1 Ocean Observatories Initiative Schedule of Construction Project Management and Control Anthony Ferlaino OOI Project Manager Science Community Workshop I Baltimore, Nov 11-12, 2009
2 Process Controls of a Large Facilities Project Scope Work Breakdown Structure Resources and Materials Time Phasing Integrated Schedule Funding Budget Program Policies and Procedures Change Control Construction Science Community Workshop 1 2
3 OOI Scope Science Community Workshop 1 3
4 Science Community Workshop 1 4
5 Summary WBS Level 3 OOI Master Program Schedule WBS: 1 System Integration Cyberinfrastructure Coastal / Global Observatory OOI_RSN Education And Public Engagement WBS: 1.1 WBS: 1.2 WBS: 1.3 WBS: 1.4 WBS: 1.7 Project Management Project Management Project Management Project Management Project Management WBS: WBS: WBS: WBS: WBS: Systems Engineering WBS: Systems Engineering WBS: Systems Engineering WBS: Systems Engineering WBS: Education System Engineering WBS: Operations Planning WBS: System Development WBS: Subsystem Development WBS: Subsystem Development WBS: Education Tools Development WBS: Education And Public Engagement WBS: Implementation WBS: Implementation Site Implementation Implementation WBS: WBS: WBS: Environmental Management WBS: Science Community Workshop 1 5
6 WBS as an Integrator Science Community Workshop 1 6
7 Policies, Process, Plans and Tools Systems Engineering Management Plan Configuration Management Plan Risk Management Plan Earned Value Management Plan Schedule Management Plan Cost Book Database, Cost Estimating Plan Property Management Plan Collaborative Tools Confluence, WebEx Alfresco JIRA Subversion DOORS Science Community Workshop 1 7
8 Program Controlled Documents _CMP_OOI _B2_Table _PEP_OOI _Annual_Work_Plan _CEP_OOI _QA_QC_Plan_OOI _Commissioning_Plan_OOI _EVM_Plan_OOI _EHSP_OOI _Risk_Management_Plan_OOI _Acquisition_Plan_OOI _OM_Plan_OOI.doc _Property_Management_Plan_OOI _Security_Management_Plan_OOI _Schedule_Management_Plan_OOI Integrated Risk Register_(all1022 xxxxx) IMS (all IOs OOI, CI, RSN, CGSN) WBS_Dictionary_(all1041 xxxxx) Cost_Book_(all1050 xxxxx) L4 RSN Primary Infrastructure L4 RSN Profilers L4 RSN Shore Station _SEMP_OOI _FND_OOI _Requirements_Module_Hierarchy _Document_Tree_OOI L1 Programmatic Requirements L1 Science Themes L2 Common Requirements L2 Cyber User Requirements L2 Educational Requirements L2 Operational Requirements L2 Reference Module L2 Science Questions L2 Science Requirements L3 CG System Requirements L3 CI System Requirements L3 RSN System Requirements L4 RSN LV Node L4 RSN Observatory Mgmt System L4 RSN Vertical Mooring L4 CG Autonomous Underwater Vehicle L4 CG Data Concentrator L4 CG Glider L4 CG Instrument Package L4 CG Moorings L4 CG Multi Function Nodes L4 CG Operations and Management Center L4 CG Platform Control L4 CG Power Systems L4 CG Profiler L4 CG Surface Buoys L4 CG Telemetry Systems L4 CI Analysis and Synthesis L4 CI Common Execution Infrastructure L4 CI Common Operating Infrastructure L4 CI Data Management L4 CI Implementation L4 CI Planning and Prosecution L4 CI Sensing and Acquisition L4 RSN Backhaul L4 RSN Extension Cable L4 RSN Instrument Package L4 RSN Jbox Science Community Workshop 1 8
9 Construction Build Something Already! Science Community Workshop 1 9
10 Systems Engineering V Model Iteration N Iteration 2 Iteration 1 Acquirer Needs & Expectations Iteration N Iteration 2 Iteration 1 OOI Commissioning Acquirer Requirements Validation End Product Formal Acceptance Testing (Requirements Validation Processes) Other Stakeholder Requirements System Technical Requirements Verification System-of-Systems Integration & Test System Integration & Test OL IOs Decomposition &Definition Logical Solution Representations Physical Solution Representations Specified Requirements Verification Software & Hardware Implementation Subsystem Integration & Test Element Integration & Testing Integration & Verification Acquisition & Supply / Technical Management / Technical Evaluation Science Community Workshop 1 10
11 Progressive Test and Acceptance Component Level Testing Connectors, LVNs, MVNs, AUVs, Gliders, Sensors, FATs, etc. Subsystem / System Integration Tests (Hardware/Software) Software functionality Control and Data integration, Data throughput, Data quality FATs Sub-System / System Readiness Testing Primary and Secondary Infrastructure inspections and tests Software release testing AUVs, Gliders etc. FATs System Acceptance Tests (Transfer of Ownership) Primary/secondary Infrastructure with nodes, software and communications Buoys, moorings, sensors, equipment and software and telecommunication Pioneer and Endurance buoys, moorings, sensors equipment, software and communications Shore stations Culminate in Commissioning at Array Level Acceptance transfers property ownership to OL Begin Operations domain control of systems Starts insurance Science Community Workshop 1 11
12 Progressive Test and Acceptance System Acceptance Tests (Transfer of Ownership) Primary/secondary Infrastructure with nodes, software and communications Buoys, moorings, sensors, equipment and software and telecommunication Pioneer and Endurance buoys, moorings, sensors equipment, software and communications Shore stations Providing Data As Available Subject to Testing Needs Demonstration of Integrated Steady-State Capabilities Culminate in Commissioning at Array Level Acceptance transfers property ownership to OL Full Support and Logistics Systems Available and Operating Begin Operations Domain control of systems Starts insurance Available for Science Community Workshop 1 12
13 Configuration Management Standards and Conventions Naming, Numbering, Drawing Responsibilities and Authority Controlled vs Non-controlled Details on Technical Documents Document Management, Types, Stages Collaboration Applications Configuration Control Structure and Process. Change Control Boards (CCB) IO Change Control Board System Level Change Control Board OOI Change Control Board Science Community Workshop 1 13
14 CCB Benefits Use change control process to manage to project baselines, requirements, guiding principles (hierarchical decision tree) The CCB process is required to ensure product quality, schedule, budget and business commitments Controlled process to estimate Impact of changes Communication that authorizes changes to a baseline release Science Community Workshop 1 14
15 Classes of Changes Class I Changes: Change to a controlled design document, controlled policy/plan document, statement of work or contract and one or more of the following statements apply: Affects any physical or functional requirement in approved configuration Affects any approved functional, allocated or product configuration documentation, cost, warranties, or contract milestones, Affects approved product configuration documentation and one or more of the following: safety, correction of a hazard or conformance to applicable design standards, compatibility, interoperability, interfaces, or logistic support, retrofit of tested or delivered units, interchangeability, substitutability, or replace ability of any item down to non-repairable subassemblies, sources on a source control drawing Affects system configuration to the extent that retrofit (replacement of components) action would be taken on a formally tested or commissioned component. Science Community Workshop 1 15
16 Classes of Changes Class II Changes: Change to a controlled item and not categorized as class 1, such as: Cost of change is below specified threshold EVM items, Task level or lower, under the management of a CAM Correction of typographical errors Science Community Workshop 1 16
17 Board Levels IO Level System Level Interfaces with other subsystems/systems or IOs OOI Level Science Scope, Baseline Budget / Schedule NSF Program Manager Review CA and CSA Thresholds Each with specified core membership, authority and reporting structure Science Community Workshop 1 17
18 Construction Build Something Already! Really! Science Community Workshop 1 18
19 Schedule Graphic Science Community Workshop 1 19
20 Schedule Graphic Science Community Workshop 1 20
21 Schedule Graphic Science Community Workshop 1 21
22 Schedule Graphic Science Community Workshop 1 22
23 Construction The Beginning. Science Community Workshop 1 23
SYSTEMS ENGINEERING MANAGEMENT PLAN
SYSTEMS ENGINEERING MANAGEMENT PLAN Version 3-12-P Document Control Number 1100-00000 2010-07-27 Consortium for Ocean Leadership 1201 New York Ave NW, 4 th Floor, Washington DC 20005 www.oceanleadership.org
CONFIGURATION MANAGEMENT PLAN
CONFIGURATION MANAGEMENT PLAN Version 2-91-P Document Control Number 1000-00000 2010-10-05 Consortium for Ocean Leadership 1201 New York Ave NW, 4 th Floor, Washington DC 20005 www.oceanleadership.org
CI CONFIGURATION MANAGEMENT PLAN
CI CONFIGURATION MANAGEMENT PLAN Version 2-00 Document Control Number 2110-00001 11/10/09 Consortium for Ocean Leadership 1201 New York Ave NW, 4 th Floor, Washington DC 20005 www.oceanleadership.org in
Configuration Management Plan
6500m HOV Project Stage 1: A-4500 HOV Document Control No.: 0000000 29-October-2009 WOODS HOLE OCEANOGRAPHIC INSTITUTION WOODS HOLE, MA 02543 Document Control Sheet Date Originator Description 08-21-09
Accounting System. Page 1 of 9
Page 1 of 9 Accounting System In support of program management and Earned Value Management, the accounting system must be able to relate costs incurred to work accomplished. Not all accounting systems
PROJECT EXECUTION PLAN
PROJECT EXECUTION PLAN November 2007 DRAFT v2.0 Consortium for Ocean Leadership 1201 New York Avenue NW, Fourth Floor, Washington, D.C. 20005 www.joiscience.org Table of Contents Executive Summary. iv
NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services
SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE Head, Office of Project Support Services
DATA REQUIREMENTS DESCRIPTION (DRD)
DATA REQUIREMENTS DESCRIPTION (DRD) 1. DPD NO.: XXX ISSUE: Draft 2. DRD NO.: STD/EDAL 3. DATA TYPE: 3 4. DATE REVISED: 5. PAGE: 1/3 6. TITLE: Engineering Drawings and Associated Lists 7. DESCRIPTION/USE:
CalMod Design-Build Electrification Services
SECTION 01800 SYSTEMS INTEGRATION AND INTEGRATOR REQUIREMENTS PART 1 GENERAL DESCRIPTION A. This section specifies the system-wide integration requirements for the Caltrain Electrification system, i.e.
Developing Work Breakdown Structures
Developing Work Breakdown Structures International Cost Estimating & Analysis Association June 2014 Neil F. Albert MCR, LLC [email protected] 703-506-4600 2014 MCR, LLC Distribution prohibited without express
From Chaos to Clarity: Embedding Security into the SDLC
From Chaos to Clarity: Embedding Security into the SDLC Felicia Nicastro Security Testing Services Practice SQS USA Session Description This session will focus on the security testing requirements which
Project Time Management
Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.
General Platform Criterion Assessment Question
Purpose: [E]nsure that the assets required to deliver services are properly controlled, and that accurate and reliable information about those assets is available when and where it is needed. (ST 4.3.1)
Head, Office of Project Management Oversight
SUBJECT: FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Management Oversight REVISION: 43 APPROVED BY: TITLE Head, Office of Project Management
ALS Configuration Management Plan. Nuclear Safety Related
Westinghouse Non-Proprietary Class 3 Advanced Logic System 6002-00002-NP, Rev. 10 Function Author Nuclear Safety Related July 2014 APPROVALS Name and Signature Anthony C. Pagano* Integrated Process Lead,
MGMT 4135 Project Management. Chapter-4. Defining the Project
MGMT 4135 Project Management Chapter-4 Where We Are Now Chapter-4 Steps for Chapter-4 Step-1 Scope Step-2 Establishing Project Priorities Step-3 Creating the Work Breakdown Structure Step-4 Integrating
Certificate of Acceptance
Critical Rail Temperature Monitor 3000 Product Description Product Image The CRTM 3000 (Critical Rail Temperature Monitor) monitoring system enables people to monitor rail temperature in real time. The
Input, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) [email protected] 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
Administering Active Directory. Administering Active Directory. Reading. Review: Organizational Units. Review: Domains. Review: Domain Trees
Reading Read over the Active Directory material in your Network+ Guide I will be providing important materials Administering Active Directory If you don t understand certain concepts, please ask for help!
How To Design A Low Cost Unmanned Vehicle
ASTM F41 Working Group CAPT Duane Ashton Unmanned Maritime Systems August 18, 2011 Methodology to Achieve Level 6: (1) Level of documentation How PEO LCS Evaluates OA Analysis at subcomponent and subfunction
NOAA. Integrated Ocean Observing System (IOOS) Program. Data Integration Framework (DIF) Master Project Plan. (Version 1.0) November 8, 2007
NOAA Integrated Ocean Observing System (IOOS) Program Data Integration Framework (DIF) Master Project Plan (Version 1.0) November 8, 2007 12/7/2007 DIF Project DRAFT- Internal Use Only Master Project Plan
Engineering a EIA - 632
es for Engineering a System EIA - 632 SE Tutorial es for Engr Sys - 1 Fundamental es for Engineering a System Acquisition and Supply Supply Acquisition es for Engineering A System Technical Management
Chap 1. Introduction to Software Architecture
Chap 1. Introduction to Software Architecture 1. Introduction 2. IEEE Recommended Practice for Architecture Modeling 3. Architecture Description Language: the UML 4. The Rational Unified Process (RUP)
GENERAL PLATFORM CRITERIA. General Platform Criterion Assessment Question
GENERAL PLATFORM CRITERIA SACM-V3-G-001 Comment: Does the tool use ITIL V3 process terms and align to ITIL V3 workflows and process integrations? SACM-V3-G-002 (OGC ISS 5.1.10) Access Controls Does the
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Configuration Management Practices
Safety Critical Software Management Practices Linda Westfall Westfall Team, Inc. International Conference on Software Quality ICSQ 2011 Copyright 1999-2010 Westfall Team, Inc. All Rights Reserved. Management
SECTION 4 TESTING & QUALITY CONTROL
Page 1 SECTION 4 TESTING & QUALITY CONTROL TESTING METHODOLOGY & THE TESTING LIFECYCLE The stages of the Testing Life Cycle are: Requirements Analysis, Planning, Test Case Development, Test Environment
JSP 886 DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTIC SUPPORT PART 8.12 CONFIGURATION MANAGEMENT
JSP 886 DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTIC SUPPORT PART 8.12 CONFIGURATION MANAGEMENT THE MASTER VERSION OF JSP 886 IS PUBLISHED ON THE DEFENCE INTRANET. FOR TECHNICAL REASONS,
Requirements Management John Hrastar
Requirements Management John Hrastar NASA Project Management Conference March 30-31, 2004 University of Maryland Conference Center Introduction Three aspects of requirements management Requirements in
NEW ROLES FOR UUVS IN INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE
NEW ROLES FOR UUVS IN INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE Barbara Fletcher Space and Naval Warfare Systems Center D744 San Diego, CA USA [email protected] ABSTRACT Intelligence, Surveillance,
telemetry Rene A.J. Chave, David D. Lemon, Jan Buermans ASL Environmental Sciences Inc. Victoria BC Canada [email protected] I.
Near real-time transmission of reduced data from a moored multi-frequency sonar by low bandwidth telemetry Rene A.J. Chave, David D. Lemon, Jan Buermans ASL Environmental Sciences Inc. Victoria BC Canada
PROJECT SCOPE MANAGEMENT
5 PROJECT SCOPE MANAGEMENT Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully
Program/Project Management Series Work Breakdown Structure Reference Guide
Program/Project Management Series Work Breakdown Structure Reference Guide National Aeronautics and Space Administration May 1994 2 Work Breakdown Structure Reference Guide May 1994 Table of Contents Chapter
Realizing CMMI using Enterprise Architect and UML for Process Improvement
Realizing CMMI using Enterprise Architect and UML for Process Improvement Jack Hunnicutt, Anteon Corporation www.anteon.com Ramsay Millar, integrate IT architects LLC www.integrateitarchitects.com Introduction
Configuration Management - The Big Picture
Configuration Management - The Big Picture Consists of: 1. Product s aligned to system development life cycle comprised of hardware and software configuration items described by specifications, design
3SL. Requirements Definition and Management Using Cradle
3SL Requirements Definition and Management Using Cradle November 2014 1 1 Introduction This white paper describes Requirements Definition and Management activities for system/product development and modification
What is Automotive Software Engineering? What is Automotive Software Engineering? What is Automotive Software Engineering?
Process models: Capability Maturity Model Integration (CMMI) Software Process Improvement and Capability Determination (SPICE) V-Model Standards: MISRA-C standard AUTOSAR Configuration management Product
International Software & Systems Engineering. Standards. Jim Moore The MITRE Corporation Chair, US TAG to ISO/IEC JTC1/SC7 James.W.Moore@ieee.
This presentation represents the opinion of the author and does not present positions of The MITRE Corporation or of the U.S. Department of Defense. Prepared for the 4th Annual PSM Users Group Conference
Federal Aviation Administration Standard Work Breakdown Structure (WBS) Version 3.1
Federal Aviation Administration Standard Work Breakdown Structure (WBS) Version 3.1 July, 2003 Page Intentionally Left Blank INTRODUCTION This Federal Aviation Administration (FAA) Standard Work Breakdown
The CMDB at the Center of the Universe
The CMDB at the Center of the Universe Reg Harbeck CA Wednesday, February 27 Session 5331 Purpose Clarify origin of CMDB concept and what it is Understand difference and equivalence between CMDB and Asset
Configuration Management Self Assessment Checklist
Configuration Management Self Assessment Checklist Introduction: The purpose of this Configuration Management (CM) Self- Assessment Checklist is to ensure that the Organization correctly understands the
Project Management Using Earned Value
Project Management Using Earned Value Third Edition Gary C. Humphreys Earned Value Management Consulting Training 2002, 2011, 2014 Gary C. Humphreys Humphreys & Associates, Inc. All rights reserved. No
Time Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
Project Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Enterprise Application Enablement for the Internet of Things
Enterprise Application Enablement for the Internet of Things Prof. Dr. Uwe Kubach VP Internet of Things Platform, P&I Technology, SAP SE Public Internet of Things (IoT) Trends 12 50 bn 40 50 % Devices
Project Planning. Project Scope. Work Breakdown Structure.
Chapter 5 Project Planning. Project Scope. Work Breakdown Structure. 1 Objectives Acquire a general understanding of the parts of the project management plan Understand the importance of discovering and
Data Migration: Moving from Dell PowerVault MD3000i/MD3000 to MD3200i/MD3220i and MD3600i/MD3620i Series Storage Arrays
Data Migration: Moving from Dell PowerVault MD3000i/MD3000 to MD3200i/MD3220i and MD3600i/MD3620i A Dell Technical White Paper PowerVault MD3200/MD3200i and MD3600i Storage Arrays THIS WHITE PAPER IS FOR
Guidelines: Project Schedule Project Management Office (PMO)
Guidelines: Project Schedule Project Management Office (PMO) Process The project Schedule outlines the tasks and activities of the project; the duration; start and end dates for each individual task and
Altiris Asset Management Suite 7.0
Altiris Asset Management Suite 7.0 1 Today s Agenda 1 Asset Management Overview 2 What's New in AMS 7 3 New Process Automations (workflow) 4 Migration from 6.x to 7.0 Altiris Asset Management Suite 7.0
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
SCHEDULE AND BUDGETING
PROJECT CONTROLS The right combination of software management tools, proper initial project set-up, timely and accurate data input, continuous tracking of progress, a meaningful reporting structure, strong
PMI Lexicon of Project Management Terms
Project Management Institute PMI Lexicon of Project Management Terms Version 3.0 Published by: Project Management Institute, Inc. 14 Campus Boulevard Newtown Square, Pennsylvania 19073-3299 USA Phone:
PROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in this Project Scope Statement is implicitly excluded from the project. Create links to referenced documents (e.g., Link_To_ ) by using Insert
Tracking & Fleet Management System. Itzik Baron, Mobile Satellite Sales Manager
Tracking & Fleet Management System Itzik Baron, Mobile Satellite Sales Manager Overview Communication solutions provider offering domestic and international fiber & satellite based connectivity services
Configuration & Build Management
Object-Oriented Software Engineering Using UML, Patterns, and Java Configuration & Build Management Outline of the Lecture Purpose of Software Configuration Management (SCM) Some Terminology Software Configuration
Configuration Management
Configuration Management Co Al Florence This presenter s affiliation with the MITRE Corporation is provided for identification purposes only and is not intended to convey or imply MITRE s concurrence with
IT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
Appendix D Glossary Of Terms
Appendix D Glossary Of Terms The notational style used in this glossary is to begin the definition of each defined term with a new paragraph beginning with the term in UPPERCASE. Any word or phrase used
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements
Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality
BK MIKRO9. Tool monitoring system. Getting Started with Profibus Release 1.00 / 21.4.2008
BK MIKRO9 Tool monitoring system Getting Started with Profibus Release 1.00 / 21.4.2008 MSC Tuttlingen GmbH Rudolf-Diesel-Straße 17 D-78532 Tuttlingen Tel. +49 7461 925 200 Fax +49 7461 925 268 E-Mail
CENTRE FOR MARITIME RESEARCH AND EXPERIMENTATION
CENTRE FOR MARITIME RESEARCH AND EXPERIMENTATION Gabriel Grenon, Dr.Alain Maguer Per Arne Sletner Head, Autonomous Unmanned Vehicles Section Dronitaly Slide 1 Mission CMRE organises and conducts scientific
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Service Asset & Configuration Management PinkVERIFY
-11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to
This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.
This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts. To begin, how does the Prime integrate the subcontractor
Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
Service Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0
Service Support Configuration Management ITIL Configuration Management - 1 Goals of Configuration Management The goals of Configuration Management are to: Account for all the IT assets and configurations
Montana Department of Transportation Information Services Division. System Development Life Cycle (SDLC) Guide
Montana Department of Transportation Information Services Division System Development Life Cycle (SDLC) Guide Version 2 August 2, 2007 \mdt_sdlc_process\mdt_sdlc_v02.doc Table of Contents 1 Business Analysis...3
PROGRAM MANAGER S GUIDE
PROGRAM MANAGER S GUIDE Directory Just click on the individual directory item below or select from the bookmark tab. A Modular Open Systems Approach (MOSA) to Acquisition Forward Executive Summary MOSA
IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?
1 IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN? Presented at The Nexus of Agile Software Development and Earned Value Management, OSD-PARCA, February 19 20, 2015 Institute for Defense Analysis, Alexandria,
Criteria for Flight Project Critical Milestone Reviews
Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority
JOURNAL OF OBJECT TECHNOLOGY
JOURNAL OF OBJECT TECHNOLOGY Online at www.jot.fm. Published by ETH Zurich, Chair of Software Engineering JOT, 2006 Vol. 5. No. 8, November-December 2006 Requirements Engineering Tasks Donald Firesmith,
Effective Space Project Management
Effective Space Project Management Nghi M. Nguyen, P.E., PMP, President, NDV Project Management Services Inc. and Project Management Consultant, Canadian Space Agency (CSA) Introduction The application
How To Write A Contract For Software Quality Assurance
U.S. Department of Energy Washington, D.C. NOTICE DOE N 203.1 Approved: Expires: 06-02-01 SUBJECT: SOFTWARE QUALITY ASSURANCE 1. OBJECTIVES. To define requirements and responsibilities for software quality
Time Management. Part 2 Work Breakdown Structure (WBS) Review. Richard Boser
Time Management Part 2 Work Breakdown Structure (WBS) Review Richard Boser WBS Planning Process PMBOK WBS is deliverable-oriented grouping of components that organizes and defines the total scope of the
Certificate of Acceptance
Product Description Product Image < Scope of Acceptance Full Acceptance / Trial Acceptance (delete as appropriate) Network
Quick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
The Arctic Observing Network and its Data Management Challenges Florence Fetterer (NSIDC/CIRES/CU), James A. Moore (NCAR/EOL), and the CADIS team
The Arctic Observing Network and its Data Management Challenges Florence Fetterer (NSIDC/CIRES/CU), James A. Moore (NCAR/EOL), and the CADIS team Photo courtesy Andrew Mahoney NSF Vision What is AON? a
Superseded by T MU AM 04001 PL v2.0
Plan T MU AM 04001 PL TfNSW Configuration Management Plan Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by
Lecture Slides for Managing and Leading Software Projects. Chapter 5: Project Planning Techniques
Lecture Slides for Managing and Leading Software Projects Chapter 5: Project Planning Techniques developed by Richard E. (Dick) Fairley, Ph.D. to accompany the text Managing and Leading Software Projects
PROJECT TIME MANAGEMENT
PROJECT TIME MANAGEMENT http://www.tutorialspoint.com/pmp-exams/project_time_management.htm Copyright tutorialspoint.com Here is a list of sample questions which would help you to understand the pattern
Goddard Procedures and Guidelines
Goddard Procedures and Guidelines DIRECTIVE NO. APPROVED BY Signature: Original signed by NAME: A. V. Diaz TITLE: Director Responsible Office: Title: Code 300 / Office of Systems Safety and Mission Assurance,
SWEBOK Certification Program. Software Engineering Management
SWEBOK Certification Program Software Engineering Management Copyright Statement Copyright 2011. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted
Databases & Data Infrastructure. Kerstin Lehnert
+ Databases & Data Infrastructure Kerstin Lehnert + Access to Data is Needed 2 to allow verification of research results to allow re-use of data + The road to reuse is perilous (1) 3 Accessibility Discovery,
SolarWinds. Packet Analysis Sensor Deployment Guide
SolarWinds Packet Analysis Sensor Deployment Guide Copyright 1995-2015 SolarWinds Worldwide, LLC. All rights reserved worldwide. No part of this document may be reproduced by any means nor modified, decompiled,
Fundamentals of Measurements
Objective Software Project Measurements Slide 1 Fundamentals of Measurements Educational Objective: To review the fundamentals of software measurement, to illustrate that measurement plays a central role
Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes
Agenda 0 Instructor Introduction 3 minutes 0 Agenda review 2 minutes 0 Chapter of the week 50 minutes 0 Q&A of chapter 10 minutes 0 Break 10 minutes 0 Exercises 25 minutes 0 Round table 15 minutes 0 Closure