1 STANDARD COLLECTION DETAILS Detail No. Detail Title Pages ND-01 NOTICE TO CONTRACTORS 1 ND-02 MANHOLE CONSTRUCTION NOTES AND INDEX 2 ND-10 STANDARD MANHOLE CONNECTION 2 ND-11 STANDARD MANHOLE DETAIL 54" DIA OR LARGER DISTRICT PIPE 2 ND-12 STANDARD MANHOLE DETAIL CCFRPM DISTRICT PIPE 2 ND-13 STANDARD MANHOLE DETAIL FRP 2 ND-14 STANDARD MANHOLE DETAIL POLYMER CONCRETE 3 ND-15 STANDARD GREASE INTERCEPTOR 2 ND-16 STANDARD MANHOLE DETAIL CIPP REPAIR 1 ND-20 STANDARD SERVICE CONNECTION - CONCRETE PIPE 1 ND-21 STANDARD SERVICE CONNECTION - CIPP LINED PIPE 1 ND-22 STANDARD SERVICE CONNECTION - CCFRPM FIBERGLASS PIPE 1 ND-23 STANDARD SERVICE CONNECTION - ABANDONMENT 1 ND-30 CRACKED PIPE REPAIR 1 ND-31 STRUCTURAL SUPPORT AT CROSSING 2 Table of Contents

2 Effective immediately, the following will be accomplished by all contractors before starting any work or excavation around or on any sewer line owned by the North Davis Sewer District: Hours of Operation a) b) c) Sewer Lateral Connections: a) b) c) d) e) The District's working hours are 7:30 a.m. to 4:00 p.m., Monday through Friday. No sewer inspection will be done on weekends, holidays or after 3:00 p.m. All inspections lasting after 4:00 p.m. will result in overtime being billed to the contractor. Multiple inspection visits required for work that is incomplete, not to District standards, or not ready for inspection will result in additional time being billed to the contractor. No work shall begin until the proper fees of $ for connection and inspection, plus impact fees as calculated by the City or District (whichever may apply) are certified to the District as having been paid. The District only accepts cash or check. No work shall begin until the proper building permits and licenses have been obtained from the City, County, or Sewer District. Minimum notice of 48 hours shall be given to the District prior to any work commencing on or digging being done on District-owned lines. No digging or work shall be done on District-owned lines without the presence of a District Inspector. All sewer taps must be Core Drilled, INSERTA TEE, GPK 4, or equivalent. Setting of Manholes on District owned-line a) Manholes are required to be set for connecting lines 6 inches or larger. b) No manholes shall be set on District-owned lines without prior approval by the District. Contractors shall submit design drawings and manhole details of proposed manholes on District line for approval 14 days prior to work commencing. Design drawings shall be submitted in PDF electronic format unless otherwise requested by the District. c) After approval of drawings, a minimum of 48 hours notice shall be given to the District inspectors before any manhole is set on a District-owned line. The manhole must be set in the presence of a District inspector. Flow Control and Bypass Pumping Operations a) Where required to complete the Work, the Contractor shall provide bypass pumping and flow control. Contractor shall submit a bypass pumping plan prior to commencement of the work for review and acceptance by the District. The plan shall at a minimum provide materials, equipment and flow calculations and be of sufficient detail to demonstrate the system's capacity to control flows. The Contractor shall coordinate with the District to determine the required capacity. Concrete Batching a) Ready mix concrete shall be provided in accordance with ASTM C94, Standard Specification for Ready-Mixed Concrete. b) The design water content of the mix (w/c ratio) shall not be exceeded. Addition of water, air entrainment or superplasticizer shall only be performed by the Supplier. c) Non-air entrained concrete shall be discharged ninety (90) minutes after batching. Air entrained concrete or concrete that includes silica fume shall be discharged within sixty (60) minutes of batching. d) Requests for longer batching times shall be submitted and accepted by the District prior to procurement of concrete by the Contractor. e) The District shall not be responsible for the cost of rejected batches exceeding time limitations, loss of air-entrainment or slump. Warranty: a) Contractor shall guarantee work for a period of one year from the date of installation. Failure of contractors to comply with these guidelines could result in the contractor being barred from working on District lines. If there are any questions on a line being a District line, please contact the District ND-01 Notice to Contractors

3 STANDARD MANHOLE ON EXISTING SEWER LINE 1. Manhole shall be constructed so as to prevent load to the existing pipe. The base of the manhole shall provide a minimum of 9 inches of concrete beneath the existing pipe unless otherwise shown, placed on 12 inches of one inch gravel bedding compacted to 95% density. 2. Manhole floor elevation shall be a minimum of 2 inches above top of pipe, have a 12:1 slope to the pipe, and a smooth finish. 3. Connection to manhole shall be made using a flexible, watertight connection per ASTM C923, Kor-n-seal or equal. Flexible couplings shall be correctly sized, flexible water tight couplings per ASTM C1173, Fernco Inc, Mission Rubber Company or approved equal. All hardware shall be 316 series stainless steel, unless otherwise approved. 4. Manhole shall be constructed using a pre-cast eccentric type sections and cast iron traffic type frame and cover marked "NORTH DAVIS SEWER". Section joints shall be sealed with rubber gaskets and shall be watertight. 5. Wrap exterior joints. Wrap shall conform to ASTM C877 Type II or Type III. Press-seal Ez-Wrap, Cretex Wrap, Conseal 2/2 or approved equal. 6. Invert of branch line at manhole connection shall be adjusted to be at or near crown of existing main line. 7. Branch line channel to be formed with same slope, size, depth, and shape as pipe with smooth finish; it shall be curved in direction of flow with uniform radius and minimize dropping and splashing of flow. 8. Cutting into existing line shall be made by smooth saw cuts. 9. Installing contractor shall be responsible for proper slope and installation of connecting line. 10. Installing contractor shall be responsible for proper backfilling, compacting, and pavement restoration. 11. Contractor shall notify District 48 hours before installation begins and a District inspector must be present before installation takes place. 12. Contractor shall meet all restoration requirements of the agency, city or UDOT where the manhole is installed and shall coordinate any additional installation or inspection requirements with the agency. CONNECTION TO AN EXISTING MANHOLE 1. Item numbers 3, 5, 8, 9, 10 and 11 above shall apply. 2. In addition, the manhole junction channel shall be constructed to the same size, shape, and slope of the incoming line. Channel shall curve in the direction of flow with uniform radius and minimize dropping and splashing of flow. 3. No manhole connection shall be made until complete design drawings of the manhole and line installations are submitted to the District for approval - 14 days prior to work commencing. ND-02 Manhole Construction Notes and Index 1 of 2

4 Detail no. Detail Title Use ND-10 ND-11 STANDARD MANHOLE CONNECTION STANDARD MANHOLE DETAIL 54" DIA OR LARGER DISTRICT PIPE Concrete, RCP, and PVC District Pipe < 54" DIA. (See Note 1) RCP District Pipe 54" DIA ND-12 STANDARD MANHOLE DETAIL CCFRPM DISTRICT PIPE CCFRPM Pipe 18" DIA ND-13 ND-14 STANDARD MANHOLE DETAIL FRP STANDARD MANHOLE DETAIL POLYMER CONCRETE Lined Concrete and RCP, CCFRPM or as directed by District Lined Concrete and RCP, CCFRPM or as directed by District ND-15 STANDARD GREASE INTERCEPTOR As directed by District ND-16 STANDARD MANHOLE DETAIL CIPP REPAIR CIPP Lined District Pipe NOTE 1. District reserves the right to require precast FRP or polymer manholes on pipes that are planned to be rehabilitated by cured-in-place (CIPP) or other methods within two years of drawing submittal. ND-02 Manhole Construction Notes and Index 2 of 2

5 EXISTING DISTRICT PIPE NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SLOPE AND CONSTRUCTION OF CONNECTING PIPELINE. HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 3. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. CUTTING OF EXISTING LINE TO FORM CHANNEL SHALL BE ACCOMPLISHED WITH SMOOTH SAW CUTS A FLOW 2'-0" MAX. A 4. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. 5. PRECAST MANHOLE BASES SHALL BE USED FOR CONSTRUCTION OF ALL NEW DISTRICT SEWER SYSTEMS. PRECAST MANHOLE BASES OR CAST-IN-PLACE MANHOLE BASES MAY BE USED AT THE CONTRACTOR'S OPTION FOR NEW MANHOLES INSTALLED ON EXISTING DISTRICT SANITARY SEWERS. CONTRACTOR SHALL PROVIDE A SUITABLE FOUNDATION IN ALL AREAS. CONNECTING PIPE JUNCTION CHANNEL SHALL BE FORMED WITH SAME SLOPE, SIZE, DEPTH, AND SHAPE AS CONNECTING PIPE WITH SMOOTH FINISH - CHANNEL SHALL CURVE IN DIRECTION OF FLOW WITH UNIFORM RADIUS AND MINIMIZE DROPPING AND SPLASHING OF FLOW 6" (TYP) 6. CAST-IN-PLACE BASE SHALL BE COMPLETED IN A SINGLE POUR. CONCRETE SHALL BE TYPE II/V PORTLAND CEMENT PER ASTM C150 WITH A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI PER ASTM C39. NO ADDITIVES SHALL BE PERMITTED WITHOUT PRIOR APPROVAL BY THE DISTRICT. 7. PRECAST MANHOLE BASES SHALL CONFORM TO ASTM C478. CONCRETE SHALL BE TYPE II/V PORTLAND CEMENT PER ASTM C150 WITH A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI PER ASTM C39. CONNECTIONS TO PRECAST BASES SHALL BE FACTORY INSTALLED AND MEET THE REQUIREMENTS OF ASTM C923, Z-LOK, PRES-SEAL PSX OR APPROVED EQUAL. 8. MANHOLES ON CCFRPM OR CIPP LINED DISTRICT SEWERS SHALL BE PRECAST FRP (HOBAS, LF MANUFACTURING INC OR EQUAL) OR POLYMER (ARMOROCK OR EQUAL) UNLESS OTHERWISE APPROVED BY THE DISTRICT. SEE DETAIL ND-12, ND-13 AND ND GRADE RINGS SHALL BE GROUTED TO PREVENT INFILTRATION. GROUT SHALL BE FULL STRENGTH, NON-METALLIC, NON-SHRINK TYPE V GROUT (MASTERFLOW 713, FIVESTAR GROUT OR APPROVED EQUAL) WITH ADDITIVES FOR PROTECTION AGAINST HYDROGEN SULFIDE ATTACK. PLAN 10. PROVIDE HYDROPHILIC WATER STOP BETWEEN PIPE AND CAST CONCRETE, BOTH SIDES, ALL AROUND. CLEAN PIPE USING WIRE BRUSH, POWER WASH OR SAND BLAST TO PROVIDE A CLEAN, DURABLE SURFACE. SECURE WATERSTOP TO PIPE USING MANUFACTURER'S RECOMMENDED METHODS. APPLY LAYER OF GREENSTREAK LEAKMASTER OR APPROVED EQUAL BETWEEN WATERSTOP AND PIPE. ND-10 Standard Manhole Connection 1 of 2

6 12" WIDE MIN, 8" DEEP CONCRETE COLLAR IN PAVED AREAS REINFORCEMENT REQUIRED (1) #4 BAR ALL AROUND 30" MANHOLE RING AND COVER MARKED "NORTH DAVIS SEWER" (D & L SUPPLY A , OR APPROVED EQUAL) GRADE RINGS - A MINIMUM OF ONE 6-INCH RING, BUT NOT MORE THAN 18" TOTAL HEIGHT INCLUDING FRAME, RINGS, AND GROUT, SHALL BE USED PRECAST ECCENTRIC CONE (SHALL MEET ASTM C-478 STANDARDS) WHEN INSUFFICIENT DEPTH PREVENTS THE USE OF A CONE, A CONCRETE PRECAST H-20 FLAT LID SHALL BE USED. MANHOLE DIAMETER SHALL BE 4'-0" FOR PIPE SIZES LESS THAN 15" - MANHOLE DIAMETER SHALL BE 5'-0" FOR PIPE SIZES OF 15" TO 30", MANHOLE DIAMETER SHALL BE 6' FOR PIPE SIZES GREATER THAN 30" AND FOR ALL CONNECTING AND JUNCTION MANHOLES (FOR DISTRICT PIPES 54" DIA OR LARGER SEE DETAIL ND-11). 30" DIA. IF LOCATED IN UNIMPROVED GROUND SET COVER 6" ABOVE GRADE UNLESS DIRECTED OTHERWISE BY DISTRICT GROUT FOR SETTING GRADE RINGS AND FRAME SHALL PROVIDE A WATERTIGHT BARRIER TO PREVENT INFILTRATION AND BE PLACED ACROSS THE FULL WIDTH, 1/2-INCH MIN AND 1-INCH MAX THICK. SEAL ALL JOINTS WITH RAMNECK OR EQUAL (ALL JOINTS SHALL BE TESTED FOR WATERTIGHTNESS) TAPE WRAP EXTERIOR JOINTS. WRAP SHALL CONFORM TO ASTM C877 TYPE II OR TYPE III. (PRESS-SEAL EZ-WRAP, CRETEX WRAP, CONSEAL 2/2 OR APPROVED EQUAL) INVERT OF CONNECTING PIPE SHALL BE AT OR NEAR CROWN OF EXITING DISTRICT SEWER PIPE TOP OF FLOOR SHALL BE 2" MIN. ABOVE PIPE 1:12 FLOOR SLOPE WITH SMOOTH TROWELED FINISH 6" PRECAST CONCRETE MANHOLE SECTIONS PER ASTM C-478. PRECAST RISER TO BE SET IN CONCRETE (TYP) (CAST-IN-PLACE BASE) CONNECTING PIPE SHALL BE INSTALLED IN CORE DRILLED OPENING WITH A FLEXIBLE WATERTIGHT BOOT. (PSX, PRESS SEAL, KOR-N-SEAL OR EQUAL) IF A BOOTED CONNECTION IS NOT POSSIBLE, PLACE HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE " 9" MIN SECTION A PRECAST OR CAST-IN-PLACE MANHOLE BASE DISTRICT SEWER PIPE 1" MINUS GRAVEL BASE UNDISTURBED NATIVE SOIL ND-10 Standard Manhole Connection 2 of 2

7 PRECAST MANHOLE PER STANDARD MANHOLE CONNECTION DETAIL FRAME & COVER PER DETAIL ND-10 PRECAST MANHOLE PER STANDARD DETAIL PER TABLE "A" CONNECTING PIPE A HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE 4. FLOW MIN WIDTH PER TABLE "A" "L" MIN EXISTING DISTRICT SEWER PIPE MIN LENGTH PER TABLE "A" CONNECTING PIPE A CLEAR HEIGHT PROVIDE STAINLESS STEEL BAND (NON-SHEAR) TYPE. (FERNCO OR APPROVED EQUAL) HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE 4. 6' MIN TO TRANSITION (MIN 48" RISER TO GRADE) 1'-0" MIN 6" FROM WATERSTOP TO OUTSIDE EDGE OF MANHOLE 6" MAX MIN DIA PER TABLE "A" 3" MIN L VARIES 45 TYP VARIES SEE TABLE "A" MIN WIDTH PER TABLE "A" SECTION A 8" MIN SAW CUT & REMOVE EXISTING PIPE CROWN PRECAST RISER TO BE SET IN CONCRETE (TYP) (CAST-IN-PLACE BASE) 1'-0" MIN 1'-0" MIN #5 BAR 12" OC BOTH WAYS TOP & BOTTOM GRADE 60 3" MIN (TYP) 12" GRANULAR BEDDING COMPACTED TO 95% DRY DENSITY (OR CONTROL DENSITY FILL) UNDISTURBED NATIVE SOIL PLAN 6" MIN FROM EDGE OF CONCRETE ND-11 Standard Manhole Detail 54" DIA or Larger District Pipe 1 of 2

8 NOTES: 1. THIS STANDARD DRAWING SHALL BE USED FOR ACCESS TO EXISTING DISTRICT SEWER PIPES WITH DIAMETERS 54" DIA OR LARGER. THIS DETAIL SHALL NOT APPLY TO NEW DISTRICT SANITARY SEWER AND MANHOLE CONSTRUCTION. 2. WHERE DEPTH OF COVER OVER THE TOP OF PIPE EXCEEDS 10 FEET, REINFORCEMENT REQUIREMENTS SHALL BE REVIEWED AND VERIFIED BY A UTAH LICENSED CIVIL OR STRUCTURAL ENGINEER. 3. CONCRETE SHALL BE TYPE V CEMENT WITH A MINIMUM 4000 PSI COMPRESSIVE STRENGTH AT 28 DAYS UNLESS OTHERWISE DIRECTED BY THE DISTRICT. 4. PROVIDE HYDROPHILIC WATER STOP BETWEEN PIPE AND CAST CONCRETE, BOTH SIDES, ALL AROUND. CLEAN PIPE USING WIRE BRUSH, POWER WASH OR SAND BLAST TO PROVIDE A CLEAN, DURABLE SURFACE. SECURE WATERSTOP TO PIPE USING MANUFACTURER'S RECOMMENDED METHODS. APPLY LAYER OF GREENSTREAK LEAKMASTER OR APPROVED EQUAL BETWEEN WATERSTOP AND PIPE. 5. MINIMUM MANHOLE DIAMETER SHALL BE AS SHOWN IN TABLE A. MANHOLE COMPONENTS SHALL BE PROVIDED IN ACCORDANCE WITH DETAIL ND-10. DISTRICT PIPE DIA (IN) MIN MANHOLE DIA (IN) TABLE "A" ENCASEMENT MIN WIDTH (IN) 6. WHERE EXISTING DISTRICT PIPES HAVE BEEN REHABILITATED WITH CURED-IN-PLACE PIPE LINERS, CIPP LINERS SHALL BE CUT AND THE CIPP LINER ROUGHENED AND SEALED WITH AN APPROVED EPOXY PER DETAIL ND CONNECTING PIPE SHALL MATCH THE CROWN OF EXISTING DISTRICT PIPE. SAW CUT AND REMOVE EXISTING PIPE FROM CROWN TO SPRINGLINE. CONSTRUCT SLOPING INLET CHANNEL AND SHAPE CHANNEL TO FORM A SMOOTH FLOW SURFACE. ENCASEMENT MIN LENGTH (IN) 60" OR LESS 60" 96" 96" 78" OR LESS 72" 118" 118" 84" OR LESS 84" 124" 124" 8. PIPE CONNECTIONS SET IN THE CONCRETE BASE SHALL BE WATERTIGHT. PROVIDE HYDROPHILIC WATER STOPS, GROUT RINGS OR CAST-IN-PLACE RUBBER BOOTS MEETING APPLICABLE REQUIREMENTS OF ASTM C923. (PRESS SEAL, LINK-SEAL, OR APPROVED EQUAL) SUBMIT PRODUCT DETAILS AND PROPOSED CONNECTION FOR APPROVAL BY THE DISTRICT. ND-11 Standard Manhole Detail 54" DIA or Larger District Pipe 2 of 2

9 HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE 6. EQ 2'-0" MIN. PRECAST MANHOLE PER CONNECTING PIPE DETAIL ND-13 OR ND-14 PROVIDE WATERTIGHT SEAL (INSERTA TEE OR APPROVED EQUAL WHERE CONNECTING TO CCFRPM) EQ FIELD CUT EXISTING PIPE, CLOSURE COUPLING PER CCFRPM MFR 2'-0" MIN. MIN DIA PER TABLE "A" PRECAST RISER TO BE SET IN CONCRETE (TYP) (CAST-IN-PLACE BASE) 2'-0" MIN. MIN WIDTH PER TABLE "A" A A CONCRETE ENCASEMENT 24" MIN CCFRPM TEE BASE OR FITTING HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE 6. PRECAST MANHOLE PER DETAIL ND-13 OR ND-14. NOTES: MIN LENGTH PER TABLE "A" PLAN 1. THIS STANDARD DRAWING SHALL APPLY WHERE MANHOLES ARE CONSTRUCTED ON CCFRPM (FIBERGLASS) DISTRICT PIPES. AT THE CONTRACTORS OPTION, A PRECAST MANHOLE BASE MAY BE INSTALLED. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER MANHOLE CONNECTIONS AS ACCEPTED BY THE DISTRICT. 2. CUT EXISTING PIPE TO NEAT STRAIGHT LINES WITH CUTTING TOOLS SUITABLE FOR THE PIPE MATERIAL. DAMAGED PIPE SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE DISTRICT. EXISTING DISTRICT PIPELINES SHALL BE FULLY SUPPORTED AT ALL TIMES. CCFRPM TEE BASE OR FITTING EXISTING DISTRICT PIPE (CCFRPM, 18" DIA OR GREATER) UNDISTURBED NATIVE SOIL 3. CONCRETE SHALL BE TYPE V CEMENT WITH A MINIMUM 4000 PSI COMPRESSIVE STRENGTH AT 28 DAYS. 4. MINIMUM MANHOLE DIAMETER SHALL BE AS SHOWN IN TABLE "A". PRECAST MANHOLES COMPONENTS SHALL BE PROVIDED IN ACCORDANCE WITH DETAIL ND-13 OR ND ADDITIONAL DETAIL AND REINFORCING REQUIREMENTS SHOWN ON PAGE 2 OF PROVIDE HYDROPHILIC WATER STOP BETWEEN PIPE AND CAST CONCRETE, BOTH SIDES, ALL AROUND. CLEAN PIPE USING WIRE BRUSH, POWER WASH OR SAND BLAST TO PROVIDE A CLEAN, DURABLE SURFACE. SECURE WATERSTOP TO PIPE USING MANUFACTURER'S RECOMMENDED METHODS. APPLY LAYER OF GREENSTREAK LEAKMASTER OR APPROVED EQUAL BETWEEN WATERSTOP AND PIPE. DISTRICT PIPE DIA (IN) MIN MANHOLE DIA (IN) TABLE "A" 12" GRANULAR BEDDING COMPACTED TO 95% DRY DENSITY (OR CONTROLLED DENSITY FILL) MIN ENCASEMENT WIDTH (IN) MIN ENCASEMENT LENGTH (IN) 18" TO 45" 48" 74" 78" 60" OR LESS 84" OR LESS SECTION A 60" 88" 102" 90" 112" 132" ND-12 Standard Manhole Detail CCFRPM District Pipe 1 of 2

10 PRECAST MANHOLE PER DETAIL ND-13 OR ND-14 NON SHRINK GROUT #4 H2E - TYP. 4 SIDES #6 2'-0" MIN. #4 12" - TYP. 4 SIDES B #5 12" 12" 20 ) #4 X 1'-4" TYP. EACH END 2'-0" 12" EF #5 12" EF VARIES CCFRPM TEE BASE OR FITTING 1'-0" 12" - LAP 2'-4" 20 ) #4 ADD (2) #6 EACH SIDE OF MANHOLE (4) 12" B EXISTING DISTRICT PIPE (CCFRPM, 18" DIA OR GREATER) SECTION B REINFORCING 12" EW SECTION A REINFORCING ND-12 Standard Manhole Detail CCFRPM District Pipe 2 of 2

11 12" WIDE MIN, 8" DEEP CONCRETE COLLAR IN PAVED AREAS EXISTING PAVEMENT REINFORCEMENT REQUIRED (1) #4 BAR ALL AROUND 30" MANHOLE RING AND COVER MARKED "NORTH DAVIS SEWER" (D & L SUPPLY A , OR APPROVED EQUAL) FINISHED GRADE FRP NECK TO EXTEND INSIDE GRADE RINGS. GRADE RINGS TO EXTEND A MINIMUM OF 1" PAST FLAT SURFACE OF MANHOLE CONE PLACE AND COMPACT MANHOLE BACKFILL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS 30" EPOXY COATED PRECAST CONCRETE GRADE RINGS 12" MIN / 18" MAX. GROUT FOR SETTING GRADE RINGS AND FRAME SHALL PROVIDE A WATERTIGHT BARRIER TO PREVENT INFILTRATION AND BE PLACED ACROSS THE FULL WIDTH, 1/2-INCH MIN AND 1-INCH MAX THICK. FACTORY-BONDED JOINT FRP MANHOLE. WALL THICKNESS PER MANUFACTURER PRODUCT SUBMITTAL MIN 1/2" WALL THICKNESS FACTORY CAST FLOW CHANNEL WITH FRP CHANNEL SUPPORTS CONCRETE BASE AS REQUIRED TO COUNTERACT FLOTATION WATER TIGHT, FLEXIBLE PIPE CONNECTION, APPROVED BY THE DISTRICT CONNECTING PIPE MANHOLE DIAMETER SHALL BE 4'-0" FOR PIPE SIZES LESS THAN 15" - MANHOLE DIAMETER SHALL BE 5'-0" FOR PIPE SIZES OF 15" TO 30", MANHOLE DIAMETER SHALL BE 6' FOR PIPE SIZES GREATER THAN 30" AND FOR ALL CONNECTING AND JUNCTION MANHOLES (FOR DISTRICT PIPES 54" DIA OR LARGER SEE DETAIL ND-11.) FACTORY INSTALLED PVC STUBOUTS OR CONNECTIONS DISTRICT SEWER PIPE ANTI-FLOTATION RING 12" MIN #4 REBAR 12" OCEW PROVIDE MIN 12", 1" MINUS GRAVEL BASE UNDISTURBED NATIVE SOIL ND-13 Standard Manhole Detail FRP 1 of 2

12 NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SLOPE AND CONSTRUCTION OF CONNECTING PIPELINE. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 3. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 4. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. 5. MANHOLE BASE SHALL BE PRECAST FRP UNLESS OTHERWISE APPROVED BY THE DISTRICT. 6. THE CONTRACTOR SHALL BE A LICENSED OR CERTIFIED INSTALLER BY THE MANUFACTURER OF THE MANHOLE PROVIDED. 10. WHERE APPROVED BY THE DISTRICT, CONCRETE GRADE RINGS AND ALL OTHER EXPOSED CONCRETE SURFACES SHALL BE CORROSION PROTECTED WITH AN APPROVED EPOXY COATING. EPOXY SHALL BE A SOLVENT-FREE, 100% SOLID, MOISTURE TOLERANT HIGH BUILD EPOXY COATING, RAVEN 405, ENVIRONMENTAL COATINGS SEWER SHIELD 100, SAUEREISEN SEWERGARD 210 OR APPROVED EQUAL. SURFACE PREPARATION AND APPLICATION SHALL BE AS RECOMMENDED BY THE MANUFACTURER. 11. GRADE RINGS SHALL BE GROUTED TO PREVENT INFILTRATION. GROUT SHALL BE FULL STRENGTH, NON-METALLIC, NON-SHRINK TYPE V GROUT (MASTERFLOW 713, FIVESTAR GROUT OR APPROVED EQUAL) WITH ADDITIVES FOR PROTECTION AGAINST HYDROGEN SULFIDE ATTACK. 12. CONNECTING PIPE SHALL MATCH CROWNS WITH DISTRICT PIPE UNLESS OTHERWISE DIRECTED BY THE DISTRICT, 7. MANHOLES AND THEIR BASES SHALL BE CIRCULAR FIBERGLASS REINFORCED POLYESTER MANHOLES DESIGNED, FABRICATED AND TESTED TO MEET OR EXCEED THE REQUIREMENTS OF ASTM D3753. HOBAS, L.F. MANUFACTURING OR APPROVED EQUAL. 8. PRECAST CONCRETE AND CAST-IN-PLACE COMPONENTS SHALL NOT BE ALLOWED UNLESS OTHERWISE APPROVED BY THE DISTRICT. 9. ALL MANHOLES SHALL BE PROVIDED WITH ANTI-FLOTATION RINGS FULLY ENCASED IN A CONCRETE PAD OF SUFFICIENT SIZE AND THICKNESS TO PREVENT FLOTATION. ND-13 Standard Manhole Detail FRP 2 of 2

13 30" MANHOLE RING AND COVER MARKED "NORTH DAVIS SEWER" (D & L SUPPLY A , OR EQUAL) CONCRETE COLLAR, 12" WIDE, 8" DEEP (ALL LOCATIONS) W/ (1) #4 REINFORCEMENT BAR ALL AROUND EPOXY COATED CONCRETE, POLYMER OR EPP GRADE RINGS AS APPROVED BY THE DISTRICT. 18" MAX TOTAL HEIGHT INCLUDING FRAME, RINGS & GROUT PLACE AND COMPACT BACKFILL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS 30" FINISH GRADE (PAVED AND UNPAVED) GROUT FOR SETTING GRADE RINGS AND FRAME SHALL PROVIDE A WATERTIGHT BARRIER TO PREVENT INFILTRATION AND BE PLACED ACROSS THE FULL WIDTH, 1/2-INCH MIN AND 1-INCH MAX THICK. BUTYL MASTIC PRECAST POLYMER MANHOLE MIN WALL THICKNESS PER MANUFACTURER PRODUCT SUBMITTAL I.D. BARREL O.D. BUTYL MASTIC BELL O.D. MANHOLE DIAMETER SHALL BE 4'-0" FOR PIPE SIZES LESS THAN 15" - MANHOLE DIAMETER SHALL BE 5'-0" FOR PIPE SIZES OF 15" TO 30", MANHOLE DIAMETER SHALL BE 6' FOR PIPE SIZES GREATER THAN 30" AND FOR ALL CONNECTING AND JUNCTION MANHOLES (FOR DISTRICT PIPES 54" DIA OR LARGER SEE DETAIL ND-11.) PRECAST POLYMER BASE OR CAST-IN-PLACE BASE AS DIRECTED BY THE DISTRICT DISTRICT SEWER PIPE WATER TIGHT, FLEXIBLE PIPE CONNECTIONS APPROVED BY DISTRICT PROVIDE MIN 12", 1" MINUS GRAVEL BASE OVER UNDISTURBED NATIVE SOIL FACTORY CAST FLOW CHANNEL ND-14 Standard Manhole Detail Polymer 1 of 3

14 NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SLOPE AND CONSTRUCTION OF CONNECTING PIPELINE. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 3. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 4. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. 5. MANHOLE BASE SHALL BE PRECAST POLYMER UNLESS OTHERWISE APPROVED BY THE DISTRICT. 6. THE CONTRACTOR SHALL BE A LICENSED OR CERTIFIED INSTALLER BY THE MANUFACTURER OF THE MANHOLE PROVIDED. 7. MANHOLES AND THEIR BASE SHALL BE CIRCULAR PRECAST POLYMER DESIGNED, FABRICATED AND TESTED TO MEET OR EXCEED THE REQUIREMENTS OF D6783. POLYMER COMPONENTS SHALL BE A MIXTURE OF UNSATURATED ISOPHTHALIC POLYESTER RESIN, SAND AND AGGREGATE. NO CEMENTIOUS OR CALCIUM CARBONATE MATERIALS SHALL BE ALLOWED. ARMOROCK OR APPROVED EQUAL. 8. PRECAST CONCRETE AND CAST-IN-PLACE COMPONENTS SHALL NOT BE ALLOWED UNLESS OTHERWISE APPROVED BY THE DISTRICT. 9. ALL MANHOLES SHALL BE PROVIDED WITH ANTI-FLOTATION RINGS FULLY ENCASED IN A CONCRETE PAD OF SUFFICIENT SIZE AND THICKNESS TO PREVENT FLOTATION. 10. WHERE APPROVED BY THE DISTRICT, CONCRETE GRADE RINGS AND ALL OTHER EXPOSED CONCRETE SURFACES SHALL BE CORROSION PROTECTED WITH AN APPROVED EPOXY COATING. EPOXY SHALL BE A 100% SOLID, EPOXY COATING, ARMORROCK EPOXY OR APPROVED EQUAL. 11. GRADE RINGS AND DOG HOUSE MANHOLE CONNECTIONS SHALL BE GROUTED TO PREVENT INFILTRATION. GROUT SHALL BE FULL STRENGTH, NON-METALLIC, NON-SHRINK TYPE V GROUT (MASTERFLOW 713, FIVESTAR GROUT OR APPROVED EQUAL) WITH ADDITIVES FOR PROTECTION AGAINST HYDROGEN SULFIDE ATTACK. 12. CONNECTING PIPE SHALL MATCH CROWNS WITH DISTRICT PIPE UNLESS OTHERWISE DIRECTED BY THE DISTRICT. ND-14 Standard Manhole Detail Polymer 2 of 3

15 MANHOLE I.D. FIELD APPLIED EPOXY COATING, ARMORROCK EPOXY OR APPROVED EQUAL PRECAST POLYMER RISER SET IN CONCRETE WITH WATER TIGHT SEAL FACTORY CAST FLOW CHANNEL PRECAST POLYMER BASE BASE HEIGHT PER MANUFACTURER RESIN AGGREGATE WALL & BENCH SAWCUT AND REMOVE TOP OF PIPE PRIOR TO COATING 12" MIN CAST-IN-PLACE BASE 6" MIN, 12" MAX FROM EXTERIOR OF MANHOLE OR BELL OD IF GREATER CAST-IN-PLACE CONCRETE BASE OR ENCASEMENT HYDROPHILLIC WATERSTOP ALL AROUND EXISTING DISTRICT PIPE AND CONNECTING PIPE(S) (TYPICAL), GREENSTREAK HYDROTITE (OR APPROVED EQUAL), SEE NOTE 5. BASE OPTION NOTES: 1. CONTRACTOR SHALL PROVIDE SUITABLE FOUNDATION AS DIRECTED BY THE DISTRICT IN AREAS OF UNSTABLE TRENCH BOTTOM, WET CONDITIONS, OR OVER EXCAVATION. 2. CAST-IN-PLACE CONCRETE SHALL BE TYPE V CEMENT WITH A MINIMUM 4000 PSI COMPRESSIVE STRENGTH AT 28 DAYS UNLESS OTHERWISE DIRECTED BY THE DISTRICT. BASE SHALL BE CURED A MINIMUM OF THREE DAYS PRIOR TO STACKING MANHOLE. 3. BENCH TO HAVE 1:12 FLOOR SLOPE WITH TROWELLED FINISH. 4. EPOXY COATING TO BE APPLIED MIN 4" ABOVE BENCH AND OVERLAP CUT OUT SEWER PIPE. 5. PROVIDE HYDROPHILIC WATER STOP BETWEEN PIPE AND CAST CONCRETE, BOTH SIDES, ALL AROUND. CLEAN PIPE USING WIRE BRUSH, POWER WASH OR SAND BLAST TO PROVIDE A CLEAN, DURABLE SURFACE. SECURE WATERSTOP TO PIPE USING MANUFACTURER'S RECOMMENDED METHODS. APPLY LAYER OF GREENSTREAK LEAKMASTER OR APPROVED EQUAL BETWEEN WATERSTOP AND PIPE. ND-14 Standard Manhole Detail Polymer 3 of 3

16 MANHOLE RING AND NON-VENTED COVER MARKED "SEWER" - (TYPICAL) (D & L A-1181, OR EQUAL) INLET SEWER SEWER OUTLET PLAN DOUBLE SWEEP CLEANOUT 1'-6" WIDE, 6" DEEP CONCRETE COLLARS IN PAVED AREAS. REINFORCEMENT REQUIRED. (1) #4 BAR ALL AROUND 20" MIN. DIA. FINISH GRADE (PAVEMENT OR LANDSCAPING) MANHOLE COVERS LOCATED TO ALLOW VIEWING OF AND SAMPLING FROM INLET AND OUTLET TEES (TYPICAL) INLET SANITARY TEES PRECAST CONCRETE TANK 6" GREASE STORAGE LIQUID LEVEL OUTLET TEE - 6" MIN. RISER SECTION / GRADE RINGS (NOT TO EXCEED 12" TOTAL HEIGHT). GROUT FOR SETTING GRADE RINGS AND FRAME SHALL PROVIDE A WATERTIGHT BARRIER TO PREVENT INFILTRATION AND BE PLACED ACROSS THE FULL WIDTH, 1/2-INCH MIN AND 1-INCH MAX THICK. 1" MINUS GRAVEL BASE SST PIPE SUPPORTS REQUIRED (TYP) 12" SECTION UNDISTURBED NATIVE SOIL ND-15 Standard Grease Interceptor 1 of 2

17 NOTES: 2 SS EXP ANCHORS EACH CLAMP "Z" SHAPED STEEL STRAP FITTING, TYP 1. GREASE INTERCEPTOR SHALL BE LOCATED TO BE CONTINUOUSLY AND EASILY ACCESSIBLE FOR INSPECTION AND CLEANING AND AS CLOSE AS PRACTICAL TO THE SOURCE OF WASTEWATER. IT SHALL NOT BE LOCATED IN DRIVE-UP LANES, PARKING STALLS, OR SIMILAR AREAS THAT COULD BE PERIODICALLY BLOCKED. 2. WHEN LOCATED IN PAVED AREA, THE TRAP, MANHOLE COVERS, ETC, SHALL BE TRAFFIC RATED. 3. INLET AND OUTLET TEES SHALL BE LOCATED DIRECTLY BELOW MANHOLE ACCESSES. WALL NOTE: ALL HARDWARE 316 STAINLESS STEEL 4. GREASE INTERCEPTORS SHALL HAVE A MINIMUM OF TWO COMPARTMENTS. 5. MINIMUM HYDRAULIC VOLUME OF THE TRAP SHALL BE 1000 GALLONS. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 7. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 8. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. SST PIPE SUPPORT 9. GRADE RINGS SHALL BE GROUTED TO PREVENT INFILTRATION. GROUT SHALL BE FULL STRENGTH, NON-METALLIC, NON-SHRINK TYPE V GROUT (MASTERFLOW 713, FIVESTAR GROUT OR APPROVED EQUAL) WITH ADDITIVES FOR PROTECTION AGAINST HYDROGEN SULFIDE ATTACK. ND-15 Standard Grease Interceptor 2 of 2

18 EXISTING DISTRICT PIPE MANHOLE WALL (PRECAST FRP OR POLYMER MANHOLES ONLY ON CIPP LINED PIPES) GROUT ANNULAR SPACE AS REQ. COAT 4" MIN OF CIPP LINER AT CUT EDGE (SEE NOTE 3) REMOVE EXISTING HOST PIPE CROWN W/ CIPP LINER CUT AND BEVEL CIPP LINER 45 (ALL AROUND) PRIOR TO COATING 4" MIN TYP GROUT ANNULAR SPACE AS REQ. EXISTING CIPP LINER 45 COAT 4" MIN OF CIPP LINER AT CUT EDGE (SEE NOTE 3) MANHOLE INVERT EXISTING CIPP LINER 4" MIN EXISTING DISTRICT PIPE DETAIL B MANHOLE BASE (VIEW SHOWN FOR MANHOLE WITH HOST PIPE & LINER REMOVED) DETAIL A MANHOLE BASE CAST AROUND EXISTING PIPE NOTES: 1. THIS STANDARD DRAWING SHALL APPLY WHERE MANHOLES ARE CONSTRUCTED ON DISTRICT PIPES REHABILITATED WITH CURED-IN-PLACE PIPE LINERS(CIPP). 2. CUT CIPP LINER TO NEAT STRAIGHT LINES WITH CUTTING TOOLS SUITABLE FOR THE LINER MATERIAL. DAMAGED LINERS SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE DISTRICT. 3. REMOVE POLYETHYLENE LAYER IF PRESENT AND ROUGHEN CIPP SURFACE AT ALL CUT EDGES. WHERE FRP LINERS ARE CUT, REMOVE PRE LINER SHEET AND FOIL (IF INSTALLED). SMOOTH LINER EDGE PRIOR TO COATING. 4. CONTRACTOR SHALL COAT CIPP LINER AND EXPOSED CONCRETE AT CHANNEL AND BENCH WITH AN APPROVED EPOXY COATING SYSTEM; NEOPOXY, SEWER SHIELD 100, SAUEREISEN SEWERGARD 210, RAVEN 405 OR APPROVED EQUAL. COATINGS SHALL BE PROVIDED BY A CERTIFIED CONTRACTOR/APPLICATOR IN STRICT ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS. 5. WHERE EXISTING HOST PIPE AND LINER ARE REMOVED PROVIDE A SMOOTH TRANSITION BETWEEN MANHOLE INVERT AND CUT EDGE OF CIPP LINER PER DETAIL B. ND-16 Standard Manhole Detail CIPP Repair

19 CONNECTING SERVICE LATERAL (MATERIAL AND CONSTRUCTION SHALL CONFORM TO REQUIREMENTS OF APPLICABLE JURISDICTIONAL AGENCY) 45 BEND FLEXIBLE AND WATERTIGHT CONNECTION FITTING - FITTING SHALL HAVE POSITIVE STOP TO PREVENT PROTRUSION INTO SEWER LINE (INSERTA TEE, GPK 4, OR EQUAL) CORE DRILLED OPENING (INSTALLATION OF ANCHOR BOLTS IN THE PIPE WALL OR HAMMER DRILLING SHALL NOT BE ALLOWED AS PART OF THE CORE DRILLING OPERATION) LATERAL SHALL BE FLUSH WITH INSIDE OF PIPE PEA GRAVEL FILL SHALL BE PLACED AND COMPACTED BENEATH CONNECTING SERVICE TO UNDISTURBED SUBGRADE AND TO A MINIMUM DEPTH OF 6" ABOVE PIPE 45 NOTES: 1. CONTRACTOR SHALL MEASURE DISTANCE FROM THE NEAREST MANHOLE TO THE SERVICE LATERAL AND FURNISH MEASUREMENT TO DISTRICT. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SLOPE AND CONSTRUCTION OF CONNECTING SERVICE LATERAL. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 4. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 5. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. 6. CONCRETE CORES SHALL BE RETAINED AND NOT ALLOWED TO FALL INTO THE SEWER LINE. EXISTING DISTRICT PIPE. CONTRACTOR TO VERIFY PIPE MATERIAL PRIOR TO CONSTRUCTION ND-20 Standard Service Connection - Concrete Pipe

20 CONNECTING SERVICE LATERAL, (MATERIAL AND CONSTRUCTION SHALL CONFORM TO REQUIREMENTS OF APPLICABLE JURISDICTIONAL AGENCY) PVC LATERAL SERVICE ENCASE IN CONCRETE, MINIMUM 12" BELOW & 6" ABOVE 45 SHOP FABRICATED BEND PEA GRAVEL FILL SHALL BE PLACED AND COMPACTED BENEATH CONNECTING SERVICE TO UNDISTURBED SUBGRADE AND TO A MINIMUM DEPTH OF 6" ABOVE PIPE FLEXIBLE AND WATERTIGHT CONNECTION FITTING - FITTING SHALL HAVE POSITIVE STOP TO PREVENT PROTRUSION INTO SEWER LINE AND ENGAGE AT CIPP LINER - (INSERTA TEE OR EQUAL - SEE NOTE 12) NON SHRINK, NON METALLIC GROUT PROVIDE ENCASED FULL STAINLESS STEEL BAND (NON-SHEAR) TYPE. (FERNCO OR APPROVED EQUAL) WHERE CONNECTING TO EXISTING SERVICE LATERAL NOTES: 1. CONTRACTOR SHALL MEASURE DISTANCE FROM THE NEAREST MANHOLE TO THE SERVICE LATERAL AND FURNISH MEASUREMENT TO DISTRICT. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SLOPE AND CONSTRUCTION OF CONNECTING SERVICE LATERAL. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 4. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 5. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. 45 CORE DRILLED OPENING IN HOST PIPE CORE DRILLED OPENING IN CIPP LINER EXISTING CIPP LINER THICKNESS AS PROVIDED BY THE DISTRICT - SEE NOTE 12. EXISTING REHABILITATED DISTRICT PIPE (NTS) 6. SERVICE CONNECTION BANDS, SCREWS, HOUSING AND HARDWARE SHALL BE 316 SST. RUBBER MATERIALS SHALL BE NITRILE OR NEOPRENE UNLESS OTHERWISE DIRECTED BY THE DISTRICT. 7. CONTRACTOR SHALL MANUALLY BACKFILL AND COMPACT AROUND INSERTA TEE OR SADDLE UNTIL A MIN OF 12 OF COVER IS PLACED OVER THE CONNECTION. 8. CORE DRILLING OF CONCRETE PIPE SHALL USE THE WET DIAMOND BIT PROCESS. DO NOT ATTACH GUIDES TO THE EXISTING PIPE TO PERFORM CORE DRILLING. CORE DRILL DIAMETER SHALL BE PER THE CONNECTION MANUFACTURER'S REQUIREMENTS FOR INSTALLATION OF THE PROVIDED PRODUCT. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE DAMAGED PIPE AND LINER. 9. CORE DRILLING OF THE CIPP LINER SHALL BE ACCOMPLISHED EITHER ROBOTICALLY FROM INSIDE THE PIPE OR EXTERNALLY. DIAMETER OF THE HOLE SHALL BE SIZED FOR THE FLEXIBLE AND WATERTIGHT CONNECTION FITTING. 10. FILL VOIDS, OVER CUT OR REMOVED CONCRETE PIPE WITH NON SHRINK NON METALLIC CEMENT GROUT. 11. CONCRETE AND CIPP LINER CORES SHALL BE RETAINED AND NOT ALLOWED TO FALL INTO THE SEWER LINE. 12. INSERTA TEE PROVIDED SHALL BE PER TABLE 1 UNLESS OTHERWISE RECOMMENDED BY THE MANUFACTURER BASED ON THE EXISTING REHABILTATED DISTRICT PIPE DIAMETER, SERVICE CONNECTION DIAMETER, AND EXISTING CIPP LINER THICKNESS. CONTRACTOR SHALL VERIFY THE LINER THICKNESS PRIOR TO INSTALLING THE CONNECTION INTO THE CORED LINER. ND-21 Standard Service Connection - CIPP Lined Pipe 1 of 2

21 TABLE 1 Rehabilitated District Concrete Pipe CIPP Liner Thickness INSERTA - TEE ORDERING INFORMATION Lateral Nominal Diameter (inch) Standard CIPP INSERTA-TEE LINER: RUBBER SLEEVE THICKNESS* Nominal Pipe Diameter (in) Minimum Liner Thickness (mm) Maximum Liner Thickness (mm) Minimum Liner Thickness (mm) P26FB12CIP 6P26FB12CIP 8P3512CIP P26FB15CIP 6P26FB15CIP 8P3515CIP P26FB18CIP 6P26FB18CIP 8P3518CIP P26FB21CIP 6P26FB21CIP 8P3521CIP P26FB24CIP 6P26FB24CIP 8P3524CIP P26FB27CIP 6P26FB27CIP 8P3527CIP P26FB30CIP 6P26FB30CIP 8P3530CIP P26FB36CIP 6P26FB36CIP 8P3536CIP 19.0 WHEN ORDERRING INSERTA TEE, CONTRACTOR SHALL PROVIDE THE NOMINAL DISTRICT PIPE DIAMETER, LATERAL DIAMETER AND MATERIAL TO BE INSTALLED, AND EXISTING CIPP LINER THICKNESS TO VERIFY PROPER SIZING OF THE RUBBER SLEEVE. INSERTA TEE WITH RUBBER SLEEVE THICKNESS SIZED FOR STANDARD CIPP LINER THICKNESS WITHOUT VERIFICATION SHALL NOT BE ACCEPTED BY THE DISTRICT. ND-21 Standard Service Connection - CIPP Lined Pipe 2 of 2

22 CONNECTING SERVICE LATERAL, (MATERIAL AND CONSTRUCTION SHALL CONFORM TO REQUIREMENTS OF APPLICABLE JURISDICTIONAL AGENCY) ENCASE IN CONCRETE, MINIMUM 12" BELOW & 6" ABOVE 45 SHOP FABRICATED BEND PEA GRAVEL FILL SHALL BE PLACED AND COMPACTED BENEATH CONNECTING SERVICE TO UNDISTURBED SUBGRADE AND TO A MINIMUM DEPTH OF 6" ABOVE PIPE FLEXIBLE AND WATERTIGHT CONNECTION FITTING - FITTING SHALL HAVE POSITIVE STOP TO PREVENT PROTRUSION INTO SEWER LINE (INSERTA TEE OR EQUAL) NON SHRINK, NON METALLIC GROUT CORE DRILLED OPENING PROVIDE ENCASED FULL STAINLESS STEEL BAND (NON-SHEAR) TYPE. (FERNCO OR APPROVED EQUAL) WHERE CONNECTING TO EXISTING SERVICE LATERAL 45 EXISTING CCFRPM (FIBERGLASS) DISTRICT PIPE (18" DIA OR GREATER) NTS. NOTES: 1. CONTRACTOR SHALL MEASURE DISTANCE FROM THE NEAREST MANHOLE TO THE SERVICE LATERAL AND FURNISH MEASUREMENT TO DISTRICT. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SLOPE AND CONSTRUCTION OF CONNECTING SERVICE LATERAL. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 4. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 5. CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. 6. SERVICE CONNECTION BANDS, SCREWS, HOUSING AND HARDWARE SHALL BE 316 SST. RUBBER MATERIALS SHALL BE NITRILE OR NEOPRENE UNLESS OTHERWISE DIRECTED BY THE DISTRICT. 7. CONTRACTOR SHALL MANUALLY BACKFILL AND COMPACT AROUND INSERTA TEE UNTIL A MIN OF 12 OF COVER IS PLACED OVER THE CONNECTION. 8. CORE DRILLING OF PIPE SHALL BE PERFORMED USING CUTTING EQUIPMENT RECOMMENDED BY MANUFACTURERS OF FIBERGLASS PIPE. DO NOT ATTACH GUIDES TO THE EXISTING PIPE TO PERFORM CORE DRILLING. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE DAMAGED PIPE. 9. FLEXIBLE AND WATERTIGHT FITTING SHALL BE SIZED FOR THE CCFRPM PIPE. 10. FIBERGLASS CORES SHALL BE RETAINED AND NOT ALLOWED TO FALL INTO THE SEWER LINE ND-22 Standard Service Connection - CCFRPM Fiberglass Pipe

23 EXISTING SERVICE LATERAL, ABANDON IN PLACE ENCASE CAP IN CONCRETE THRUST BLOCK EXISTING DISTRICT PIPE REMOVE INTERFERING PORTIONS OF EXISTING SERVICE LATERAL, CUT AND CAP PIPE (TYP) ROW INSTALL WATER TIGHT EXPANSION PLUG AT EXISTING SERVICE LATERAL CONNECTION TO MAIN EXISTING SERVICE LATERAL, VARIES NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING SEWER AND OTHER UTILITIES, PROPER BACKFILLING, COMPACTING, AND PAVEMENT RESTORATION. 2. CONTRACTOR SHALL NOTIFY DISTRICT 48 HOURS BEFORE INSTALLATION BEGINS. 3. CONCRETE THRUST BLOCKS SHALL BE A MINIMUM ONE CUBIC FOOT IN SIZE PLACED AT CAP TO PREVENT DISPLACEMENT OF CAP DURING SEWER CLEANING AND OTHER MAINTENANCE ACTIVITIES. CONCRETE SHALL BE TYPE II/V PORTLAND CEMENT PER ASTM C150 WITH A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI PER ASTM C CONTRACTOR SHALL GUARANTEE WORK FOR A PERIOD OF ONE YEAR. ND-23 Standard Service Connection Abandonment

24 CRACKED PIPE SECTION REINFORCED CONCRETE ENCASEMENT 2 x EXISTING PIPE OD BUT NOT LESS THAN 12" A DISTRICT PIPE GRAVEL BEDDING REINFORCEMENT STEEL, 4 - CONT #4 24" OC MIN (2) EACH SIDE OF REPAIR COUPLING, MIN 3" CLR STAINLESS STEEL REPAIR COUPLING OVER CRACKS NOTES: 1. REPAIR COUPLINGS SHALL PROVIDE A WATER TIGHT SEAL AND BE MANUFACTURED FOR USE WITH THE GRAVITY SEWER PIPE MATERIAL TO BE REPAIRED. CONTRACTOR SHALL SUBMIT PRODUCT DATA FOR REVIEW AND ACCEPTANCE BY THE DISTRICT. 2. ALL HARDWARE (SHELLS, NUTS, BOLTS, WASHERS, TAKE UP CLAMPS OR RINGS) SHALL BE TYPE 304 STAINLESS STEEL PER ASTM A240 UNLESS OTHERWISE APPROVED BY THE DISTRICT. 3. GASKETS SHALL BE FULL LENGTH CIRCUMFERENTIAL SBR OR NITRILE (BUNA-N) UNLESS OTHERWISE APPROVED BY THE DISTRICT. 4. REPAIRS SHALL BE INSPECTED AND APPROVED BY THE DISTRICT PRIOR TO ENCASEMENT AND BACKFILLING. 5. CONRETE SHALL BE TYPE II/V PORTLAND CEMENT PER ASTM C150 WITH A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI PER ASTM C39. NO ADDITIVES SHALL BE PERMITTED WITHOUT PRIOR APPROVAL BY THE DISTRICT. 6. MINIMUM ENCASEMENT SHALL BE AS FOLLOWS: NOMINAL DIAMETER (IN) A (IN) ENCASEMENT 24" OR LESS 6 OD " OR LESS 8 OD " OR LESS 10 OD " OR LARGER 12 OD + 24 ND-30 Cracked Pipe Repair

25 12" MIN TRENCH WIDTH 12" MIN 6" MIN OD 6" MIN EXIST PIPE 6" MIN 24" MAX (SEE NOTE 3 AND 4) 1/2" FELT EXPANSION JOINT FILLER CLASS B CONCRETE NEW SEWER PIPE 1/2 OD 1/2"EXPANSION JOINT FILLER MATERIAL ALL AROUND, SEE NOTE 2 6" SCH 80 PVC DRAIN HOLE FILL W/ PEA GRAVEL (TYP) PROVIDE BEDDING PER DISTRICT REQUIREMENTS EXISTING PIPE OVER NEW SEWER MAIN ND-31 Structural Support at Crossings 1 of 2

26 NEW SEWER PIPE 12" MIN TRENCH WIDTH 12" MIN 1/2"EXPANSION JOINT FILLER MATERIAL ALL AROUND, SEE NOTE 2 6"MIN OD 6"MIN SPRINGLINE 6"MIN 24" MAX (SEE NOTE 3 AND 4) 1/2" FELT EXPANSION JOINT FILLER IF CONCRETE EXTEND UP TO BOTTOM OF NEW PIPE EXIST PIPE CLASS B CONCRETE DO NOT DISTURB EXISTING PIPE BEDDING BELOW SPRINGLINE OF PIPE SECTION D UNDISTURBED SOIL (TYP) D - EXISTING PIPE UNDER NEW SEWER MAIN NOTES: 1. INSTALL #15 FELT OR NEOPRENE WATERSTOP AROUND NEW WATER PIPE PRIOR TO THE POUR OF CONCRETE ENCASEMENT TO PREVENT BONDING. 2. BACKFILL TO BE BROUGHT UP UNIFORMLY ON BOTH SIDES OF CONC. SUPPORT. 3. THIS DETAIL SHALL APPLY WHERE VERTICAL CLEARANCE OUTSIDE TO OUTSIDE OF SEWER PIPE OR LATERAL IS LESS THAN 24-INCH. 4. WASTEWATER LINES SHALL BE INSTALLED BELOW POTABLE WATER LINES. A MINIMUM SEPARATION OF 18 INCHES BETWEEN THE BOTTOM OF THE POTABLE WATER LINE AND THE TOP OF THE WASTEWATER LINE SHALL BE MAINTAINED. WHERE A POTABLE WATERLINE CROSSES UNDER A WASTEWATER OR STORM LINE, A FULL LENGTH OF PIPE SHALL BE CENTERED ABOVE THE WATER LINE SO THAT BOTH JOINTS WILL BE AS FAR FROM THE POTABLE WATER LINE AS POSSIBLE. ADDITIONAL MITIGATION MEASURES MAY BE REQUIRED PER UTAH DEQ AND R (2)(b). ND-31 Structural Support at Crossings 2 of 2

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers. SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, and equipment required to install precast concrete manholes, sanitary leaching rings, pump station, valve chamber, structures, frames,

More information

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted. SECTION 3000 - SANITARY SEWERS 3001 SCOPE. This section applies to sanitary sewer construction and shall consist of furnishing all labor, materials, and equipment for the complete installation of sewers

More information

SECTION 02401 - SANITARY SEWER PIPE

SECTION 02401 - SANITARY SEWER PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.) CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection

More information

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...

More information

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21 September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires

More information

LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL

LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL February 2010 LOGAN TOWNSHIP UTILITIES AUTHORITY INSPECTION AND TESTING PROCEDURE TABLE OF CONTENTS SECTION

More information

SECTION 03300 CAST-IN-PLACE CONCRETE

SECTION 03300 CAST-IN-PLACE CONCRETE SECTION 03300 PART 1 GENERAL 1.01 DESCRIPTION This section describes materials and methods for formwork, reinforcement, mixing, placement, curing and repairs of concrete, and the use of cementations materials

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

OAR52 A-1 (September, 1981)

OAR52 A-1 (September, 1981) APPENDIX A SEWER PIPELINES (1) MINIMUM REQUIREMENTS FOR SEWER - PIPELINES (a) Capacity: Sewers shall be of such diameter as to pass without overflow, bypass, or back flow onto damageable property of a

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

Customer Procedures and General Information for Sewer Customers

Customer Procedures and General Information for Sewer Customers Customer Procedures and General Information for Sewer Customers Helpful Hints for Customers Ordinance Review of District and Customer Responsibility of New and Existing Sewer Lines Material and Manner

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

SECTION 16402 UNDERGROUND ELECTRIC SERVICE

SECTION 16402 UNDERGROUND ELECTRIC SERVICE SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and

More information

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM 1.0 General Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM a) It is the intent of this specification to ensure that all gravity sewer system infrastructure constructed within the service

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

TABLE OF CONTENTS DETAILED SPECIFICATIONS SANITARY SEWER

TABLE OF CONTENTS DETAILED SPECIFICATIONS SANITARY SEWER TABLE OF CONTENTS DETAILED SPECIFICATIONS SANITARY SEWER SECTION I GENERAL...1 SECTION II PAYMENTS...1 SECTION III - GENERAL REQUIREMENTS FOR ALL SEWER PIPE INSPECTION...1 SECTION IV - SEWER PIPE MATERIALS...2

More information

DIVISION 3. Standards for Sewer Installation

DIVISION 3. Standards for Sewer Installation DIVISION 3 Standards for Sewer Installation Division 3 Sewer Installation Page 1 of 16 Division 3 Standards for Sewer Installation Table of Contents 3-1.000 SANITARY SEWER INSTALLATION... 4 3-1.010 General...

More information

WATER & SEWER CORROSIVE RESISTANT PRODUCTS

WATER & SEWER CORROSIVE RESISTANT PRODUCTS WATER & SEWER CORROSIVE RESISTANT PRODUCTS The Standard of Excellence in the Industry CASING SPACERS COUPLINGS & FLANGE COUPLING ADAPTERS REPAIR CLAMPS DUCTILE IRON SADDLES STAINLESS STEEL SADDLES TAPPING

More information

City of West Linn Public Works Standard Construction Specifications. Table of Contents

City of West Linn Public Works Standard Construction Specifications. Table of Contents City of West Linn Public Works Standard Construction Specifications Table of Contents DIVISION SIX STORM DRAIN TECHNICAL REQUIREMENTS... 1 601 PIPE AND FITTINGS... 1 601.01 Description...1 601.02 Materials...1

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;