
4 Information Report to Municipal Heritage Committee Report Number MHC November 2, 2015 Page 4 of 4 Financial Considerations: Not applicable Contacts: Paige Agnew, Director, Planning, Building & Licensing Services extension 3252 Stacey Forfar, Manager, Development Approvals extension 3253 Amy Didrikson, Heritage Planner, Development Approvals extension 3288 Other City of Kingston Staff Consulted: Not applicable Exhibits Attached: Exhibit A Structural Peer Review, 24
5 Exhibit A Jp2g Consultants Inc. ENGINEERS PLANNERS PROJECT MANAGERS 1150 Morrison Drive, Suite 410, Ottawa, ON K2H 8S9 T , F , Via Heritage Development Approvals Planning, Building and Licensing Services City of Kingston 1211 John Counter Blvd., Kingston, ON K7K 6C7 sforfar@cityofkingston.ca Attention Stacey Forfar Re Independent Opinion Structural Peer Review 218 Green Bay Road Kingston, ON 1. Introduction 1.1. Authorization This report was prepared by Jp2g Consultants Inc. (Jp2g) at the request of City of Kingston in accordance with our proposal dated October 15, Mandate The subject of the current assignment is an existing late 19th century home located at 218 Green Bay Road that is exhibiting some structural distress. The purpose of our assignment is to offer an independent opinion as to the condition of the existing structure as there are differing opinions on the cost and effort required to remediate the structural issues. The engineer retained by the owner is suggesting that it is a very costly exercise which is precipitating the owners request to demolish the building. However, the heritage consultant is indicating that the effort required would be less than anticipated by the engineer Relevant Document Review The following reports were provided by the City of Kingston for our review: Date Organization Description 1 June 16, 2015 rev June 23, 2015 CaraCo Development Corporation Summary of potential solutions for foundation repair/rehabilitation with costing associated with one of the options 2 June 24, 2015 Pelow Engineering Structural condition review summary with opinions of effort required to rehabilitate the structure integrity 3 July 14, 2015 Andre Scheinman Condition review with opinion of effort required to rehabilitate the structure 4 July 27, 2015 Pelow Engineering Response Andre Scheinman s report 1.4. Scope of Work The scope of our effort was limited to: visiting the site to review the existing condition; facilitating a round table discussion addressing the technical issues in the respective reports; and reviewing the costing. 25 Page 1 of 5
6 Exhibit A 1.5. Limitations Jp2g Consultants Inc. is the Consultant referenced throughout this document. Our review is limited to an independent opinion to be used to inform the decision making process of the City of Kingston only. Our opinions do not relieve the professional responsibilities of others involved in the project. Jp2g has not assessed the stability of the existing structure under the current state of demolition and excavation and does not accept responsibility for any distress, damage or collapse that may occur as a result of temporary instability. Any user accepts that decisions made or actions taken based upon interpretation of our work are the responsibility of only the parties directly involved in the decisions or actions. No party other than our Client shall rely on the Consultant s work without the express written consent of the Consultant, and then only to the extent of the specific terms in that consent. Any use which a third party makes of this work, or any reliance on or decisions made based on it, are the responsibility of such third parties. Any third party user of this report specifically denies any right to any claims, whether in contract, tort and/or any other cause of action in law, against the Consultant (including Sub-Consultants, their officers, agents and employees).the work reflects the Consultant s best judgement in light of the information reviewed by them at the time of preparation. It is not a certification of compliance with past or present regulations. Unless otherwise agreed in writing by the Consultant, it shall not be used to express or imply warranty as to the fitness of the property for a particular purpose. No portion of this report may be used as a separate entity; it is written to be read in its entirety. Only the specific information identified has been reviewed. No physical or destructive testing and no design calculations have been performed unless specifically recorded. Conditions existing but not recorded were not apparent given the level of study undertaken. Only conditions actually seen during examination of representative samples can be said to have been appraised and comments on the balance of the conditions are assumptions based upon extrapolation. Therefore, this work does not eliminate uncertainty regarding the potential for existing or future costs, hazards or losses in connection with a property. We can perform further investigation on items of concern if so required. The Consultant is not responsible for, or obligated to identify, mistakes or insufficiencies in the information obtained from the various sources, or to verify the accuracy of the information. No statements by the Consultant are given as or shall be interpreted as opinions for legal, environmental or health findings. The Consultant is not investigating or providing advice about pollutants, contaminants or hazardous materials. The Client and other users of this report expressly deny any right to any claim against the Consultant, including claims arising from personal injury related to pollutants, contaminants or hazardous materials, including but not limited to asbestos, mould, mildew or other fungus. Applicable codes and design standards have undergone revision since the subject property was designed and constructed. As an example, design loads (such as those for temperature, snow, wind, rain, seismic etc) and the specific methods of calculating the capacity of the systems to resist these loads may have changed significantly. Unless specifically included in our scope, no calculations or evaluations have been completed to verify compliance with current building codes and design standards. Budget figures are our opinion of a probable current dollar value of the work and are provided for approximate budget purposes only. Accurate figures can only be obtained by establishing a scope of work and receiving quotes from suitable contractors. 26 Page 2 of 5
7 Exhibit A 2. Site Review Our office visited the site on October 19, 2015 for a cursory review of the property, in advance of the round table discussion, to help inform the discussions as well as our opinion. At the time of our visit, the interior finishes and portions of the ground and second floor structures had been removed. Excavations adjacent to a portion of the foundation wall on the exterior and interior have occurred. The house is described as a two story load bearing brick walled structure founded on a stone foundation. The excavations have revealed a shallow founding depth of approx. 2-0 with slightly deeper foundations adjacent the existing cistern. For the purpose of this report, portions of the house will be referenced as front and rear. Where front shall denote the front façade with the two flanking walls and rear shall denote that portion near the rear porch and masonry cistern. In our opinion, the condition of the interior and exterior brick walls of the front of the building were found to be in fair condition typical to that anticipated for a brick structure of this vintage. There are some areas of deterioration/cracking requiring restoration and some of the original embedded horizontal wood elements have rotted and are in need of restoration. The level of necessary repair observed is consistent with that which we believe would be anticipated for a structure of this vintage. Photo 1: Front Façade Photo 2: Interior Condition of Exterior Wall The brick walls at the rear of the building have undergone some significant distress in the past with cracking (previously repaired) beginning to re-activate. Excavation near the rear of the building where the cracking has re-activated has revealed significant distress in the foundation wall. Photo 3: Existing Crack Re-Activated Photo 4: Foundation Distress and Damaged Brick 27 Page 3 of 5
8 Exhibit A 3. Round Table Discussion Following our site visit, a round table discussion was had to discuss the issues identified in the reports. Those in attendance included: John Pelow Pelow Engineering Andre Schienman Heritage Consultant Stacey Forfar City of Kingston Amy Didrikson City of Kingston Ian Fuller Jp2g Consultants Inc. The basis of the discussion focused around the original Pelow report. In order of the issues identified in Pelow report, the discussion is generally summarized as follows: 1. It was agreed that it is not unusual for heritage masonry structures to not meet the standards of new construction with respect to straightness, square and level but is not specifically cause for concern. Furthermore it was agreed that stability issues with the exterior wall could be addressed by appropriate detailing of the new interior wall structure which is being installed for insulation purposes. Mr. Pelow confirmed that the context of his comment that the majority of the brick cannot be reused was made when considering deconstructing and rebuilding the building as opposed renovation and maintaining the existing building. 2. It was agreed that a significant foundation intervention/ repair/rehabilitation was required to extend the longevity of the structure. Differing opinions were expressed regarding maintaining the existing and insulating to provide appropriate frost cover versus underpinning to extend the bearing depth below frost. Mr. Pelow advocated an underpinning strategy with a new foundation to achieve frost depth and was not comfortable with the notion of maintaining/improving the existing performance level of the original foundation as would be allowed under Part 11 of the Ontario Building Code provide that the authority having jurisdiction approved such an approach. Particular concern was that only a small portion of the original foundation had been uncovered and therefore other unforeseen conditions may be uncovered. 3. All agreed that the moisture infiltration would have exacerbated the foundation deterioration. 4. All agreed that movement at the footing level was contributing the cracking in the brick and that the rotten horizontal wood elements within the brick will need to repaired. It was generally agreed that the rear portion of the structure had undergone sufficient distress to warrant demolition. 5. It was agreed that the extensive foundation repair would be to maintain the integrity of the building and Mr. Pelow expressed that foundation work on this building would present a risk of structural damage during construction. An engineered temporary structure within the building would be required to mitigate risks during the foundation underpinning and such a structure would not eliminate all risk. A review of the CaraCo costing revealed that extensive brick work and restoration cost were included in the tabulated cost of $471, It was agreed that the unforeseen encountered in this project was the condition of the foundation once uncovered. Using the CaraCo costing it appears that costs attributed solely to the foundation repair would be in the order of $225,000 to $250,000, which would include some additional temporary structure as well as brick repairs that may be required as a result of damage that could occur during the underpinning procedure. 28 Page 4 of 5
9 Exhibit A 4. Conclusion It is our opinion that regardless of the differing views with respect to the exact methodology for the repair and restoration of the foundation walls (ie. Insulate or underpin) that the original foundation walls is in need of a significant repair/remediation. A technical solution could be engineered to implement such a repair and would involve some form of underpinning. An order of magnitude cost of $200,000-$250,000 should be considered as a probable order of magnitude to affect these repairs. It should be noted that underpinning unreinforced masonry structures creates a situation where there is an element of risk while implementing the work. It is our opinion that the brick walls were generally visible from the exterior and that the removal of the interior finishes did not expose any conditions that would be considered abnormal. Therefore, in our opinion, the costs attributed to the brick work are not an unforeseen condition. Trusting this is satisfactory. Yours truly, Ian Fuller, M.Eng., P.Eng. 29 Page 5 of 5
201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationHIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL
HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone
More informationCredit Card Payment Processing Service Fees
CITY OF KINGSTON REPORT TO COUNCIL Report No.: 14-129 TO: FROM: RESOURCE STAFF: Mayor and Members of Council Desirée Kennedy, City Treasurer Pat Carrol, Manager of Taxation and Revenue DATE OF MEETING:
More informationLighthouse Engineering, L.L.C.
Wednesday, August 20, 2014 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:
More informationNational Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067
Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com
More informationPage & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationDEMOLITION PERMIT CHECKLIST* B.H.M.C. Section 10-3-4201
GEORGE CHAVEZ, City Building Official DAVID YELTON, Building Inspection Manager NESTOR OTAZU, Community Preservation Manager BUILDING & SAFETY DIVISION 455 North Rexford Drive, 1 st Floor Beverly Hills,
More informationMayor and Members of Council Cynthia Beach, Commissioner, Corporate & Strategic Initiatives
CITY OF KINGSTON REPORT TO COUNCIL Report No.: 14-073 TO: FROM: RESOURCE STAFF: Mayor and Members of Council Cynthia Beach, Commissioner, Corporate & Strategic Initiatives Peter Huigenbos, Manager, Real
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Engineering Evaluation
More informationPELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT November 2007 PURPOSE OF INVESTIGATION Determine possible locations of moisture intrusion into and through facade. Determine cause of horizontal and vertical
More informationSTRUCTURAL ASSESSMENT
STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha
More informationPhotos showing the change in condition from 2006 to 2012 are located in Appendix A.
January 27, 2012 Ms. Theresa Gallavan Economic Development Director City of Lompoc 100 Civic Center Plaza Lompoc, California 93436 RE: Lompoc Theater Limited Visual Condition Assessment Dear Theresa: Representatives
More informationBernie Nimer, Dave Seton Mayfair Hotel Development Corporation
SITE INVESTIGATION REPORT NO. S1r1 PROJECT: The Mayfair Hotel PROJECT NO: 140565 ATTN: Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation PREPARED BY: Cory Zurell, PhD, P.Eng. DATE: 13 April
More informationWhat is the Register?
What is the Register? The Register of Property of Cultural Heritage Value or Interest, also known as the Register. A heritage conservation management tool under the Ontario Heritage Act. An administrative
More informationPRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com
PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com June 17, 2015 Ms. Kimberley Heaton McCarthy Supervising Planner Building and Safety
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationMINUTES. Date: March 24, 2010 LPC 50/10 Location: 728 St. Helens, Tacoma Municipal Bldg North, Room 16
Members Mark McIntire, Chair Ross Buffington, Vice Chair Edward Echtle Ken House Imad Al Janabi, PhD. Fred King Megan Luce Bret Maddox, S.E. Ha Pham Pamela Sundell Kathryn Longwell, North Slope Ex-Officio
More informationHEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com
HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com, 2011 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,
More informationPOLICY NUMBER: C450B SUPERSEDES: C450A. Policy to Encourage the Designation and Rehabilitation of Municipal Historic Resources in Edmonton
CITY POLICY REFERENCE: City Council 1988 October 25 Historical Resources Act RSA 2000 ADOPTED BY: City Council 2008 October 29 SUPERSEDES: C450A PREPARED BY: Planning and Development DATE: 2008 September
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationELIGIBLE REPAIR PROJECT PARAMETERS
THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building
More informationD Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
More informationChapter 11: Demolition
City of Independence Chapter 11: Demolition In this chapter you will find: Demolition Mothballing Treatment Types of Demolition By Neglect and Recommended Corrective Measures DEMOLITION Photograph on cover
More informationPhoto 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.
May 7,2015 KSANDER & ASSOCIATES CONSULTING PROFESSIONAL ENGINEERS 130 HUINTER STREET, UNIT 103, PETERBOROUGH, ONTARIO K9H2K8 TELEPHONE (705) 743-9221 FAX 743-0904 Ontario Region Conservation Authority
More informationMetropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
More informationbout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions
A bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions CE 28 b Ground slopes towards window well No granular fill or connection to footing drain Ground floor
More informationSteve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA 94022 RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022
M G C O N S T R U C T O R S & E N G I N E E R S, I N C. I N S P E C T O R S E N G I N E E R S B U I L D E R S C A L I F O R N I A E N G I N E E R I N G A N D B U I L D I N G L I C E N S E A / B 6 4 2 0
More information4460.1 REV 1. 4-1. GENERAL. All instructions of this Handbook apply to rehabilitation projects unless modified by this Chapter.
4460.1 REV 1 CHAPTER 4. REHABILITATION 4-1. GENERAL. All instructions of this Handbook apply to rehabilitation projects unless modified by this Chapter. 4-2. DEFINITIONS. A. Substantial Rehabilitation.
More information14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102
Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Project No.: 15538.00 Re: Structural Condition Review of the building at 700 4 th St. E. Dear Sarah: We
More informationArticle 5: Building Regulations
Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of
More informationRehab Inspection Report Page 1
Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation
More informationHOME INSURANCE ASSESSMENT
m pl e HOME INSURANCE ASSESSMENT Sa Street Address, Suburb File. 0000 Date. December 2014 Street Address, Suburb Page 1 of 8 File. 0000 Date. December 2014 Client Name Street Address Suburb HOME INSURANCE
More informationRe: Damages to Alaska Building from Legislative Information Office Construction
510 L Street Suite 200 Anchorage, AK 99501-1949 (907) 274-22362236 Phone (907) 274-25202520 Fax www.bbfm.com July 22, 2015 Jim Gottstein Alaska Building 406 G Street, Suite 206 Anchorage, AK 99501 Re:
More informationStructural Assessment Report
Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive
More informationM E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION
M E M O R A N D U M PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA PLANNING DIVISION DATE: September 10, 2007 TO: FROM: The Honorable Landmarks Commission Planning Staff SUBJECT: 11A.
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationHERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division
PART 1 - PURPOSE HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division 1.1 Heritage property tax relief is a financial tool for municipalities to
More informationPrepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By
Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More informationDecember 24, 2008. twalker@sedaconstruction.com. SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216
December 24, 2008 twalker@sedaconstruction.com SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216 RE: Georgetown Community 2C - Revised Assessment Date: October
More informationHeritage Incentive Program Guidelines
Heritage Incentive Program Guidelines Photo: Public Archives of Prince Edward Island City of Charlottetown 2012 Heritage Incentive Program The Charlottetown Heritage Incentive Program includes both monetary
More informationLighthouse Engineering, L.L.C.
Monday, May 07, 2012 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:
More informationCommercial Building Program (CBP)
Commercial Building Program (CBP) Rehabilitation or Demolition Schuyler, Nebraska {previously titled, Commercial Building Rehabilitation Program } Aging commercial buildings require timely maintenance
More informationFoundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for:
A Full Service Real Estate Inspection & Engineering Firm for Houston, Texas 77089 August 30, 2012 Prepared for: CLIENT S NAME MAILING ADDRESS Houston, Texas 77089 Prepared by: Charles J. Jenkins, P.E.
More informationKALAMAZOO DOWNTOWN DEVELOPMENT AUTHORITY BUILDING REHABILITATION PROGRAM
KALAMAZOO DOWNTOWN DEVELOPMENT AUTHORITY BUILDING REHABILITATION PROGRAM PURPOSE As a fundamental goal of the Downtown Development Plan and Tax Increment Financing Plan (Plan), the Kalamazoo Downtown Development
More informationbout your HOUSE before you start Repairing And Replacing Materials Exterior Walls
A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.
More informationHERITAGE BUILDING REHABILITATION PROGRAM
City of Regina Heritage Property Incentive HERITAGE BUILDING REHABILITATION PROGRAM What incentives are available? o A tax exemption may be granted to a maximum value equivalent to 50% of eligible work
More informationPROFESSIONAL ENGINEERING INSPECTIONS, INC.
PROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX 271492 HOUSTON, TEXAS 77277 Registered Engineering Firm #1503 http://www.profengineering.com (713) 664-1264 July 8, 2004 Mr. Simple Samson 2831 Octoberfest
More informationNational Building Code of Canada 2010
National Building Code of Canada 2010 Emergency Change Issued by the Canadian Commission on Building and Fire Codes The table that follows lists two emergency changes that apply to the National Building
More informationHistoric Preservation Principles and Approaches
Section 4: Historic Preservation Principles & Approaches four section Historic Preservation Principles and Approaches Before any preservation project is begun, a number of fundamental decisions need to
More informationBuilding Restoration
Ar. Pallavi Sharma Research Scholar, Amity School of Architecture and Planning, Amity University, Haryana, India ABSTRACT Building restoration describes the process of the renewal and refurbishment of
More informationBEFORE THE PHOENIX PLANNING COMMISSION CITY OF PHOENIX, STATE OF OREGON
BEFORE THE PHOENIX PLANNING COMMISSION CITY OF PHOENIX, STATE OF OREGON In the matter of an application for a ) PLANNING COMMISSION Demolition Permit for a property ) Commonly known as Furry House ) RECOMMENDATION
More informationA Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.
A Solid Foundation Solution for Homeowners from Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. Stop the damaging effects of foundation settling... Sinking foundations, cracked
More informationSECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
More informationMemorandum. July 16, 2008. To: Plan Commission City of Madison
Memorandum July 16, 2008 To: Plan Commission City of Madison From: Marc Schellpfeffer Engberg Anderson Re: Structural/Architectural Assessment of Homes for Proposed Demolition Findorff Yards Office Lofts
More informationCOMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT W I T N E S S E T H:
COMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT THIS AGREEMENT, made and entered into this day of 201_, by and between RICHMOND AFFORDABLE HOUSING, a nonprofit corporation organized
More informationEnhancements to Streamlined (k) Limited Repair Program
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT WASHINGTON, DC 20410-8000 ASSISTANT SECRETARY FOR HOUSING- FEDERAL HOUSING COMMISSIONER December 29, 2005 MORTGAGEE LETTER 2005-50 TO: ALL APPROVED MORTGAGEES
More informationTARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY
TARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY A. General Purpose and Objectives The purpose of this Policy is to encourage the rehabilitation and restoration of certain historic properties within Tarrant
More informationPERFORMANCE GUIDELINES
1. Foundation/Basement 17 PERFORMANCE GUIDELINES 1. FOUNDATION/BASEMENT 1.1 Efflorescence on concrete or masonry surfaces Efflorescence is the formation of a white crystalline or powdery deposit on the
More informationSmall Business Permit Service
Small Business Permit Service Building Permit Requirements For a Unit Finish or Interior Alteration Industrial, Commercial or Institutional Occupancies Building Permit Application The following documents
More informationBuilding Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
More informationBefore You Start an Energy Efficiency Retrofit The Building Envelope
ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,
More informationEngineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
More informationCHAPTER 67.2 RESIDENTIAL BUILDING CODE
CHAPTER 67.2 RESIDENTIAL BUILDING CODE 1. APPLICABILITY. This Chapter shall have, along with the Code adopted hereby, the scope and applicability set out in said code except as modified by the provisions
More information3 Masonry and Manufactured Stone (Interior and Exterior)
3 Masonry and Manufactured Stone (Interior and Exterior) 3.1 Efflorescence (a whitish crystalline powder) is present on masonry surfaces. Efflorescence commonly occurs on masonry surfaces. This is not
More informationSlavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
More information1809 Summer Street Description
COA Application, 1809 Summer Street, Houston TX 77007 1809 Summer Street Description 1809 Summer is a 5,150 square foot lot on the south side of Summer Street. The only structure on the lot is the Dentler
More informationSimpson Engineering A state licensed engineering firm F-1607
Simpson Engineering A state licensed engineering firm F-1607 4126 Allencrest 13901 Midway Lane, Dallas, Road, Texas Ste.102-136 75244 Telephone: 214-351-1637 Dallas, - Fax: TX 214-351-1639 75244-4388 Telephone:
More informationReport on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.
Report on Sanctuary/Chancel Crawl Space Inspection St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove Project No. E112056 1. Background St. John in the Wilderness (SJITW) is considering
More informationCITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
More informationDemo Permit Guide For Homeowners
Demo Permit Guide For Homeowners Building Services Tel: 705-436-3710 ext. 3504 or 3506 Fax: 705-436-7120 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca A Demo Permit Guide for
More informationMEMORANDUM. General: Foundation:
MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010
More informationThe New Texas Historic Preservation Tax Credit
How do you apply? Tips for Part 1/A - Evaluation of Significance: Application processing takes 30 days, however new National Register listings generally can take 1 year for reviews and final approval by
More information@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA: 705 671 6099
Buying A New Home Presented in Partnership with Greater Sudbury Public Library PHONE SDHBA: 705 671 6099 1 Four Month Series DATES: Sept 13: Underground / Cash Deal Oct 11: Talking with Builder / Renovator
More informationSTRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
More informationBy-law to Regulate Vacant Buildings
By-law to Regulate Vacant Buildings A-35 Enacted November 23, 2009 This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada Disclaimer: The following consolidation
More informationPreliminary Guidance for Completing MHC s Application Form for State Historic Rehabilitation Tax Credit Program Historic Preservation Certification
Preliminary Guidance for Completing MHC s Application Form for State Historic Rehabilitation Tax Credit Program Historic Preseration Certification Please make sure you type or print legibly the Application
More information1. Emergency Services
Flood Restoration Services Inc. is here to help you through this difficult time. The claims process can be very overwhelming. Here is some helpful information to help guide you through a water damage claim.
More information5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net LIMITATIONS AND DISCLAIMERS
5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net INSPECTION PROPERTY ADDRESS: INSPECTION PERFORMED FOR: XXXX Court Richmond, Texas Mr. Foundation Concerns INSPECTION DATE:
More informationProfessional Engineers Providing Structural Engineering Services In Buildings
GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART
More informationSUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS
SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS Rebuilding or repairing your home/business after the storm? Adding on, renovating, or remodeling your home/business? Here s information YOU need
More informationMitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin
Mitigation Leads to Preservation and Economic Recovery For One Community: Darlington, Wisconsin The Effects of Flooding During the past half century, multiple flooding events along the Pecatonica River
More informationInspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com
More informationExterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
More informationPhysician s Residence. Historic Structure Report IV. Building Treatment Approach
Physician s Residence Historic Structure Report Building Treatment Approach IV. Building Treatment Approach IV A. Standards for the Treatment of Historic Buildings The Physician s Residence is listed as
More informationMILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014
MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from
More informationCITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION
CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION OFFICIAL USE ONLY CASE NUMBER: SUBJECT PROPERTY ADDRESS: DATE RECEIVED: ACCEPTED BY: APPLICATION REQUIREMENTS (please
More informationSECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
More informationComplete Application & Fax to (845) 279-7768 APPLICANT INFORMATION OPERATIONS
Complete Application & Fax to (845) 279-7768 Attn: Full Name of Applicant: Address: Website Address: Separately list and describe all operations: APPLICANT INFORMATION List states in which the applicant
More informationQuick impact of protecting, strengthening and repairing, and consequences of fire damaged structure - Hotel Union, Prishtina, Kosovo
Quick impact of protecting, strengthening and repairing, and consequences of fire damaged structure - Hotel Union, Prishtina, Kosovo Authors: V. NUSHI, Sh. NIXHA, N. KABASHI University of Prishtina, Kosova
More informationElevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
More informationWilliamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)
INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationRDH Building Sciences Inc.
MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 SEA@RDHBE.COM WWW.RDHBE.COM
More informationBuilding Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
More informationHISTORIC DISTRICT RESTORATION PROGRAM APPLICATION INSTRUCTIONS
APPLICATION INSTRUCTIONS If you have any application or historic preservation questions, please contact the Planning & Community Development Department at (830) 249-9511. If you have any building or sign
More informationRepairs, Remodeling, Additions, and Retrofitting
Repairs, Remodeling, Additions, and Retrofitting HOME BUILDER S GUIDE TO COASTAL CONSTRUCTION FEMA 499/August 2005 Technical Fact Sheet No. 30 Purpose: To outline National Flood Insurance Program (NFIP)
More informationTHE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO. 2014-01
THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO. 2014-01 BEING A BY-LAW TO PROVIDE FOR THE ADMINISTRATION OF THE BUILDING CODE ACT WITHIN THE CORPORATE LIMITS OF THE TOWNSHIP OF SEVERN WHEREAS the
More information