BRISBANE CITY COUNCIL HYDRAULIC SERVICES PLAN REQUIREMENT GUIDELINES July 2013 V11
|
|
- Lauren Oliver
- 8 years ago
- Views:
Transcription
1 BRISBANE CITY COUNCIL HYDRAULIC SERVICES PLAN REQUIREMENT GUIDELINES July 2013 V11 Council s Plumbing Services Group (PSG) accepts hydraulic plans from its customers in electronic format only. When lodging hydraulic services design drawings / plans in electronic form, a copy of the drawings / plans can be submitted electronically online in PDF format. PDF drawings will be accessed and stamped with relevant approvals and then forwarded to the customer within 20 business days* not including request for information time delays. Three options are available to fast track the normal 20 business days* approval process for some applications. Fast Track assessment fees options for financial year are; 1. Fast track assessment for hydraulic plans for all other classes except a single detached dwelling involving the installation of less than 10 fixtures, excluding assessments which attract a Development Assessment (DA) application. The plan will be assessed within 5 working days of receipt of payment by Plumbing Services Group, provided all necessary information is provided. Application fee PLUS $ Fast track assessment for hydraulic plans for all other classes except a single detached dwelling involving the installation of up to and including 50 fixtures. The plan will be assessed within 10 working days of receipt of payment by Plumbing Services Group, provided all necessary information is provided Application fee PLUS $ Fast track assessment for hydraulic plans for all other classes except a single detached dwelling involving the installation of more than 50 fixtures, and up to and including 250 fixtures. The plan will be assessed within 10 working days of receipt of payment by Plumbing Services Group, provided all necessary information is provided. Application fee PLUS $ Customers are advised to regularly contact PSG on the progress of their Fast Track assessment, although Council s notification system is automated, customers should contact PSG immediately if they have not received their Fast Track request within the timeframes for the Fast track option chosen. Fast Tracks are also subject to information request time delays. It should be noted that when an information request is issued the application assessment is ceased and not reactivated until the fulfilment of the request has been provided. In order for an application to be assessed that involves the removal of an existing building/dwelling PSG must have record of a seal off application being lodged and a compliance certificate being issued. Should an application request not have a seal off application lodged where applicable an information request will be issued stating the application cannot progress until a successful seal off application and compliance certificate has been processed by PSG. When lodging Hydraulic Services Design drawings / Plans please contact PSG s Hydraulic Plan Lodgement Team on Ph
2 Amended Plans When are they required and what must be submitted to Council s Plumbing Services Group with the plans? A full set of amended Plans are required when additional plumbing fixtures are added or removed from the original approved plans and plumbing compliance permit. Amended Plans cannot be submitted via Council s online channel, all plans shall be ed to hydap@brisbane.qld.gov.au with an explanation of the changes, for example; Two new WC s added on drawing H01 between grid F and G. Please note if additional changes are added and not stated with the request for re-assessment Council may prosecute the person/company for not disclosing all information with the request. Council s assessing officers will only assess the proposed changes and not the entire application to ensure assessment timeframes are reduced. Fees and Charges? An amendment fee to hydraulic plans previously approved including each additional fixture or water meter. Inspections fee of installations resulting from the approval of amended hydraulic plans for each additional fixture or water meter. (Contact PSG on for applicable fees or refer to What is the approval turn around time for amended plans? All amended plans will be issued within 5 business days from the date of the re-submission that includes the full description of the proposed changes. Can the Plumbing Contractor still make plumbing inspection requests? Yes, but only in relation to the original approved plans. No inspections shall be carried out on the proposed new works until the amended plans are approved by Council and a new compliance permit is issued. Fixtures and Loading Units - (Required on each sheet) Number Fixtures shall be nominated on top right hand corner of each plan. Number Fixtures loading units shall be nominated on top right hand corner of each plan. Refer to fixture loading units from AS/NZS :2003 Table 6.1. Refer to chargeable plumbing fixtures (page 11 of this document). Note: Incorrect fixture count and fixture loading unit count may occur a defect fee Drainage Plan Number - (Required on each sheet) The drainage plan number (minimum 8mm high) shall be positioned in the top right hand corner placed on each sheet of the hydraulic services design plan. It is the responsibility of the person designing the plan to obtain the correct drainage plan number, by contacting Brisbane City Council s Plumbing Services Group on telephone number An area of at least A4 size should be allocated on the front/cover sheet, to provide for the Plumbing Services Group s approval stamps. Title Status - (Required on front sheet only) The title status (minimum 8mm high) of the development shall be shown on the front/cover sheet of the plan, eg; 1. Community Title 2. Freehold Title Owners Name - (Required on front sheet only) The owner s name required shall be the one nominated on the Brisbane City Council s rate notice, or the Queensland Government Titles Office records. Tenancy Plan - (Required on each sheet) Tenant s Name Tenant s Business s Name Floor Level Shop/Tenancy Number Address of Property - (Required on each sheet) The address of the property shall be the address nominated on the Brisbane City Council Rates Notice, the Proposed Address, or the one to be lodged with State Government Titles Office. 2
3 Real Property Description - (Required on front sheet only) The real property description shall be either the original full description or the proposed description. Designer - (Required on front sheet only) The full name of the person who designed the plumbing and drainage system shall be shown on each sheet of the plan; the Queensland Plumbing and Drainage Act 2002 also requires that the person who designed the plans, to be registered or licensed - the person s registration or licence number shall also be shown. This information is required on each sheet; or on the front/cover sheet, and references each sheet of the plan. Please note it is a requirement in Queensland that any Hydraulic Services Design carried out where the contact value is more than $1,100 is required to be carried out by; a person or company holding a current BSA contractors licence, a Registered Professional Engineer (RPEQ) or a Plumbing and Drainage contractor designing work that he/she is then to carry out. Plan Design - (Required on front sheet only) Nominate which Australian Standard the plans have been designed to, either, AS/NZS :2003 or AS , example; These plans have been designed to and comply with AS/NZS :2003 or These plans have been designed to and comply with AS Fire Hydrant, Hose Reel and Sprinkler Systems Where a pipe, fitting or apparatus is to be installed as part of a fire service and is not a certified item (MP 52) a testable backflow prevention device shall be installed up stream of the item. All materials to be installed as part of the fire service shall be nominated on the hydraulic services design plan. BCC Requirements Water Supply Code - Part 1 - Planning and Design - Clause Metering Fire Hose Reels and Hydrant Services All new fire services to hydrants and/or fire hose reels for commercial, industrial and residential developments shall be metered. Existing hydrants and/or fire hose reels services, where significant alterations or renovations are proposed, which will involve a Development Application or plumbing service, shall also be metered. The flow meter assembly configuration shall include a detector check valve in the by-pass line. The detector check valve shall be of stainless steel construction. The type of metering arrangement to be used is dependent on the type of fire service and the property title classification. Details of the approved types of metering arrangements are set out in Appendix WC -Fire Hose Reels and Hydrant Services Metering Arrangements. Water delivered to a fire sprinkler system shall not pass through a meter. Pipework to the sprinklers may branch off the incoming main on the supply side of a meter avoiding the need for a separate incoming main for the sprinkler service. In such an arrangement, the sprinkler branch shall not supply any other services. Drafting Requirements A1 drafting sheet shall be the minimum size, for all proposed new, additions, extensions, and Community Title or Freehold designs. A3 drafting sheet shall be the minimum size used for Tenancies. Trade Waste Plan: When a plan contains Trade Waste as part of the design, one copy of the plan shall be supplied on A3. North Point: All views shall be oriented to the north point on the plan. Street Names: All street and road names shall be shown on the site plan and other pages where applicable. Sanitary House Drain Property Connection and Brisbane City Council Sewers: The size, depth (invert & surface levels), location of the sewer main and the sanitary house drain property connection shall be shown on the locality plan or floor plan, only that section relevant to the design is required to be shown. Note: The designer is responsible for the documentation of the location and depth of the BCC sewer property connection and shall comply with the requirements of the Queensland Plumbing and Drainage Act Site Plan/ Locality plan: The information shall provide the plumbing inspector direction to locate the plumbing installation on the property. The information could be a; plan, written directions or a combination of both 3
4 Floor Plan: All stacks, elevated pipework, cold water, hot water, tempered water, fire hydrant system, fire hose reels, rainwater, greywater, recycled water and landscape irrigation system shall be shown on the plan (The floor plan scale shall be a minimum1:100.) Drafting Requirements Continued Diagrammatic: The stacks, elevated pipework, cold water, hot water, tempered water, fire hydrant system, fire hose reels, rainwater, greywater, recycled water and landscape irrigation system (only the section under constant pressure) shall be shown on the plan (scale not required). Levels: All reduced levels (R.L) for fixtures up to ground floor level shall be clearly shown on drawing as AHD to three decimal places. eg Dimensions: All dimensions shown on the plan shall be in meters and to three decimal places. eg m or 0.150m Overflow Relief Gully; Overflow Relief Valve: AHD reduced levels are required for ORG or ORV and shall be shown for; The Finished Ground Level adjacent to the Overflow Relief Gully or Overflow Relief Valve; The grate of the Overflow Relief Gully or at the invert of the outlet of the Overflow Relief Valve; The Finished Floor Level for the lowest fixture connected to the sanitary house drain. AS/NZS :1996 section Overflow Relief Valve: This fitting shall be installed on all properties that are located below AHD reduced level Car Wash Area Residential Only The location of the car wash area shall be shown on the plan, wastewaters from such areas shall discharge via a Grease Arrestor or Oil/Silt Arrestor, registered for use in Brisbane City, a minimum 1000 litre Grease Arrestor or Oil/Silt Arrestor to be installed; Additional information required on the plan for the treatment system are; Manufacturer s Name of the treatment system; Type and Model number of the treatment system; Series number of the treatment system; Size (capacity as specified by the manufacture) of the treatment system; The cover/ lid shall be the airtight type. A hose tap shall be provided adjacent to the treatment system, a Reduced Pressure Zone Device (RPZD) shall be installed upstream of the hose tap as backflow protection. The area shall be roofed or located in the underground carpark. A diagrammatic of the roof and overhang shall be shown on the plan, the minimum length of the overhang shall be 25% of the height of the roof from Finished Ground Level; Trade waste approval is not required for this type of installation. Bin wash or bin storage areas The location of the bin wash/storage area shall be shown on the plan, wastewaters from such areas shall discharge via a approved spring loaded self closing bucket trap or Grease Arrestor, registered for use in Brisbane City, a minimum 1000 litre Grease Arrestor to be installed Additional information required for spring loaded self closing bucket traps are; Manufacturer s Name of the bucket trap; Type and Model number of the bucket trap; Size and location with grate and floor levels. Additional information required on the plan for the treatment system are; Manufacturer s Name of the treatment system; Type and Model number of the treatment system; Series number of the treatment system; Size (capacity as specified by the manufacture) of the treatment system; The cover/ lid shall be the airtight type. A hose tap shall be provided adjacent to the bin area/treatment system, a Reduced Pressure Zone Device (RPZD) shall be installed upstream of the hose tap as backflow protection if located within 18 mtrs of a GIT. If no GIT is installed and all sewerage / trade waste floor outlets have stainless steel self closing bucket traps located within 18 mtrs of the tap outlet point a dual check valve can be installed. The area shall be roofed or located in the underground car park. 4
5 A diagrammatic of the roof and overhang shall be shown on the plan, the minimum length of the overhang shall be 25% of the height of the roof from Finished Ground Level; Trade waste approval is not required for this type of installation. Trade Waste Commercial and Industrial The proposed trade waste installation is part of the plumbing and drainage system, and shall be assessed for compliance with the sanitary plumbing, sanitary drainage, etc. The proposed installation shall comply with the requirements of the Queensland Plumbing and Drainage Act Note: Copies of the hydraulic plans are not required to be sent to Queensland Urban Utilities (QUU) - plans submitted to Plumbing Services Group will be forwarded to QUU for their records. The owner of the property or their managing agent will be required to submit a separate application to QUU for a trade waste permit. Trade waste permit approvals shall comply with the Water Supply Safety and Reliability Act Trade waste approval application forms can only be submitted when an occupier of the property eg; tenant or lessee is secured and such occupier will discharge trade waste to the sewer. Trade waste approval application form can be viewed or downloaded. Basic trade waste pretreatment infrastructure must be authorised for use in Brisbane by Brisbane City Council and QUU. Such infrastructure is listed on QUU s Register of Basic Trade Waste Pretreatment Infrastructure. This register can be viewed or downloaded at :- Please refer to Queensland Urban Utilities (QUU) Guideline for Assessment of Hydraulic Plans Incorporating Trade Waste document for clarification of design requirements. Trade waste generating areas (TWGA) shall be roofed. A diagrammatic of the roof and overhang shall be shown on the plan, the minimum length of the overhang shall be 25% of the height of the roof from TWGA Finished Ground Level. The grade of the floor of the TWGA and surrounding stormwater collection areas shall be shown on the plan. No direct or indirect sewer connections to fuel dispensing areas, chemical storage areas. A water meter must be installed on the water service to each individual commercial shop. Pre-treatment System information required on the hydraulic plans; Manufacturer s Name of the treatment system; Type and Model number of the treatment system; Series number of the treatment system (if applicable) Size (capacity as specified by the manufacture) of the treatment system; The cover/ lid shall be the airtight type. A hose tap shall be provided adjacent to the treatment system, a Reduced Pressure Zone Device (RPZD) shall be installed upstream of the hose tap as backflow protection. Trade Waste Generating Area information (for both existing and new tenancies) Description of designed or actual industry type (eg. food retailing, laboratory, mechanical workshop, car wash bay, bin wash area, cooling tower, laundry, etc.) (Note Bin Wash Areas only require approved self closing bucket trap complete with floor grate) Designed peak trade waste flow in litres/hour; Predicted average daily trade waste flow in litres. For external areas (eg. wash-bays and bin areas), the grade of the trade waste generating area floor and of the immediate surrounding ground areas must be shown if no bunding or wall is incorporated into the design. Grease Arrestor Sizing Guidance: Trade waste must have a one hour detention time in the grease arrestor at peak flow and peak load; The minimum size or capacity of the grease arrestor must be the greater of either- The size calculated according to legislative requirements - Sections 39 & 40 of the Standard Plumbing and Drainage Regulation 2003; or Predicted peak hourly volume multiplied by 1.2 (takes peak loading into account); or 1000 litres for a single shop premises litres per shop for a multiple shop premises ( To provide transparency in how trade waste hydraulic loads have been allocated for each grease arrestor within a premises, an information schedule (detailed below) shall be provided on the plan Where there is more than one arrestor on the premises, each arrestor must be allocated, an identification number (contact a Trade Waste Officer if you wish to use the official Brisbane Water Arrestor ID number). 5
6 The information schedule must detail the arrestor that will service each tenancy (see example below). Where an addition, alteration or re-calculation is to be carried out on an existing trade waste installation, the schedule details must be updated with the new hydraulic loadings. Where there is a new premise, the information schedule shall also be used. Where a new shop fit-out is to be installed in a premises, with multiple shops connected to a grease arrestor. The above trade waste generating area information must be supplied for all shops connected to the grease arrestor (empty shops should be marked empty). For existing shops, water consumption data may need to be reviewed to determine existing trade waste flows to allow assessment of hydraulic loadings on existing infrastructure. Consideration should also be given to the requirements of Sections 39 & 40 of the Standard Plumbing and Drainage Regulation Example of Information Schedule (using above guidance)- Tenancy/ Unit No. Tenancy Peak Hourly Trade Waste Volume (l/hr) (A) Tenancy Peak Hourly Trade Waste Load (l/hr) (B = A x 1.2) Arrestor No. Arrestor Peak Working Capacity (l/hr) Total of B s Arrestor Capacity (l) BW (new) BW (new) BW (new) New trap Tenancy 2 is OK as arrestor capacity is greater than arrestor peak working capacity. Tenancy 3 is not OK and will need additional grease trap capacity whilst tenancy 4 needs a new trap installed due to it s location - since it s arrestor peak working capacity is less than 1000 litres, it must comply with the minimum 1000l sizing guidance. Notes: 1. There is no requirement to detail how the tenancy peak hourly trade waste load was calculated, however, the above grease arrestor sizing guidance must be followed as a minimum requirement. 2. Plans will not be approved if the Arrestor Peak Working Load exceeds the Arrestor Capacity additional capacity will need to be provided in these situations. Sub-division or Reconfigured Plan A copy of the proposed sub-division or reconfigured site plan shall be supplied, where the existing Lots have been or will be reconfigured or amalgamated etc. Combined House Drain If the property is serviced by a combined house drain, and the assessment for the proposed work requires the combined house drain to be disconnected, renewed or relocated, new connection/s shall be provided for the proposed installation and other affected properties; The proposed method of reconnection for each of the affected properties, owners name, address s, RPD and drainage plan number shall be shown on the plan, a separate application shall be submitted for each affected property. Pump Wells and Discharge Chambers Permission to pump shall first be obtained from the Plumbing Services Manager, Plumbing Services Group on telephone , facsimile and hydap@brisbane.qld.gov.au The inlet pipe and the outlet pipe connected to the ejector, wet well or small bore macerator shall comply with the relevant sections of AS/NZS :1996 section 10; Requirements for pumping direct to Council s sewer and Private sanitary house drains; Provide a copy of the written permission and the maximum litres/second permitted to pump to sewer, shall be obtained from Brisbane City Council s Development and Regulatory Services Technical Specialist Engineering Team, contacting BCC Call Centre on telephone number ; Where practical the discharge chamber shall be located within the premises being serviced. Provide a copy of written permission to install the discharge chamber and rising main in either the roadway or footpath areas, from the DRS engineer, the letter shall indicate; The nominated alignment (distance off boundary line or from the crown of the road); 6
7 Package plants; In-situ plants; Rising Main; The nominated depth (below road shoulder, crown of road or from top of kerb); A maximum pump-rate of 1 l/s to Private sanitary house drain; Manufacture s name; Model number; Type: pump size and duties; Capacity; Full design to be shown on plan, Type: pump size and duties; Dual pumps; Alarm system; High and low automatic switches; Pump well vent; Dual control valves and non-return valves; Shown on the plan the pipe-size and type of material (eg. 100mm upvc); Discharge Chambers; Package Discharge Chambers; - Manufacture s name; - Model number; In-situ Discharge Chambers (as documented in the Water & Sewerage Reticulation standards.); Requirements for Alternative Water Sources for Commercial Buildings The new mandatory requirements are set out in the Queensland Development Codes (QDC) MP Alternative-Water-Sources-Commercial-Buildings, MP 4.2 Water-Savings-Targets and Queensland Plumbing and Wastewater Code. The law applies to commercial and industrial buildings class 3 to 9 and class 10 buildings associated with or ancillary to those buildings. Alternative water sources must be connected internally to the total required pedestals, cold water washing machine tap and externally to (minium) 1 tap. Note: At least 1 external tap must be supplied by from water supplies main. 1. Requirements for Rainwater Tanks The new mandatory requirements are set out in the Queensland Development Codes (QDC) MP Alternative-Water-Sources-Commercial-Buildings, MP 4.2 Water-Savings-Targets. A minimum storage capacity of 1500 litres per required pedestal Water must be connected internally to the total required pedestals, cold water washing machine tap and external use Internal fixtures supplied from a rainwater tank must have a continuous supply of water. Automatic switching device or a trickle top up system from the reticulated town water supply main. Signage to comply with QDC part MP 4.2 and MP Requirements for Greywater Treatment Plants The new mandatory requirements are set out in the Queensland Plumbing and Wastewater Code and Queensland Development Code (QDC) part MP 4.2 and MP 4.3 End use water quality to comply with table T1 in the QPW All greywater plumbing work requires plumbing and drainage approval from Brisbane City Council Greywater treatment plant must: - Be installed to receive greywater from all bathroom sanitary outlets in the building - Have a minimum processing capacity to treat total greywater input vessel volume in 24 hours - Greywater must be connected internally to the total required pedestals, cold water washing machine tap and one external hose tap. - Have a continuous supply of water. Automatic switching device or a trickle top up system from the reticulated town water supply main. - Dispose of untreated greywater to sewer - Must be an APPROVED greywater treatment system 7
8 3. Requirements for Blackwater Treatment Plants in Sewered and Unsewerd Areas Permission to install a Blackwater system in an unsewered area must be granted from the Plumbing Services Manager prior to commencement of design or construction of proposed treatment plant (Blackwater Treatment Plants in Sewered Areas must obtain written approval from Building Codes Queensland Chief Executive Officer) 4. Requirements for On-site Domestic Sewerage Treatment Plants and Septic Design Details required on Design Plan - Owner name and location of premises. - Real property description. - Drainage plan number. Top right hand corner minimum 8mm stencil. (If available) - Site plan showing location of: building and dimensions from boundaries - Street names outside property boundary - North point (all views to be orientated to north point - Dispersal Area calculation showing the site supporting the proposed installation type / depth of soil & in flows. - Secondary treatment system manufacture and model - Type of disposal area: evapotranspiration - Sub-surface irrigation to a designated wastewater effluent re-use area. - Sectional details of wastewater effluent re-use area. - Note any retaining and filling - Site slope contours to be shown - Domestic water sources (underground pipe if within 6.00m of the disposal area) - Depth to water table at location of disposal area (if above 1.50m deep) - Position of irrigation lines - Methods to prevent surface run-off entering the disposal area (i.e. Diversion Mound) - Dimensions from boundaries, building, water courses, gullies, and water sources in adjoining properties - Hard copy submission currently require the design detail on one page only,on white background suitable for Micro-filming four (4) copies of plan are required for approval). Plans can be no smaller than A3 sheet size, the size must allow all information to be clearly defined on the plan - Scale metric site plan 1:500 minimum - Site plan is 1:500 an insert 1:200 is required - Levels and chainages to three decimal places. - All abbreviations used must appear in the legend. - Copyright may not be claimed on drawings. - Designers name and contact details. 5. Sub-Meter Requirements - The new mandatory requirements are set out in the Queensland Plumbing and Wastewater Code part 4 - The performance requirements for sub-meters are for new premises only - Meterable premises will be all, sole occupancy units of certain classes of building (2,4,5,6,7 & 8) Cl:1.3 QPW - Location of sub-meters must be located in a Public and Common area as defined in the QPW code - Drawing will indicate submeter requirements Meter size, Manufacturer, model number and specification as required. - Location of master and sub meters must be clearly indentified on drawing showing common area and AMR systems if required. - All water meters shall be installed in accordance with Brisbane City Council s and Queensland Urban Utilities (QUU) Appendix WH - Technical Specification for: Submetering of Multi Unit Properties Specifications Document. - As constructed drawings for sub meters must include 1. Submeter serial numbers (and MIU serial numbers if applicable) 2. The unit number they serve. 3. The location of the submeters. 4. The date of installation of the submeters. 5. The submeter readings at the time of installation. 6. The submeter readings at the end of construction. 8
9 Sub-Water Meter Table Guide Sub meter table for (No)Street, Suburb (P/code) - Plumbing App No Serial Number Unit # Meter Location Installation Date Meter Readinginstallation Meter readingend of construction BU Unit 1 Path box Left hand side of pedestrian entry 20/1/ BU Unit 2 Path box right hand side of pedestrian entry 20/1/ BU Unit 3 Path box Left hand side of pedestrian entry 20/1/ BU Unit 4 Path box right hand side of pedestrian entry 20/1/ Master In box left hand side of DZ meter driveway front boundary 20/1/ Additional Design Information Individual lots in a Community Title development shall be connected to the Premises Group Sewer separately via a minimum single 100mm sanitary house drain branch and the inspection opening (io) for each shall be installed at the Unit/Lot boundary; The Premises Group Sewer and Water main to be designed and installed in common property (Body Corporate owned); The Premises Group Watermain to be designed and installed in common property (Body Corporate owned), the main should not pass through private units or be installed in abutting or common walls; The plumbing, drainage and water supply for each lot shall be contained wholly within that lot and shall have individual and separate connections to Premises Group Sewer and the Premises Group Watermain; Water meters shall be located in accessible positions, so a Council Officer or Agent of the Council can read or carry out maintenance; Water meters and the meter boxes shall be purchased from Brisbane City Council or approved BCC supplier; 20-25mm meter box minimum size - L. 492mm x W. 271mm; The method of providing future installation of water meters shall be shown on the plan. 1. As - Constructed Plans When a hydraulic services design drawings / plans has been approved by Council and the development constructed, Council will require an as constructed hydraulic services design drawing / plan from the plumbing contractor. If no changes have been made to the BCC approved design plan this plan may be used as the As-Constructed Plan. Where changes have been made to the approved plan a redesign shall be supplied showing all changes and containing the same information documented in the approved plan. (Approved plan 5 pages = As-Con plan 5 pages) The As constructed plan shall be drawn to the same format and standard as the Approved Plan. All - As constructed drawings require the official address, Drainage plan number and Plumbing application number on every page of drawing set preferably in the top right hand corner. The As Constructed Plans shall be supplied in hard copy format and electronically in CD format or to Brisbane City Council address: hydap@brisbane.qld.gov.au 2. Electronic Lodgement An electronic lodgement form to be filled in with your submission Line Types, fonts and abbreviations shall be as set below; Plotting scale should be 1:100 OR 1:1; All requirements shall be as set out in the standard design requirements. All documents shall be in PDF format. 3. Standard Line Types 9
10 The standard legend and line types shall be in accordance with the Australian Standards Additional Design Information contd. 4. Chargeable Plumbing Fixtures Autopsy table Bain-marie Basin Bath (foot, baby, shower) Bedpan sterilizer Bedpan washer/sterilizer Bidet, bidette Boiling water unit (includes under bench) Circular wash fountain Clothes washing machine Coffee machine Dental unit/chair Dishwashing machine Drinking fountain Floor waste gully without fixture connected Glass washing machine / Glass cleaner Garage grinder Ice maker Potato peeler Sanitary napkin disposal unit Shower (single/multiple) Sink Sink/bar Sink cleaner Sink laboratory Sink (pot or utility) Sink/tea Slop hopper Trough (ablution) Trough (laundry) Tundish Urinal - wall hung (includes waterless) Urinal stall, or each 600mm length of slab Water closet pan (WC) Wok sink Additional Design Information contd. 5. Future Loading Units Tables (AS/NZS :2003 Table 6.1) 10
11 11
12 Additional Design Information contd. Future Loading Units Tables (AS/NZS :2003 Table 6.1) 12
Sewer Service Diagram (SSD) Requirements
Sewer Service Diagram (SSD) Requirements A Sewer Service Diagram (SSD) shows the location of private wastewater service pipes on a property. In NSW where Fair Trading and delegated authorities are responsible
More informationSTANDARD PLUMBING AND DRAINAGE REGULATION 2003
Queensland Subordinate Legislation 2003 No. 265 Plumbing and Drainage Act 2002 STANDARD PLUMBING AND DRAINAGE REGULATION 2003 TABLE OF PROVISIONS Section Page PART 1 PRELIMINARY Division 1 Introduction
More informationGuidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
More informationNotifiable work. A guide for plumbers and drainers. October 2012. Building Codes Queensland Department of Housing and Public Works
Notifiable work A guide for plumbers and drainers October 2012 Building Codes Queensland Department of Housing and Public Works Notifiable work a guide for plumbers and drainers Page 2 of 22 Table of contents
More informationAdditional Services Agreement. Part 3: Schedule of our requirements
Additional Services Agreement Part 3: Schedule of our requirements Schedule of our requirements Part A Water Services 1 All water services All connections to our water mains, including those used for construction
More informationCHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.
CHAPTER 9 VENTS 901 GENERAL 901.1 Scope The provisions of this chapter shall govern the materials, design, construction, and installation of vents. 901.2 Protection of Trap Seals The protection of trap
More informationCERTIFYING DRAINLAYER
No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced
More informationSEPTIC TANK SYSTEMS. Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only.
SEPTIC TANK SYSTEMS There are three common types of septic tank systems in Tasmania Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only. Dual purpose (or all-waste)
More informationFLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses
2 February 2011 Updated 16 March 2011 FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses This fact sheet provides advice for residents about
More informationPlumbing for retail food businesses
Plumbing for retail food businesses Every day, thousands of food outlets in Sydney produce waste, such as cooking oil, grease and food solids. If that waste is discharged directly into our sewers, it can
More informationPlumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations
More informationAppendix WC. Fire Hydrant & Hose Reel Metering Arrangements
Appendix WC The following four types of metering arrangements have been approved for particular applications. Metering Arrangement No 1- M-19 SDCV (Single Detector Check Valve) assembly with bypass meter.
More informationWHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
More informationResearch of Grey Water for Use in Residential Applications Original date of publication: 12-14-2007 Updated: 8-06-2008
What is Grey Water? Research of Grey Water for Use in Residential Applications Original date of publication: 12-14-2007 Updated: 8-06-2008 Grey water comes from many sources. Grey water, gray water, greywater,
More informationPlumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling October 2014 contents General Information
More informationQueensland Plumbing and Wastewater Code guidelines
Queensland Plumbing and Wastewater Code guidelines For councils, plumbers, builders and developers A guideline to assist in the interpretation and application of the Queensland Plumbing and Wastewater
More informationMP 4.2 WATER SAVINGS TARGETS. Table of Contents
Table of Contents Purpose... 2 Commencement... 2 Application... 2 Exemption... 2 Referral Agency... 3 Associated Requirements... 3 Referenced Standards... 3 Definitions... 3 Water savings targets... 5
More informationUTILITIES DEPARTMENT
UTILITIES DEPARTMENT Dear Business Owner, As a Business owner or manager you know how important it is to provide a safe and reliable service or product. Similarly, the City of Brighton Utilities Department
More informationCITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
More informationPlumbing Code Sections For Commercial Food Facilities
Plumbing Code Sections For Commercial Food Facilities SCOPE The following list of requirements summarizes the plumbing issues that are commonly addressed in commercial retail food facilities by health
More informationMP 4.2 WATER SAVINGS TARGETS. Table of Contents
Table of Contents Purpose... 2 Commencement... 2 Application... 2 Exemption... 2 Referral Agency... 2 Associated Requirements... 3 Referenced Standards... 3 Definitions... 3 Water savings targets... 5
More informationENVIRONMENTAL HEALTH FACT SHEET NO. 500
ENVIRONMENTAL HEALTH FACT SHEET NO. 500 DECOMMISSIONING OR REUSE OF ON-SITE WASTEWATER SYSTEMS This provides information regarding the destruction, removal or reuse of septic tanks, collection wells, aerated
More informationguidance notes Form C
guidance notes Form C These guidance notes are designed to help you complete Form C Application for new water infrastructure and plot(s) connection for industrial/commercial development(s) Important: Form
More informationCompliance Document for New Zealand Building Code Clause G13 Foul Water Second Edition
Compliance Document for New Zealand Building Code Clause G13 Foul Water Second Edition Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building
More informationWhat to Expect From the Examination. How to Study the Plumbing Codes
Texas State Board of Plumbing Examiners Plumbing Inspector Examination Review Course The following Examination Review Course is designed to assist an applicant in preparing for the Plumbing Inspector examination.
More informationUpper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
More informationA HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
More informationLIVING VICTORIA WATER REBATE PROGRAM 1 JULY 2012 TO 30 JUNE 2015 FOR UP TO 50 EMPLOYEES. Small Business
FOR UP TO 50 EMPLOYEES LIVING VICTORIA WATER REBATE PROGRAM 1 JULY 2012 TO 30 JUNE 2015 Small Business Claim up to $2000 to improve the water efficiency of your business. Save water and money. The Living
More informationPMA ONLINE TRAINING Venting for Plumbing Systems
PMA ONLINE TRAINING Venting for Plumbing Systems One Hour Continuing Education Venting PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended
More information31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that
More informationCONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner
More informationPlumbing Handbook. A guide to working with Water Corporation. As endorsed by
Plumbing Handbook A guide to working with Water Corporation As endorsed by Introduction This handbook has been produced by the Water Corporation to assist plumbers and builders to work with the Corporation
More informationPLUMBING ROUGH IN INSPECTION
This Program is made Possible through the Code Officials Education & Training Fund. Revenue for the Fund comes from Assessments on Building Permits. Please turn down cell phones and put pagers on vibrate.
More informationLot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4
New Construction Permit Application Village of Shorewood Building Division One Towne Center Blvd Shorewood, IL 60404 (815)553-2310 Fax (815)744-6766 SUBMISSION CHECKLIST - Complete this application and
More informationWATER & SEWER SERVICES
WATER/SEWER ENGINEERING SECTION PHONE (703) 228-3677 WATER & SEWER SERVICES INFORMATION & APPLICATION PACKAGE REVISED MAY 2014 1 MAY 2014 Dear Customer: Thank you for taking the time to read this information
More informationTOWNSVILLE WATER Customer Service Standards
TOWNSVILLE WATER Customer Service Standards CONTENTS Townsville Water who are we? 3 What is the Customer Service Standard? 3 >> Does the Customer Service Standard apply to me? 3 >> What will Townsville
More informationCHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
More informationTrade waste approval application form
Trade waste approval application form Council of the City of Gold Coast ABN 84 858 548 460 PO Box 5042 GCMC QLD 9729 P 1300 GOLDCOAST F 07 5596 3653 E mail@cityofgoldcoast.com.au W cityofgoldcoast.com.au
More informationREGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE
No. 9195 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced
More informationPlumbers Guide Pitt Town Water Plumbers Guide, December 21, 2012
Plumbers Guide Table of Contents Welcome... 3 Contact us... 3 Plumbers guide... 4 Safe and reliable... 4 Connecting to Pitt Town recycled water... 4 Steps to connect... 5 Plumbing the house... 5 1. Standard
More informationDevelopment enquiry request
Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
More informationGUIDANCE DOCUMENT FOR SIZING AND INSTALLATION OF GREASE TRAPS AND INTERCEPTORS
GUIDANCE DOCUMENT FOR SIZING AND INSTALLATION OF GREASE TRAPS AND INTERCEPTORS Fort Worth Water Department, Pretreatment Services Division, (817)871-8305 A. Introduction: Part I: Guidance for Grease Trap
More informationResidential Plumbing BCN 1058
Residential Plumbing BCN 1058 CHAPTER 7 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System MICHAEL KNOTEK 74 Plumbing Fixtures and Sizing the Drain, Waste, and Vent System PLUMBING FIXTURES
More informationStandard terms and conditions
Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled
More informationPROPOSED Plumbing Fee Ordinance Amendment
PROPOSED Plumbing Fee Ordinance Amendment Section 4 01 13 IDAHO STATE PLUMBING CODE AMENDMENT; PERMIT FEES. 103.4.1 Section 103.4.1 of the Idaho State Plumbing Code is amended to read as follows: Section
More informationONTARIO PLUMBING INSPECTORS ASSOCIATION INC. In the public service since 1920. Wet Venting. Incorporating Stack Venting and NPC Harmonization
ONTARIO PLUMBING INSPECTORS ASSOCIATION INC. In the public service since 1920 Wet Venting Incorporating Stack Venting and NPC Harmonization Presented by: Rainier Bratsch-Blundel, CPSI Plumbing Professor
More informationFlammable and combustible liquids. Licence guide. Guide for operators
Guide for operators About this guide This guide is for businesses that provide flammable and combustible liquids. It provides advice on licensing and fit-out guidelines for businesses. Table of Contents
More informationWELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION
WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION 1 HOUSEKEEPING 2 CHANGES We will be covering the significant changes to the International Residential Code and the changes common to
More informationTop 10+ Mistakes of DWV plumbing design
Top 10+ Mistakes of DWV plumbing design Listed below are the some of the most frequently missed items, noticed by our inspectors, at plumbing rough-in when non-plumbers attempt plumbing design. Most of
More informationCommercial Food Preparation and Service (Currently under review)
Commercial Food Preparation and Service (Currently under review) Trade Waste Guideline Issued 27/02/2015 This guideline is currently under review. The grease arrestor sizing calculations are to be used
More informationBackflow Bulletin #1
Backflow Bulletin #1 FIRE PROTECTION SYSTEMS Chemicals in the System Anti-Freeze, Foam, Corrosion Inhibitors, etc. Chemicals in the System Glycerin Glycerin or similar food-grade non-toxic additive Siamese
More informationAPPLICATION FOR NEW CONSTRUCTION
CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT
More informationIntroduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References
Introduction General This Technical Booklet has been prepared by the Department of the Environment for Northern Ireland and provides for certain methods and standards of building which, if followed, will
More informationA guide to plumbing, drainlaying, and gasfitting that does not require a building consent. Superseded. Building Act 2004.
A guide to plumbing, drainlaying, and gasfitting that does not require a building consent Building Act 2004 March 2011 Contents INTRODUCTION 1 Purpose 1 Background 1 SEEKING ADVICE ON EXEMPT BUILDING WORK
More informationApplication for a water connection to a commercial or mixed use development
Application for a water connection to a commercial or mixed use development Providing clean, safe water: It s part of our Blueprint for Yorkshire Your application form for a water connection to a commercial
More informationPLUMBING PERMIT-GENERAL INFORMATION
Inc. Village of New Hyde Park PLUMBING PERMIT-GENERAL INFORMATION PLEASE COMPLETE BOTH SIDES OF PERMIT APPLICATION IN DUPLICATE FEES PLUMBING-ALTERATION BUS/RES. $ 75.00 INCL. THREE FIXTURES $ 25.00 EACH
More information6. Principles of effective plumbing systems
6. Principles of effective plumbing systems This chapter summarizes the aims and objectives of a good local plumbing system that is, the drinking-water supply that serves a building and the system for
More informationSydney Port Botany Terminal 3 Project Water Resource Management Plan
Civil Works Construction Contract Phase 1 1/8 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP
More informationPART 5 : WASTEWATER DRAINAGE
Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction
More informationCity of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 APPLICATION FOR DEMOLITION PERMIT Permit Number: Date Received:
More informationProposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier
Determination 2010/125 Proposed plumbing system within units at the Bluewater Hotel, 10 West Quay, Ahuriri, Napier 1. The matters to be determined 1.1 This is a Determination under Part 3 Subpart 1 of
More informationGeberit Sovent. Installation Guide
Geberit Sovent Installation Guide Drainage for multi-storey building Valid from 1 August 2014 Legal Information Legal Information System design / dimension data This document contains only general, technical
More informationREGISTRATION EXAMINATION, JUNE 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, JUNE 009 PLUMBING INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed THREE
More informationElement D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
More informationCITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY
Draft CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY Draft Los Angeles Plumbing Code (LAPC) 2008 California Plumbing Code (CPC) 2007 Uniform Plumbing Code (UPC) 2006 Major Code Changes Preliminary
More informationOWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993
AS AN OWNER BUILDER building work? What records should I keep? Is insurance required? W I need approval for? What do I need approval for? How do I obtain building work? How do I obtain approval? What records
More informationKAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010)
KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) Kawerau District Council General Bylaw Part 9: On-site Wastewater Disposal Systems (2010) Explanatory Statement
More informationALL YOU NEED TO KNOW...
ALL YOU NEED TO KNOW... What do you know about your septic tank system? For the purposes of this booklet, a septic tank system refers to any kind of on-site sewage management system including traditional
More informationHeating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008
Heating and Domestic Hot Water Systems for dwellings Achieving compliance with Part L 2008 Appendix: Guide to the Condensing Boiler Installation Assessment Procedure for Existing Dwellings CONTENTS PAGE
More informationPLAN CHECK CORRECTION SHEET FOR PLUMBING SYSTEMS 2014 LAPC
PLAN CHECK CORRECTION SHEET FOR PLUMBING SYSTEMS 2014 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly. Section:
More informationit has to be Hindmarsh for Service Excellence
it has to be Hindmarsh for Service Excellence Contents 2 Overview 3 Our People 4 Skills and Expertise 5 Quality, Safety and Environment 6 Insurances / Licenses / Registrations 7 An Award Winning Team 8
More informationDominic i Barbato Dpt. Of Building and Safety (818) 374 4361 domenico.barbato@lacity.org
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 domenico.barbato@lacity.org b 2011 Los Angeles Plumbing Code LAPC changes from 2008 2011 Los Angeles Plumbing Code Consists of the following:
More informationwww.garyklinka.com Page 1 of 51 Exterior Plumbing Quiz Part 1
www.garyklinka.com Page 1 of 51 Exterior Plumbing Quiz Part 1 Instructions: $60 1. Print these pages..all reference materials are included. 2. Review and answer the simple questions in each mini section.
More informationREAD ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)
CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 17 - NONPOTABLE RAINWATER CATCHMENT SYSTEMS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state
More informationAustralian/New Zealand Standard
AS/NZS 3500.4:2003 (Incorporating Amendment Nos 1 and 2) AS/NZS 3500.4:2003 Australian/New Zealand Standard Plumbing and drainage Part 4: Heated water services AS/NZS 3500.4:2003 This Joint Australian/New
More informationThe City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
More informationPLUMBING PERMIT REQUIREMENTS AND CHECKLIST
Town of North Hempstead Department of Building Safety Inspection and Enforcement 210 Plandome Road, Manhasset, NY 11030-2327 Tel. (516) 869-6311 Fax. (516) 869-7662 PLUMBING PERMIT REQUIREMENTS AND CHECKLIST
More informationEditorial Note: bold and underline denotes added text, strikethrough denotes deleted text
Code Amendment 12/20/12 2011 Oregon Plumbing Specialty Code, Grease Interceptors & Fats, Oils and Greases Editorial Note: bold and underline denotes added text, strikethrough denotes deleted text 204.0
More informationPLAN REVIEW AND APPROVAL FOR FOOD ESTABLISHMENTS PLUMBING REQUIREMENTS FOR FOOD ESTABLISHMENT PREMISES
PLAN REVIEW AND APPROVAL FOR FOOD ESTABLISHMENTS PLUMBING REQUIREMENTS FOR FOOD ESTABLISHMENT PREMISES Health Systems Protection Rev. 07/2006 35-05-20/06/07/18 OFFICE OF FOOD PROTECTION 417 FEDERAL ST
More informationLand Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents
Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions
More informationCITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
More informationLooking after your Septic Tank System
Looking after your Septic Tank System Name: Bought to you by Address: File this in your property file. 0800 TO FLUSH Call 0800 TO FLUSH 1 What do you know about your septic tank system? Just like your
More informationVILLAGE OF RADIUM HOT SPRINGS Telephone 250-347-6455 Box 340 Facsimile 250-347-9068
VILLAGE OF RADIUM HOT SPRINGS Telephone 250-347-6455 Box 340 Facsimile 250-347-9068 Radium Hot Springs, BC www.radiumhotsprings.ca V0A 1M0 Dear Applicant, RE: Building Permit Applications Pursuant to the
More information16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
More informationCHAPTER 11 STORM DRAINAGE
CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,
More informationCOMMERCIAL BUILDING PERMIT INFORMATION
COMMERCIAL BUILDING PERMIT INFORMATION This is a packet of Building, Electrical, Plumbing, HVAC, and Erosion Control permit forms you must complete to obtain the permits necessary for new construction,
More informationCity of Hillsboro Inflow and Infiltration Elimination Program
City of Hillsboro Inflow and Infiltration Elimination Program Because of continuing problems with overloaded sanitary sewers, the City of Hillsboro is inspecting the sewer system in your neighborhood.
More information2012 British Columbia Plumbing Code Update
2012 British Columbia Plumbing Code Update 2012 British Columbia Plumbing Code is published as a separate document and is broken down into Divisions similar to BCBC 2 Division A Part 1 Compliance Part
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
More informationONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report
ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report These instructions are for homeowners and inspectors completing the onsite wastewater treatment system
More informationWhen Should Examination Preparation Begin?
Texas State Board of Plumbing Examiners Tradesman Plumber-Limited Licensee Examination Review Course The following Examination Review Course is designed to assist a registered Plumber s Apprentice in preparing
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved;
More informationLAND DEVELOPMENT MANUAL
LAND DEVELOPMENT MANUAL AUGUST 2014 HUNTER WATER TABLE OF CONTENTS 1 introduction... 4 2 scope... 5 3 intended audience... 5 4 definitions, acronyms and abbreviations... 6 5 land development cycle... 9
More information6 June 2014. Document Status REVISION STATUS DATE. Initial release to industry. This Revision expired on 16 Sep. 2013.
6 June 2014 Document Status REVISION STATUS DATE REV 0 Initial release to industry. This Revision expired on 16 Sep. 2013 6 Sep 2013 REV 1 Draft submission to ESDD 16 Sep 2013 REV 2 Draft resubmission
More information4.3 Cisterns and Rain Barrels
4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may
More informationCHAPTER 26 PLUMBING CODE
CHAPTER 26 PLUMBING CODE 26.01 PLUMBING CODE The Illinois Plumbing Code as promulgated by the Illinois Department of Public Health at 77 Illinois Administrative Code, Part 890, is hereby adopted as the
More informationMandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated
More informationPractice Note 2014-62
Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National
More informationCITY OF CRESTVIEW. TRADES PERMIT APPLICATION (Mechanical, Electrical, Plumbing, Irrigation, Fire Alarm & Gas Permits)
CITY OF CRESTVIEW GROWTH MA N AGEMENT DE PART ME NT B uilding Permits & In spections P.O. Drawer 1209, Crestview, Florida 32 5 36 Phone (8 5 0 ) 68 9-1618 /161 9 Fax (8 5 0 ) 689-457 5 TRADES PERMIT APPLICATION
More information2016 BUILDING PERMIT FEES*
2016 PERMIT FEES* Fees are based on the cost of construction and shall be based on a value not less than the value determined using the Building Valuation Data Report published by ICC. Application Fee
More information