Olinda Outdoor Pool - Structural Review

Size: px
Start display at page:

Download "Olinda Outdoor Pool - Structural Review"

Transcription

1 Report Olinda Outdoor Pool - Structural Review Prepared for Yarra Ranges Shire Council By Beca Pty Ltd ABN: May 2014 Beca 2014 (unless Beca has expressly agreed otherwise with the Client in writing). This report has been prepared by Beca on the specific instructions of our Client. It is solely for our Client s use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which Beca has not given its prior written consent, is at that person's own risk.

2 Olinda Outdoor Pool - Structural Review Revision History Revision Nº Prepared By Description Date A Peter Cole Draft Report 11 April 2014 B Peter Cole Report 13 May 2014 Document Acceptance Action Name Signed Date Prepared by Peter Cole PWC 12 May 2014 Reviewed by Timothy Cox TJC 12 May 2014 Approved by Paul Collier PHC 13 May 2014 on behalf of Beca Pty Ltd Beca // 13 May 2014

3 Table of Contents 1 Introduction Limitations Background Summary of Received Reports Sharp and Howells Concrete Test Report Infracorr Electrochemical Potential Testing Report EJ s Plumbing Pipework Pressure Test Report Beca Inspection and Findings Site Visit 21 January Site Meeting 11 February Site Visit 17 February Recommendations Works Required For Non Liner Option Works Required For Liner Option Conclusion Appendices Appendix A - Sharp and Howells Pty Ltd Concrete Test Report Appendix B - Infracorr Electrochemical Potential Testing Report Beca // 13 May 2014 // Page ii

4 1 Introduction In response to a request from the Yarra Ranges Shire Council (Council), Beca has undertaken a structural review of the Olinda Pool, located on Olinda Monbulk Road, Olinda. The purpose of the review is to inform Council of the suitability of the pool shell for future use. As part of the review, Beca personnel visited the site on: Tuesday 21 January 2014 to meet Council representatives and to inspect the pool shell; Tuesday 11 February 2014 to meet Council representatives and staff from Liner Specialists Australia to discuss the option of a pool liner; Monday 17 February 2014 to meet with representatives from Council and from concrete testers Sharp and Howells Pty Ltd and their subconsultant Infracorr Consulting Pty Ltd to witness the commencement of concrete testing. This report summarises and discusses the findings of Beca s site inspections, the concrete testing and Beca s previous report regarding water turnover rates. 2 Limitations This report is limited to a review and advice regarding the main pool shell only and does not include the toddler s pool and outbuildings. The limitations relating to this report are: This report is by exception: i.e. items visually assessed as satisfactory are not discussed. Beca has undertaken a visual walk-over inspection of the pool shell, limited to areas where safe and ready access existed at the time of inspection. As advised by Council, the scope of the investigation did not include geotechnical investigations, mechanical and hydraulics testing, occupational health and safety review, Disability Discrimination Act (DDA) or Aquatic Facility Safety Assessment (AFSA) reviews. It is recommended that these tasks be separately commissioned by Council if not already undertaken to gain a holistic understanding of the asset. We have not carried out any structural checks by design calculation. In preparing the report, we have relied upon documentation and verbal reports provided by Council and by third parties. Except as otherwise stated in the report, Beca has taken this information to be true and correct. Beca will not be liable in relation to incorrect conclusions should any documentation or verbal reports be incorrect or have been concealed, withheld, misrepresented or otherwise not fully disclosed to Beca. 3 Background It is understood that the outdoor pool was constructed in 1964, and is therefore 50 years old. The pool was almost empty at the time of the site visits, with approximately 300mm of water remaining at the deep end. It is a first generation type pool typical of the era and has not undergone significant upgrade since construction, with the exception of the decommissioning of the scum gutters. They have been replaced by 6 nos of 55mm dia soiled water supply (SWS) inlets with star safety covers along the east (long) wall. It is understood that the low level soiled water drain (ELWS) located at the sump in the deep end has been decommissioned. A blind sump remains. Beca // 13 May 2014 // Page 1

5 The pool is approximately 11m wide x 27m (30 yards) long and ranges in depth from 0.9m to 3.5m as noted from the observed depth markings. The pool rapidly increases in depth towards the south end. The pool holds approximately 650,000L of water when full. It is not heated Previous Beca Reports Beca previously reviewed the pool with regard to pool water turnover rates; refer Olinda Outdoor Pool Interim Report dated 13 August In summary, the findings contained in that report were: The pool water circulation rate was estimated to be significantly lower than that required for a commercial pool with typical design bather loads. The current hydraulic piping arrangement does not allow for efficient collection of contaminants via skimming or low level extraction. The ELWS at the deep end has been decommissioned. Chlorinated water is provided to the filtered water returns (FWR) located along the south wall (deep end) only and thus the distribution of chlorinated water is limited. It is understood that the water chlorination and turnover arrangement has not changed since this report was published Council Report Council reported on their website (dated 20 December 2013) that: during a routine inspection of the pool in preparation for summer, Council staff and pool maintenance contractors found the water level in the pool had significantly dropped. A 1.5m drop in water level was recorded this year compared to the average 150mm drop recorded in previous years..the cracks are so significant that when drained, ground water was running through the pool wall into its shell. Photo 1 has been has been reproduced from the website courtesy of Council. This is addressed in Section 5.3. Beca // 13 May 2014 // Page 2

6 Photo 1 Ingress of groundwater through the concrete pool shell 4 Summary of Received Reports 4.1 Sharp and Howells Concrete Test Report Sharp and Howells Pty Ltd (Sharp and Howells) undertook physical, visual and chemical investigation and analysis of the concrete pool shell. They attended site on 17 February 2014 and took 20 concrete core samples from the walls and floor of the pool shell. Their subconsultant Infracorr Pty Ltd conducted electrochemical potential testing on the same day. Sharp and Howells report is included in Appendix A. Beca s interpretation of the findings in their report with associated explanation is provided below. Beca // 13 May 2014 // Page 3

7 4.1.1 Concrete carbonation Carbonation is the formation of calcium carbonate when carbon dioxide from the air reacts with the calcium hydroxide present in concrete. It decreases the concrete alkalinity, which is essential for corrosion prevention of the reinforcing steel. The depth of carbonation was considered to be low. ph profile testing indicated that the concrete remains alkaline Chloride levels Calcium chloride, and to a lesser extent sodium chloride, can leach calcium hydroxide from the concrete and cause chemical changes in the cement, leading to loss of strength, as well as attacking the reinforcing steel, which can cause corrosion. Low to moderate chloride levels were found at depths in the vicinity of the reinforcing steel. Some elevated levels were found at the surface and up to a depth of 40mm in laboratory samples 14/N/0203, 0205, 0207 and Sulphate levels Sulfates in solution in contact with concrete can cause chemical changes to the cement, which can cause significant microstructural effects, leading to the weakening of the cement in the concrete. Sulphates can also cause damage to porous cement through crystallization and recrystallization (salt attack). Sulphate levels were found to be within what is considered to be the normal (acceptable) range Compressive strength Compressive strength was minimum 40MPa which is satisfactory. This supports the generally acceptable readings for chloride and sulphate levels Cement content The cement content is within what is considered to be in the normal range Volume of voids The volume of voids was moderate, with some significant voids found in selected cores. Refer laboratory sample numbers 14/N/0196, 14/N/0198 corresponding to the location shown in Photo 1 and discussed in Section 5.3. The density of the concrete is considered to be satisfactory Reinforcing steel condition The condition of reinforcing steel is reported as good, with corrosion noted at concrete crack or concrete defect locations only. 4.2 Infracorr Electrochemical Potential Testing Report Sharp and Howells subconsultants Infracorr Consulting Pty Ltd (Infracorr) undertook investigation and analysis of the concrete shell for electrochemical corrosion potential. Infracorr s report is included in Appendix B. Beca s interpretation of the findings in their report with associated explanation is provided below. Beca // 13 May 2014 // Page 4

8 4.2.1 Electrochemical potential testing Corrosion of the reinforcing steel in concrete is normally prevented by the alkaline nature of the concrete. If the concrete cover is carbonated, or if chloride ions extend through the concrete cover to the reinforcing steel, then the corrosion reaction can commence, provided a sufficient supply of oxygen and moisture are both present. Depassivation of the reinforcing steel by either or both of the above mechanisms will promote anodic and cathodic activity at sites throughout the reinforcing steel. For reinforcing steel in concrete, anodic regions normally correspond to more negative potentials whilst cathodic regions correspond to less negative potentials and the anodic areas can corrode. The Infracorr report stated that the electrochemical potential results indicate that the reinforcing steel is likely to be actively corroding. The report states that this is likely to be influenced by the pool being predominantly empty at the time of testing, which introduces available oxygen into the cracks thereby exacerbating the recorded electrochemical potential results. The Infracorr report states that the observed cracking of the pool shell is unlikely to have occurred from corrosion during the in-service condition (expansion of the reinforcing steel causing concrete cracking and ultimately spalling) Corrosion rate The Infracorr report states that the rate of corrosion varies significantly and ultimately depends on the availability of oxygen, which is affected by whether the pool remains empty for a long period. At the high end of the recorded corrosion rate, concrete spalling could be expected in the medium term if the pool shell is not repaired and is left open to the air for prolonged periods. 4.3 EJ s Plumbing Pipework Pressure Test Report EJ s Plumbing Pty Ltd (EJ s Plumbing) reported that Australian Leak Detection undertook pressure testing of the SWS and FWR pipework between the Plantroom and pool shell. The tests indicated that: The FWR pipework to the shallow end passed; The FWR pipework to the deep end failed; and The SWS pipework failed. Australian Leak Detection also noted that the stabilised water level in the pool was below the pipework level, which indicates that there are leak(s) in the pool shell at this level. 5 Beca Inspection and Findings 5.1 Site Visit 21 January 2014 Beca personnel visited the site on 21 January 2014 to inspect the condition of the main pool shell. The concrete pediment appeared relatively level and in line (by eye). In conjunction with relatively little vertical or diagonal cracking noted in the pool shell walls, this indicates that the footings and underlying subgrade has been relatively stable over time. The pool shell walls are largely free of significant cracks, with the exception of a significant vertical crack at the climb-out return midway along the east side long wall. This is not a recent crack. It requires structural repair. Refer Photo 2. Beca // 13 May 2014 // Page 5

9 Photo 2 Vertical crack at climb out With the exception of the crack shown in Photo 2, there are no other significant cracks evident in the walls. Repairs of past defects in the walls and the now decommissioned scum gutters appear to generally be in a satisfactory condition. The floor consists of concrete floor panels that abut each other and the wall footing, providing a floor perimeter joint approximately 1.0 metres off the wall, with transverse joints between the floor panels. There is a continuous section of floor at the deep end. There is a flexible top sealant in these joints, which was generally in a good condition, however it has delaminated at selected locations. Council has advised that from previous repair works undertaken, there is no waterstop present beneath the top sealant, meaning that where delamination has occurred, the pool shell will leak. It is recommended that the top sealant be removed and replaced with a hydrophilic waterstop and top sealant system to limit leakage in the medium term. Significant recent, mainly longitudinal cracking in the mid-span of the floor panels was observed. This phenomenon is consistent with heave of the floor due to a high surrounding groundwater level Beca // 13 May 2014 // Page 6

10 in combination with a low pool water level. These cracks will require significant structural repair. Refer Photo 3 and Photo 4. The observed ingress of water through the pool shell wall on the west side (refer Photo 1) is consistent with the surrounding groundwater being higher than the pool water level, in combination with the concrete being porous. The high groundwater levels at the pool site may be due to one or a number of mechanisms in combination with saturated or low permeability soil conditions and an ineffective subsoil drainage system. Beca understand that subsoil drainage exists at least part way around the pool. Photo 3 Recent cracks in concrete floor panels Beca // 13 May 2014 // Page 7

11 Photo 4 Recent longitudinal and transverse cracks in concrete floor panel These mechanisms could be: Leakage of the pool water through the pool shell into the surrounding soil; Leakage from the pool s hydraulic pipework; Leakage from nearby water mains / plumbing; Runoff from Olinda Monbulk Road (particularly to the south west corner of the pool shell) that has infiltrated into surrounding soil. It is recommended that the subsoil drainage system is investigated. Council reported that leakage from the pool shell over the 2013 winter was more pronounced than in previous years, refer Section The cause of the recent leak is not obvious but could be related to the aforementioned vertical concrete crack at the climbout (refer Photo 2) and to the porous concrete (refer Photo 1). It does not appear to be solely related to the hydraulic pipework, as the pool emptied of its own accord to a level some 1.5 metres below operating level (refer Section 3.1.2), indicating that a leak is at this level (as well as others possibly higher in the wall). A leak test of the pool shell is recommended to be undertaken to ascertain the cause of the recent major leak. The pool shell requires repainting prior to recomissioning should a liner not be installed. Beca // 13 May 2014 // Page 8

12 5.2 Site Meeting 11 February 2014 Beca personnel attended site on Tuesday 11 February 2014 with a Council representative to meet representatives from Liner Specialists Australia. Liner Specialists Australia proposed the installation of an Aquaforce 3 ply reinforced vinyl membrane 1.14mm thick. The product has a 10 year limited product warranty and the firm provides a 7 year warranty on their labour. The product has previously been installed at the Croydon Leisure and Aquatic Centre. It is understood to have performed satisfactorily. A successful liner solution is reliant on the substrate material (ie concrete pool shell) being sound and non-porous (noting that porous concrete is evident at at least one location as shown in Photo1). Carefully detailed interfaces with penetrations through the liner such as filtered water returns and soiled water pipework are required to ensure the liner does not delaminate. It is essential that the surrounding groundwater level is kept low and that the hydraulic pipework does not leak during the service life of the liner. Should the liner option be selected, groundwater relief drains would need to be unblocked and/or repaired and maintained in a serviceable condition. The liner is required to terminate below the level of the decommissioned scum gutter tiles to prevent pool water leakage from the scum gutter penetrating behind the liner. Council would need to ensure that the capacity of the soiled water lines is sufficient so that during times of high bather load, the pool water level does not rise over the top of these inlets. Council would need to undertake a significant amount of work to prepare the pool shell and make good the pool s hydraulic pipework prior to the installation of a liner. 5.3 Site Visit 17 February 2014 Beca personnel attended the site on Monday 17 February 2014 with a representative from Council, Sharp and Howells and their subconsulants Infracorr. Beca personnel witnessed the coring of concrete laboratory samples 14/N/0196, 0197 and 0198, all located in the west wall near the location of the ingress of groundwater shown in Photo 1. Photos of laboratory samples 14/N/0196 and 0197 are shown in Photos 5 and 6 respectively. The key features of laboratory sample 14/N/0196 is: the length of concrete 143mm. significant voids noted throughout, particularly at back face. cementitious repair to the front face, variable depth. 2 layers of steel reinforcing, one at the front and one at the back back concrete faces approx. 50mm depth from the core ends. The key features of laboratory sample 14/N/0197 is: the length of concrete 152mm. significant voids noted throughout, particularly near the reinforcement. Thick cementitious repair to the front face to the depth of reinforcement approximately 70mm deep. 2 layers of steel reinforcing, one at the front and one at the back back concrete faces approx. 50mm depth from the core ends. Beca // 13 May 2014 // Page 9

13 Both samples indicate significant removal and repair of the internal concrete face of the pool shell wall at some stage at this location. The reason for the repair is not known. The reinforcement is in good condition, with little corrosion evident. This repair and significant voids are generally consistent with the observed leakage through the pool shell wall at this location. The voids may have been formed due to poor concrete compaction practices during construction, possibly at a cold concrete joint. This area requires repair. A further 7 core samples were taken from the east and west walls and 10 cores were taken from the floor slabs. Core samples obtained from the walls ranged in length from 81 to 265mm, noting that these core lengths may be less than the thickness of the wall. Core samples obtained from the floors ranged in length from 110 to 179mm, noting that these core lengths maybe less than the thickness of the floor. The test results (apart from laboratory samples 14/N/0196 and 14/N/0197 discussed above) indicate that the concrete shell is generally in a satisfactory condition for its age and form of construction, noting that the quality of construction was generally of a high standard. Should the pool be recommissioned without a liner, it is recommended that at the location of the water ingress through the wall, the existing repair material is removed, the substrate cleaned and primed and the wall repaired with an epoxy mortar. Beca // 13 May 2014 // Page 10

14 Photo 5 Photograph of Laboratory Sample 14/N/0196 Provided that the recommended structural repair work is undertaken and preventative and reactive maintenance is undertaken in a diligent manner, the test results indicate that the pool shell can remain serviceable in the medium term. Beca // 13 May 2014 // Page 11

15 Photo 6 Photograph of Laboratory Sample 14/N/ Recommendations 6.1 Works Required For Non Liner Option Should the concrete pool shell be recommissioned without the liner option, the following works are recommended to extend its service life in the medium term. 1. Structural repair of wall cracks, in particular the vertical crack at the climb-out return midway along the east side long wall. 2. Structural repair of the porous concrete at the west wall at the deep end. 3. Structural epoxy repair of the recent cracks located in the floor panels. 4. Installation of a hydrophilic waterstop and top sealant in the floor joints. Beca // 13 May 2014 // Page 12

16 5. Undertake a leak test to confirm that the recent major leak has been remedied. This will require the pool to be filled at the completion of the structural repair work. The pool may need to be reemptied and additional locations repaired if further leaks are discovered. 6. Pressure clean, prepare and repaint the pool shell. The following ancillary works in addition to the above listed works are required to minimise leaks and reduce the risk of future structural damage due to a high surrounding groundwater table. These items should be undertaken prior to the structural repairs outlined above to ensure that groundwater does not affect the repair work. 7. Repair all hydraulic pipework, identified as being the FWR lines at the deep end and the SWS line. 8. Unblock groundwater relief drains. These recommendations pertain solely to improving the structural integrity of the pool shell. For budgetary purposes an allowance of $100,000 is recommended. 6.2 Works Required For Liner Option Should the concrete pool shell be recommissioned with a liner, the works relating to structural crack repair are not essential provided the future service life of the pool is viewed as being medium term. It is essential however, that risk of damage to the liner or the formation of bubbles behind it that can be caused by the surrounding groundwater table is mitigated. The following works are recommended: Item 7 above. Item 8 above 9. Significant works to improve the groundwater relief drain system to ensure that the groundwater level remains below the bottom of the pool floor at all times. 10. Probable improvement to the soiled water supply line capacity to ensure the level of the pool water does not rise over the top of these inlets. 11. Preparation of the concrete pool shell surface. 12. Works at the liner penetrations. 13. Works at the termination level of the liner. These recommendations pertain solely to improving the structural integrity of the pool shell prior to the supply and installation of a liner. For budgetary purposes an allowance of $80,000 is recommended, excluding the cost to supply and install the liner. In addition to these works, it is recommended that Council investigate the following issues: Detailed investigation of the pool plant and hydraulic pipework arrangement to confirm water quality and turnover rates for design bather loads to comply with Health Regulations Occupational health and safety. Equal access (DDA). Aquatic Facility Safety Assessment. The condition and serviceability of outbuildings. These issues may drive changes to the configuration of the pool shell such as a reduction in depth or the addition of a wet deck. Beca // 13 May 2014 // Page 13

17 7 Conclusion Beca s site inspection and the concrete testing undertaken by Sharp and Howells indicates that apart from some significant specific defects requiring repair as noted in Section 6, the concrete shell is generally in a satisfactory condition for its age and form of construction, noting that the quality of construction in 1964 was generally of a high standard. The hydraulic pipework pressure testing undertaken by Australian Leak Detection indicates that repair and/or replacement of some of the pipework is required, notwithstanding that on completion of a hydraulic review, replacement maybe required in any case due to the pipework being undersized. In order to re-commission the concrete pool shell, an allowance of $100,000 is recommended. Should the installation of a liner be considered, and an allowance of $80,000 to prepare the pool shell and associated pipework is recommended. This does not include an allowance for the supply and installation of the liner. Holistically, the pool shell structural repair work needs to be considered in conjunction with all other compliance issues that directly impact on the operation and health and safety of the pool operators and the pool customers. It is recommended that Council investigate the following issues: Detailed investigation of the pool plant and hydraulic pipework arrangement to confirm water quality and turnover rates for design bather loads. Upgrade of these items and the inclusion of a balance tank is often required for pools of this era. Occupational health and safety. Equal access (Disability Discrimination Act). Aquatic Facility Safety Assessment. The condition and serviceability of outbuildings. On completion of these activities, a complete understanding of the upgrade needs of the facility can then be determined. Beca // 13 May 2014 // Page 14

18 Appendix A Sharp and Howells Concrete Test Report

19 Appendix B Infracorr Electrochemical Potential Testing Report

Durability of reinforced concrete pipe the hard facts!

Durability of reinforced concrete pipe the hard facts! Durability of reinforced concrete pipe the hard facts! David Millar, Executive Director, Concrete Pipe Association of Australasia CPAA Seminar Stormwater Drainage Pipe - The Long Life Asset, February 2006

More information

Differentiation of Water Sources using Analytical Water Chemistry Data

Differentiation of Water Sources using Analytical Water Chemistry Data Differentiation of Water Sources using Analytical Water Chemistry Data Derek Morris, John Bryant CPG-9926, and Michael Gehrig Abstract Assessment of the groundwater regime at a site can often be at the

More information

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:

More information

constructive solutions Fosroc total waterproofing protection of below-ground structures

constructive solutions Fosroc total waterproofing protection of below-ground structures constructive solutions Fosroc total waterproofing protection of below-ground structures Our profile Since the company s beginnings over 50 years ago, Fosroc has developed into an International leader in

More information

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Issue of the Guidelines on Prevention of Water Seepage in New Buildings graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING Typical s Table of Contents: No. 4 5 6 7 8 9 0 External waterproofing of below ground concrete wall & slab Internal waterproofing of foundation

More information

SikaProof A Technology

SikaProof A Technology SikaProof A Technology The fully bonded waterproofing system Keep your basements durably and securely watertight What is SikaProof A? How does it work? Where can it be used? What are the advantages of

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

COPYRIGHT. Dincel Construction System Pty Ltd

COPYRIGHT. Dincel Construction System Pty Ltd BASEMENT CONSTRUCTION Dincel Construction System Pty Ltd 101 Quarry Road ERSKINE PARK NSW 2759 PO Box 104, ST CLAIR NSW 2759 Phone: (612) 9670 1633 Fax: (612) 9670 6744 Email: construction@dincel.com.au

More information

SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY

SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY SULPHATE ATTACK AND CHLORIDE ION PENETRATION: THEIR ROLE IN CONCRETE DURABILITY Concrete durability continues to be a subject of controversy among design professionals, specifiers, Government instrumentalities,

More information

Structural Audit of Buildings

Structural Audit of Buildings International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings

More information

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS This Document is designed to cover best practice installation procedures for a one layer torch applied sheet membrane system to basement walls. PRELIMINARY WORK Ensure that all surface preparation work,

More information

From: Commissioner, Development File: Date of Meeting: Services Department E-6800 (9) June 18, 2007

From: Commissioner, Development File: Date of Meeting: Services Department E-6800 (9) June 18, 2007 Report To: Development Services Committee Item: Date of Report: DS-07-174 June 13, 2007 From: Commissioner, Development File: Date of Meeting: Services Department E-6800 (9) June 18, 2007 Subject: Calcium

More information

Metropolitan Builders Association Masonry & Concrete Standard

Metropolitan Builders Association Masonry & Concrete Standard Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.

More information

PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT

PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT PREVENTING GROUNDWATER POLLUTION IS EVERYONE S JOB! Even if our drinking water comes from rivers, lakes, or reservoirs, we need to be mindful of

More information

PROBLEM SOLVING FORUM

PROBLEM SOLVING FORUM 4 Dealing with Water Tank Blisters Amy Forsgren Swedish Corrosion Institute Stockholm, Sweden: Blistering of the paint system used in a steel water tank indicates that the steel surface was not cleaned

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

Protecting Your Pools Crack Treatments

Protecting Your Pools Crack Treatments 1 Protecting Your Pools Crack Treatments Scuba Pool Repair Inc. 800 Cristich Lane Campbell, CA 95008 Phone: 408-866-1945 Fax: 408-866-1931 Email: office@scubapoolrepair.com www.scubapoolrepair.com Scuba

More information

DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS

DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS J. David Rogers, Robert Olshansky, and Robert B. Rogers Expansive soils in many parts of the United States pose a significant hazard to foundations for light

More information

Sika FerroGard -903 + The Unique Multi-Functional Surface Applied Corrosion Inhibitor for Reinforced Concrete. Innovation & Consistency.

Sika FerroGard -903 + The Unique Multi-Functional Surface Applied Corrosion Inhibitor for Reinforced Concrete. Innovation & Consistency. FerroGard -903 + The Unique Multi-Functional Surface Applied Corrosion Inhibitor for Reinforced Concrete Innovation & Consistency since 1910 Corrosion in Reinforced Concrete Structures Aggressive Influences

More information

Stainless Steel Perimeter Recirculation Systems Engineered supply and return systems for swimming pools, water features and aquatic facilities.

Stainless Steel Perimeter Recirculation Systems Engineered supply and return systems for swimming pools, water features and aquatic facilities. Stainless Steel Perimeter Recirculation Systems Engineered supply and return systems for swimming pools, water features and aquatic facilities. Whether it is new construction, renovation or operation,

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

Moisture Mitigation for Concrete Slabs

Moisture Mitigation for Concrete Slabs Moisture Mitigation for Concrete Slabs A brief description of alternative methods for dealing with slab moisture problems By Peter A. Craig M oisture-related problems with floor coverings and coatings

More information

ASHULIA APPARELS LTD. Client Summary Report

ASHULIA APPARELS LTD. Client Summary Report Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

A Guide to Structural Waterproofing

A Guide to Structural Waterproofing A Guide to Structural Waterproofing Part One Waterproofing Protection For Below Ground Structures 1 2012 W. R. Grace & Co Benjamin J. Brooks Table of Contents Grace Around The World Reference Material

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Concrete Repair and Protection

Concrete Repair and Protection Concrete Repair and Protection with Remmers Systems Cleaning Equipment Cleaning Chemicals Corrosion Inhibitors Repair and Re-profiling Mortars Protective Impregnations and Coatings Repair and Protection

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

What Causes Foundation Leaking?

What Causes Foundation Leaking? A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

The history of brick in Scotland Signs of deterioration in brickwork Causes of deterioration Repair and maintenance of brick structures

The history of brick in Scotland Signs of deterioration in brickwork Causes of deterioration Repair and maintenance of brick structures Repairing brickwork Introduction Bricks can be defined as small rectangular blocks of fired clay. They come in a variety of sizes, shapes and colours. They also vary in age and quality. A large number

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA 94022 RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA 94022 RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022 M G C O N S T R U C T O R S & E N G I N E E R S, I N C. I N S P E C T O R S E N G I N E E R S B U I L D E R S C A L I F O R N I A E N G I N E E R I N G A N D B U I L D I N G L I C E N S E A / B 6 4 2 0

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

Sources A recent survey of leaking basements showed water comes from a variety of sources, but walls are the usual culprit: Occurrence of moisture

Sources A recent survey of leaking basements showed water comes from a variety of sources, but walls are the usual culprit: Occurrence of moisture NEGATIVE SIDE WATERPROOFING»»»»»»»»»»»»»» NEGATIVE SIDE WATERPROOFING NEGATIVE SIDE WATERPROOFING NEGATIVE SIDE WATERPROOFING It s Possible to Waterproof Leaking Basements From the Inside By Basil Mewes

More information

Guelph WWTP Digester No. 1 Inspection Report

Guelph WWTP Digester No. 1 Inspection Report Guelph WWTP Digester No. 1 Inspection Report PREPARED FOR: The City of Guelph- Revised and finalized by City of Guelph. DATE: February 15, 2011 Background In 2010 the City tendered a digester cleaning

More information

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto

More information

IN SPEC. with. Kanowna Belle Gold mine maintenance (page 4) Major Project secured at Barrick Granny Smith (page 2) Chemical grouting (page 6)

IN SPEC. with. Kanowna Belle Gold mine maintenance (page 4) Major Project secured at Barrick Granny Smith (page 2) Chemical grouting (page 6) DECEMBER 2010 IN SPEC with Kanowna Belle Gold mine maintenance (page 4) Major Project secured at Barrick Granny Smith (page 2) Chemical grouting (page 6) 02 02 A MESSAGE FROM PHIL Phil Harcourt Managing

More information

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW January 2013 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 27, Ernst & Young Centre

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

Preventing water damage in the basement

Preventing water damage in the basement Preventing water damage in the basement Thousands of home insurance claims are filed every year. Some losses are major, others aren t, but they re always an inconvenience and usually avoidable! As prevention

More information

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation

More information

What you need to know about concrete block basement construction.

What you need to know about concrete block basement construction. Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home

More information

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS

MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Mapeguard WP System ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Products used: Mapeguard WP 200, Mapeguard ST, Mapeguard IC, Mapeguard EC, Mapeguard WP

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Engineering Evaluation

More information

A guide to preventing structural damage

A guide to preventing structural damage A guide to preventing structural damage Home owners guide to planning landscaping and maintenance of foundations Structural damage can result from movement in clay soils caused by varying moisture conditions

More information

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012 BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012 Prepared in cooperation with the Building Inspectors Association of Southeastern Wisconsin www.biasew.net 1 BEST MANAGEMENT

More information

WATERPROOFING SikaProof -A TECHNOLOGY

WATERPROOFING SikaProof -A TECHNOLOGY SikaProof -A TECHNOLOGY content What is SikaProof -A? 6 How does it work? 8 Where can it be used? 0 What are the advantages of SikaProof -A? 2 How should it be installed? SikaProof -A system components

More information

How To Test A Wrap N Drain X Dampproofing System

How To Test A Wrap N Drain X Dampproofing System National Research Council Canada Institute for Research in Construction Conseil national de recherches Canada Institut de recherche en construction CCMC 13094-R &&0& EVALUATION DIVISION 07111 REPORT Issued

More information

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank. SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage

More information

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL CONTENTS: 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

DRAINAGE PIPE REPAIR & RELINING SOLUTIONS

DRAINAGE PIPE REPAIR & RELINING SOLUTIONS DRAINAGE PIPE REPAIR & RELINING SOLUTIONS Our technology Nuflow are the specialists in trenchless pipe relining, providing a structural repair. We provide a simple, practical, cost effective solution to

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Rehabilitation of an Aging Concrete Reservoir Adit Tower Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco

More information

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving

More information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes

More information

BELOW GROUND TANKING

BELOW GROUND TANKING BELOW GROUND TANKING Basement & Foundation Waterproofing Systems - What, Why & How By Paul Evans MBAV Specialist Contractor, Registered Building Practitioner Vice President Australian Institute of Waterproofing

More information

INVESTIGATING AND REMEDIATING LEAKS IN BELOW GRADE STRUCTURES AND UNDER PLAZAS

INVESTIGATING AND REMEDIATING LEAKS IN BELOW GRADE STRUCTURES AND UNDER PLAZAS INVESTIGATING AND REMEDIATING LEAKS IN BELOW GRADE STRUCTURES AND UNDER PLAZAS JUSTIN HENSHELL, FAIA, FASTM HENSHELL & BUCCELLATO, RED BANK, NJ B U I L D I N G E N V E L O P E T E C H N O L O G Y S Y M

More information

Waterproofing of exterior walls at 7 Anderson Place, Queenstown

Waterproofing of exterior walls at 7 Anderson Place, Queenstown Waterproofing of exterior walls at 7 Anderson Place, Queenstown 1 The parties and the matter to be determined 1.1 This is a determination under Part 3 Subpart 1 of the Building Act 2004 ( the Act ) made

More information

Basement Moisture Problems

Basement Moisture Problems Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design

More information

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be

More information

Asbestos Containing Materials Survey And Register Moil Shopping Centre

Asbestos Containing Materials Survey And Register Moil Shopping Centre Asbestos Survey and Register Asbestos Containing Materials Survey And Register Moil Shopping Centre Property Name: Moil Shopping Centre Property Address: 8 Moil Cres. Darwin, NT Prepared for: John Nicolakis

More information

701210-393. 28 August 2014. Toronto Catholic District School Board Catholic Education Centre 80 Sheppard Avenue East North York, Ontario M2N 6E8

701210-393. 28 August 2014. Toronto Catholic District School Board Catholic Education Centre 80 Sheppard Avenue East North York, Ontario M2N 6E8 Toronto Catholic District School Board Catholic Education Centre 80 Sheppard Avenue East North York, Ontario M2N 6E8 Attention: Re: Ms. Kathleen Wilson Safety Officer, Accident Prevention, Occupational

More information

Solving Persistent Moisture Problems and Moisture Damage

Solving Persistent Moisture Problems and Moisture Damage B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started

More information

Coexisting with Expansive Soil. An Informational Guide for Homeowners

Coexisting with Expansive Soil. An Informational Guide for Homeowners Coexisting with Expansive Soil An Informational Guide for Homeowners Overview Homes in California are built on a variety of soil types with differing characteristics that can affect homes and surrounding

More information

Rapid Chloride Permeability Testing

Rapid Chloride Permeability Testing Rapid Chloride Permeability Testing A test that can be used for a wide range of applications and quality control purposes if the inherent limitations are understood By Prakash Joshi and Cesar Chan C orrosion

More information

Remedial Waterproofing of Basement

Remedial Waterproofing of Basement Remedial Waterproofing of Basement [Source:http://www.property-care.org/files/cop_structural_ waterproofing.pdf and http://www.foundation-repair-guide.com] 1.0 Introduction Remedial waterproofing of basement

More information

Melbourne balcony Assessments

Melbourne balcony Assessments Balcony Assessment Melbourne balcony Assessments Address: SAMPLE Date: Assessor: Luke O Neill Registered Builder DBL-C 31305 Assessment Guidelines This is an assessment of balcony and elements as presented

More information

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23 COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix

More information

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures Foundation Water Problems An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures This presentation was prepared and presented by Dwight Walker

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW

CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW A U C K L A N D C O U N C I L Decision following the hearing of an application for resource consent SUBJECT: Application for resource consent under section 88 of the Resource Management Act 1991 by D C

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012 DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines

More information

The AQUAFIN Approach to Concrete Repair

The AQUAFIN Approach to Concrete Repair Concrete Repair Building Product Systems Waterproofing & Concrete Restoration Decorative Coatings Moisture Vapor Remediation & Flooring Injection Grouting The AQUAFIN Approach to Concrete Repair www.aquafin.net

More information

G. Common Defects in Buildings - Leakage

G. Common Defects in Buildings - Leakage F. Common Defects in Buildings - Structural 32. Recently, some concrete chips have fallen from the ceiling in my kitchen. There are rusty steel bars and the area in question measures about 300 x 400mm.

More information

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902 External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water

More information

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness.

More information

Water Permeability vs Waterproof

Water Permeability vs Waterproof ASCE Met Section Construction Group, Cooper Union Student Chapter, May 25, 2000 Water Permeability vs Waterproof by Patrick F. McGrath, Ph.D. Xypex Chemical Corporation, Richmond, B.C., Canada The paper

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

1. That the respondent pay the applicants the sum of $2,498.23 within 14 days of the date of this order.

1. That the respondent pay the applicants the sum of $2,498.23 within 14 days of the date of this order. VICTORIAN CIVIL AND ADMINISTRATIVE TRIBUNAL CIVIL DIVISION DOMESTIC BUILDING LIST VCAT REFERENCE NO. D830/2009 CATCHWORDS Domestic Building List Alleged defect causing damage. Claim for cost of repairs.

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building

More information

Corrosion protection linings. Issue 1

Corrosion protection linings. Issue 1 Corrosion protection linings Issue 1 Introduction While Humes sewerage pipes and products are designed to serve over 100 years in accordance with AS/NZS 4058, we offer corrosion protection linings to increase

More information