2 75 ELECTRICITY SUPPLY - MEASURE OF LIVING AND DEVELOPMENT Introduction : T h e ELECTIRICTY is a basic physical infrastructure, that has the capability of improving the level of living and development. However, lack of sufficient electricity and other sources of energy has hampered the growth of industries The per capita consumption of power in India is a meager 282 Kwh whereas in Canada it is 18,117, Kwh, Sweeden 16,655 Kwh and the United States 12,160, Kwh (1996). The consumption of power per consumer in Ahmedabad is 2768 Kwh, including the commerical and industrial consumers, which is about 10 times more than the national average. About - 887,085 consumers including 474 high-tension industrial consumers consumed 2466 million units of electricity during within the Ahemedabad electricity zones (A.E.C.). The per capita consumption of electricity is considered as one of the realistic indicators of development and social well-being. The modem urban living needs more electricity due to the use of elevators in high-rise buildings, airconditioning systems at homes, wide ranging domestic appliances which reflect the distinct high level of living. In this section an attempt is made to analyse (1) the growth and development of electricity in Ahmedabad city (2) the power transmission network (3) the sectorwise consumption of electricity (4) seasonal variations in electricity consumption and revenue earned (5) intra-urban variations (AEC zones) in residential and commercial consumption of electricity and (6) Zone-wise distribution and density of street lamp-posts in Ahmedabad city Growth and Development of Electricity : The electricity supply operations commenced in Ahmedabad in the year 1915 with a small diesel power station of 2 x 50 Kw. The diesel alternator sets were located at shahpur within the Walled city of Ahmedabad To meet the further obligations of supplying electricity to the consumers, the company has given not only the licence to install the transmission and distribution (T & D) system in the city but also to provide adequate generating capability Thus, soon after the establishment of the power house at Shahpur, the company installed steam thermal stations A and B on the western bank of river Sabarmati near the railway bridge.

3 76 In late fifties, the generating capacity was increased by installing C station at Sabarmati, with an installed capacity of 120 MW comprising four units of 15 MW and two units of 30 MW. The company s license was further extended in the late seventies when another thermal unit of 110 MW D station was installed and in eighties E station with 110 MW installed capacity In the meantime, the A and B stations which had outlived their lives were scrapped and F station of 110 MW was installed and commissioned in (Appendix No. X) Lastly, G station, a combined cycle plant of gas and steam turbines with a total capacity of around 100 MW has been installed and commissioned in in the southern part of the city at Vinzol (Figure 6 1) Electricity has played an important role in the growth and development of industries in Ahmedabad. The textile industries which had flourished in the past, suffered sudden setback during the last decade leading to the reduction in load growth. However, the load in southern part of city near Vatva has been growing at the rate of about percent per annum due to the development of industrial estates by the Gujarat Industrial Development Corporation (GIDC). The growth of industries on the eastern side is also significant. The load in the commercial and residential sector also has registered an increase due to the expansion of residential areas in the Western Ahmedabad covering the fringe villages such as Ghatlodia, Sola, Thaltej, Ambli, Bopal, Sarkhej etc. and associated commercial development along the main transport arteries and junctions However, it is observed that the annual overall load growth has been varying from year to year and the average has been a little less than 4 percent. Power Transmission System : Initially, 11 Kw express cables were laid from Sabarmati thermal power station to a number of main receiving stations located at various load centres in the city, for transmitting the generated power. Later on when the C station was commissioned, two 66 Kw overhead double circuit power line transmission system was installed on the eastern perphery of the city with stepdown stations. When the subsequent 110 MW units were installed, 132 KV system at substation U Simultaneously 66 KV interconnection with Gujarat Electricity Board was also upgraded to 132 KV at Sabarmati to augment the capacity of the interconnection to 150

4 ELECTRICITY ZONES WITH TRANSMISSION LINES AND SUBSTATIONS OF AHMEDABAD CITY INDEX == AECO S 132 KV UNE AECO S 66KV LINE AJECO S 66 KV CABLE 132 KV SUB-STATION a 66 KV SUB-STATION MJLS. A SWITCH HOUSE SCALE KMS FIG 6.1

5 78 MW. Thus, the electricity is transmitted throughout the city via., the extra high voltage (EHV) which take care of extra bulk load. At the generating station, the 11 Kw is stepped up through the transformers and 66 or 132 EHV lines are connected to various EHV stations There are 12 EHV stations in the city including those at Narol, Odhav, Nikol, Amraiwadi, Vatva, Vasna, Naranpura, Thaltej, Jamalpur and Gandhinagar (Fig 6 1). EHV Sub-stations are fed by high capacity distribution transformers Hene the electricity is stepped down and converted to HT lines (11 KW) which connect various localities. Further it is converted into LT (440 watts) via substation transformers and power is distributed to residential houses through underground cables or through overhead lines from the street poles. EHV lines are used because one EHV line is equivalent to hundreds of lower voltage power lines. The new 132 KV Substation at Thaltej became operational during At the close of the year March 1997 there were 2433 kms. (Previous year kms) of high tension lines and 8285 Ions (Previous year 7585 kms) of low tension mains in the system. 157 new distribution Substations were added during the year. Sectorwise Consumption of Electricity : The consumption of electricity by various sectors is intersting The industrial connections (277 connections) with high tension lines account for only percent of the total connections of the city but interms of consumption account for percent of the total consumption (Table 6.1). The urabn institutions also use the high tension power showing ratio of 1 74 as connection to power consumption. In the low tension power (LTP) use category there are 4.13 percent of total connections consuming percent of total consumption. There are maximum number of residential connections 6,82,754, accounting for percent of the total connections but interms of electricity consumption it only registers percent of the total electricity consumption. Even the per residential consumption and yearly consumption is lowest among all other users. The city has in all 8,47,532 connections consuming million units o f power ( ) The decreasing order interms of absolute number of

6 79 TABLE Sectrowise Consumption of Electricity Type of Yearly Number Percent of Cumulative Consumption Percent of Cumulative use consumption of total percent of of power power percent of power connections connections connections (in MU) consumption consumption r o = KWH Industrial 30,22, (HT) Instituttonal 7,68, (HT) LTMD 12,397 34, and LTP Commercial ,28, Agricultural Residential 969 6,82, Total ,47, connections is residential, commercial, LTMD and LTP, agriculture, industry and institutional, whereas interns of absolute power consumption the decreasing order is industrial, residential, LTMD and LTP, commercial, institutional and agricultural sectors. The lorenz curve (Fig. 6.2), show the concentration of power consumption by number of connections. Nearly 71 percent of the total power consumption is accounted by 19 percent of the total electricity connections, (mainly, industrial, institutional, commercial and agricultural), whereas the remaining 29 percent of the electricity is consumed by the 80 percent of the connections (residential). Though it is highly, uneven pattern of electricity consumption, the basic requirement of power by various sectors is highly uneven. The industrial and institutional connections use high tension power which constitute 0.05 percent of the total connections of the city but account for 40 percent of the total electricity consumption o f the city (Fig 6.2)

7 DEGREE OF CONCENTRATION OF POWER CONSUMPTION BY VARIOUS SECTORS, IN AHMEDABAD CITY. ( ) CUMULATIVE V. OF POWER CONNECTIONS CUMULATIVE % OF POWER CONSUMPTION VARIOUS SECTORS 11 INDUSTRIAL INSTITUTION LTMD & LTP COMMERCIAL AGRICULTURE RESIDENTIAL FIG 62

8 81 Seasonal Variation in Electricity Consumption : o The demand for electricity in various sectors of urban life and activity varies from season to season. The variation is less significant in case of AMC requirement as compared to the residential requirement (9 percent variation). The electricity consumption in the residential sector is relatively low during winter due to cool weather condition and is high during summer and monsoon due to hot and humid condition and also due to associated mosquito menace TABLE Electricity Consumption and Revenue Earned by Seasons ( ) Type of use Summer March-June Million Revenue units (Rs. in lacs) Monsoon July-Oct Million Revenue units (Rs. in lacs) Winter Nov.-Feb. Million Revenue units (Rs. in lacs) Total Million Revenue units (Rs. in lacs) Industrial , , , , (33.67) (34.49) (31.84) (100.00) Residential , , (34.95) (38 98) (26.06) (100.00) Commercial (35 21) (36 94) (27.85) (100.00) AMC* (33.66) (33.20) (33,15) (100.00) 4.65 Agricultural (LTP) (4345) (16.99) (39 55) (100.00) 0.63 Miscellaneous ^ (38.66) (36.92) (24.42) (100.00) 0.14 Street lighting , (3093) (38,13) Total , , , , (35.86) (29.95) (100.00) (100.00) (*AMC - for Municipal hospitals, Water pumping stations, Sewerage treatment plants and Municipal buildings) (Figures in bracket indicate row percentage)

9 82 However, during the summer season the electricity consumption is relatively low on account of residents habit of sleeping on the terrace, balcony and in the open space. The electricity consumption by way of street lighting is more (38.13 percent) during winter (Table 6 2) due to longer duration of night hours The low demand for electricity (17 percent) in the agricultural sector during monsoon season is well reflected However, for winter crops including greengrocery there is a need of irrigation and hence the higher electricity consumption (39.55 percent of the total annual requirement of agriculture) Thus, except agriculture and street lighting all other sectors consume less electricity during winter season compared to other seasons. The summer and monsoon season requirement does not show much of difference except in agricultural sector (Table 6.2). The industrial sector contributed nearly 60 percent to the total revenue earned by the AEC during The residential consumers contributed about 20 percent and the commercial consumers about 14 percent and AMC about 5 percent to the total revenue The industrial sector registered an increase in the percentage share of electricity consumption from in to in (Table 6 1 and 6.2) Intra-urban Variation in Electricity Consumption : The Ahmedabad Electricity Company has made three zones of Ahmedabad namely the City zone, Naranpura and Amraiwadi for their administrative and services purpose The City zone o f AEC covers 17 municipal wards extending over sq km. area and serve 39 percent of total residential and commercial consumers of Ahmedabad city. About one third of the total residential and commercial consumption of the city is recorded in the City zone. The Naranpura zone covers 9 municipal wards west of Sabarmati river extending over sq.km, area and serve 34 percent of the residential and commercial consumers who consume 44 percent of the total residential and commercial consumption. This shows the higher level of socio-economic condition and living of the residents of Naranpura zone (Western Ahmedabad) The landscape of Western Ahmedabad is marked by the quality development of residential and commercial establishments Even the per consumer per year average electricity bill is about Rs (Table 6.3), which is much higher than the other two zones. Amraiwadi zone shows a lower per consumer per year electricity bill (Rs. 3036) indicating the residential and commercial

10 83 development of lower socio-economic nature Except for the average number of consumers, the descending order of zones for electricity consumption, average consumption, total revenue generation and per consumer per year electricity bill is Naranpura, City zone and Amraiwadi 46 percent of the total residential and commercial electricity revenue comes from Naranpura zone. The city zone has more number of consumers (Table 6 3) but their relative per consumer consumption is low on account of short duration of use in case of commercial consumers and conservational attitude o f residential consumers (Fig 6.3 & 6.4) TABLE Zonewise Distribution of Residential and Commercial Consumers, Consumption and Revenue ( ) AEC zones Absolute and average No. of consumers (Res.+ comm. + others Elect. consumption in million units Average consumption (Kwh) Per consumer per year Elect bill (in Rs.) Total revenue (Rs. in lacs) City zone , (39 29) (33 29) (33.36) Naranpura 306, , (34 44) (44 49) (46.14) Amraiwadi 233, (26.27) (22.22) (20.50) Total 8,89, , (100) (100) (100) Residential and Commercial Consumers : The maximum number of residential consumers are (38 percent) in Naranpura zone (Western Ahmedabad) accounting for 52 percent of the total residential consumption of the city Simlarly, Naranpura zone also has a maximum average consumption of electricity by the commercial consumers despite their low percentage. (606 Kwh and 52 percent of the total commercial consumption of the city) (Table 6.3). However, the concentration of commercial consumers is observed in the City zone (48 91 percent) but their electricity consumption is

11 ZONEWISE PATTERN OF ELECTRICITY CONSUMPTION. ABSOLUTE ELECTRICITY CONSUMPTION INM.U. TOTAL REVENUE IN LAKH Rs. A iaolate Electricity C e jw m p tie a i» n.a Tom Revenue m u m Rs ) )00 I CITY ZONE, 2 AMRAIWADI ZONE, 3 NARANPURA ZONE. AVERAGE ELECTRICITY CONSUMPTION (KWH) PER CONSUMER BILL INRs. ia Irw i il n ' <1000 "if. z >1000 Bill ia Rs. < >4000 FIG 6,3

12 85 quite low (1 : 0.54) due to smaller units of commercial establishments that are huddled together In Amraiwadi (the Eastern Ahmedabad) zone the commercial consumers have an average consumption of 485 Kwh electricity on account of the power consuming commercial complexes and units such as saw mills, flour mills, workshops etc. Among the residential consumers, the residents of Naranpura zone have a higher average (149 Kwh) of power consumption followed by the residents of City zone and Amraiwadi zone. The average commercial consumption for the whole city is 12 times more than the residential average consumption. The ratio of commercial consumers to residential consumers is 1 3 for the whole city and is maximum in Amraiwadi ( ) followed by Naranpujra zone (1 : 3.4) and the city zone ( ) (Table 6.3). This shows the relative proportion (predominance) of residential consumers and commercial consumers. The Amraiwadi has the preponderance of residential consumers with low average consumption whereas the City zone has relatively lower proportion or residential consumers in relation to the commercial consumers. Zonewise bi-monthly variation in power consumption and revenue : In all the three zones of AEC, the electricity consumption is lowest in the months of Februaiy-March and highest in the months o f June-July. TABLE - 6.4(A) Bimonthly Variation in Electricity Consumption *( ) (in million units) AEC Zone April-May June-July Aug.-Sept Oct-Nov. Dec.-Jan. Feb.-March City Zone Naranpura Amraiwadi Total (*only the residential and commercial sectors)

13 86 The decreasing order of bimonthly consumption of electricity is Naranpura, City zone and Amraiwadi zone. (Table 6 4(a)) throughout the year The collection of electricity bill also follows the similar pattern of bimonthly variation and decreasing order of zones. The electricity consumption and the collection of revenue is relatively more during June to November and is relatively less during the remaining months in all the zones TABLE - 6.4(B) Bimonthly Variation in Revenue Collection (Residential & Commercial) ( ) (in lacs Rs.) AEC Zones April-May June-July Aug.-Sept. Oct.-Nov. Dec.-Jan. Feb.-March City zone Naranpura Amraiwadi Total Street lighting : The city glamour and beauty is enhanced by the density, type of lighting and alignment of street lamp-posts (Refer Chapter IV also). Nearly 41 percent of the total lamp posts of the City are in the City zone having a density of 5 per hectare. This is mainly because of the concentration of commercial, transportational, residential and institutional activities. The other outer areas have about 17 to 24 percent of the total lamp-posts each. However, in the newly annexed areas of Eastern Ahmedabad the density of lamp-posts is one per hectare (Table 6.5) This area is characterised by low level of socio-economic condition and hence needs provision of more lamp posts to facilitate their social condition. The overall density of lamp-posts in the city is 3 per hectare (Appendix No. XI)

14 87 TABLE Distribution and Density of Street Lamp-Posts (1996) AEC zones Number of mun. wards Total area Total number (in sq. kms.) of street lamp-posts Percentage of total lamp-posts Number of Lamp-posts per Ha. City zone , Naranpura , Amraiwadi , East Ahmedabad (Newly incorporated areas) , Total , Thus, the foregoing analysis shows the lions-share of industrial consumption (36 percent of the total consumption) of electricity, whereas interms of number the residential consumers dominate the scene forming 80 percent of the total consumers. The industrial consumers contribute about 60 percent of the AEG earnings Naranpura zone showed higher percentage of electricity consumption (both residential and commercial) compared to other two zones reflecting relatively a higher level of socio-economic condition. The newly annexed areas of Eastern Ahmedabad need more electricity for various developmental purposes and also the provision of more street lamp-posts. The generation of power represents a plant load factor of over 75 percent. The AEC is fairly successful in achieving the goal of providing steady, stable and quality power to its consumers.

The function of a power station is to deliver

The function of a power station is to deliver CHAPTER CHAPTER 3 Variable Load on Power Stations 3.1 Structure of Electric Power System 3.2 Variable Load on Power Station 3.3 Load Curves 3.4 Important Terms and Factors 3.5 Units Generated per Annum

More information

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015 ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, GENERAL AND EXTRA HIGH TENSION Effective from 1 st April, 2015 1. The tariff figures indicated in this tariff schedule

More information

Torrent Power Limited Distribution, Ahmedabad Truing Up for FY 2012-13 and Determination of Tariff for FY 2014-15

Torrent Power Limited Distribution, Ahmedabad Truing Up for FY 2012-13 and Determination of Tariff for FY 2014-15 ANNEXURE: TARIFF SCHEDULE FOR FY 2014-15 TARIFF SCHEDULE EFFECTIVE FROM 1 st May, 2014 TARIFF SCHEDULE FOR AHMEDABAD - GANDHINAGAR LICENSE AREA OF TORRENT POWER LIMITED- AHMEDABAD TARIFF FOR SUPPLY OF

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS FEBRUARY 2008 PB POWER PB Power Page i EXECUTIVE SUMMARY General

More information

ELECTRICITY TARIFF (Effective from September 1, 1999.)

ELECTRICITY TARIFF (Effective from September 1, 1999.) ELECTRICITY TARIFF (Effective from September 1, 1999.) * Payment period of electricity bill without surcharge is 30 days. * For late payment, surcharge @ 2% per month is applicable to all classes consumers.

More information

Overview of Long Island Electric Service Territory

Overview of Long Island Electric Service Territory Overview of Long Island Electric Service Territory Long Island Electric Service Territory» Long Island s electric service customers are located in Nassau County and Suffolk County (except for the villages

More information

Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by

Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) 1 2 3 4 5 I. Tamil Nadu Districts Municipalities (Hill Stations) Building Rules 1993. Rules Required Available

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM BY AUTHORISED PERSONS Effective from 1 October 2011 to 30 September

More information

Financial Analysis of Solar Photovoltaic Power plant in India

Financial Analysis of Solar Photovoltaic Power plant in India Financial Analysis of Solar Photovoltaic Power plant in India M. Ganga Prasanna, S. Mahammed Sameer, G. Hemavathi Department of Management Studies MadanapalleInstitute of Technology& Science Post Box No:

More information

Conservation Voltage Reduction (CVR)

Conservation Voltage Reduction (CVR) Conservation Voltage Reduction (CVR) Nicholas Abi-Samra Senior Vice President October 15, 2013 DNV GL Energy Table of Contents What does CVR do? Why Does CVR Work? DNV GL s CVR Project Experience Needs

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

How To Get A Better Deal On Power From Powerline Power From Pse

How To Get A Better Deal On Power From Powerline Power From Pse ELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS Rates Effective January 1, 2010 If you would like information about our services, details about your rights and responsibilities, or a copy of

More information

Karnataka Electricity Regulatory Commission. Discussion note on

Karnataka Electricity Regulatory Commission. Discussion note on Karnataka Electricity Regulatory Commission Discussion note on Draft KERC (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015. 1.0.

More information

Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan

Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan South Sudan Electricity Sector Investment Opportunities Introduction Status of electricity supply in South

More information

Electricity Rates Forecasting:

Electricity Rates Forecasting: Electricity Rates Forecasting: Muskrat Falls Will Options: Stabilize Rates for Consumers Legal S92A, Good Faith and Regulatory Proceedings in Quebec Department of Natural Resources October 2012 Department

More information

11- Benefits due to Power Generation

11- Benefits due to Power Generation IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 11-02: Benefits due to Power Generation Large Scale Pumped Storage

More information

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)

More information

AMSC s Superconductor Cable Technologies for Electric Utilities

AMSC s Superconductor Cable Technologies for Electric Utilities International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,

More information

Comparative Study of Ambient Air Quality Status of Ahmedabad and Gandhinagar City in Gujarat, India

Comparative Study of Ambient Air Quality Status of Ahmedabad and Gandhinagar City in Gujarat, India http://www.e-journals.in Chemical Science Transactions DOI:10.7598/cst2015.932 2015, 4(1), 89-94 RESEARCH ARTICLE Comparative Study of Ambient Air Quality Status of Ahmedabad and Gandhinagar City in Gujarat,

More information

Kyrgyzstan: Power Generation & Transmission

Kyrgyzstan: Power Generation & Transmission Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...

More information

Benefits of Geothermal Energy By Dr. Silas Simiyu

Benefits of Geothermal Energy By Dr. Silas Simiyu Benefits of Geothermal Energy By Dr. Silas Simiyu Introduction Geo means Thermal means Intoduction The Earth Crust Mantle Outer core Inner core Is renewable and sustainable Reservoir managed well (Re-injection)

More information

BC Hydro. Electric Distribution System Cost of Service Study

BC Hydro. Electric Distribution System Cost of Service Study BC Hydro Electric Distribution System Reimer Consulting Group Inc. Arnie Reimer May 7, 2010 Table of Contents 1. Executive Summary... 3 2. BC Hydro Electric Distribution System... 4 2.1. General Description...

More information

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Table of Contents Our Commitment to Energy Conservation...1 1.0 Introduction...2 2.0 Energy Supply in Ontario...3 2.1 Energy Supply

More information

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT Appendix E Environmental Noise Impact Assessment Executive Summary The purpose of this environmental

More information

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power THE EUROPEAN GREEN BUILDING PROGRAMME Technical Module on Combined Heat and Power Contents Foreword...1 1. Introduction...2 2. Inventory of the CHP system...3 3. Assessment of technical energy saving measures...5

More information

Wholesale Data Center Suites Available Now

Wholesale Data Center Suites Available Now Wholesale Data Center Suites Available Now FROM 2,500 to 100,000 Sq Ft A secure, fortified Mission Critical data center facility located in Innovation Park, Charlotte, NC Scalable data center suites available

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2006-07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI Guideline for Energy Efficient Electrical systems for building Presentation by TERI Objective of study The study highlights how BBMP can implement energy efficiency measures in building in co-ordination

More information

Argentina Energy efficiency report

Argentina Energy efficiency report Argentina Energy efficiency report Objectives: o 5.4% energy savings in industry in 216 o 6% electricity savings in 216 Overview 2- (%/year) Primary intensity (EU=1)¹ 16 - -2.3% + CO 2 intensity (EU=1)

More information

6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through

6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through Thermo 1 (MEP 261) Thermodynamics An Engineering Approach Yunus A. Cengel & Michael A. Boles 7 th Edition, McGraw-Hill Companies, ISBN-978-0-07-352932-5, 2008 Sheet 6:Chapter 6 6 17 A 600-MW steam power

More information

Electricity Price Comparison. Namibia Manufacturers Association (NMA)

Electricity Price Comparison. Namibia Manufacturers Association (NMA) Electricity Price Comparison December 2012 Submitted to: Namibia Manufacturers Association (NMA) P O Box 20810 Windhoek Namibia Tel +264 (0)61 233206 Fax +264 (0)61 233360 Submitted by: EMCON (Pty) Ltd

More information

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),

More information

Electric Gas Reliability Workshop April 2012

Electric Gas Reliability Workshop April 2012 Electric Gas Reliability Workshop April 2012 New Mexico experience New Mexico Gas Company lost approximately 30,000 customers in February 2011 Customers were without natural gas for several days before

More information

Energy consumption forecasts

Energy consumption forecasts Pty Ltd ABN 85 082 464 622 Level 2 / 21 Kirksway Place Hobart TAS 7000 www.auroraenergy.com.au Enquiries regarding this document should be addressed to: Network Regulatory Manager Pty Ltd GPO Box 191 Hobart

More information

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR) WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS A. Completed December 2001 Shedgum Debottlenecking # 45943/00 47.34 Million Total 600.8 Million 154 n American Oil Co. (ARAMCO) ARAMCO Feb. 1998 to Dec.

More information

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION 1 EFFICIENT ELECTRICAL ENERGY TRANSMISSION

More information

NBF. Electrical. www.nbfelectrical.com.au WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY

NBF. Electrical. www.nbfelectrical.com.au WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY Electrical NBF www.nbfelectrical.com.au WHY GO SOLAR? NBF ELECTRICAL EXPLAINS WHY contact NBF Electrical Nathan Fielke Mobile: 0433 145 587 Fax: (08) 8346 4044 ABN 75 536 121 682 CEC A3966385 PGE197475

More information

NEW COMMERCIAL Rates. Understanding the. Commercial Customers

NEW COMMERCIAL Rates. Understanding the. Commercial Customers Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount

More information

STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND

STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND NOTICE This is unofficial English translation of KYEPCO s STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND ( tokutei kibo juyo hyojun kyokyu joken

More information

GRID CONNECTION Introduction Technical The grid Electricity production

GRID CONNECTION Introduction Technical The grid Electricity production GRID CONNECTION Introduction It was in London in 1882 that the Edison Company first produced electricity centrally that could be delivered to customers via a distribution network or grid. Since then electricity

More information

Powerco Limited Pricing Guide 2015 ANNUAL REPORT 2015

Powerco Limited Pricing Guide 2015 ANNUAL REPORT 2015 ANNUAL REPORT 2015 PRICING GUIDE 2015 1 CONTENTS Introduction Page 03 Who we are Page 04 The Electricity Industry Page 05 Our Pricing Policy Page 08 How Powerco Performs Page 10 Pricing Methodology Page

More information

SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM

SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM J.Godson 1,M.Karthick 2,T.Muthukrishnan 3,M.S.Sivagamasundari 4 Final year UG students, Department of EEE,V V College of Engineering,Tisaiyanvilai, Tirunelveli,

More information

Roadmap for Enhancing Energy Efficiency in New Buildings

Roadmap for Enhancing Energy Efficiency in New Buildings Roadmap for Enhancing Energy Efficiency in New Buildings Shabnam Bassi Bureau of Energy Efficiency Government of India Page 1 of 33 ENERGY CONSERVATION ACT, 2001 Energy Conservation Act, enacted in October

More information

Ladies and Gentlemen,

Ladies and Gentlemen, Ladies and Gentlemen, I would like to begin my speech by thanking deeply the Maniatakeion Foundation and especially the Chairman, Mr. Dimitris Maniatakis for his invitation and to congratulate him for

More information

By Manitoba Hydro, March 4 th 2013

By Manitoba Hydro, March 4 th 2013 Rebuttal to Bipole III Coalition underground cable report Potential Use of Underground Cables for Sections of the Planned 500 kvdc Bipole III Overhead Line in Manitoba By Manitoba Hydro, March 4 th 2013

More information

Commonwealth of Puerto Rico PUERTO RICO ELECTRIC POWER AUTHORITY. ANNUAL BUDGET OF CAPITAL EXPENDITURES FISCAL YEAR 2003-2004 (Dollars in thousands)

Commonwealth of Puerto Rico PUERTO RICO ELECTRIC POWER AUTHORITY. ANNUAL BUDGET OF CAPITAL EXPENDITURES FISCAL YEAR 2003-2004 (Dollars in thousands) No. Title Amount Production Plant Thermal Production Plant 100 New Generation 15,865 160 Improvements to Steam Boilers 13,289 165 Improvements to Steam Turbine Generator 11,093 170 Improvements to Steam

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN

WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN WIND AND SOLAR ENERGY DEVELOPMENTS IN IRAN H. Kazemi Karegar a,b, A.Zahedi a,v. Ohis a, G. taleghani b and M. Khalaji b a Department of Electrical & Computer Systems Engineering, PO Box 35, Monash University,

More information

RETAIL ELECTRIC SERVICE TARIFF P.S.C. Md. No. 3 R Sheet 61

RETAIL ELECTRIC SERVICE TARIFF P.S.C. Md. No. 3 R Sheet 61 R Sheet 61 SCHEDULE R RESIDENTIAL SERVICE AVAILABILITY Available throughout the area served by the Cooperative to individual residences and individually metered dwelling units in multiple-occupancy buildings

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

Tamil Nadu would provide to its residents, high quality infrastructure all over the State comparable with the best in the world

Tamil Nadu would provide to its residents, high quality infrastructure all over the State comparable with the best in the world Tamil Vision 2023 The vision for Tamil for 2023 is to become India s most prosperous progressive State with no poverty, where its people enjoy all the basic services of a modern society live in harmonious

More information

Using Renewable Energy to Pump Water

Using Renewable Energy to Pump Water L-5457 6/04 Using Renewable Energy to Pump Water Juan Enciso and Michael Mecke* You can save money and help reduce air pollution by using renewable energy sources such as solar or wind power for your home,

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Electricity market drivers

Electricity market drivers Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas

More information

How could suppliers and customers dramatically reduce future electricity bill? Professor Furong Li Chair in Electrical Power Systems

How could suppliers and customers dramatically reduce future electricity bill? Professor Furong Li Chair in Electrical Power Systems How could suppliers and customers dramatically reduce future electricity bill? Professor Furong Li Chair in Electrical Power Systems Measures to Reduce Bills 3000kWh/yr @ 17pence/kWh x = 500/yr Reducing

More information

DECISION APPROVAL OF THE NATIONAL MASTER PLAN FOR POWER DEVELOPMENT FOR THE 2011-2020 PERIOD WITH THE VISION TO 2030

DECISION APPROVAL OF THE NATIONAL MASTER PLAN FOR POWER DEVELOPMENT FOR THE 2011-2020 PERIOD WITH THE VISION TO 2030 THE PRIME MINISTER ------- THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 1208/QD-TTg --------------- Hanoi, 21 July 2011 DECISION APPROVAL OF THE NATIONAL MASTER PLAN FOR POWER

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

Energy Technology. Marco Ordonez

Energy Technology. Marco Ordonez Energy Technology Marco Ordonez Solar Power Solar Power The conversion of sunlight into electricity. Solar Power can be done directly using photovoltaic's, or indirectly using concentrated power. Concentrated

More information

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003 F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify

More information

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks.

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks. Australia has one of the world s longest alternating current (AC) systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

Energy Systems Integration

Energy Systems Integration Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,

More information

INDUSTRIAL ZONE KUTNÁ HORA

INDUSTRIAL ZONE KUTNÁ HORA GENERAL INFORMATION The Kutná Hora Na Rovinách (On the Plains) Industrial Zone is a highly attractive location for engineering manufacturing companies seeking to take advantage of a highly skilled, cost-effective

More information

Energy Saving by ESCO (Energy Service Company) Project in Hospital

Energy Saving by ESCO (Energy Service Company) Project in Hospital 7th International Energy Conversion Engineering Conference 2-5 August 2009, Denver, Colorado AIAA 2009-4568 Tracking Number: 171427 Energy Saving by ESCO (Energy Service Company) Project in Hospital Satoru

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA

SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA Presented By SAAD M. AL DEKHAYL SEC Consultant Orlando, December 2012 Power Gen 2012 CONTENTS Introduction SEC Organization Structure Distribution Overview

More information

ELECTRICITY DEMAND DARWIN ( 1990-1994 )

ELECTRICITY DEMAND DARWIN ( 1990-1994 ) ELECTRICITY DEMAND IN DARWIN ( 1990-1994 ) A dissertation submitted to the Graduate School of Business Northern Territory University by THANHTANG In partial fulfilment of the requirements for the Graduate

More information

Measuring Electricity Class Activity

Measuring Electricity Class Activity Measuring Electricity Class Activity Objective: To understand what energy is, how it impacts our daily lives, and how one can become an energy steward. Learning Outcomes: Students will: 1. Understand where

More information

SP Energy Networks 2015 2023 Business Plan

SP Energy Networks 2015 2023 Business Plan Environmental Discretionary Reward Scheme 1 SP Energy Networks 2015 2023 Business Plan Executive summary SP Distribution Ltd SP Manweb plc July 2013 RIIO ED1 Business Plan 2015 to 2023 2 A Message from

More information

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT ROOSEVELT WATER CONSERVATION DISTRICT RESPONSE TO ARIZONA POWER AUTHORITY REQUEST FOR INFORMATION DATED SEPTEMBER 12, 2012 PRESENTED OCTOBER 24, 2012 RWCD is an irrigation district that was established

More information

Electric Power Annual 2013

Electric Power Annual 2013 Electric Power Annual 2013 March 2015 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration

More information

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Abstract Denmark is in a situation with many scattered sources of electricity,

More information

Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay.

Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay. Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay August 2014 Outline of Talk 1. Introduction - The Present Scenario 2. Estimating India

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Summary technical description of the SUNSTORE 4 plant in Marstal

Summary technical description of the SUNSTORE 4 plant in Marstal Summary technical description of the SUNSTORE 4 plant in Marstal The purpose of the SUNSTORE concept implemented in Marstal is to show that district heating can be produced with 100 % RES of which solar

More information

Treasure Valley Electrical Plan

Treasure Valley Electrical Plan Treasure Valley Electrical Plan Community Advisory Committee January 25, 2006 Agenda 10 a.m. Welcome 10:10 a.m. Follow up DSM discussion 10:30 a.m. TVEP CAC process update 10:40 a.m. Transmission Presentation

More information

ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL

ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL International Journal of Science, Environment and Technology, Vol. 2, No 5, 2013, 920 929 ISSN 2278-3687 (O) ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL 1 G. RudraNarsimha

More information

Electric Power Annual 2014

Electric Power Annual 2014 Electric Power Annual 2014 February 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration

More information

A fridge that takes only 0.1 kwh a day?

A fridge that takes only 0.1 kwh a day? A fridge that takes only 0.1 kwh a day? By Tom Chalko, Mt Best, Australia, mtbest.net There is no mistake in the title. This article describes an inexpensive fridge that is 10 to 20 times more energy efficient

More information

Wind-Diesel Hybrid System Options for Alaska. Steve Drouilhet National Renewable Energy Laboratory Golden, CO

Wind-Diesel Hybrid System Options for Alaska. Steve Drouilhet National Renewable Energy Laboratory Golden, CO Wind-Diesel Hybrid System Options for Alaska Steve Drouilhet National Renewable Energy Laboratory Golden, CO Wind-Diesel Hybrid Power Systems Basic Concept A wind-diesel hybrid system combines wind turbine(s)

More information

Strategy for Providing 24x7 Power Supply. Forum of Regulators

Strategy for Providing 24x7 Power Supply. Forum of Regulators Strategy for Providing 24x7 Power Supply Forum of Regulators December, 2014 Strategy for Providing 24x7 Power Supply Forum of Regulators December, 2014 Table of Contents 1. INTRODUCTION...12 2 POWER

More information

FACT SHEET. NEM fast facts:

FACT SHEET. NEM fast facts: (NEM) operates on one of the world s longest interconnected power systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

Olympic Park & Stratford Energy Schemes Marketing. Kevin McDonald. District Energy Delivery Models the Concession Approach

Olympic Park & Stratford Energy Schemes Marketing. Kevin McDonald. District Energy Delivery Models the Concession Approach Olympic Park & Stratford Energy Schemes Marketing Kevin McDonald District Energy Delivery Models the Concession Approach The largest utility company in the world; Local partnerships and bespoke solutions;

More information

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM J.S. Hu, Philip C.W. Kwong, and Christopher Y.H. Chao Department of Mechanical Engineering, The Hong Kong University of Science and Technology Clear Water Bay,

More information

POPLAR BLUFF MUNICIPAL UTILITIES AND CITY CABLE

POPLAR BLUFF MUNICIPAL UTILITIES AND CITY CABLE APPENDIX D POPLAR BLUFF MUNICIPAL UTILITIES AND CITY CABLE ELECTRIC RESIDENTIAL S Applicable to all residential customers taking service through a single meter for domestic uses, inclusive of lighting,

More information

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012 University of Maryland College Park District Energy System IDEA Campus Energy Conference February 9, 2012 UMCP District Energy System The University of Maryland district energy system consists of a well

More information

Case Study 5 Use of Wind Turbine Technology

Case Study 5 Use of Wind Turbine Technology Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity

More information

Japan s Largest Photovoltaic Power Plant

Japan s Largest Photovoltaic Power Plant Hitachi Review Vol. 63 (2014), No. 7 398 Featured Articles Japan s Largest Photovoltaic Power Plant Turnkey Construction Contract and Commissioning of Oita Solar Power Yuichi Nagayama Tetsuharu Ohya Hiroaki

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

Division F ELECTRICITY, GAS, HEAT SUPPLY AND WATER

Division F ELECTRICITY, GAS, HEAT SUPPLY AND WATER Division F ELECTRICITY, GAS, HEAT SUPPLY AND WATER This Division comprises establishments engaged in providing electricity, gas, heat or water (excluding water for irrigation), and those engaged in the

More information

Neighbourhood Energy in Vancouver Sewage Heat Recovery within a city-wide strategy

Neighbourhood Energy in Vancouver Sewage Heat Recovery within a city-wide strategy Neighbourhood Energy in Vancouver Sewage Heat Recovery within a city-wide strategy IDEA Annual Conference, June 4, 2013 Kieran McConnell, NEU Systems Engineer SLIDE 1 1) The role of Neighbourhood Energy

More information

Value of storage in providing balancing services for electricity generation systems with high wind penetration

Value of storage in providing balancing services for electricity generation systems with high wind penetration Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1

More information

Energy efficiency and excess winter deaths: Comparing the UK and Sweden

Energy efficiency and excess winter deaths: Comparing the UK and Sweden Westgate House 2a Prebend Street London N1 8PT 020 7359 8000 sarah@ukace.org Energy efficiency and excess winter deaths: Comparing the UK and Sweden November 2013 1 Introduction David Cameron pledged in

More information

HEAT PUMPS A KEY COMPONENT IN LOW CARBON FUTURE

HEAT PUMPS A KEY COMPONENT IN LOW CARBON FUTURE HEAT PUMPS A KEY COMPONENT IN LOW CARBON FUTURE Satish Joshi Managing Director CONTENTS 1. INTRODUCTION, APPLICATIONS 2. TECHNOLOGY, PROJECTS DONE, COST COMPARISION 3. HEAT PUMPS IN THE RENEWABLES DIRECTIVE,

More information

P. Locker, Photo Graphic Design, Bolton

P. Locker, Photo Graphic Design, Bolton DfEE Project Team: Chris Bissell Principal Architect Richard Daniels Senior Engineer Graphics: Paul Isbell Photographs: P. Locker, Photo Graphic Design, Bolton Cover Design and typesetting: The Stationery

More information

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) OUTLINE OF PRESENTATION (ECG) 2 Introduction Map of Operational Area Company Mandate,

More information

Proposal for Improve the Electrical Power Supply in Port Sudan Town

Proposal for Improve the Electrical Power Supply in Port Sudan Town Proposal for Improve the Electrical Power Supply in Port Sudan Town Naeim Farouk Department of Mechanical Engineering, Faculty of Engineering, Red Sea University, Port Sudan Sudan nmfarouk@gmail.com, naeemgely@yahoo.com

More information