1 WORK HEALTH & SAFETY COMMITTEE MEETING Thursday, 28 May 2015, commencing at am MINUTES 1. ATTENDANCE 1.1. Present R Gregor (Interim Chief Executive Officer), K Trezise (Chairperson & Works HSR), N Haines (Works Manager), A Buckham (Employee Representative) and R Richter (WHS Coordinator, Administration HSR and Minute Recorder) In Attendance J Beaton (Regional Risk Coordinator (RRC)) 1.2. Apologies Cr E Scholz (Council Representative) 2. CONFIRMATION OF PREVIOUS MINUTES 2.1. Amendments Nil 2.2. Acceptance That the minutes of the Special Work Health & Safety Committee meeting held on 23 April 2015 be confirmed as true and correct. 3. BUSINESS ARISING FROM PREVIOUS MINUTES 3.1. LGAWCS, Guidance Note on Contractors using Council Plant The WHS Committee recommends to the Chief Executive Officer that Council s Property & Infrastructure Management Policy is reviewed to incorporate at dot point 2 Hiring of Council Machinery per advice from the Local Government Association Workers Compensation and Mutual Liability Scheme s, that Council Plant and Equipment will not be hired without an approved Council operator and that where a Contactor of Council utilises Council machinery/plant, the arrangement is formalised and risk management methodologies employed to reduce potential liability to Council. This use must be approved by an authorised Officer of Council and documented. Council s WHS Contractor Management Procedure and Forms are to be reviewed in line with the above recommendation. 4. CORRESPONDENCE 4.1. For Consideration or Action LGAWCS, Reasonably Practicable The request for confirmation by the Local Government Association Workers Compensation Scheme (LGAWCS) and Local Government Association Mutual Liability Scheme (LGAMLS) that Council does understand the reasonably practicable concept and how it is applied to be responded to by Alan McGuire, Chief Executive Officer. R Richter / A Buckham File Ref: Page 1 of 5
2 4.2. For Information LGAWCS, Partnership Plan with Return to Work SA (RTWSA) LGAWCS, Principal s (Council) Obligations to Independent Contractors LGAWCS, Mobile Plant Overturn 5. PLANNING PROGRESSION POLICIES, PROCEDURES, PLANS, PROGRAMS AND CALENDARS WHS & IM Plan Progress updated within the Plan with evidence documented. Program Actions 1.1, 2.3, 2.4, 3.1, 3.2, 3.6, 4.4, 4.5, 5.1, 5.2, 5.3, 6.1, 6.2, 7.1, 7.2, 7.3, 7.4, 8.1, 8.4, 8.5, 8.6, 8.7, 8.8 & 8.9 to be marked as completed with additional evidence documented where applicable. A Buckham / N Haines KPI Action Plan & Monitoring 5.2. Policy and Procedure Development and Review Schedule 5.3. Policies and / or Procedures Reviewed and Recommended for Adoption The WHS Committee recommends the Procedures listed to the Interim Chief Executive Officer for adoption: Prevention of Falls Procedure V2 Prevention of Falls Procedure One Pager & Flow Chart V1 Hot Work Procedure One Pager & Flow Chart V1 N Haines / A Buckham Hot Work Procedure V2 Designated Hot Work Areas for the Depot to be listed within the Procedure; with the concrete apron at the rear of the main Workshop be included subject to the risk assessment for Welding Operations in a Designated Hot Work Area being reviewed to include the concrete apron area Specific control compressed and liquefied gases a. The Line Manager in conjunction with the permit issuer should make sure that when compressed and liquefied gases are used as fuel, a source of oxygen or as shielding gases in certain types of welding: Wording to be amended pending clarification of this paragraphs meaning from the LGAWCS. The amended Hot Work Procedure to be re presented to the July 2015 WHS Committee meeting for adoption Templates / Forms Reviewed and Recommended for Adoption The Committee recommends the Templates & Forms listed to the Interim Chief Executive Officer for adoption: Hazardous Manual Task Risk Assessment V4 Heights Checklist V2 Work At Heights Permit V2 Safety Harness Checklist V2 Prevention of Falls Risk Assessment Form V3 Safe Work Method Statement for High Risk Construction Work V1 WHS Construction Activities Guidance Checklist V1 Hot Work Permit V2 Emergency Response Plan for Hot Work in a Designated Hot Work Area V1 Hazardous Chemical Risk Assessment V2.1 File Ref: Page 2 of 5
3 5.5. Plan Programs Hazard Management Hazard / Risk Register reviewed Contractor Reports (excluding contracts that are minor in nature i.e. minor maintenance) P Boylan, construction work still in progress Plant & Equipment (power operated) Process & Work Place Risk Assessments The Risk Assessment noted by the Committee: # 2021: Welding Operations in a Designated Hot Work Area V1 To be reviewed to include the concrete apron at the rear of the main Workshop refer Agreed Safe Methods of Work e.g. Safe Work Instructions (SWI) Nil Training Systems Training Available WorkZone Traffic Management, Wudinna TAFE June2015 Cardio Pulmonary Resuscitation Refresher, Wudinna TAFE 21/07/2015 WH&S Training Needs per: 2015 Training Plan Review Works & Administration 2015 Training Needs Analysis & Reaccreditation Schedule Review WHS Training Undertaken: Operate and Maintain Chainsaw, TAFE SA Wudinna Campus, 6 7/05/2015: 1 Works worker Return to Work Act Overview, Webinar 27/04/2015: WHS Coordinator (WHSC) Due Diligence Officers WHS, Kimba 16/04/2015: Economic Development Officer (EDO), Works Manager (WM), Finance Officer (FO), WHSC Injury Management Training for Rehabilitation Coordinators, Teleconference 7/04/2015: WHSC Workplace Induction 24 26/03/2015: 1 Administration worker Professional Development Training Undertaken: Public Health Partnerships Forum, Adelaide 15/05/2015: Manager Environment & Community Services (MECS) Annual Financial Statements Training, Wudinna 6/05/2015: FO 2015 SALG Financial Management Group Conference, Adelaide 13/03/2015: Chief Executive Officer (CEO) Fines Enforcement & Recovery, Port Lincoln 30/03/15: MECS Audit Committees, Wudinna 27/03/27: 4 Elected Members (EM), Corporate Services Manager (CSM) and FO Audit Committees, Port Lincoln 25/03/2015: 1 EM Budget Management Information & Reporting, Adelaide 10/03/2015: FO CWMS, Safe Drinking Water & Legionella Updates, Adelaide 5/03/2015: MECS Certificate IV Planning, Various 4/03/2015, 10/04/2015, 1/05/2015, 22/05/2015: General Clerical Officer (GCO) Certificate III in Water Operations, TAFE SA 3 5/03/2015, 28 30/04/2015, 19 22/05/2015: EDO Land Services Group Account Holder SAILIS Overviews, Port Lincoln 24/02/2015: FO 2015 EPLGA Conference, Whyalla 22 24/02/15: 4 EM s, WM, CSM 2015 EPLGA Conference, Whyalla 24/02/2015: CEO and WAO Training Closed Out Training Evaluation Forms completed and Training Database updated File Ref: Page 3 of 5
4 Internal Auditing The following Internal Audits have been completed with actions included in the CAPA Register: Isolation, Lock Out & Tag Out Procedure Emergency Management Procedure Internal Audit Procedure Manual Handling Procedure Excavation & Trenching Procedure Hot Work Procedure Excavation & Trenching Register Review 5.6. WHS Program Scheduled Actions Calendar Performance Indicator October: 5 of 5 = 100% November: 9 of 9 = 100% December: 14 of 15 = 93.33% January: 4 of 4 = 100% February: 11 of 14 = 78.57% March: 7 of 8 = 87.5% April: 4 of 4 = 100% May: 10 of 19 = 52.63% (to date) Statistics updated following items closed out post Agenda distribution and from WHS Committee meeting Workplace Testing Nobles, Safety Harness / Heights Equipment: 21/05/2015 no issues identified within report. Chief Executive Officer and Officers to discuss the need for the retention of Safety Harness s as Council has no workers trained for Work at Heights and the equipment not being used by Council workers. Consideration is given to either donating equipment to an Emergency Services Organisation or putting out for tender due to ongoing cost of compliance certification Workplace Monitoring (Inspections) undertaken since last meeting Works Depot Quarterly Safety / Hazard Inspection: 25/03/2015 Refuse Site Quarterly Safety / Hazard Inspection: 25/03/2015 Issues requiring actions have been included in the relevant Department Action Plan and included on the CAPA Register Other Programmed Actions Completed First Aid Kit Servicing, West Coast First Aid Supplies: 8/05/ CAPA Register CAPA Register discussed and Items updated Action items 334, 339, 340, 343, 346, 349, 351, 356, 375, 379, 380, 385 and 397 are endorsed by the Committee for removal to the Completed Items CAPA Register. R Richter / A Buckham RRC requested Works to review Items on the CAPA with a view to closing out of overdue items. 6. ACCIDENT STATISTICS / ACCIDENT REPORTS / HAZARD INSPECTION REPORTS 6.1. Claims Statistics CATS statistics for April 2015 were reviewed. CATS Statistics for Wudinna District Council as at 30/04/2015. The rebate penalty indication is 55% as at 30/04/2015 File Ref: Page 4 of 5
5 WH&S Committee Minutes 28 May Injury / Incident Reports Three incidences were reported since the last meeting: i. Incident 08/ : Tool Box hinge break resulting in blow to head ii. Incident 09/ : Side panel on dozer slipped off tracks iii. Incident 10/ : Wire penetration into thumb Recommendation The following incident is to be closed out: Incident 08/ : Hinges replaced on both Tool Boxes. A Buckham / N Haines Actions still outstanding for: i. Incident 05/ : Repetitive Strain Injury operating Bull Dozer ii. Incident 03/ : Manual handling lifting side panel on dozer iii. Incident 06/ : Jarring of back, knees & ankles while dismounting Skip Truck iv. Incident 07/ : Back strain whilst lifting spring out of side tipper v. Incident 09/ : Side panel on dozer slipped off tracks vi. Incident 10/ : Wire penetration into thumb 7. REHABILITATION There have been no workplace injuries that have resulted in a claim since the last WHS Committee meeting. 8. WHS COORDINATORS REPORT The WHS Coordinators Report on the Progress of the WHS & IM Plan incorporating statistics is accepted. N Haines / A Buckham 9. OTHER BUSINESS 9.1. Death of a Worker at Arium, Iron Duke in relation to remote and isolated work procedures 9.2. Risk Review The RRC expressed her disappointment at the lack of information provided and inputted into the Risk Review by Officers Risk Management Committee meetings Meetings to be reinstated: alternate Meetings with Emergency Planning Committee 10. DATE OF NEXT MEETING A Special Meeting of the WHS Committee to be held on Thursday, 23 July 2015 commencing at 10am. 11. CLOSE OF MEETING 12 noon Confirmed at the Next Meeting of the Work Health & Safety Committee CHAIRPERSON File Ref: Page 5 of 5
WHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
More informationWHS Document Management Procedure
1. Overview The purpose of this procedure is to provide minimum standards for how Wudinna District Council will maintain its WHS Management System documentation so that documents are drafted, maintained,
More informationWHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
More informationWHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
More informationWHS DOCUMENT MANAGEMENT PROCEDURE
1. OVERVIEW The purpose of this procedure is to provide minimum standards for how The Flinders Ranges Council will maintain its WHS management system documentation so that documents are drafted, maintained,
More informationRockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure HS Contract Management Document Number OHS-PROC-136 This document applies to the following site(s): Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
More informationDistrict Council of Cleve
1. Overview The purpose of this procedure is to provide minimum standards for how the District Council of Cleve will maintain its WHS management system documentation so that documents are drafted, maintained,
More informationAccident/Incident Investigation & Reporting Procedure
Accident/Incident Investigation & 1. Overview The recognises its obligation to ensure that all accidents and incidents are reported, recorded and investigated. We are committed to identifying corrective
More informationEvent Management Guidelines. Month 2011. 1 Event Management Guidelines (Month, 2011)
Month 2011 1 (Month, 2011) Table of Contents Executive Summary... 2 More information... 2 Event Risk Assessment... 3 Event Checklist... 4 Event Details... 8 Event Contact List... 10 Event Task List...
More informationOHS Contractor Management Procedure
The Wudinna District Council will through this procedure seek to ensure that Contractors they engage have an adequate understanding and a commitment to Occupational Health, Safety and Welfare as well as
More informationCONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
More informationIssue Date: April 2011 Review Date: April 2013 Page Number: 1 of 8
Issue Date: April 2011 Review Date: April 2013 Page Number: 1 of 8 1. Purpose: The purpose of this procedure is to outline the consultative arrangements that are to be developed and implemented across
More informationWHS DOCUMENT MANAGEMENT PROCEDURE
1. Overview The purpose of this procedure is to provide standards for how the District Council of Peterborough will maintain its WHS management system documentation so that documents are drafted, maintained,
More informationOHSMS Implementation Guide
OHSMS Implementation Guide Developed by the Employee Health Unit, Department of Education and Early Childhood Development and Marsh Pty Ltd. Published by the Employee Health Unit, Department of Education
More informationWork Health and Safety Management Plan
Work Health and Safety Management Plan Controlled COPY No. 1 Issue No. 1.0 Date: 01 Jan 2013 This is a controlled document. Only registered holders of controlled copies will receive updates Wo Document
More informationWHS Policies and Procedures Package
WHS Policies and Procedures Package The following is an extract to highlight the style and layout of this publication, as well as a snapshot of the content. Some samples may not be included in their entirety
More informationVersion Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 Administered by: Governance Coordinator
Risk Management Framework Version Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 TRIM CON: 12/1132 Administered by: Governance Coordinator Last Review Date: 2013 Next Review
More informationSITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
More informationPolicy Number: 054 Work Health and Safety July 2015
Policy Number: 054 Work Health and Safety July 2015 TRIM Ref: TD14/318 Policy Details 1. Owner Manager, Business Operations 2. Compliance is required by Staff, contractors and volunteers 3. Approved by
More informationHealth and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
More informationPre-Qualification Questionnaire Checklist
Pre-Qualification Questionnaire Checklist Thank you for your interest in becoming an Approved Contractor with Christchurch Airport. To ensure efficient processing of your application please utilise the
More informationGuide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
More informationConfined Space Management Procedure
1. Overview The District Council of Mount Remarkable as part of its commitment under its Hazardous Work Policy, recognises its obligation to eliminate, or where that is not reasonably practicable, minimise,
More information4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7
Page 1 of 7 1 Purpose It is a legal requirement under the NSW Work Health and Safety Act 2011 and NSW Work Health and Safety Regulation 2011 to identify hazards, assess the risk of those hazards, implement
More informationWHS CONTRACTOR MANAGEMENT PROCEDURE
WHS CONTRACTOR MANAGEMENT PROCEDURE Version No: Issued 3.0 18/11/2013 15/11/2018 1. Overview The District Council of Peterborough as part of its commitment under its WHS Contractor Management policy, recognises
More informationWHS CONTRACTOR MANAGEMENT PROCEDURE
MANAGEMENT PROCEDURE 1. OVERVIEW The Flinders Ranges Council as part of its commitment under its WHS Contractor Management Policy, recognises its obligation to: Ensure, so far as is reasonably practicable,
More informationWork Health and Safety. Seven Steps for Small Business
Work Health and Safety Seven Steps for Small Business Work health and safety (WHS) is a key management responsibility for every small business. South Australia s WHS laws took effect on 1 January 2013.
More informationCommunity support services occupational health and safety compliance kit
Community support services occupational health and safety compliance kit How to control the risk of workplace injuries in six areas of the community support services sector May 2011 MIA027/01/05.11 About
More informationWHS Induction Series. 36 Toolbox Talks. Contents
36 Toolbox Talks 3-5 minute toolbox talks for induction or refresher safety training. Having regular training programs that educate your workers about workplace issues has never been easier than now with
More informationWork Health and Safety (WHS) Policy
Basketball Queensland s Commitment Basketball Queensland (BQ) is committed to achieving organisational best practice in Work Health, and Safety (WHS). BQ has an organisational goal of Zero Harm and Loss
More informationContractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
More informationBenchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
More informationTo affirm the Institute s commitment to provide and maintain, as far as is reasonably practicable, a safe and healthy work and learning environment.
Policy Merge Transition Statement In November 2014, the (BKI) Board approved this policy as a BKI policy going forward. The content of this policy originated from either Bendigo TAFE, Kangan Institute
More informationExcavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
More informationWORK HEALTH AND SAFETY
WORK HEALTH AND SAFETY SCOPE POLICY Work Health and Safety System Work Health and Safety Objectives Roles and Responsibilities Executive Responsibilities Manager Responsibilities Worker Responsibilities
More informationGOVERNANCE COMMITTEE 16 JULY 2014
23 GOVERNANCE COMMITTEE 16 JULY 2014 3 STATE GOVERNMENT LEGISLATIVE REVIEW - WORK HEALTH & SAFETY ACT 2011; WORK HEALTH AND SAFETY REGULATION 2011; WORKERS COMPENSATION AND REHABILITATION ACT AND WORKERS
More informationCorporate Standard. Contractor Management
Corporate Standard Contents Purpose... 2 Scope... 2 Definitions... 2 Background... 3 Specific Requirements... 4 Responsibilities... 11 Review Date... 11 References... 11 Date Issued July 2010 Management
More informationContractor Safety Management
1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor
More informationS.I.A Sydney Safety Conference
S.I.A Sydney Safety Conference Harmonised Work Health and Safety Laws Presenter: Bill Kritharas, Partner Date: 23 October 2012 adelaide brisbane canberra melbourne newcastle perth sydney upper hunter Introduction
More informationWHS-02 Safety Management System Procedure
Table of Contents Table of Contents... 1 1 Purpose... 3 2 Scope... 3 3 Roles and Responsibilities... 3 4 Definitions... 4 5 References... 5 6 Records... 5 7 Principles... 5 7.1 Safety Management Cycle...
More informationAccounts Receivable and Rates Officer Head Office Based
Accounts Receivable and Rates Head Office Based Corporate Services Division Position Description Position Title: Accounts Receivable and Rates Level: Level 4 Department: Corporate Services, Finance Position
More informationRisk Management & Assessment at UQ
Risk Management & Assessment at UQ Course Overview: This training module has been developed for workers at the University of Queensland, and forms part of the OH&S training program at UQ. The aim of this
More informationMeasuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
More informationSenior Health & Safety Report For the County Utilities Commission
Agenda Item No: 13 To: Joint Audit Committee Date: 25 June 2014 By: Title: Chief Constable Health and Safety Purpose of Report: The purpose of this report is to provide a summary of injury/incident data,
More informationHS307 Hazard & Incident Reporting Procedure
Policy Hierarchy link Responsible Officer Contact Officer HS307 Hazard & Incident Reporting Procedure Work Health and Safety Act 2011 Work Health and Safety Regulation 2011 Work Health and Safety Policy
More informationProcedure. Work Health and Safety Incident Notification. Document number: PRO-00388. Description Process Owner Approved for issue. Rev no.
Procedure Work Health and Safety Incident Notification Document number: PRO-00388 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
More informationVolunteer Guidelines
Volunteer Guidelines COUNCIL VOLUNTEERS, INSURANCE & OCCUPATIONAL HEALTH & SAFETY GUIDELINES FOR VOLUNTEERS. INTRODUCTION The Waratah-Wynyard community and its visitors are fortunate to enjoy a lifestyle
More informationCity of Belmont Contractor Induction Program
City of Belmont Contractor Induction Program Page 1 of 17 14 March 2011 Source: OSH Date: 13/12/2013 City of Belmont Contractor Induction Program Table of Contents TABLE OF CONTENTS... 1 INTRODUCTION...
More informationWork Health & Safety Policy Document Number: WH&S 023 003 Ver 1
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1 Approved by: Senior Leadership Team Page 1 of 7 POLICY OWNER: Human Resources PURPOSE: To ensure, so far as is reasonably practicable, that
More informationTo establish a process to control all UON Health and Safety Management System Framework
UON Health and Safety Procedure: HSP 9.1 Records, Documents and Document Control 1. Purpose To establish a process to control all UON Health and Safety Management System Framework policies, elements, procedures,
More informationApproved Contractor Application (SAFE Form B)
Approved Contractor Application (SAFE Form B) 1. Business Information Company Name: Postal Address: Physical Address: (If differs from Postal) Phone: Mobile: Email Address: Number of Employees: 2. Key
More informationREGIONAL COUNCIL OF GOYDER. Work Health Safety and Injury Management Policy
Work Health Safety and Injury Management Policy Section: W Version No: 1.4 Adopted: 17/12/13 Next Review: Minutes Ref: 271/13 Responsibility: OHS & Risk Manager Note under 1.1: Organisational objectives
More informationSTRATEGIC ASSET MANAGER POSITION & PERSON DESCRIPTION February 2015
GENERAL Position & Person Descriptions form an important part of an integrated planning process to ensure that individual performance, and the required outputs and outcomes, align with the strategic and
More informationProject Management Procedures SECTION 3 PROCUREMENT
Property & Campus Services Project Management Procedures SECTION 3 PROCUREMENT Maintainer: pcs-project-office@unimelb.edu.au Page: 1 of 8 3.1 TABLE OF CONTENTS 3.2 INTRODUCTION...3 3.3 SELECTION OF TENDERERS...3
More informationWORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
More informationManager Corporate Governance. Director Corporate and Community Services. 9.5% Employer Superannuation Contribution (Included in TRP)
Position Description Position Manager Corporate Governance Directorate Department Responsible To Position Responsible For Staff Directly Responsible For Staff Indirectly Corporate and Community Services
More informationENVIRONMENT MANAGEMENT PLAN
HEALTH SAFETY AND ENVIRONMENT MANAGEMENT PLAN HEALTH SAFETY AND ENVIRONMENT MANAGEMENT PLAN DOCUMENT No.: PL01 DATE 19/02/2012 DOCUMENT TYPE : Plan TOTAL PAGES : 48 APPROVED: Craig Dunlop AMENDMENT DATE
More informationNo. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
More informationOccupational Health and Safety Management Framework Abu Dhabi An Overview of Requirements
Occupational Health and Safety Management Framework Abu Dhabi An Overview of Requirements John Ewing Chartered Health and Safety Professional Agenda OSHAD an Introduction AD EHSMS RF Brief overview of
More informationCONTRACTOR INDUCTION HANDBOOK
CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with
More informationINTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations...
March 2006 INTRODUCTION... 3 1.0 Purpose... 4 2.0 Policy... 4 Exception for Short-Term Workplace Visits... 4 Relevant Legislation and Regulations... 5 Definitions... 5 Contractor Safety Coordination Overview...
More informationAFTRS Health and Safety Risk Management Policy
AFTRS Health and Safety Risk Management Policy Responsible Officer Contact Officer Authorisation Director, Corporate and Student Services Head of Human Resources Chief Executive Officer Effective Date
More informationTraffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
More informationREPORT 4 FOR DECISION. This report will be considered in public
REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director
More informationSpecialist remote area rental solutions.
Specialist remote area rental solutions. Wet & Dry Hire Remote Area Mobilisation Modern Fleet of Specialised Plant & Equipment Highly Trained Indigenous Operators Competitive Prices Mine Site Ready Introducing
More informationRPL Kit - A Transition Guide
Diploma of OHS (BSB51307) to the Diploma of WHS (BSB51312) Transition RPL Kit A Transition Guide This process/course is designed for candidates who currently hold a Diploma of Occupational Health and Safety
More informationCORPORATE HEALTH AND SAFETY COMMITTEE
CORPORATE HEALTH AND SAFETY COMMITTEE ABERDEEN, Friday, 20 February 2015. Minute of Meeting of the CORPORATE HEALTH AND SAFETY COMMITTEE. Present:- Councillor Graham Chairperson. City Council Representatives:-
More informationHealth & Safety Management System Manual
Health & Safety Management System Manual Document Information Document Number Description HSMSM This manual describes the Health & Safety Management System elements of the Integrated Management System
More informationDistrict Council of Cleve
.1 Issued: 21/8/14 Next Review: August 2017 Procedure Name: WHS Contractor Management Procedure 1. Overview The District Council of Cleve, as part of its commitment under its WHS Contractor Management
More informationProcedure SO:1.28 Rehabilitation
SO:1.28 Policy Workplace Health and Safety Document Control Responsible Officer: Chief Operations Officer Contact Officer: Workplace health and safety officer Effective Date: 8 June 2012 Procedure Number:
More informationCONTRACTOR MANAGEMENT SYSTEM
CONTRACTOR MANAGEMENT SYSTEM NEW CONTRACTOR QUESTIONNAIRE Version 1 A Centre of Regional Excellence. December 2011 QUESTIONNAIRE TO BE RETURNED TO THE RISK MANAGEMENT SERVICE UNIT WITH SUPPORTING DOCUMENTATION
More informationIncident Response and Investigation Procedure
Incident Response and Investigation Procedure Related Policies Work Health and Safety Policy Responsible Executive Director, Human Resources Approved by Executive Director, Human Resources Approved and
More informationPolicy Work Health & Safety (WHS) (AUS)
Policy Work Health & Safety (WHS) (AUS) Navitas Limited ACN 109 613 309 Document Document I.D. GHR-04-04P Responsibility Group General Manager Human Resources Initial Issue Date June 2011 Version Control
More informationPolicy Number: 022 Injury Management and Return to Work
Policy Number: 022 Injury Management and Return to Work July 2015 Policy Details 1. Owner Manager, Business Operations 2. Compliance is required by Staff, contractors and volunteers 3. Approved by The
More informationCar Parking. A Health and Safety Perspective. David Bone
Car Parking A Health and Safety Perspective David Bone Contents 1: Introduction 2: Legislation 3: Management Systems 4: Common Workplace Hazards Introduction HEALTH AND SAFETY Is a condition free from
More informationWORK HEALTH AND SAFETY PUBLIC COURSES 2015 COURSE DATES AND FEES
PO Box 1774, Oxenford, Queensland 4210 Telephone: (07) 5573 6199 Fax: (07) 5580 6366 Email: information@drasafety.com.au WORK HEALTH AND SAFETY PUBLIC COURSES 2015 COURSE DATES AND FEES WHSA (5 days):
More informationSAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
More informationCONTRACTOR S MANAGEMENT PROCEDURE
CONTRACTOR S MANAGEMENT PROCEDURE S No Activity Responsibility 1 Pre-job meeting There shall be a pre-job meeting with contractor after award of contract in which following points shall be discussed and
More informationThis document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site.
Introduction This document is meant to be a starting point for any company wanting to implement the safety passport scheme for their contractors on site. It was put together by members of the Food & Drink
More informationADDITIONAL INFORMATION REPRESENTATIVES ON OUTSIDE BODIES
Item: ST150911/6.1 DME: 72044 ADDITIONAL INFORMATION REPRESENTATIVES ON OUTSIDE BODIES TO: FROM: FOCUS 1: STRATEGY 1.9: RE: State Executive Committee Chief Executive Officer (Contact Barry Parsons) Representation
More informationProcedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue
Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
More informationHISTORIC SCOTLAND BOARD MEETING 25-27 JUNE: ORKNEY HSB 10/06 HEALTH AND SAFETY ANNUAL REPORT FOR 2005 2006
HEALTH AND SAFETY ANNUAL REPORT FOR 2005 2006 1 INTRODUCTION 1.1 Managing corporate risks is a key issue for all organisations. One key risk is the health and safety of our staff and others such as visitors
More informationACCIDENT/INCIDENT REPORTING AND INVESTIGATION
ACT PUBLIC SECTOR ACCIDENT/INCIDENT REPORTING AND INVESTIGATION 1. PURPOSE ACT Government Directorates and entities are required to report and investigate all workplace accidents and incidents and ensure
More informationHEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
More informationINTERIM WASTE STORE CONSTRUCTION LICENCE EFFECTIVE CONTROL PLAN
Interim Waste Store Construction Licence Application Document IWS-C-LA-D1 INTERIM WASTE STORE CONSTRUCTION LICENCE EFFECTIVE CONTROL PLAN (rev 2) Prepared By Australian Nuclear Science and Technology Organisation
More informationAnnual Health and Safety r e p o r t 2 0 1 0 1 1
Statement Estates and Facilities Health and Safety Officer The Health and Safety Team Dear Colleagues, There have been a great number of significant changes to the Health and Safety management throughout
More informationGetting the occupational safety basics organised
Getting the occupational safety basics organised 10 important measures Introduction Occupational health and safety are the foundation of wellbeing at work. The employer is responsible for providing safe
More informationINCIDENT REPORTING POLICY
INCIDENT REPORTING POLICY Revised April 2011 1 Incident Reporting Policy Introduction This policy has been developed to detail the standards to be applied following an accident or incident at Northumbria
More informationThis policy applies to all policies and procedures and supporting documentation such as work instructions and templates at the Whyalla City Council.
Page 1 of 6 1. POLICY OBJECTIVE It is critical that the Corporation of the City of Whyalla develops and continues to review and amend in a consistent manner, a broad range of both Council approved (public)
More informationWork Health Safety & Injury Management Procedure
Date of Adoption: 09 / 07 / 2013 The process outlined by this Procedure will meet the minimum requirements to assist you and the Local Government Association Workers Compensation Scheme (LGAWCS) meet legislative
More informationSMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
More informationWORKPLACE REHABILITATION & RETURN TO WORK QUEENSLAND
WORKPLACE REHABILITATION & RETURN TO WORK QUEENSLAND POLICY STATEMENT Kelly Services is committed to the prevention of work-related injuries and illnesses by providing a safe working environment through
More informationBusiness Solutions Safety Handbook OHS&E
Business Solutions Safety Handbook OHS&E PERTH Sales 45 Ventnor Ave West Perth WA 6005 MANDURAH Admin & Sales 4/11 Davey Street Mandurah WA 6210 MANDURAH Short Stay Accommodation 5/25 Sholl Street Mandurah
More informationManagement of Contractors and Suppliers Procedure
Management of Contractors and HSE P1101 Table of Content 1 DOCUMENT CONTROL... 2 2 PURPOSE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 ROLES AND RESPONSIBILITIES... 5 6 PROCESS DETAILS... 9 6.1 Confirm Need
More informationSAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
More informationWORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015
WORK AT HEIGHT STFC Safety Code No 9 Rev. 1.4, Issued April, 2015 Note - This document may have been superseded by a more recent version. Revisions 1 Initial Launch November 2007 1.1 Amendments to training
More informationShort Courses. Melbourne Polytechnic 77-91 St Georges Road Building A Room A117 Preston VIC 3072
Short Courses 2015 Melbourne Polytechnic 77-91 St Georges Road Building A Room A117 Preston VIC 3072 Tel: 03 9269 1581 Fax: 03 9269 1428 Email: bec@nmit.edu.au Issue Date: February 2015 BUSINESS Office
More informationHazard Identification, Risk Assessment and Control Procedure
Hazard Identification, Risk Assessment and Control Procedure 1. Purpose To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage workplace and
More informationOccupational Health & Safety Corporate Procedures Manual
Occupational Health & Safety Corporate Procedures Manual CONTROLLED COPY Copyright July 2013 Hutchinson Builders This document in whole or part, may not be copied, reproduced, stored in any form within
More informationWE ARE HERE TO HELP. ICB Group has resources to support your loss control, claims management, safety and
ICB ICB Introduction WE ARE HERE TO HELP. ICB has resources to support your loss control, claims management, safety and will help to protect your business and increase your bottom line. This resource portfolio
More information