DCM 18.1 How to Prepare a Data Center Strategy

Size: px
Start display at page:

Download "DCM 18.1 How to Prepare a Data Center Strategy"

Transcription

1 DCM 18.1 How to Prepare a Data Center Strategy What you need to know to build a business case for data center sourcing Presented by: Steve Miano, Managing Principal, & Gary Davis, Principal/Director, Data Center Practice at PlanNet Consulting 1

2 DCM 18.1 How to Prepare a Data Center Strategy We will present an informative how-to-guide for data center managers looking to understand the process of developing a data center strategy. Along with helpful tips, real-life project examples will be utilized for decisionmakers to decide whether to upgrade, build, consolidate or co-locate their data centers. 2

3 Agenda What is a data center strategy? Getting started Assessing the current state Developing a future state model Building a business case What your decision makers want to know Case studies 3

4 Data Center Strategy A data center strategy is usually initiated for any or all of the following reasons: Data center failures are impacting the business Growth is expected to exceed power, cooling and/or space capacities Risk real or perceived Lowering Cost of Operation Improve systems availability and disaster recovery Inform a decision to build, co-locate or a combination of approaches 4

5 Getting Started Define your objectives Business drivers Technology imperatives Desired outcome Assemble a Core Team Identify/appoint a project sponsor Sponsorship typically comes from Real Estate, Facilities or IT Typical make-up of a Core Team Facilities representative (VP, Director) IT representatives - CIO, IT Infrastructure VP, Network, user representative(s) Procurement, sourcing and finance 5

6 Identify Stakeholders A data center strategy has many stakeholders It s critical to engage to appropriate stakeholder resources to gain consensus and eliminate surprises Missing a key stakeholder is analogous to missing a tire on your car 6

7 Gather Information Formalize the project with a stakeholder kick-off Introduce the initiative and objectives Layout timelines Set expectations 7

8 Assessing the Current State Develop and issue a Comprehensive Request for Information and meet with Stakeholders to gather information Some of the information is available electronically (e.g., CMDB, As-Built drawings, energy bills, etc.) Some of the information will be drawn out in Stakeholder meetings (e.g., application portfolio, financial models, etc.) RFI Categories Equipment/application inventory Data Center Facilities Real Estate Operations Network Business Systems and Services Business Continuity Finance Growth and Capacity Planning IT Strategic Plan 8

9 Assessing the Current State Key Points Establish current demand load KW is the currency Determine historical demand growth (3-5 years) Assess existing facility s attribute and constraints (e.g., Tier rating, power, cooling, space, SPOCs) Identify applications and their tier levels Identify network constraints (e.g., latency sensitive applications) Identify adjacency requirements/constraints Identify key business and IT initiatives (e.g., new business ventures, merger/acquisition, virtualization, etc.) Document outage history (many executives are unaware of outages) 9

10 Outages.what outages? 10

11 Future State Identify the future state scenario Establish operational objectives and service levels Establish availability targets Tier Rating Geography Determine efficiency objectives (PUE) Define sustainability goals Consider adaptability needs Plan for the Unplanned 11

12 Establish the Future State Determine relevant sourcing models Co-Location Greenfield Tenant Improvement Retrofit Existing Facilities Cloud Managed Services Select markets to be evaluated Ideally, markets with co-location options, cheap power and free-cooling potential Determine business affinity to particular markets Existing operations Business drivers Existing or future real estate or facility programs Include any market bias of executive management 12

13 Establish Demand Forecast Align business growth with IT growth Optimize IT deployment as part of the deployment of a new data center 30,000 28,000 26,000 24,000 22,000 Capacity Demand Forecast Capacity Demand - k Watts 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 Un-optimized Managed Optimized 13

14 Establish Demand Forecast Establish capacity threshold vs. demand forecast Depict historical growth with future planning Identify strategies to mitigate capacity constraints 14

15 Define Day 1/Day 2 Plan for incremental deployment based on demand forecast 16,000 14,000 Site 1 - Production Buildout Phases 12,000 k Watts 10,000 8,000 6,000 4,000 * DAY 1: 3,900 kw, 22.5K SF *DAY 2: 7,900 kw, 22.5K SF 2,000 0 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 Managed Forecast Deployed Capacity 15

16 Market Analysis Qualitative Metrics use to disqualify markets Energy Rates vs. Nat l average Sustainability Free cooling Reliability Telecommunications Labor Facilities Diversity Relative costs Latency Availability Relative costs Control/Lease Terms Transportation/Accessibility Flight Availability Door to Door Time Vendor and Services Support Proximity to critical vendors Environmental Risk Seismic/Volcanic Hurricane/Tidal Severe Weather Incentives (very dependent on specific properties) Enterprise Zones Sales Tax Energy rebate programs 16

17 Qualitative Market Rankings What s important to you? Keep it simple 17

18 Building a Business Case Determine Capital Expenditures Determine Operational Expenditures Develop a Multi-Year Total Cost of Ownership for each model (5/10 yr) Compare TCO for each model 18

19 Determine CapEx & OpEx CAPEX Construction and Soft Costs (Greenfield, TI) Cable Plant Network Electronics Depreciation Migration Equipment IT Labor / Services OPEX Lease costs Power Maintenance Facility Management Security IT Operations Staff Telecommunications Services Sales Tax Migration 19

20 Total Cost of Operation Co-location Example 20

21 Total Cost of Operation Tenant Improvement Example Seattle TI/Lease Year 1 Year 2 Year 3 Year 4 Year 5 5 year Total Year 6 Year 7 Year 8 Year 9 Year Year Total Operating Costs Power $ 297 $ 320 $ 345 $ 371 $ 400 $ 1,734 $ 429 $ 460 $ 494 $ 530 $ 568 $ 4,216 Predictive Maintenance $ 131 $ 221 $ 279 $ 233 $ 240 $ 1,104 $ 247 $ 254 $ 262 $ 270 $ 278 $ 2,415 Rent $ 462 $ 476 $ 490 $ 505 $ 520 $ 2,453 $ 536 $ 552 $ 568 $ 585 $ 603 $ 5,296 IT Staff $ 250 $ 258 $ 265 $ 273 $ 282 $ 1,328 $ 290 $ 299 $ 308 $ 317 $ 326 $ 2,868 Facilities Staff $ 147 $ 151 $ 155 $ 160 $ 165 $ 778 $ 170 $ 175 $ 180 $ 186 $ 191 $ 1,680 Telecommunications $ 828 $ 845 $ 861 $ 879 $ 896 $ 4,309 $ 914 $ 932 $ 951 $ 970 $ 990 $ 9,066 Other Costs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - DC Equipment Sales Tax $ 131 $ 134 $ 137 $ 139 $ 142 $ 683 $ 145 $ 148 $ 148 $ 151 $ 151 $ 1,425 Operating Costs Subtotal $ 2,246 $ 2,405 $ 2,533 $ 2,561 $ 2,644 $ 12,388 $ 2,730 $ 2,820 $ 2,911 $ 3,009 $ 3,107 $ 26,966 Capital Costs DC TI $ 6,078 $ - $ - $ - $ - $ 6,078 $ 876 $ - $ - $ - $ - $ 6,954 Racks / Cabling $ 1,112 $ - $ - $ - $ - $ 1,112 $ 127 $ - $ - $ - $ - $ 1,240 Network Electronics $ 1,157 $ - $ - $ - $ - $ 1,157 $ 378 $ - $ - $ - $ - $ 1,535 Migration Costs $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Capital Costs Subtotal $ 8,347 $ - $ - $ - $ - $ 8,347 $ 1,381 $ - $ - $ - $ - $ 9,728 Depreciation $ 796 $ 796 $ 859 $ 796 $ 796 $ 4,041 $ 716 $ 716 $ 557 $ 557 $ 557 $ 7,145 Total $ 3,041 $ 3,200 $ 3,392 $ 3,357 $ 3,440 $ 16,429 $ 3,447 $ 3,537 $ 3,468 $ 3,566 $ 3,664 $ 34, In thousands

22 Compare Models Annual Operating Costs Years 1-10 (in 1000's) Year 1 Year 2 Year 3 Year 4 Year 5 5 year Total Dif $ Dif % 10 Year Total Dif $ Dif % As-Is Owned $ 2,929 $ 3,125 $ 3,461 $ 3,661 $ 3,878 $ 17,054 $ - 0% $ 39,639 $ - 0% Optimized Owned $ 2,669 $ 2,869 $ 3,047 $ 3,232 $ 3,433 $ 15,251 $ (1,804) -11% $ 35,527 $ (4,112) -10% Market 1 Co-Lo $ 3,145 $ 3,117 $ 3,281 $ 3,298 $ 3,383 $ 16,224 $ (830) -5% $ 33,773 $ (5,866) -15% Market 2 Co-Lo $ 3,205 $ 3,188 $ 3,362 $ 3,391 $ 3,489 $ 16,635 $ (419) -2% $ 34,896 $ (4,743) -12% Market 3 TI / Lease $ 4,388 $ 3,653 $ 3,900 $ 3,882 $ 3,993 $ 19,816 $ 3,620 21% $ 44,423 $ 4,784 12% Market 4 Co-Lo $ 3,327 $ 3,400 $ 3,610 $ 3,677 $ 3,814 $ 17,828 $ 3,449 20% $ 38,203 $ (1,436) -4% Market 5 TI / Lease $ 3,302 $ 3,497 $ 3,730 $ 3,717 $ 3,823 $ 18,068 $ 3,447 20% $ 38,071 $ (1,569) -4% Market 6 Co-Lo $ 3,306 $ 3,368 $ 3,557 $ 3,622 $ 3,746 $ 17,599 $ 3,425 20% $ 37,778 $ (1,861) -5% 22

23 Scenario Analysis Annual Operating Expense Comparison $10,000 Annual Operting Expenses (1,000's) $9,000 $8,000 $7,000 $6,000 $5,000 $4,000 $3,000 $2,000 $1, w/stabalization Scenario 2 $65.5M 10 Yr TOC Year Scenario 2 Scenario 1 Scenario 3 Senario 1 $68.1M 10 Yr TOC Scenario 3 (Current-state with expansion) $58.7M 10Yr TOC 23

24 Case Studies Major Regional Bank Issues Aging primary data center in a high risk region Sub Tier 2 design History of outages Running out of capacity Facing major capital expenditures to retrofit the primary data center Lease expiring on Disaster Recovery site Results Analysis Assess deficiencies of existing facilities Determine amount of time before the DC reaches capacity Evaluate low-risk markets Evaluate own vs. co-lo Outcome Move primary DC to co-lo Retrofit existing DC to Tier 2 Repurpose existing DC to sub-production and DR Improved availability with nominal increases in TOC 24

25 Case Studies Global Technology Company Issues 40+ data centers worldwide Growing through acquisition Unsustainable operating costs Unmanageable data center footprint Business driver to consolidate operations Latency sensitivity from global engineering applications Results Analysis Outcome Assess operation efficiencies and costs Evaluate multiple markets and corporate owned real estate Evaluate geo-regional consolidation alternatives Analyze enterprise architecture Evaluate own vs. co-lo Geo-regional consolidation (N.A, ENAME, PAC-RIM) Deploy owned Tier 2+ DCs Multi-site recovery $100M+ 10-year future cost avoidance 25

26 Case Studies Global Entertainment Company Issues Significantly high energy costs High-risk location Planning for significant business technology initiatives Facing future capital expenditures to uplift primary data center Results Analysis Assess deficiencies of existing facilities Determine impact of new computing demand Evaluate low-cost markets Evaluate own vs. co-location Outcome Expand primary DC to co-lo Leverage existing facility for business partner and DR Recommended phased deployment to optimize ROI 26

27 Case Studies Regional Healthcare Company Issues Aging primary data center in a high risk region Sub Tier 2 design History of outages Running out of capacity Facing major capital expenditures to retrofit the primary data center Affinity for in-state deployment Results Analysis Assess deficiencies of existing facilities Assess mitigation strategies to buy time Evaluate regional markets Evaluate own vs. co-location Outcome Move primary DC to co-lo in a lower risk geography Repurpose existing DC to sub-production and DR Stabilize current environment Recommended best value alternative 27

28 Thank you for your time! Steve Miano Principal PlanNet Consulting Gary Davis Principal PlanNet Consulting

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal

More information

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing

HOW TO PREPARE A DATA CENTER STRATEGY. What you need to know to build a business case for Data Center sourcing HOW TO PREPARE A DATA CENTER STRATEGY What you need to know to build a business case for Data Center sourcing Presented by: Gary Davis Principal PlanNet Consulting (714) 982-5886 Steve Miano Principal

More information

ITM 6.1: To Colocate or Not Colocate

ITM 6.1: To Colocate or Not Colocate ITM 6.1: To Colocate or Not Colocate Presented by: Steve Miano, Managing Principal, PlanNet; and Gary Davis, Principal, Data Center Services, PlanNet 1 Data Center World Certified Vendor Neutral Each presenter

More information

Migration Planning and Execution:

Migration Planning and Execution: WHITE PAPER: FDCCI INDUSTRY DAY MIGRATION PLANNING AND EXECUTION Migration Planning and Execution: CA Technologies Services for Effective Data Center Consolidation SEPTEMBER 2011 Table of Contents Executive

More information

PMINJ Chapter May 5 th Symposium 2014. Best Practices to Manage Disruptive Technologies

PMINJ Chapter May 5 th Symposium 2014. Best Practices to Manage Disruptive Technologies PMINJ Chapter May 5 th Symposium 2014 Best Practices to Manage Disruptive Technologies Steve Carter The 451Group 451 Research, LLC www.451research.com Best Practices to Manage Disruptive Technologies Steve

More information

Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today s presentation)

Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today s presentation) Data Center Migration Primer Mark Smith Wednesday, June 27, 2012 General Information Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today

More information

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION Five key success factors IT organizations today are under constant business pressure to transform their infrastructure to reduce costs, increase

More information

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION Five key success factors Whether the decision to relocate or consolidate a data center is driven by cost pressure or the need for greater IT efficiency,

More information

SERVICE OFFERING: DATA CENTER REAL ESTATE & SITE SELECTION SERVICES. Data Center Expertise Delivered with Integrity

SERVICE OFFERING: DATA CENTER REAL ESTATE & SITE SELECTION SERVICES. Data Center Expertise Delivered with Integrity SERVICE OFFERING: DATA CENTER REAL ESTATE & SITE SELECTION SERVICES Data Center Expertise Delivered with Integrity Whether owning or leasing data center space, Discerning Analytics can expertly walk with

More information

Data Center Build vs. Buy

Data Center Build vs. Buy 2014 Data Center Build vs. Buy More information available on our website: /page/whitepapers Data Center Build vs. Buy 2014 When considering colocating your data center, first you must understand your technical

More information

The facility in a converged infrastructure Michalis Kefalakis HP Data Centre Facilities Strategy Lead EMEA

The facility in a converged infrastructure Michalis Kefalakis HP Data Centre Facilities Strategy Lead EMEA The facility in a converged infrastructure Michalis Kefalakis HP Data Centre Facilities Strategy Lead EMEA Agenda Introduction A typical data centre facility program A converged approach The data centre

More information

Federal Data Center Consolidation Initiative

Federal Data Center Consolidation Initiative Federal Data Center Consolidation Initiative 2011 Data Center Consolidation Plan & Progress Report (date) 1 Introduction... 2 2 Agency Goals for Data Center Consolidation... 2 3 Implementing Shared Services/Multi-tenancy...

More information

EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider EXECUTIVE REPORT The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider Executive Summary Even through challenging economic times, the need for physical data center capacity continues

More information

Data Centre Outsourcing a Buyer s Guide

Data Centre Outsourcing a Buyer s Guide Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine

More information

Getting Started with Business Intelligence

Getting Started with Business Intelligence Getting Started with Business Intelligence Tips and Tools to Ensure Success 153 Kearny St., San Francisco, CA info@birst.com (866) 940-1496 Introduction Identifying and selecting a Business Intelligence

More information

W H I T E P A P E R. Reducing Server Total Cost of Ownership with VMware Virtualization Software

W H I T E P A P E R. Reducing Server Total Cost of Ownership with VMware Virtualization Software W H I T E P A P E R Reducing Server Total Cost of Ownership with VMware Virtualization Software Table of Contents Executive Summary............................................................ 3 Why is

More information

CONSIDERING CLOUD and ON-PREMISE ACCOUNTING SOLUTIONS. A Guide to Put Things in Focus

CONSIDERING CLOUD and ON-PREMISE ACCOUNTING SOLUTIONS. A Guide to Put Things in Focus CONSIDERING CLOUD and ON-PREMISE ACCOUNTING SOLUTIONS INTRODUCTION As the world increasingly embraces a 24/7, borderless model for business, the demands on finance have never been greater. Unfortunately,

More information

2011 EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

2011 EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider 2011 EXECUTIVE REPORT The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider Executive Summary Even through challenging

More information

Optimizing for Success in Implementing Mission Critical Real Estate Strategies

Optimizing for Success in Implementing Mission Critical Real Estate Strategies #CNGSanDiego Optimizing for Success in Implementing Mission Critical Real Estate Strategies Moderator: Paul E. Himes Panelists: Keith Dines Digital Realty Trust Bill Dougherty Cushman & Wakefield Dave

More information

IT Disaster Recovery Services Program

IT Disaster Recovery Services Program Summary Overview of 2016-2018 Program v.20160526 IT Disaster Recovery Strategy Implementation 2008 Data Center Strategic Plan Part 1 Part 2 Disaster Recovery Strategic Plan Part 1 Part 2 2016 2019 Implementation

More information

Selecting a colocation provider needn't be a risky endeavour.

Selecting a colocation provider needn't be a risky endeavour. COLOCATION BUYER S GUIDE Selecting a colocation provider needn't be a risky endeavour. Guidance for assessing your own colocation requirements, and a framework to assess the providers on the market. An

More information

Bridging the Gap Between IT and Facilities: Morgan Stanley Case Study

Bridging the Gap Between IT and Facilities: Morgan Stanley Case Study Bridging the Gap Between IT and Facilities: Morgan Stanley Case Study Vijay Mistry, Executive Director Head of Enterprise Data Centers - Europe February 2014 Morgan Stanley: A Leader in Global Financial

More information

Hybrid Cloud Mini Roundtable. April 17, 2013. Expect Excellence. www.divihn.com

Hybrid Cloud Mini Roundtable. April 17, 2013. Expect Excellence. www.divihn.com Hybrid Cloud Mini Roundtable April 17, 2013 Expect Excellence www.divihn.com Today s Agenda What to expect today Introductions Plus, why are you here this evening? What is Hybrid Cloud? Why Hybrid Cloud?

More information

Federal Data Center Consolidation Initiative (FDCCI)

Federal Data Center Consolidation Initiative (FDCCI) Federal Data Center Consolidation Initiative (FDCCI) Final Data Center Consolidation Plan U. S. Office of Personnel Management Office of the Chief Information Officer Update 9/30/2011 1 Introduction...

More information

Information Technology Strategic Plan Final Presentation

Information Technology Strategic Plan Final Presentation City of Boise, ID Information Technology Strategic Plan Final Presentation August 28, 2012 Pacific Technologies, Inc. Practical planning. Positive change. City of Boise, ID IT Strategic Plan Final Presentation

More information

TCO (TOTAL COST OF OWNERSHIP) CLIENT ALTERNATIVES TO PURCHASING

TCO (TOTAL COST OF OWNERSHIP) CLIENT ALTERNATIVES TO PURCHASING TCO (TOTAL COST OF OWNERSHIP) CLIENT ALTERNATIVES TO PURCHASING William J. Stuckert President CDO2 TCO (Total Cost of Ownership) Agenda TCO Total Cost of Ownership Industry Information Finance Alternatives

More information

Data Center: In House Outsource Optimize Options

Data Center: In House Outsource Optimize Options Data Center: In House Outsource Optimize Options Presented By: Mark Evanko Principal Engineer BRUNS-PAK 999 New Durham Road Edison, NJ 08817 www.bruns-pak.com AFCOM Global Data Center World Conference

More information

U.S. Nuclear Regulatory Commission

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 2011 Data Center Consolidation Plan and Progress Report Version 2.0 September 30, 2011 Enclosure Contents 1 Introduction... 2 2 Agency Goals for Data Center Consolidation...

More information

Making Leaders Successful Every Day

Making Leaders Successful Every Day Making Leaders Successful Every Day Why & How Enterprises Are Adopting the Cloud James Staten, VP, Principal Analyst The bottom line 1. Public cloud adoption is driven by the business, not IT Empowered

More information

Physical infrastructure: Effective consolidation of space, power, and cooling

Physical infrastructure: Effective consolidation of space, power, and cooling 2011 GreenGov Symposium Oct. 31 Nov. 2, 2011 Washington Hilton Washington, DC Physical infrastructure: Effective consolidation of space, power, and cooling Neil Rasmussen Sr. VP, Innovation Chief Scientist,

More information

Building the Business Case for. Data Center Modernization

Building the Business Case for. Data Center Modernization White Paper Intel Xeon Processor Data Center Modernization Building the Business Case for Data Center Modernization A financial and technical ROI-based approach Introduction IT departments are under more

More information

Proposal: Long Term Data Center Briefing Presentation. Information System Advisory Committee May 24, 2012

Proposal: Long Term Data Center Briefing Presentation. Information System Advisory Committee May 24, 2012 Proposal: Long Term Data Center Briefing Presentation Information System Advisory Committee May 24, 2012 Data Center Strategic Roadmap Goal Provide functional data center facilities for Citizens which

More information

Data Center Refresh: Build or Buy?

Data Center Refresh: Build or Buy? Data Center Refresh: Build or Buy? In-house data centers vs. colocation, managed services and cloud computing: 5 questions to consider Presented by Cosentry, the trusted Midwest provider of Managed and

More information

OUTSOURCE or INSOURCE A Datacentre Buy or Build Guide

OUTSOURCE or INSOURCE A Datacentre Buy or Build Guide White Paper OUTSOURCE or INSOURCE A Datacentre Buy or Build Guide Yidan Wang V1.1 Oct 2013 A MATHEMATICAL APPROACH [ F - ( R + M + T )] x C = S Executive Summary The datacentre industry, which is a component

More information

Cloud Computing. Introductions 10/20/2010

Cloud Computing. Introductions 10/20/2010 Cloud Computing An In-Depth Discussion Introductions Nathaniel Gates President of Cloud49, Anchorage AK Nathaniel Gates is a lifelong Alaskan who understands the unique challenges businesses face operating

More information

Factors to Consider When Developing a Cloud ROI. Michelle Olson

Factors to Consider When Developing a Cloud ROI. Michelle Olson Factors to Consider When Developing a Cloud ROI Michelle Olson Return On Investment (ROI) The calculation for return on investment can be modified to suit any situation. It all depends on what you decide

More information

Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions

Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions Nov. 17, 2011 Introduction Today s Presenters: Rachel Dines, Research

More information

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor Table of Contents Executive Summary... 3 Virtual Data Center Trends... 3 Reducing Data Center

More information

The business value of improved backup and recovery

The business value of improved backup and recovery IBM Software Thought Leadership White Paper January 2013 The business value of improved backup and recovery The IBM Butterfly Analysis Engine uses empirical data to support better business results 2 The

More information

CIOs: How to Become the CEO s Business Partner

CIOs: How to Become the CEO s Business Partner CIOs: How to Become the CEO s Business Partner A Best Practices ebook Nicolas Betbeder-Matibet, Managing Director, MEGA Asia - The Agenda for CIOs in 2012 According to Gartner*: CIO strategies concentrate

More information

DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE

DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE 1 Introduction and Instructions This sample Statement

More information

Insourcing vs. Outsourcing. Bart Leung Senior Associate, Ehvert Mission Critical

Insourcing vs. Outsourcing. Bart Leung Senior Associate, Ehvert Mission Critical Insourcing vs. Outsourcing Bart Leung Senior Associate, Ehvert Mission Critical 1 Agenda Ehvert Mission Critical Data Centres Then and Now Power & Cooling Considerations Costs Making the Choice 2 History

More information

SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY

SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY SCALABILITY & CAPACITY PLANNING: BUILD VS. BUY Considerations when Investing in IT Infrastructure Milldam Public Affairs October 3, 2011 A white paper by Overview: This paper explores issues that arise

More information

EXECUTIVE REPORT. Scalability & Capacity Planning: Build vs. Buy

EXECUTIVE REPORT. Scalability & Capacity Planning: Build vs. Buy EXECUTIVE REPORT Scalability & Capacity Overview This paper explores issues that arise when planning for growth of Information Technology infrastructure. The paper explains how colocation of data centers

More information

Data Center / Collocation Real Estate Dynamics

Data Center / Collocation Real Estate Dynamics Data Center / Collocation Real Estate Dynamics 1 Outline Data Center Real Estate Market Historical Demand/Supply Current costs and timeline Deal Structuring Direct Control of Data centers vs. Collocation

More information

Scalability & Capacity Planning: Build vs. Buy

Scalability & Capacity Planning: Build vs. Buy EXECUTIVE REPORT Scalability & Capacity Overview This paper explores issues that arise when planning for growth of Information Technology infrastructure. The paper explains how colocation of data centers

More information

Defining a blueprint for a smarter data center for flexibility and cost-effectiveness

Defining a blueprint for a smarter data center for flexibility and cost-effectiveness IBM Global Technology Services Cross-industry Defining a blueprint for a smarter data center for flexibility and cost-effectiveness Analytics-based services provide insight for action 2 Defining a blueprint

More information

Cloud Computing Readiness - Background

Cloud Computing Readiness - Background IT Best Practices Audit Cloud Computing Readiness - Background Cloud based offerings are maturing and finally taking off after a long period (e.g. Software as a Service offerings have been available for

More information

Oracle Data Centre Rationalisation

Oracle Data Centre Rationalisation Ian Gardner - Oracle Applications Architect 2012-06-13 Oracle Data Centre Rationalisation A Practical View Ian.Gardner@uk.ibm.com Tel. 07740 923060 2012 IBM Corporation Why perform Oracle Data Centre Rationalisations...

More information

Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com

Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com WHITE PAPER Solutions for the Datacenter's Thermal Challenges Sponsored by: IBM and Intel Jed Scaramella January 2007 Matthew Eastwood IDC OPINION Global Headquarters: 5 Speen Street Framingham, MA 01701

More information

Engineers Ireland Cost of Data Centre Operation/Ownership. 14 th March, 2013 Robert Bath Digital Realty

Engineers Ireland Cost of Data Centre Operation/Ownership. 14 th March, 2013 Robert Bath Digital Realty Engineers Ireland Cost of Data Centre Operation/Ownership 14 th March, 2013 Robert Bath Digital Realty Total Cost of Operation (TCO) Rental TCO - 10 Year Lease Term Power Cooling Connectivity Costs 26%

More information

www.pwc.com Business Resiliency Business Continuity Management - January 14, 2014

www.pwc.com Business Resiliency Business Continuity Management - January 14, 2014 www.pwc.com Business Resiliency Business Continuity Management - January 14, 2014 Agenda Key Definitions Risks Business Continuity Management Program BCM Capability Assessment Process BCM Value Proposition

More information

Introduction to AWS Economics

Introduction to AWS Economics Introduction to AWS Economics Reducing Costs and Complexity May 2015 2015, Amazon Web Services, Inc. or its affiliates. All rights reserved. Notices This document is provided for informational purposes

More information

Market Pulse Research: Big Data Storage & Analytics

Market Pulse Research: Big Data Storage & Analytics Market Pulse Research: Big Data Storage & Analytics MARKETING RESEARCH EMPLOYEE ENGAGEMENT A WORLD OF INSIGHTS January 2015 Presented on behalf of HP & Microsoft METHODOLOGY & RESEARCH OBJECTIVES Sample

More information

How To Make A Data Center More Efficient

How To Make A Data Center More Efficient Who broke the colo? May - 2007 What Happens OUTSIDE the Data Center. Broadband Video! IP Centric Devices Thick Clients Web Services Real Time Communications Big Data/Big Pipes 2 Is Driving Deployment INSIDE

More information

Technology & Innovation Conference. July 2015

Technology & Innovation Conference. July 2015 Technology & Innovation Conference July 2015 Growth Drivers of Digital Banking Channels Globally, there are 5 billion mobile phone users, which is 2.5x the number of bank accounts. Meeting the needs of

More information

Data Center Operations

Data Center Operations Data Center Operations Reducing Total Cost of Ownership Christopher S. Lodge Vice President & General Manager, Data Center Services www.paetec.com Agenda Introductions IT Key Data Objectives for 2010 IT

More information

Enabling an agile Data Centre in a (Fr)agile market

Enabling an agile Data Centre in a (Fr)agile market Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without

More information

Datacenter Migration Think, Plan, Execute

Datacenter Migration Think, Plan, Execute Datacenter Migration Think, Plan, Execute Datacenter migration is often regarded as a purely technical, almost trivial side-project, to be delivered by existing IT staff alongside their day jobs. With

More information

CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY.

CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY. CYRUSONE COMPANY OVERVIEW BUILT FOR TOMORROW. READY TODAY. ABOUT CYRUSONE GLOBAL DATA CENTER FACILITIES. A Global Leader 24 high performance data centers worldwide Servicing 9 of top 20 Global Fortune

More information

AE Initiative Summary Business Case Data Center Aggregation

AE Initiative Summary Business Case Data Center Aggregation AE Initiative Summary Business Case Data Center Aggregation Business Sponsorship & Ownership Project Name: Team Members Business Unit(s): Business Process Owner(s): Preliminary Cost Estimate: Preliminary

More information

How To Design A Data Center

How To Design A Data Center Approaches to Achieve Next-Generation Data Center Joe Li Business Head of Mission Critical Infrastructure Solutions What CIOs should know.. High way to Next-Generation Data Center Energy-Efficiency Scalability

More information

Data Center Solutions - Modular Design

Data Center Solutions - Modular Design June 29, 2010 Issue Dustin Kehoe Current Analysis Principal Analyst, The economics of data centers are completely out of sync for many enterprises. This is caused by a range of interconnected variables

More information

Building a Next Generation Data Centre in Hong Kong

Building a Next Generation Data Centre in Hong Kong Building a Next Generation Data Centre in Hong Kong Case Study: Hong Kong Exchanges and Clearing Limited Finance & Investment Forum for Data Centres Asia and Pacific October 26th 2011 Ryan Wuebbels Head

More information

Unique Facility Identifier Data Standards Business Case

Unique Facility Identifier Data Standards Business Case Office of Financial Management S T A T E O F W A S H I N G T O N Primary Contributors Office of Financial Management: Data Architecture Group Information Technology Portfolio Steering Committee Unique

More information

How To Save Money On A Data Center

How To Save Money On A Data Center Federal Data Center Consolidation Initiative Data Center Consolidation Plan for the U.S. Small Business Administration Maintained by: The Office of the Chief Information Officer Paul Christy, CIO Revised:

More information

CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE

CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE CLOUD ERP AND ACCOUNTING: SELECTION AND PLANNING GUIDE Over the last three years, well over half of U.S. companies have elected to take advantage of one or more cloud-based solutions or services, but critical

More information

Data Center & Cloud Transition Service Models. February 4, 2013

Data Center & Cloud Transition Service Models. February 4, 2013 Data Center & Cloud Transition Service Models February 4, 2013 Agenda Background on HUIT s Cloud Vision and Goals Guiding Principles for Cloud Transition & SOC Service Models Transition Funding Approach

More information

Evolution of the Data Center

Evolution of the Data Center Evolution of the Data Center Carole Post New York City Chief Information Officer Albany, NY June 9, 2011 1 Topics 1. Shared Services in a Federated Enterprise 2. IT Infrastructure Consolidation 3. Enterprise

More information

C24 - Inside the Data Center Andrew J. Luca

C24 - Inside the Data Center Andrew J. Luca C24 - Inside the Data Center Andrew J. Luca Inside the Data Center What an auditor needs to know Course Objectives Understand the looks and feel of a data center Know what to look for and what questions

More information

Data Center Consolidation in the Federal Government Looking beyond the technology

Data Center Consolidation in the Federal Government Looking beyond the technology Data Center Consolidation in the Federal Government Looking beyond the technology Overview The reported number of Federal data centers grew from 432 in 1998 to 2,094 in 2010 1, an increase that is costly,

More information

Datacenter Efficiency

Datacenter Efficiency EXECUTIVE STRATEGY BRIEF Operating highly-efficient datacenters is imperative as more consumers and companies move to a cloud computing environment. With high energy costs and pressure to reduce carbon

More information

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity SmartDesign Intelligent, Integrated Infrastructure For The Data Center Solutions For Business-Critical Continuity Prepare Your Data Center For What s Next Efficiency. Availability. Capacity. Control. One

More information

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

IBM Portable Modular Data Center Overview for Critical Facilities Round Table Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers

More information

IT Economics: A Structured Approach to Identify, Measure and Reduce IT Costs. David Merrill Chief Economist Hitachi Data Systems

IT Economics: A Structured Approach to Identify, Measure and Reduce IT Costs. David Merrill Chief Economist Hitachi Data Systems IT Economics: A Structured Approach to Identify, Measure and Reduce IT Costs David Merrill Chief Economist Hitachi Data Systems Leverage IT Economics Econ 101 Demand is growing Budgets are flat or declining

More information

Federal Data Centers: The Build vs. Buy Decision

Federal Data Centers: The Build vs. Buy Decision Executive Report Federal Data Centers: The Build vs. Buy Decision How system integrators supporting government agencies should approach IT infrastructure solutions. Why third-party IT infrastructure providers

More information

Disaster recovery strategic planning: How achievable will it be?

Disaster recovery strategic planning: How achievable will it be? Disaster recovery strategic planning: How achievable will it be? Amr Ahmed Ernst & Young Advisory Services, Executive Director amr.ahmed@ey.com Christopher Rivera Ernst & Young Advisory Services, Manager

More information

Common mistakes in datacentre planning

Common mistakes in datacentre planning Common mistakes in datacentre planning White Paper Last edited: March 2013 Document Control Document Information Title Author Common mistakes in datacentre planning Nick Ewing This document is based upon

More information

Why the Hybrid Cloud Makes Sense

Why the Hybrid Cloud Makes Sense CITO Research Advancing the craft of technology leadership Why the Hybrid Cloud Makes Sense Sponsored by Contents The Hybrid Cloud: A CIO s New Focus 1 Business Challenges Driving Enterprises into the

More information

The Surprising Truth About Your DR Maturity Level

The Surprising Truth About Your DR Maturity Level The Surprising Truth About Your DR Maturity Level Todd Scallan VP, Product & Engineering tscallan@axcient.com Daniel Kuperman Sr. Manager Product Marketing dkuperman@axcient.com Agenda 1 Context: Why do

More information

Data Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert

Data Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert Data Center Consolidation Trends & Solutions Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert Agenda Traditional Data Centers Drivers of a Changing Environment Alternate

More information

Patrick Osterhaus President & CTO Protera Technologies Patrick@protera.biz

Patrick Osterhaus President & CTO Protera Technologies Patrick@protera.biz Leveraging the Cloud to Increase the Efficiency and Reduce Cost of Operation of Your SAP Landscape Lynn Warhurst Controller Merrifield Garden Center Lynn@merrifieldgardencenter.com Patrick Osterhaus President

More information

Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation

Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation EXECUTIVE REPORT Avoid Rolling the Dice: Solving the CIO s Data Center Dilemma with Colocation Overview CIOs today face a litany of challenges and risks when it comes to meeting the goal of making the

More information

NetApp SANscreen: come controllare i costi senza sacrificare la service quality. Roberto Patano Business Development Manager NetApp Italia

NetApp SANscreen: come controllare i costi senza sacrificare la service quality. Roberto Patano Business Development Manager NetApp Italia NetApp SANscreen: come controllare i costi senza sacrificare la service quality Roberto Patano Business Development Manager NetApp Italia Data Center Transformation Explosive Data Growth Dedicated Architectures

More information

Below you ll find out how we helped clients with our Design, Consulting & Management services.

Below you ll find out how we helped clients with our Design, Consulting & Management services. PROJECT PORTFOLIO Introduction Nephin and its team have worked in a wide variety of industries, both nationally and internationally. This work ranges from designing large, cutting-edge facilities for large

More information

Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops

Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops Reducing Total Cost of Ownership through Outsourced Hosted Virtual Desktops July 2009 Table of Contents Introduction... 3 What are Outsourced Hosted Virtual Desktops?... 3 How Outsourced Hosted Virtual

More information

EXECUTIVE REPORT. Build vs Buy: Key Steps to Overcome Capital Constraints in the Data Center

EXECUTIVE REPORT. Build vs Buy: Key Steps to Overcome Capital Constraints in the Data Center EXECUTIVE REPORT Build vs Buy: Key Steps to Overcome Capital Constraints in the Data Center Overview Data center industry trends are changing the way businesses spend money and invest in IT initiatives.

More information

IT Financial Management and Cost Recovery

IT Financial Management and Cost Recovery WHITE PAPER November 2010 IT Financial Management and Cost Recovery Patricia Genetin Sr. Principal Consultant/CA Technical Sales David Messineo Sr. Services Architect/CA Services Table of Contents Executive

More information

Next Steps for Federal Data Center Consolidation Initiative

Next Steps for Federal Data Center Consolidation Initiative Next Steps for Federal Data Center Consolidation Initiative Presented to: GDI Conference April 28 2011 Creating Value, Delivering Results 2011 eglobaltech Incorporated. Tech, Inc. All rights reserved.

More information

Data Center Colocation Build vs. Buy

Data Center Colocation Build vs. Buy Data Center Colocation Build vs. Buy Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for

More information

Colocation Buyer s Guide. Learn the benefits of colocation and decide if a third party data center makes sense for your business.

Colocation Buyer s Guide. Learn the benefits of colocation and decide if a third party data center makes sense for your business. Colocation Buyer s Guide Learn the benefits of colocation and decide if a third party data center makes sense for your business. Size does matter. Where do you fit? Colocation is not total outsourcing.

More information

The Big Data Revolution Our Industry is changing FAST!

The Big Data Revolution Our Industry is changing FAST! The Big Data Revolution Our Industry is changing FAST! David Blumanis Vice President, Data Center Solutions Asia Pacific & Japan Massive Growth of Data The Internet is going through radical changes: From

More information

Pursuing Operational Excellence. Better Data Center Management Through the Use of Metrics

Pursuing Operational Excellence. Better Data Center Management Through the Use of Metrics Pursuing Operational Excellence Better Data Center Management Through the Use of Metrics Objective Use financial modeling of your data center costs to optimize their utilization. Data Centers are Expensive

More information

mini data center facilities as a service: choosing the right infrastructure team Walter Miros / May 19, 2016

mini data center facilities as a service: choosing the right infrastructure team Walter Miros / May 19, 2016 mini data center facilities as a service: choosing the right infrastructure team Walter Miros / May 19, 2016 Copyright 2016 The information contained herein is subject to change without notice. Agenda

More information

Radware ADC-VX Solution. The Agility of Virtual; The Predictability of Physical

Radware ADC-VX Solution. The Agility of Virtual; The Predictability of Physical Radware ADC-VX Solution The Agility of Virtual; The Predictability of Physical Table of Contents General... 3 Virtualization and consolidation trends in the data centers... 3 How virtualization and consolidation

More information

Software License Compliance Review

Software License Compliance Review SoftSummit 2009 Preparing for a Software Vendor Compliance Review: Improving Response and Realizing Cost Savings Through SAM Presented by: Bruce Vanderbush Partner Christopher Ruhl Director October 21,

More information

Organizations remain under intense pressure to reduce costs To reduce costs we must increase efficiency in resource allocation

Organizations remain under intense pressure to reduce costs To reduce costs we must increase efficiency in resource allocation Total Cost of Ownership: What is it Really? August 11, 2003 The Challenge How do I optimize my IT investments? Organizations remain under intense pressure to reduce costs To reduce costs we must increase

More information

RESTRICTION ON DISCLOSURE AND USE OF DATA

RESTRICTION ON DISCLOSURE AND USE OF DATA RESTRICTION ON DISCLOSURE AND USE OF DATA This document includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose

More information

ABERDEEN CITY COUNCIL

ABERDEEN CITY COUNCIL ABERDEEN CITY COUNCIL COMMITTEE Finance Policy & Resources DATE 23 rd April 2015 DIRECTOR TITLE OF REPORT REPORT NUMBER CHECKLIST COMPLETED Ewan Sutherland (Acting) Data Centre Provision CG/15/24 Yes 1.

More information

Hosting Infrastructure. Data Centre Economics

Hosting Infrastructure. Data Centre Economics Hosting Infrastructure Data Centre Economics THE IT LIFECYCLE The IT Lifecycle is 3-5 years before a refresh is required. Data Centre infrastructure has a 5 year lifecycle before reinvestment is required.

More information