1 Strategies for Navigating Through 106 Katie Egan-Bruhy Commonwealth Cultural Resources Group, Inc Milwaukee, Wisconsin
2 Preliminary Assessment and Identification of Fatal Flaws Delineation of Study Corridor Early Identification of Deeply Buried Sites Pros and Cons of Phase II Evaluation vs. Avoidance Memoranda of Agreement
3 Essential to consult with FERC and SHPO on what may be perceived as potential fatal flaws in project development phase Need full understanding of nature of resource and previous research What may be perceived as Fatal Flaw, may or may not be such Has resource been field verified Land-use history should be considered regarding integrity Does SHPO or agency perceive resource as non-negotiable
4
5
6 Continual refinement of alignment results in necessity to return to previously surveyed tracts multiple times resulting in project delays Realignments commonly occur at: Waterbody crossings Wetland margins Widening the survey corridor at onset in these areas would reduce need to return to survey tracts Notably these are commonly locations of archaeological sites and affords lattitude in alignment through sites
7 REX 48 DTLs 12 or 25% identified with National Register eligible deeply buried sites <7% of surface sites National Register eligible
8
9 Phase II While site may be found National Register eligible many are not; therefore, time and cost limited to Phase II Avoidance Cost of redesign Time and cost of landowner negotiation Delays relating to resurvey and potential identification of new sites Additional construction costs associated with realignment
10 Consultation Early and Often Limiting factors Landowner access unsurveyed tracts Including Deep Test Locals Completion of Phase II evaluations Mitigation of adverse effects Mitigation Data recovery Offsetting adverse effect to interested parties Public Benefit
11
12 To Avoid, or not Avoid Private gas/crude transmission applicants face resource conflicts akin to highway/roadway, but without the selfregulation/determination of a public agency Routing is often encouraged along existing transmission/utility corridors, many of which are already sited through or around important resources (and not just archaeological!) As existing transmission/utility corridors increase width to increases capacity and meet demand, looping and/or colocating potentially impacts important resources as avoidance becomes increasingly difficult Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 12 2/2/2015
13 Managing Resources Balance between construction, operations, and maintenance responsibilities AND resource type, National Register of Historic Places (NRHP) eligibility, and/or other standards of resource sensitivity Managing cultural resources not just a condition of significance or eligibility for inclusion on the NRHP Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 13 2/2/2015
14 Managing Resources Example from Bakken Breakout (2012) article Treasure trove of archaeology stopping preferred bypass route around Williston North Dakota has an abundance of sites that aren t often field verified and/or evaluated but simply avoided Williston Bypass (while a highway project) impacted the climate for cultural resource protection in ND on oil and gas projects in ways that we have yet to fully comprehend Preferred route abandoned: just over 11 miles (3 of which were greenfield) & 8000 (YES!) cultural features Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 14 2/2/2015
15 Example 1-Site boundary impacted, features avoided 2 Precontact sites 12 stone features over large area 3 existing pipelines within the site Solution (?) evaluate impacted portion and avoid features Next pipeline? Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 15 2/2/2015
16 Example 2-Site boundary avoided for now Precontact site 19 stone features over a large area 2 existing lines within the site, 1 existing routed north to avoid Water to north and south Next pipeline? Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 16 2/2/2015
17 Example 3-Site boundaries avoided for now 2 Precontact sites 11 stone features over a large area; 2 stone features 3 existing pipelines north of sites Projected workspace modified to avoid Next pipeline? Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 17 2/2/2015
18 Example 4-Site boundary avoided for now Precontact site Single stone feature 3 existing pipelines south of site Projected workspace modified to avoid, but with potential difficulty Next pipeline? Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 18 2/2/2015
19 Example 5-Site boundary avoided almost Precontact site 3 stone features 2 existing pipelines south of site Projected workspace modified to avoid, but with difficulty HDD needed as well Next pipeline? Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 19 2/2/2015
20 Important Planning Concepts Avoidance of stone features preferred in North Dakota Resistance to detailed examination of sites because of resource sensitivity, regardless of NRHP eligibility or potential (yet unknown) research values Resistance to HDD in some cases because of perceived risks presented by frac-out and long-term maintenance activities Requires educating permitting agencies in the detailed engineering measures/technology utilized to reduce risk Technical Conference on Environmental Permitting & Construction February 2-4, 2015 The Westin Riverwalk - San Antonio, TX 20 2/2/2015
Work Type Definition and Submittal Requirements Work Type Definition: Archeological
Archaeological Work Historic Archaeological Work The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies
More informationSHALE GAS AND THE CRM EXPERIENCE. www.graypape.com
SHALE GAS AND THE CRM EXPERIENCE www.graypape.com Typical CRM Projects Function in a well defined compliance arena Generally follow the principles established in Section 106 of the National Historic Preservation
More informationTEXAS UTILITY LAWYERS 2015 ANNUAL MEETING SAN ANTONIO, TX OCTOBER 15, 2015 CHARLES R. YARBROUGH, II AND JAREN A. TAYLOR
TEXAS UTILITY LAWYERS 2015 ANNUAL MEETING SAN ANTONIO, TX OCTOBER 15, 2015 CHARLES R. YARBROUGH, II AND JAREN A. TAYLOR The views expressed in this presentation represent those of the author only and are
More informationOVERVIEW ABOUT WBI ENERGY
OVERVIEW The proposed Demicks Lake Pipeline Project involves approximately 22 miles of 24-inch diameter natural gas pipeline between a natural gas processing plant proposed by ONEOK Rockies Midstream (ONEOK)
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ALGONQUIN GAS TRANSMISSION, LLC ) Docket No. CP14-96-000
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ALGONQUIN GAS TRANSMISSION, LLC ) Docket No. CP14-96-000 LOCAL OFFICIALS EMERGENCY MOTION FOR STAY OF CONSTRUCTION OF THE WEST ROXBURY
More informationAPPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES
APPENDIX K NATURAL GAS PIPELINE & STORAGE PERMITTING PROCESSES Natural Gas Pipeline & Storage Permitting Processes NiSource follows the Federal Energy Regulatory Commission (FERC) planning and permitting
More informationFrequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
More informationPhase III: Data Recovery and Mitigation
Phase III: Data Recovery and Mitigation Introduction... 51 Developing a Data Recovery Plan... 51 Methods and Techniques for Data Recovery... 53 Reporting the Results of Data Recovery Projects... 55 Interested
More informationInquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available
More information2014 STAMP Conference MIT Partnership for a Systems Approach to Safety Using STAMP Principles in Risk Management of Large Scale Pipeline Projects
2014 STAMP Conference MIT Partnership for a Systems Approach to Safety Using STAMP Principles in Risk Management of Large Scale Pipeline Projects Lorena Pelegrín 27/03/2014 Table of Contents Background
More informationOne-Call Notification Screening
Purpose Reference The purpose of this document is to share learnings with pipeline operators related to the process of receiving, analyzing, and managing notifications from the State One-call Center to
More informationMillennium Pipeline Company, LLC Response to New York State Energy Highway RFI
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320
More informationBurlington County Board of Chosen Freeholders County Engineer s Office. NJ Natural Gas Company Proposed Secondary High Pressure Pipeline
Board of Chosen Freeholders County NJ Natural Gas Company Proposed Secondary High Pressure Pipeline NJ Board of Public Utilities Hearing August 26, 2015 NJ Natural Gas Company Company s Preferred Pipeline
More informationGuide to Transportation Archaeology
Guide to Transportation Archaeology Wisconsin Department of Transportation Division of Transportation System Development Bureau of Technical Services Environmental Process & Documents Section: Guide last
More informationEnvironmental Review Process
The Saskatchewan Natural Gas Advantage Workshop Environmental Review Process Bernie Ryma Environment & Sustainability TransGas February 24, 2010 Presentation Outline The presentation today will provide
More informationCitizens Guide to Stopping LNG Pipelines on Private Land in Oregon
CitizensGuidetoStoppingLNGPipelines onprivatelandinoregon OregonLNGplanstobuildover85milesofhigh pressurenaturalgaspipelinetoconnectits proposedlngterminalalongthecolumbiariverinwarrentontoaninterconnectnear
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationAmherst, NH Pipeline Task Force Working Document Preliminary Economic Impact Assessment v. 1
Amherst, NH Pipeline Task Force Working Document Preliminary Economic Impact Assessment v. 1 Introduction: A subgroup of the Amherst Pipeline Task Force was charged with assessing the economic impact of
More informationBLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS
BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA June 2007 (updated May 5, 2010) The Role of the Federal Energy Regulatory Commission The Federal
More informationRe: FortisBC Energy Inc. An Application to Recover Final Project Costs in the Fraser River South Arm Crossing Upgrade Project
ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas. regu latory.affa irs@fortisbc.com September 17, 2012 SIXTH FLOOR, 900 HOWE STREET, BOX 250
More informationMichigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions
What is the DNR s authority for leasing oil and gas? How are state-owned oil and gas rights leased? Who decides which state-owned oil and gas rights will be offered for lease at the auction? How often
More informationPipeline Regulatory and Environmental Permits
Chapter 3 Pipeline Regulatory and Environmental Permits William E. Bauer Chapter Outline Introduction 57 3.1 Regulation of Interstate Pipelines 58 3.1.1 FERC-Regulated Natural Gas Pipelines 58 3.1.2 FERC-Regulated
More informationALASKA NATURAL GAS PIPELINE PROJECT
ALASKA NATURAL GAS PIPELINE PROJECT Testimony on AGIA of W. H. Sparger House Resources Committee May 11, 2007 EPC Energy Project Consultants, LLC Introduction William H. (Bill) Sparger Energy Project Consultants.
More information146 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
146 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Houston Pipe Line
More informationRe: Comments on Constitution Pipeline DEIS Application Docket No. CP13-499
JAMES BRYAN BACON, ESQ., P.C. Attorney and Counselor at Law P.O. Box 575 New Paltz, New York 12561 (845) 419-2338 April 7, 2014 Kimberly D. Bose, Secretary Nathaniel J. Davis, Sr., Deputy Secretary Federal
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationRegulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
More informationBruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
More informationCity of Houston Economic Development 2010 in Review
City of Houston Economic Development 2010 in Review TOTALS $654,000,000 in new capital investment 10,800 jobs TEXAS ENTERPRISE ZONE SPECIFIC PROJECTS The Texas Enterprise Zone Program is an economic development
More informationDISASTER RECOVERY SURVEY PRESENTED BY
DISASTER RECOVERY SURVEY PRESENTED BY OVERVIEW Disaster recovery (DR) has long been important to business continuity. IT professionals need to ensure that their data is secure and protected in case of
More informationWatershed Delineation
ooooo Appendix D: Watershed Delineation Department of Environmental Protection Stream Survey Manual 113 Appendix D: Watershed Delineation Imagine a watershed as an enormous bowl. As water falls onto the
More informationIN RE: ) ) Docket No. HLP-2014-0001 DAKOTA ACCESS LLC ) The Science and Environmental Health Network
STATE OF IOWA DEPARTMENT OF COMMERCE BEFORE THE IOWA UTILITIES BOARD IN RE: ) ) Docket No. HLP-01-0001 DAKOTA ACCESS LLC ) 1 1 DIRECT TESTIMONY OF Carolyn Raffensperger ON BEHALF OF The Science and Environmental
More informationUnearthing Mineral Rights:
CourthouseDirect.com Presents Unearthing Mineral Rights: An Insider s Guide to Searching Titles for Mineral Rights Introduction Mineral rights can be one of the more difficult types of property to research
More informationTHE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS
THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES PRESENTATION AT CITIZEN PLANNER TRAINING COLLABORATIVE CONFERENC E BY EUGENE B. BENSON, EXECUTIVE DIRECTOR, MACC MARCH 21, 2015 Massachusetts
More informationNatural gas is a gaseous hydrocarbon mixture consisting primarily. Getting Gas to the People
5 Getting Gas to the People The Federal Energy Regulatory Commission s Permitting Process for Pipeline Infrastructure Suedeen Kelly and Vera Callahan Neinast Natural gas is a gaseous hydrocarbon mixture
More informationFor additional information on qualifications and experience of representative EDGE senior staff members, please contact us.
About Us Edge Engineering & Science, LLC (EDGE) is a privately owned professional services firm headquartered in Houston, Texas. EDGE was established with the primary goal of providing high quality environmental
More informationPlan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
More informationExecutive Director s Recommendation Commission Meeting: July 11, 2013
Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United
More informationFiber Options. 2015 Service Provider Training. June 2, 2015 Phoenix June 16, 2015 Tampa
2015 Service Provider Training Fiber Options June 2, 2015 Phoenix June 16, 2015 Tampa Agenda Today we ll talk about: Review of the FCC s Second E-Rate Modernization Order Expanding Access to Broadband
More informationNortheast Energy Direct (NED) Project Frequently Asked Questions
Northeast Energy Direct (NED) Project Frequently Asked Questions The Need for the Pipeline Why do we need a new pipeline? Tennessee Gas Pipeline Company, L.L.C. (Tennessee), a Kinder Morgan company, has
More informationPipelines & The City
Pipelines & The City Purpose of Discussion Pipeline Authority to Use or Cross City Streets Authorized Activities of City Condemnation What Entities in Texas are Authorized by Law to Operate Gas Pipelines?
More informationPrevious Process. All Section 106 documents & consultations with SHPO go from Caltrans to FHWA for review & transmittal & back again
Previous Process All undertakings subject to Section 106* All Section 106 documents & consultations with SHPO go from Caltrans to FHWA for review & transmittal & back again Transmittal times dependent
More informationConventional Pipeline Station Work PIPELINE SYSTEM CONSTRUCTION SERVICES
Conventional Pipeline Station Work PIPELINE SYSTEM CONSTRUCTION SERVICES ABOUT US SIZE Largest pipeline contractor in North America, we have unmatched resources. FINANCIAL STRENGTH Being owned by Quanta
More informationFirstNet Historic Preservation Requirements
FirstNet Historic Preservation Requirements Christopher Eck Federal Preservation Officer December 10, 2014 NEPA NEPA is considered an umbrella law as it provides a framework within which a wide variety
More informationTENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey
Prepared for: Houston, TX COMPREHENSIVE MITIGATION PLAN HIGHLANDS REGION TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey AECOM, Inc. September
More informationOSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
More informationAPPENDIX B. Agency Correspondence
APPENDIX B Agency Correspondence Connecticut State Historic Preservation Office INTEGRATED HISTORIC PRESERVATION PLANNING June 29, 2012 Ms. Amanda Mayhew Northeast Utilities Service Company 107 Selden
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationDCM1.3. How To Find The Right Provider For Your Disaster Recovery Needs. Jake Sherrill, CEO, Tier 4 Advisors
DCM1.3 How To Find The Right Provider For Your Disaster Recovery Needs. Jake Sherrill, CEO, Tier 4 Advisors DCM1.3 How To Find The Right Provider For Your Disaster Recovery Needs. This session will explain
More informationALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta
ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta HUNT OIL COMPANY OF CANADA INC. APPLICATION FOR A SWEET NATURAL GAS PIPELINE HARMATTAN-ELKTON, RICINUS, Examiner Report 2001-3 AND CAROLINE FIELDS Application
More informationLegislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
More informationMay 11, 2015. Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700. Dear Mr.
May 11, 2015 Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700 Dear Mr. Felder, The Coyote Valley Band of Pomo Indians hereby objects to the
More informationGENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
More informationAccess Management South Dakota Department of Transportation
Public Meeting/ Open House October 21, 2014 Minnehaha County Environmental Assessment and Section 4(f) De Minimis Analysis Northern Segment of Hwy 100 I-90 to South of Madison Street Minnehaha County The
More informationAccess Northeast Project New England Energy Reliability Solution
Access Northeast Project New England Energy Reliability Solution Open Season Notice for Firm Service February 18, 2015 May 1, 2015 Access Northeast Project New England Energy Reliability Solution Eversource
More informationBuilding Interstate Natural Gas Transmission Pipelines: A Primer
Building Interstate Natural Gas Transmission Pipelines: A Primer INGAA FOUNDATION REPORT 2013.01 January 2013 The INGAA Foundation Inc. 20 F Street NW Suite 450 Washington, DC 20001 INGAA Foundation Ad-Hoc
More informationGuide to IRS Collections. Tax Payment Options and Solutions. Offer in Compromise 4/30/2015
Guide to IRS Collections Kristy Maitre Tax Specialist Center for Agricultural Law and Taxation May 4, 2015 Tax Payment Options and Solutions When to submit an Offer in Compromise Releasing a Federal Tax
More informationCHAPTER 27 New Public Road Connections. Table of Contents
Chapter 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections... 27-3 ARTICLE 1 - General... 27-3 Responsibility...
More informationELEMENT 4 - FUTURE LAND USE ELEMENT
ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible
More informationPUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
More informationSR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
More informationThe Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes:
Infrastructure Development, Ecosystem Services and the need for Adaptive Management: An EPFI s Perspective Chris Pullen Export Development Canada IAIA Biodiversity Symposium February 7, 2013 Presentation
More informationBEAR DEN PHASE 2 PROJECT. Plan of Development. APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction
BEAR DEN PHASE 2 PROJECT Plan of Development APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction BEAR DEN PHASE 2 PROJECT Plan of Development Plan for
More informationOVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
More informationHow Teacher Health Plans Compare with Plans Offered by Milwaukee Area Employers
How Teacher Health Plans Compare with Plans Offered by Milwaukee Area Employers EXECUTIVE SUMMARY In 2010, school districts paid twice as much as Milwaukee area employers to provide health care coverage
More informationPROCEEDINGS OF THE CENTRAL BROWN COUNTY WATER AUTHORITY
PROCEEDINGS OF THE CENTRAL BROWN COUNTY WATER AUTHORITY Pursuant to Section 19.84 Wis. Stats, a regular meeting of the Central Brown County Water Authority was held on Wednesday, at the DePere City Hall
More informationCapturing the Value of Transportation to Finance Transportation: Case Studies from Texas
Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas Presented by: Rafael Aldrete, Texas A&M Transportation Institute NACTO Designing Cities Regional Conference Phoenix
More informationWelcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU
Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future
More informationRoseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95
Roseman Technology Site *Caroline County, Virginia 110 Acres Seconds off Interstate 95 Water Service Provider: Caroline Location: I - 95 Route 639, Ladysmith Exit 110 County Suitable for Construction:110
More information5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION PennEast Pipeline Company, LLC Docket No. PF15-1-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PENNEAST
More informationEscape the Limblessage
Click Click to edit to Master edit Master text styles text styles Riverside County - Orange County Second level Third level Fourth level Fifth level 1 1 MIS Corridor Demand 2 2 County Line Crossings %
More informationSelling Mineral Rights
Mineral Auction The Mineral Auction is the place for buying and selling mineral rights. Read more on how to sell or buy mineral rights, oil and gas royalties at best price. Wondering how to sell your mineral
More informationArapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape
Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Spring 2014 The flood of September 2013 changed the landscape of the Boulder and Canyon Lakes Ranger Districts.
More informationPLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON
PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON 1. INTRODUCTION The Washington State Department of Transportation (WSDOT)
More informationPeople Are Asking Us About the Rover Pipeline Project
People Are Asking Us About the Rover Pipeline Project Thank you for your interest in the Rover Pipeline Project. We are committed to addressing questions from the community, landowners and other interested
More informationGold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
More informationGas to the West INFORMATION LEAFLET. gastothewest.com. info@gastothewest.com. www
Gas to the West INFORMATION LEAFLET 0800 975 2322 gastothewest.com @ info@gastothewest.com Gas to the West 1. INTRODUCTION This Gas to the West Project is a major energy infrastructure project to extend
More informationCHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)
CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) Intelligent Transportation Systems (ITS) enables people and goods to move more safely and efficiently through a state-of-the-art multi-modal transportation
More informationArlington Storage Company, LLC, Docket No. CP13-83-000 Submission of Implementation Plan and Request for Clearance to Commence Construction
August 12, 2014 VIA ELECTRONIC FILING Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re:, Docket No. Submission of Implementation Plan and Request
More informationA. OES EFP Comments and Recommendations regarding designation of a route through the Fond du Lac Reservation.
April 23, 2009 Burl W. Haar Executive Secretary Minnesota Public Utilities Commission 127 7 th Place East, Suite 350 St. Paul, MN 55101-2147 RE: Comments and Recommendations of the Office of Energy Security
More informationCOLORADO DEPARTMENT OF TRANSPORTATION. LINKING PLANNING and THE NATIONAL ENVIRONMENTAL POLICY ACT GUIDANCE
COLORADO DEPARTMENT OF TRANSPORTATION LINKING PLANNING and THE NATIONAL ENVIRONMENTAL POLICY ACT GUIDANCE Yates Oppermann March 2007 Introduction The purpose of this guidance is to provide the Colorado
More informationSCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development
Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of
More informationPipeline Engineering. Natural Gas Distribution
R Pipeline Engineering Natural Gas Distribution Gas Distribution Engineering Services Our team of professionals at EN Engineering has been designing, upgrading and maintaining distribution system assets
More informationThe Future of Resource-Based Infrastructure Development: Are Pipeline Projects still being developed..
The Future of Resource-Based Infrastructure Development: Are Pipeline Projects still being developed.. KIM MCCAIG, EXECUTIVE DIRECTOR, CEPA FOUNDATION Who is CEPA versus CEPA Foundation? The Canadian Energy
More informationThe Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
More information3.11 Utilities. 3.11.1 Affected Environment. 3.11.2 Environmental Consequences
3 Affected Environment and Environmental Consequences 3.11 Utilities 3.11.1 Affected Environment Sterling Highway MP 45 60 Project Draft SEIS Cooper Landing and the surrounding area are rural and do not
More informationENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
More informationChapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
More informationSubmitted Electronically via erulemaking Portal to FWS-R5-ES-2011-0024
March 17, 2015 Public Comments Processing Attn: FWS-R5-ES-2011-0024 Division of Policy and Directives Management U.S. Fish and Wildlife Service, MS: BPHC 5275 Leesburg Pike Falls Church, VA 22041-3803
More informationUNECE Energy Week Geneva. in Energy Security
UNECE Energy Week Geneva Investing in Energy Security Committee on Sustainable Energy and related Meetings Wednesday 28 November 2007 Special Session: Investing in and Financing the Hydrocarbon Sector
More informationSECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS
SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS This page intentionally left blank. 9.0SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS 9.1 PUBLIC OUTREACH AND PUBLIC INVOLVEMENT Public
More informationHistoric Bridge Alternatives Analysis Layout
Section 4(f) of the USDOT Act of 1966 (Title 49, USC, Section 303) requires special considerations be made regarding the use of any publicly owned park, recreation area, wildlife/waterfowl refuge or historic
More informationK A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
More informationWhen does a Landowner own all rights, including Minerals and Royalty?
Tommy Smart When does a Landowner own all rights, including Minerals and Royalty? When there have been no conveyances, donations or reservations of minerals or royalty, by the owner or his predecessors
More informationCITY OF SAN ANTONIO TAX ABATEMENT GUIDELINES
CITY OF SAN ANTONIO TAX ABATEMENT GUIDELINES Effective January 1, 2015 through December 31, 2016 (Approved by City Council December 11, 2014) CITY OF SAN ANTONIO Economic Development Department P.O. Box
More informationWhat Do I Need to Know?
An Interstate Natural Gas Facility on My Land? What Do I Need to Know? Prepared by the Federal Energy Regulatory Commission Federal Energy Regulatory Commission Washington, DC www.ferc.gov An Interstate
More informationERIC C. CAMP WHITAKER, CHALK, SWINDLE & SAWYER, LLP 301 COMMERCE STREET, SUITE 3500 FORT WORTH, TEXAS 76102 (817) 878-0500 ECAMP@WHITAKERCHALK.
NATURAL GAS PIPELINE EASEMENT AND RIGHT-OF-WAY AGREEMENTS: ERIC C. CAMP WHITAKER, CHALK, SWINDLE & SAWYER, LLP 301 COMMERCE STREET, SUITE 3500 FORT WORTH, TEXAS 76102 (817) 878-0500 ECAMP@WHITAKERCHALK.COM
More informationThis packet provides necessary information regarding Transco s Park and Loan services. Transco
Park and Loan Service This packet provides necessary information regarding Transco s Park and Loan services. Transco Version 2.2-1 - February 13, 2013 Park and Loan Table of Contents Important Information
More informationHOW WILL PROGRESS BE MONITORED? POLICY AREA. 1. Implement the 2040 Growth Concept and local adopted land use and transportation plans
PERFORMANCE MONITORING APPROACH OAR 660-044-0040(3)(e) directs Metro to identify performance measures and targets to monitor and guide implementation of the Climate Smart Strategy. The purpose of performance