2 Identified Priority 1 Concerns
3 1 st Priority 1 Concern This column was checked. The Ferroscan image gives a result of 16 bars in this column. Columns possess very low factors of safety Based on the drawings and the Ferro-scan result, the column reinforcement appears to be consistent with the rebar arrangement at ground level. According to the load rundown calculation, typical columns have been found to possess very low factors of safety with regard to their load carrying capacity, thus giving an AMBER warning. Therefore, we require further action and investigation to be carried out as noted at the priority actions a DEA. The building was constructed in 1997 with stone aggregate and high strength steel as informed in asbuilt drawings. However, a DEA needs to be carried out to verify this information.
4 Identified Priority 3 Concerns
5 1 st Priority 3 Concern On the 9/F ceiling (the roof slab), there are many areas where water seepage has caused water damage leading to loosening of plaster. In other areas; such as the ceiling below the toilets at the rear of the building on each floor also exhibits water damage (6/F). On some floors, walls also have water damage (4/F). This should be repaired and prevented from happening again. Water ingress has caused water damage at several locations
6 2 nd Priority 3 Concern From the picture, it may be concluded that no waterproof membrane has been applied at the roof level of the building. This means that any cracks in the surface finishes on the roof will allow water to seep into the concrete slab beneath the finishes, and cause long-term soaking of the slab, causing the defects as observed on 9/F ceiling. Roof Floor does not appear to have any proper waterproof membrane to protect lower floor from water damage
7 Priority Actions
8 Problems Observed Summary ITEM 1: (1 st Priority 1) Preliminary load take-down calculation found that some typical columns possess the marginal spare loading capacity. ITEM 2: (1 st Priority 3) Several areas at 9/F (roof) have significant water damage at wall and ceiling locations. ITEM 3: (2 nd Priority 3) the roof floor appears not to have any proper waterproofing layer.
9 Item No. Observation Recommended Action Plan Recommended Timeline 1 Carry out a partial Detailed Engineering Assessment of the entire 1st Priority 1 - Preliminary load take-down calculation building including any intrusive testing required. found that some typical columns possess the marginal spare The Factory Engineer to review design, loads and columns stresses in loading capacity. the building in accordance with BNBC regulations. Prepare and produce the loading plans for all floors 6-weeks 2 1st Priority 1 - Preliminary load take-down calculation found that some typical columns possess the marginal spare Continue to strictly maintain loading plan. loading capacity. 6-months 3 1st Priority 3 - Several areas at 9/F (roof) have significant water damage at wall and ceiling locations. Provide temporary propping to the damaged concrete areas (slabs and beams). 6-weeks 4 1st Priority 3 - Several areas at 9/F (roof) have significant water damage at wall and ceiling locations. Hack away the damaged plaster and concrete and expose reinforcement to check for corrosion. Carry out replacement of reinforcement and suitably repair all structural elements as necessary. 6-months 5 2nd Priority 3 - The roof floor appears not to have any proper waterproofing layer. Remove the existing screed, applying a new waterproofing membrane and re-applying the screed if necessary. The repair works should be carried out under dry conditions, to avoid trapping of air or water pockets which would affect the effectiveness of the waterproofing. 6-months
ASHULIA APPARELS LTD. Client Summary Report
Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary
More informationSisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E)
Revision: issue 1 Date: 11 June 2014 Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) 24 th May 2014 Structural Inspection Report Observations
More informationSite Inspection Report
Site Inspection Report Project Title: 1 Canada Square Location: 1 Canada Square, Canary Wharf, London Date of Inspection: 16/05/12 System / Products: TBA (suggested flame free application) Attendees: G
More informationRepair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study
Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study Surresh Chandra Pattanaik ab, E. Gopal Krishnan b and Mohan Kumar c a School of Civil Engineering,
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationUniversity of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage
University of Missouri Hospitals and Clinics Structural Repair and Protection of Post-tensioned Parking Garage 1 University of Missouri Project The University of Missouri Health Care Patient and Visitor
More informationExterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
More informationChapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More informationReference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls
Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto
More informationG. Common Defects in Buildings - Leakage
F. Common Defects in Buildings - Structural 32. Recently, some concrete chips have fallen from the ceiling in my kitchen. There are rusty steel bars and the area in question measures about 300 x 400mm.
More informationNon Destructive Waterproofing Remedial Treatment
Non Destructive Waterproofing Remedial Treatment Jeffrey Toh T.A., Tan Shan Shan, Mathew Bey T.K. and Francis Chan W.C. Vision Building Forensics Pte Ltd 29, Jurong Port Road, Singapore 619102 Visionbf@starhub.net.sg
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationSECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationBILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"
BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints
More informationMelbourne balcony Assessments
Balcony Assessment Melbourne balcony Assessments Address: SAMPLE Date: Assessor: Luke O Neill Registered Builder DBL-C 31305 Assessment Guidelines This is an assessment of balcony and elements as presented
More information201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
More informationBuilding Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
More informationHanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
More informationIssue of the Guidelines on Prevention of Water Seepage in New Buildings
graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural
More information48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
More informationBasement & Foundation Damage
Basement & Foundation Damage Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationIf stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
More informationREHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW
2005 New York City Bridge Conference September 12-13, 2005 REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW The Novoarbatsky Bridge across the Moskva River had been built in 1957 Plan of the bridge Steel
More informationSCHOOL BUILDING RENOVATION REPORT I. BUILDING BEFORE RENOVATION
SCHOOL BUILDING RENOVATION REPORT I. BUILDING BEFORE RENOVATION Data of building before renovation in 2014: - year of renovation of the elevation 1997, - year of renovation of the roof 2000, - year of
More informationCurrent opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction
Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and
More informationCHAPTER 8- REDUCING THE MOISTURE
CHAPTER 8- REDUCING THE MOISTURE I ve learned many different ways to cut down on moisture and dampness over my many years of being a homeowner. All those tips I ve included right here for you so that you
More informationChapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
More informationBELL ASSOCIATES ARCHITECTURE PLANNING
BELL ASSOCIATES ARCHITECTURE PLANNING Roger Bell dip. arch. tech. Bsc. CAD Rogerstown, Rush, Co. Dublin. Muchgrange, Greenore, Co. Louth E bellassociates@eircom.net T 01-8430267 T 042 938 3865 M 087 2371984
More informationDesign and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
More informationImproving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
More informationPROJECT COST ESTIMATES & FEASIBILITIES
PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed
More informationHow To Repair A House
Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationInstallation Instructions
Installation Instructions Pedestal Models FS 500 LE FS 800 LE Insert Models IS 500 LE IS 800 LE Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email info@pecan-eng.com.au Phone:
More informationRe: Damages to Alaska Building from Legislative Information Office Construction
510 L Street Suite 200 Anchorage, AK 99501-1949 (907) 274-22362236 Phone (907) 274-25202520 Fax www.bbfm.com July 22, 2015 Jim Gottstein Alaska Building 406 G Street, Suite 206 Anchorage, AK 99501 Re:
More informationBuilding Control Guidance Note
Elements Renovation / Replacement. Issued 25/01/13 Rev a Page 1 of 9 (Applies to both Domestic and Non-Domestic Premises) Works relating to thermal elements can arise in building an extension, a material
More informationHIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
More informationBLACK JACK ALL WEATHER ROOF COATING
PAGE: 1 of 6 PRINT DATE: 16/09/2004 BLACK JACK ALL WEATHER ROOF COATING DESCRIPTION BLACK JACK ALL WEATHER ROOF COATING is a solvent based, full bodied black brushable compound with added fibres for reinforcement.
More informationSTRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California
More informationWEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,
More informationStructural Retrofitting Process and Techniques
Structural Retrofitting Process and Techniques Md. Mostafizur Rahman Sr. Business Consultant Fosroc Chemicals (I) Pvt Ltd Brief over view of FOSROC Construction Products Supplier with Manufacturing facilities
More informationL_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.
L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -
More informationCONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
More informationSchool Construction Authority Architecture & Engineering
SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following
More informationProject Report. Structural Investigations Hotel del Sol Yuma, Arizona
Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,
More informationImproving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.
Improving the flood resistance of your home Advice sheet 4: Flood-resilient walls. This sheet provides guidance on identifying different types of wall, and reducing the flow of floodwater through them
More informationRepair and Remodeling Estimating Methods. 4th Edition. RSMeans
Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationThe Guide To Waterproofing An Existing Basement
The Guide To Waterproofing An Existing Basement John Newton & Company is the leading independent supplier of basement waterproofing and damp proofing solutions in the UK. Newton System 500 is a maintainable
More informationSTEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.
STEP-BY-STEP construction guide Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. Welcome to our CONSERVATORY AND SUNROOM CONSTRUCTION GUIDE What is the specification
More informationPage & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
More informationPhoto 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.
May 7,2015 KSANDER & ASSOCIATES CONSULTING PROFESSIONAL ENGINEERS 130 HUINTER STREET, UNIT 103, PETERBOROUGH, ONTARIO K9H2K8 TELEPHONE (705) 743-9221 FAX 743-0904 Ontario Region Conservation Authority
More informationMarch 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202
Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request
More informationGuide for home buyers
Guide for home buyers The homes on this development are protected by a 10 year New Home Warranty from Premier Guarantee. All homes covered by our warranty are insured against a wide range of structural
More informationStructural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
More informationMETHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS
This Document is designed to cover best practice installation procedures for a one layer torch applied sheet membrane system to basement walls. PRELIMINARY WORK Ensure that all surface preparation work,
More informationSection 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.
Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice
More informationMEMORANDUM. General: Foundation:
MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010
More informationLighthouse Engineering, L.L.C.
Wednesday, August 20, 2014 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationPERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS
PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS Jan 2012 CONTENTS GENERAL... 1 1 Background... 1 2 Qualifications and Expectations of Structural Engineers... 1
More informationR E S I D E N T I A L H O U S I N G
HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing
More informationSCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP
SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP CONTENTS 1. Site address... 3 2. Background... 4 3. Scope of work... 4 4. General conditions... 5 4.1 Materials,
More informationOTTAWA CIVIC CENTRE & NORTH SIDE STANDS LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007
OTTAWA CIVIC CENTRE & NORTH SIDE STANDS at LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007 for CITY OF OTTAWA REAL PROPERTY ASSET MANAGEMENT prepared by ADJELEIAN ALLEN RUBELI LIMITED
More informationINSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider
INSPECTION FINDINGS for Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado Inspection Date: August 8, 2007 Perfonned By: Drew Schneider INSPECTRUM 27691 Moffat Road Evergreen, CO 80439 303.697.0990
More informationCulvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners
Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners McConnell Road Culvert Greensboro, North Carolina Fisher Park Circle Culvert Greensboro, North Carolina Shady
More informationSources A recent survey of leaking basements showed water comes from a variety of sources, but walls are the usual culprit: Occurrence of moisture
NEGATIVE SIDE WATERPROOFING»»»»»»»»»»»»»» NEGATIVE SIDE WATERPROOFING NEGATIVE SIDE WATERPROOFING NEGATIVE SIDE WATERPROOFING It s Possible to Waterproof Leaking Basements From the Inside By Basil Mewes
More informationFire Preventive and Fireproof Performance Test and Evaluation Procedure Manual
BR BO-01-02 Effective from June 1, 2000 Revision: March 26, 2002 Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual (Unofficial Manual) Technical Appraisal Department, Building
More informationChapter. Earthquake Damage: Types, Process, Categories
3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic
More informationDocument type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5. 1. Purpose
Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5 1. Purpose The purpose of this practice note is to address the incidence of deck and roof membrane
More informationWI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE
Multi-storey Precast Concrete Framed Structures Kim S. Elliott BTech, PhD, CEng, MICE Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE WI LEY Blackwell Contents Preface Notation Precast Concepts, History
More informationSports Buildings: budget costs for the Flood Relief Fund
Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but
More informationMULTI-TIGHT 2K. The New Generation for Waterproofing Buildings
MULTI-TIGHT 2K The New Generation for Waterproofing Buildings MULTI-TIGHT 2K Properties: One Product for all Cases Functional Use for New Construction and Refurbishment Quick drying Adheres to many substrates
More informationBasement Waterproofing in Existing Buildings
A S S O C I A T I O N Basement Waterproofing in Existing Buildings A guide to protecting your home Follow us on Twitter Find us on Facebook www.property-care.org A basic understanding of Basement Waterproofing
More informationAlways. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+
Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+ The wall sleeve The wall sleeve a largely unnoticed but very important sealing part. Wall sleeves
More informationInvestigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps
Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure
More informationBraselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.
1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &
More informationPrestige Home Inspection LLC
Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012
More informationHigh Performance PSA in Sheet Membrane in Water Protection
High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is
More informationTAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
More informationPoints of Construction
Points of Construction BCB Homes builds the best homes in America. Period. The physics of building in the South Florida hot, humid climate are hard enough on their own, but BCB executes the details better
More informationRepair of Spalling and Leaking Clay Brick Building Walls
B etter buildings Repair of Spalling and Leaking Clay Brick Building Walls Overview A few years after being built in Waterloo in 1980, a condominium of three, six-storey buildings showed severe spalling
More informationSuccessful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November
More informationMilestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION
Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /
More information14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102
Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Project No.: 15538.00 Re: Structural Condition Review of the building at 700 4 th St. E. Dear Sarah: We
More informationA Report on Post-Earthquake Rapid Visual Damage Assessment of Buildings Of Tribhuvan International Airport
A Report on Post-Earthquake Rapid Visual Damage Assessment of Buildings Of Tribhuvan International Airport Prepared By: Civil Engineering Division Tribhuvan International Airport Civil Aviation Office
More informationENTRY FORM. DVASE 2015 Excellence in Structural Engineering Awards Program
ENTRY FORM DVASE 2015 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M X Other Structures Under $5M Buildings
More informationPLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE
Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other
More informationThe bonded waterproof membrane, which can be verified by non destructive means DENSARE -2002. 18/14 IHö/JP/KK
The bonded waterproof membrane, which can be verified by non destructive means DENSARE -2002 18/14 IHö/JP/KK The bonded waterproof membrane, which can be verified by non destructive means DENSARE -2002
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
More informationBurns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm
Burns Home Services Service Makes the Difference 2620 W Grovers Ave, Phoenix, AZ 85053 Tel: 602-889-6970 Fax: 602-870-4563 Mobile: 602-291-7138 Garryh@burnshomeservices.com SUMMARY REPORT Client: John
More informationAnalysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
More informationBTC. Building Technology Consultants, PC 1845 E. Rand Road, Suite L-100 Arlington Heights, Illinois 60004 Main: (847) 454-8800, Fax: (847) 454-8801
BTC Structural Engineer Hpreicher@btcpc.com Patrick E. Reicher is a Structural Engineer at Building Technology Consultants, PC. 6BREGISTRATIONS Licensed Structural Engineer (SE), Illinois Certified Construction
More informationExcerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
More informationPhotos showing the change in condition from 2006 to 2012 are located in Appendix A.
January 27, 2012 Ms. Theresa Gallavan Economic Development Director City of Lompoc 100 Civic Center Plaza Lompoc, California 93436 RE: Lompoc Theater Limited Visual Condition Assessment Dear Theresa: Representatives
More information