TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES January 16, 2014 Meeting from ISO Headquarters Folsom, California

Size: px
Start display at page:

Download "TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES January 16, 2014 Meeting from ISO Headquarters Folsom, California"

Transcription

1 TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES January 16, 2014 Meeting from ISO Headquarters Folsom, California Steve Rutty, Acting Chairperson of the Transmission Maintenance Coordination Committee (TMCC), called the meeting to order at approximately 9:30 a.m. ATTENDANCE The following TMCC members were in attendance: Tibor Foki (International Brotherhood of Electrical Workers Local Union 47 (IBEW 47)) David Hahn (Western Area Power Administration (WAPA)) Steve Rutty (California Independent System Operator Corporation (ISO)) Acting Chairperson Cory Mitsui (San Diego Gas & Electric (SDG&E)) Mike Palusso (Southern California Edison (SCE)) Jamie Patterson (California Energy Commission (CEC)) Steven Powell (Trans Bay Cable, LLC (TBC)) Jack Vranish (PacifiCorp) Tom Wright (Pacific Gas and Electric (PG&E)) Jorge Somoano (City of Burbank Water & Power (BWP)) James Andresen (Valley Electric Association (VEA)) Landis Marttila (International Brotherhood of Electrical Workers Local Union 1245 (IBEW 1245)) Ryan Yamamoto (California Public Utility Commission (CPUC)) The following TMCC members were not in attendance: David Haerle (Los Angeles Department of Water & Power (LADWP)) The following members of the public were in attendance: Julie Balch (ISO) Jim McHan (ISO) Jeff Evans (ISO) Lou Fonte (ISO) Duke Luu (ISO) Rodney Winter (SDG&E) Monica Curry (SDG&E) Mike Wuethrich (SCE) Adam Mikulski (BPA) David Gregory (PG&E) Leland Bridges (VEA) David Hernandez (BWP) Page 1 of 5

2 The following agenda items were addressed: Opening Comments: None Decision on 10/17/2013 General Session Minutes Jamie Patterson (CEC) moved for approval of the October 17, 2013 meeting minutes which was seconded by Landis Marttila (IBEW 1245) and the minutes were duly approved. Decision on Membership Renewals Four (4) TMCC voting member positions were open for renewal, three (3) were associated with PTO s membership and one (1) was associated with labor representation. Steve Rutty, Acting Chairperson, introduced the candidates stating their qualifications to be considered for the vacant positions. The candidates are: Steven Powell (TBC), Tom Wright (PG&E), Landis Marttila (IBEW 1245), and Michael Palusso (SCE). Mr. Patterson (CEC) motioned for approval of the candidates which was seconded by Tibor Foki (IBEW 47). Motion Passed. Share recent experiences involving NERC Reliability Standards and compliance processing Mr. Palusso initiated a discussion on the recent approval of NERC Standard PRC which requires Transmission Owners to document and implement programs for the maintenance of all Protection Systems affecting the reliability of the BES. Mr. Palusso stated SCE has implanted practices and processes to be compliant and indicated SCE s Maintenance Practices are also in line with PRC The practices are time-based and not conditional based. Cory Mitsui (SDGE) and Tom Wright (PGE) also indicated their practices were also time based method for maintenance of facilities covered under PRC Mr. Palusso stated PRC-005-3, Protection System and Automatic Reclosing Maintenance, will be voted on soon. Briefing on General Orders 165 and 174 Ryan Yamamoto (CPUC) stated starting in February the CPUC will conduct twice the number of substation and transmission audits this year. The CPUC will be adding two new IOUs (NV Energy and Bear Valley Electric Service) and the large municipalities (IID, LADWP, and SMUD) to their audit schedule. Mr. Yamamoto stated SCE will be hosting a substation inspection best practices workshop the week of January 23, 2014 in Pomona, CA. Below is a table of the proposed dates for the substation and transmission audits: Page 2 of 5

3 Utility Dates Transmission (GO 165) Substation (GO 174) SDG&E February 3-7, 2014 X LADWP February 24-28, 2014 X SCE March 10-21, 2014 X X PG&E March 31 - April 11, 2014 X X NV Energy May 5-16, 2014 X X SMUD July 14-18, 2014 X PacifiCorp August 4-15, 2014 X X SDG&E August 25-29, 2014 X IID September 29 - October 10, 2014 X X Bear Valley November 3-7, 2014 X X Discussion on Critical Infrastructure Protection (CIP) Rodney Winter (SDG&E) indicated SDG&E is hosting a conference call on January 28, 2014 and a peer workshop on February 24, 2014 to discuss and develop processes to prepare for the future enforcement of NERC Version 5 CIP Standards. All interested TMCC members were asked to submit contact information to Mr. Winters. NERC CIP Reliability Standards (Version 5) subject to future enforcement are the following: CIP Cyber Security Security Management Controls CIP Cyber Security Personnel and Training CIP Cyber Security Electronic Security Perimeter(s) CIP Cyber Security Physical Security of BES Cyber Systems CIP Cyber Security Systems Security Management CIP Cyber Security Incident Reporting and Response Planning CIP Cyber Security Recovery Plans for BES Cyber Systems CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP Cyber Security Information Protection Mr. Winter and Mr. Mitsui indicated SDG&E would like to develop a peer workgroup on a continual basis to discuss, share experiences and develop processes for the CIP Version 5 Reliability Standards. Mr. Rutty indicated the ISO would be willing to host meetings at the ISO facility after the TMCC meetings. All TMCC members supported Mr. Rutty s offer. Page 3 of 5

4 Briefing on major grid events Jack Vranish (PacifiCorp) indicated Peak Reliability (formerly WECC RC) coordinated with PacifiCorp Operations, during the next-day study process, to shed load pre-contingency to protect against low voltage on a section of their system in Idaho for an N-1 contingency because of a scheduled outage. Mr. Vranish indicated PacifiCorp has never done this in the past, but with the revised WECC RC System Operating Limit (SOL) Methodology the RC is taking a more active role in the operations next-day study process to determine impacts to the BES.Mr. Vranish indicated PacifiCorp will have to study and plan their maintenance activities to be in compliant with the current WECC RC SOL Methodology. Mr. Vranish stated approximately 50,000 customers were affected by the pre-contingency mitigation. Tom Wright (PG&E) indicated the incident at PG&E s Metcalf substation is still under investigation by the appropriate authorities. Discussion on incorporation of Availability metrics into maintenance programs Cori Mitsui (SDG&E) opened a discussion on how the PTOs are incorporating the Availability metrics into their maintenance programs. Mr. Mitsui indicated the Availability metrics are a good tool to determine reliability. Mr. Palusso indicated he uses the pivot charts, which are developed from the detailed outage data used to develop the Availability metrics, to determine problem areas. Mr. Palusso will then contact the respective business unit responsible for the area to discuss mitigation measures. Discussion and decision on Availability Metric streamline modification Duke Luu (ISO) presented on the proposed Availability Metric Streamline Modification. Over the last year (2013), in an effort to reduce workload, a subcommittee of the TMCC has been working to develop a more streamlined method to compile outage data used in the annual availability performance monitoring system. The availability performance monitoring system is a key element of the ISO transmission maintenance standards. Based on the subcommittee s recommendation, the ISO prepared and disbursed preliminary results to PG&E, SCE, & SDG&E that reflected the new streamlined process. Early indications show the new streamline method will result in a significant time and resource savings for the PTO s and ISO. No changes will be required to Appendix C of the Transmission Control Agreement and minimal changes will be required to the ISO Maintenance Procedures 2 and 5 to align with the new methodology. The proposed schedule for implementation is as follows: Update Procedure 5 by January 24, 2014 Update Procedure 2 by February 28, 2014 ISO will compile forced outage data and develop control charts using the SLIC database for 2003 to 2013 outages and provide to PTO by February 28, 2013 Page 4 of 5

5 PTO to develop and submit Availability Report to ISO by April 1, 2014 Mr. Palusso stated SCE support the proposed changes since it would reduce workload. David Gregory (PG&E) stated there was another method to determine availability using SGS Statistical Services. Mr. Gregory stated he would present the SGS method at the next TMCC meeting. Mr. Palusso motioned to approve the new streamline method and implementation schedule which was seconded by Mr. Marttila. The TMCC members approved the new streamline method and implementation schedule. New Business Issues and Future Agenda Items: The next regular quarterly TMCC meeting at the ISO Headquarters on 250 Outcropping Way in Folsom, California is scheduled for April 17, 2014 from 10:00 a.m. to 2:00 p.m. Discussion on CIP PG&E to provide a presentation on SGS Statistical method of determining availability. Share recent experiences involving NERC Reliability Standards and compliance processing Briefing on General Orders 165 and 176 SCE to provide a presentation on animal contact mitigation TMCC MEMBER ACTION ITEMS ISO will draft the minutes for this meeting and post as a document for the April 17, 2014 TMCC meeting; ISO will disburse Availability Metric streamline modification presentation; ISO will disburse TMCC sign in sheet; and ISO will post the minutes approved for the October 17, 2013 TMCC meetings on the ISO website; Mr. Patterson motioned to adjourn the meeting and Tibor Foki (IBEW 47) seconded the motion. Meeting was adjourned. Page 5 of 5

Managing Electrical Demand through Difficult Periods: California s Experience with Demand Response

Managing Electrical Demand through Difficult Periods: California s Experience with Demand Response Managing Electrical Demand through Difficult Periods: California s Experience with Demand Response Greg Wikler Vice President and Senior Research Officer Global Energy Partners, LLC Walnut Creek, CA USA

More information

White Paper. Understanding California s Electricity Prices

White Paper. Understanding California s Electricity Prices White Paper Understanding California s Electricity Prices Executive Summary Most industry experts predict that average electricity prices throughout the U.S. will increase significantly over the next decade.

More information

DRAFT STAFF REPORT STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES 2005 TO 2018 CALIFORNIA ENERGY COMMISSION JUNE 2007 CEC-200-2007-013-SD

DRAFT STAFF REPORT STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES 2005 TO 2018 CALIFORNIA ENERGY COMMISSION JUNE 2007 CEC-200-2007-013-SD CALIFORNIA ENERGY COMMISSION STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES 2005 TO 2018 DRAFT STAFF REPORT JUNE 2007 CEC-200-2007-013-SD Arnold Schwarzenegger, Governor CALIFORNIA ENERGY COMMISSION

More information

PREPARED DIRECT TESTIMONY OF SCOTT KING ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY

PREPARED DIRECT TESTIMONY OF SCOTT KING ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of SOUTHERN CALIFORNIA GAS COMPANY (U 0 G) for Review of its Safety Model Assessment Proceeding Pursuant to Decision 1-1-0.

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015 Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015 Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission

More information

AURORA Vulnerability Background

AURORA Vulnerability Background AURORA Vulnerability Background Southern California Edison (SCE) September 2011-1- Outline What is AURORA? Your Responsibility as a Customer Sectors Impacted by AURORA Review of Regulatory Agencies History

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission system operations

More information

Section 1: Executive Summary

Section 1: Executive Summary Section 1: Executive Summary SECTION 1: EXECUTIVE SUMMARY 1.1 SECTION PURPOSE This report has been prepared for the Nevada Energy Assistance Corporation (NEAC), a 501(c)(3) non-profit agency; in support

More information

NERC Cyber Security Standards

NERC Cyber Security Standards SANS January, 2008 Stan Johnson Manager of Situation Awareness and Infrastructure Security Stan.johnson@NERC.net 609-452-8060 Agenda History and Status of Applicable Entities Definitions High Level of

More information

Implementation Plan for Version 5 CIP Cyber Security Standards

Implementation Plan for Version 5 CIP Cyber Security Standards Implementation Plan for Version 5 CIP Cyber Security Standards April 10September 11, 2012 Prerequisite Approvals All Version 5 CIP Cyber Security Standards and the proposed additions, modifications, and

More information

Electric Operations Manager

Electric Operations Manager CITY OF ANAHEIM invites applications for the position of: Electric Operations Manager SALARY: $10,602.75 - $14,578.75 Monthly $127,233.00 - $174,945.00 Annually OPENING DATE: 04/07/16 CLOSING DATE: Continuous

More information

California s Electricity Market. Overview

California s Electricity Market. Overview California s Electricity Market Law Seminar s International Tribal Energy and the California Market June 23, 2008 Denny Brown California Energy Commission Overview Role of the Energy Commission Electricity

More information

Intentionally left blank

Intentionally left blank Intentionally left blank Table of Contents Executive Summary... 7 Introduction... 7 The Transmission Planning Process... 9 Collaborative Planning Efforts... 10 Reliability Assessment... 12 33 Percent RPS

More information

148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Arizona Public

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking on the Commission s Own Motion to Improve Distribution Level Interconnection Rules and Regulations for Certain

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator ) Corporation ) Docket No. ER10-500-000 MOTION OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR

More information

Understanding California s Electricity Prices Updated April 2011

Understanding California s Electricity Prices Updated April 2011 White Paper Understanding California s Electricity Prices Updated April 2011 Executive Summary Most industry experts conclude that average electricity prices throughout the U.S. will increase significantly

More information

Affidavit Of Charles A. Smart

Affidavit Of Charles A. Smart IN THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Duke Energy Moss Landing LLC ) Docket No. ER--000 Duke Energy Oakland LLC ) Docket No. ER--000 Affidavit Of Charles A. Smart

More information

State Planning Agency, Tribal Utilities & Renewable Energy Regime in California

State Planning Agency, Tribal Utilities & Renewable Energy Regime in California California and Clean Energy/Tech Permit Streamlining & Business Development Governor s Office of Planning and Research Scott Morgan National Governor s Association Workshop December 9, 2011 Office of Planning

More information

DQI WHITE PAPER UPDATE CPUC RECOMMENDATION #1. Continuing effort on DQI issues by a new DQI Subteam of the OCC

DQI WHITE PAPER UPDATE CPUC RECOMMENDATION #1. Continuing effort on DQI issues by a new DQI Subteam of the OCC DQI WHITE PAPER UPDATE CPUC RECOMMENDATION #1 Continuing effort on DQI issues by a new DQI Subteam of the OCC Recommendation 1 was for the CPUC to recommend the continuing effort of the DQI working group

More information

April 28, 2009. Dear Mr. Chairman:

April 28, 2009. Dear Mr. Chairman: April 28, 2009 The Honorable Edward J. Markey Chairman Subcommittee on Energy and Environment Committee on Energy and Commerce U.S. House of Representatives Washington, D.C. 20515 Dear Mr. Chairman: I

More information

Cyber Security Compliance (NERC CIP V5)

Cyber Security Compliance (NERC CIP V5) Cyber Security Compliance (NERC CIP V5) Ray Wright NovaTech, LLC Abstract: In December 2013, the Federal Energy Regulatory Commission (FERC) issued Order No. 791 which approved the Version 5 CIP Reliability

More information

BENCHMARKING ANALYSIS. February 17, 2015

BENCHMARKING ANALYSIS. February 17, 2015 BENCHMARKING ANALYSIS February 17, 2015 BACKGROUND Key City Stakeholders requested this benchmarking study including Mayor Garcetti, the Los Angeles City Council, and the City s Rate Payer Advocate. This

More information

San Diego Gas & Electric Company ) Docket No. ER98-4498- 000 MOTION TO INTERVENE AND PROTEST OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

San Diego Gas & Electric Company ) Docket No. ER98-4498- 000 MOTION TO INTERVENE AND PROTEST OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION San Diego Gas & Electric Company ) Docket No. ER98-4498- 000 MOTION TO INTERVENE AND PROTEST OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR

More information

Cyber Security Standards: Version 5 Revisions. Security Reliability Program 2015

Cyber Security Standards: Version 5 Revisions. Security Reliability Program 2015 Cyber Security Standards: Version 5 Revisions Security Reliability Program 2015 Overview of Development Activities The Team Standard Drafting Team (SDT) appointed to address these revisions in Project

More information

AMI Fact Book 4Q 2009

AMI Fact Book 4Q 2009 Synopsis This report is a catalog of current and future AMI and smart meter deployments in the U.S. It includes profiles of utilities, government agencies, and private organizations influencing the development

More information

Southern California Plug-in Electric Vehicle Readiness Plan. Prepared for the Southern California Association of Governments

Southern California Plug-in Electric Vehicle Readiness Plan. Prepared for the Southern California Association of Governments Southern California Plug-in Electric Vehicle Readiness Plan Prepared for the Southern California Association of Governments December 2012 14 Utility Policies 14.1 Introduction Electrical utilities currently

More information

CIP-003-5 Cyber Security Security Management Controls

CIP-003-5 Cyber Security Security Management Controls A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-5 3. Purpose: To specify consistent and sustainable security management controls that establish responsibility and

More information

MARKETING AGENCY RFP: CREATIVE PITCH BRIEF

MARKETING AGENCY RFP: CREATIVE PITCH BRIEF MARKETING AGENCY RFP: CREATIVE PITCH BRIEF Client contact information: Regina Marston regina.marston@energycenter.org 858.644.1196 Project: Energy Upgrade California Launch brand with campaign to introduce

More information

Stakeholder Process: Integrated Balancing Authority Area (IBAA)

Stakeholder Process: Integrated Balancing Authority Area (IBAA) Stakeholder Process: Integrated Balancing Authority Area (IBAA) Attachment B 1. Summary of Submitted Comments and Stakeholder Meetings Stakeholders submitted rounds of written comments to the CAISO on

More information

Overview of California Renewable Energy and Grid Infrastructure Policies, National and Global Trends

Overview of California Renewable Energy and Grid Infrastructure Policies, National and Global Trends Overview of California Renewable Energy and Grid Infrastructure Policies, National and Global Trends Angelina Galiteva Governor, California ISO, Founder Renewables 100 Policy Institute Paris, December

More information

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.

More information

How To Reduce Energy Use

How To Reduce Energy Use Opportunities for: Reducing Carbon Footprint Slashing Peak Demand Hybrid DX Air Conditioning utilizing ice storage Paul Kuhlman Director, Ice Energy Inc. pkuhlman@ice-energy.com We are experiencing a warming

More information

Transmission Grid Reliability And Performance Monitoring

Transmission Grid Reliability And Performance Monitoring Transmission Grid Reliability And Performance Monitoring NARUC s Summer Committee Meetings July 29, 2002 Portland, Oregon by Vikram S. Budhraja President, Electric Power Group, LLC Chair, Consortium for

More information

Distributed PV the road California is already on. Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011

Distributed PV the road California is already on. Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011 Distributed PV the road California is already on Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011 1 John Geesman, Energy Commissioner, 2007 source: California

More information

California s Energy Future

California s Energy Future California s Energy Future 1 Sunrise Powerlink Commitment and Imperial Valley Renewable Energy Projects Project Name Technology Location Contract Capacity (MW) Flowing across Sunrise Today (MW) Project

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Docket No. ER13-1470-000 Operator Corporation Northern Tier Transmission Group Deseret Generation

More information

Applicability and Eligibility

Applicability and Eligibility Application for Resource Adequacy Deliverability Status for a Distributed Generation Resource Interconnected or Seeking Interconnection to the Distribution Facilities of an Investor-Owned Utility Participating

More information

Top Ten Compliance Issues for Implementing the NERC CIP Reliability Standard

Top Ten Compliance Issues for Implementing the NERC CIP Reliability Standard Top Ten Compliance Issues for Implementing the NERC CIP Reliability Standard The North American Electric Reliability Corporation 1 s (NERC) CIP Reliability Standard is the most comprehensive and pervasive

More information

SECTION 5.15 ELECTRICITY AND NATURAL GAS

SECTION 5.15 ELECTRICITY AND NATURAL GAS SECTION 5.15 ELECTRICITY AND NATURAL GAS 5.15 ELECTRICITY AND NATURAL GAS This section addresses the potential impacts of the proposed project with regard to electricity and natural gas consumption. The

More information

Bay Area Earthquake Alliance

Bay Area Earthquake Alliance Bay Area Earthquake Alliance Meeting Notes Steering Committee Feb. 5, 2009 USGS, Menlo Park, CA 94025 Attendees: *Chair and Co-chair Brad Aagaard, USGS, baagaard@usgs.gov *Jack Boatwright, USGS, boat@usgs.gov

More information

Asset Management Business Update

Asset Management Business Update Asset Management Business Update Improvements through Asset Management Mark Davis, Director, Asset Management & AW October 29, 2008 1 From Maintenance to Asset Management Maintain the System -Initial Focus

More information

Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders

Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders Nicolas Puga, Principal San Diego, California October 18-19, 2007 Historical trends of US-Mexico electricity trade may soon change

More information

COMPANY INFORMATION AND FACTS. California Independent System Operator Corporation

COMPANY INFORMATION AND FACTS. California Independent System Operator Corporation COMPANY INFORMATION AND FACTS California Independent System Operator Corporation GUARDIAN of the grid The California Independent System Operator Corporation The ISO manages the flow of electricity across

More information

MEMORANDUM. March 9, 2007

MEMORANDUM. March 9, 2007 MEMORANDUM March 9, 2007 TO: FROM: SUBJECT: MEMBERS, PORT COMMISSION Hon. Anne Lazarus, President Hon. Kimberly Brandon, Vice President Hon. Rodney Fong Hon. Michael Hardeman Monique Moyer Executive Director

More information

NERC CIP Tools and Techniques

NERC CIP Tools and Techniques NERC CIP Tools and Techniques Supplemental Project - Introduction Webcast Scott Sternfeld, Project Manager Smart Grid Substation & Cyber Security Research Labs ssternfeld@epri.com (843) 619-0050 October

More information

BIG-BOLD GOAL: Transform HVAC Industry in California. STRATEGY: Form a Task Force to ensure integration between Utility and Industry actions.

BIG-BOLD GOAL: Transform HVAC Industry in California. STRATEGY: Form a Task Force to ensure integration between Utility and Industry actions. BIG-BOLD GOAL: Transform HVAC Industry in California STRATEGY: Form a Task Force to ensure integration between Utility and Industry actions. IOU Pacific Gas & Electric (PG&E), San Diego Gas & Electric

More information

An Asset Management Approach for EPA/CARB SF 6 Regulations

An Asset Management Approach for EPA/CARB SF 6 Regulations An Asset Management Approach for EPA/CARB SF 6 Regulations Robert Preston Lloyd, P.E. Senior Technical Specialist Substation Compliance & Asset Management Southern California Edison Agenda Purpose Background

More information

9325 Sky Park Court main 858.244.1177 Suite 100 fax 858.244.1178 San Diego, CA 92123 www.energycenter.org July 27, 2015 Advice No. 59 B (Center for Sustainable Energy ) Advice No. 4609 E B (Pacific Gas

More information

Tehachapi Wind Energy Storage Project (TSP)

Tehachapi Wind Energy Storage Project (TSP) Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description

More information

Automating NERC CIP Compliance for EMS. Walter Sikora 2010 EMS Users Conference

Automating NERC CIP Compliance for EMS. Walter Sikora 2010 EMS Users Conference Automating NERC CIP Compliance for EMS Walter Sikora 2010 EMS Users Conference What do we fear? Thieves / Extortionists Enemies/Terrorists Stuxnet Malware Hacker 2025 Accidents / Mistakes 9/21/2010 # 2

More information

JOINT EVENT WITH IIBA-LA. Trends & Best Practices in. Cybersecurity for networks, cloud computing and mobile

JOINT EVENT WITH IIBA-LA. Trends & Best Practices in. Cybersecurity for networks, cloud computing and mobile JOINT EVENT WITH IIBA-LA Trends & Best Practices in Cybersecurity for networks, cloud computing and mobile April 23 rd, 2015 Hands-on Experts Share Current Strategies to Manage Cybersecurity Today s enterprise

More information

Standard CIP 004 3a Cyber Security Personnel and Training

Standard CIP 004 3a Cyber Security Personnel and Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-3a 3. Purpose: Standard CIP-004-3 requires that personnel having authorized cyber or authorized unescorted physical access

More information

Top 10 Compliance Issues for Implementing Security Programs

Top 10 Compliance Issues for Implementing Security Programs www.dyonyx.com Top 10 Compliance Issues for Implementing Security Programs This White Paper articulates the top ten issues that we have encountered in the design and implementation of comprehensive Security

More information

The California Solar Initiative

The California Solar Initiative The California Solar Initiative The California Solar Initiative (CSI) has a goal to create 3,000 MW of distributed solar generation in California while creating a self-sustaining solar industry free from

More information

Cyber Infrastructure for the Smart Grid

Cyber Infrastructure for the Smart Grid Cyber Infrastructure for the Smart Grid Dr. Anurag K. Srivastava, Dr. Carl Hauser, and Dr. Dave Bakken Smart Grid Use Cases: Part 2 SGIC Xcel Energy SG Xcel Energy A public Service company of Colorado

More information

Midwest Reliability Organization Procedure For NERC PRC-012

Midwest Reliability Organization Procedure For NERC PRC-012 Midwest Reliability Organization Procedure For NERC PRC-012 A. Introduction The following procedure developed by the MRO Protective Relay Subcommittee (PRS) and Transmission Assessment Subcommittee (TAS)

More information

Webinar Basics. 5. If at any time you experience technical difficulties, please call the C.A.S.H. office at (916) 448-8577.

Webinar Basics. 5. If at any time you experience technical difficulties, please call the C.A.S.H. office at (916) 448-8577. Webinar Basics 1. You must dial in on a phone line to hear the audio portion of this webinar. Please refer to your webinar registration confirmation for the dial in instructions. 2. The handouts for this

More information

AB 2145: The Monopoly Protection Bill

AB 2145: The Monopoly Protection Bill AB 2145: The Monopoly Protection Bill Assembly Bill 2145 (Bradford D), aims to smother local clean energy initiatives to favor monopoly utility corporations that should be focusing on energy distribution

More information

Auto-DR Implementation in California State Utilities

Auto-DR Implementation in California State Utilities Enhancing Price Response Programs Through Auto-DR: California s s 2007 Implementation Experience Greg Wikler Global Energy Partners, LLC Albert Chiu Pacific Gas & Electric Company AESP 18th National Energy

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System

More information

IEPR Lead Commissioner Workshop Electricity Infrastructure Issues in California

IEPR Lead Commissioner Workshop Electricity Infrastructure Issues in California IEPR Lead Commissioner Workshop Electricity Infrastructure Issues in California South Coast AQMD Air Quality-Related Energy Policy Affecting Electricity Infrastructure Barry R. Wallerstein, D.Env. Executive

More information

Standard CIP 003 1 Cyber Security Security Management Controls

Standard CIP 003 1 Cyber Security Security Management Controls A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-1 3. Purpose: Standard CIP-003 requires that Responsible Entities have minimum security management controls in place

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Pacific Gas and Electric Company Docket No. ER03-299-000 JOINT PROTEST AND MOTION TO CONSOLIDATE OF THE CALIFORNIA INDEPENDENT SYSTEM

More information

Energy Storage. Opportunities, Challenges and Solutions

Energy Storage. Opportunities, Challenges and Solutions Energy Storage Opportunities, Challenges and Solutions By Les Sherman February 2014 Energy Storage Opportunities, Challenges and Solutions By Les Sherman As our nation pursues ambitious goals towards substantially

More information

NERC CIP Implementation Prepared by David Grubbs City of Garland NERC Critical Infrastructure Protection Committee (CIPC) Municipal Systems are well represented on the NERC CIPC Committee David Grubbs,

More information

PG&E and Renewables. Finding the ROI in Green Programs. Andrew Yip Manager Solar and Customer Generation Integrated Demand-Side Management

PG&E and Renewables. Finding the ROI in Green Programs. Andrew Yip Manager Solar and Customer Generation Integrated Demand-Side Management 1 PG&E and Renewables Finding the ROI in Green Programs Andrew Yip Manager Solar and Customer Generation Integrated Demand-Side Management Pacific Gas and Electric Company Energy services to 15 MM people:

More information

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, N. W. Washington, DC 20004. 202-756-3300 Fax: 202-756-3333. July 11, 2007

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, N. W. Washington, DC 20004. 202-756-3300 Fax: 202-756-3333. July 11, 2007 ALSTON&BIRD LLP The Atlantic Building 950 F Street, N. W. Washington, DC 20004 202-756-3300 Fax: 202-756-3333 Michael Kunselman Direct Dial: 202-756-3395 Email: Michael.Kunselman@alston.com July 11, 2007

More information

The first step in protecting Critical Cyber Assets is identifying them. CIP-002 focuses on this identification process.

The first step in protecting Critical Cyber Assets is identifying them. CIP-002 focuses on this identification process. CIPS Overview Introduction The reliability of the energy grid depends not only on physical assets, but cyber assets. The North American Electric Reliability Corporation (NERC) realized that, along with

More information

Standard CIP 007 3a Cyber Security Systems Security Management

Standard CIP 007 3a Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-3a 3. Purpose: Standard CIP-007-3 requires Responsible Entities to define methods, processes, and procedures for

More information

IRA Risk Factors Update for CIP. Ben Christensen Senior Compliance Risk Analyst, Cyber Security October 14, 2015

IRA Risk Factors Update for CIP. Ben Christensen Senior Compliance Risk Analyst, Cyber Security October 14, 2015 IRA Risk Factors Update for CIP Ben Christensen Senior Compliance Risk Analyst, Cyber Security October 14, 2015 2 Agenda Why the changes? What s new? Example of a Risk Factor How does this effect CIP V5?

More information

PG&E Web Tool for Reporting Information Related to. NERC Reliability Requirement Compliance

PG&E Web Tool for Reporting Information Related to. NERC Reliability Requirement Compliance PG&E Web Tool for Reporting Information Related to NERC Reliability Requirement Compliance Overview On June 18, 2007, mandatory reliability standards adopted by the Federal Energy Regulatory Commission

More information

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review California Independent System Operator Corporation September 29, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Moving Towards the Smart Grid. Southern California Edison s Advanced Metering Infrastructure (AMI) Program

Moving Towards the Smart Grid. Southern California Edison s Advanced Metering Infrastructure (AMI) Program Moving Towards the Smart Grid Southern California Edison s Advanced Metering Infrastructure (AMI) Program 1 Copyright 2006, Southern California Edison www.sce.com/ami Select SCE Projects using Smart Grid

More information

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

133 FERC 61,224 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

133 FERC 61,224 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 133 FERC 61,224 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. California

More information

Summary of CIP Version 5 Standards

Summary of CIP Version 5 Standards Summary of CIP Version 5 Standards In Version 5 of the Critical Infrastructure Protection ( CIP ) Reliability Standards ( CIP Version 5 Standards ), the existing versions of CIP-002 through CIP-009 have

More information

FILED 2-10-14 04:59 PM

FILED 2-10-14 04:59 PM BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA FILED 2-10-14 04:59 PM Application of San Diego Gas & Electric Company (U 902 M) for Approval of The SDG&E Solar Energy Project Application

More information

STATE OF CALIFORNIA ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION

STATE OF CALIFORNIA ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION STATE OF CALIFORNIA ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION Implementation of Renewables ) Docket No. 03-RPS-1078 Portfolio Standard Legislation (Public ) RPS Proceeding Utilities Code

More information

Cap-and-Trade Program Summary of Vintage 2013 Electrical Distribution Utility Allocated Allowance Value Reports

Cap-and-Trade Program Summary of Vintage 2013 Electrical Distribution Utility Allocated Allowance Value Reports Cap-and-Trade Program Summary of Vintage 2013 Electrical Distribution Allocated Allowance Value Reports Purpose This report summarizes how electrical distribution utilities (EDU) are using the value of

More information

CITY OF LAKE WORTH 7 North Dixie Highway Lake Worth, Florida 33460 Phone: 561-586-1600 Fax: 561-586-1750

CITY OF LAKE WORTH 7 North Dixie Highway Lake Worth, Florida 33460 Phone: 561-586-1600 Fax: 561-586-1750 CITY OF LAKE WORTH 7 North Dixie Highway Lake Worth, Florida 33460 Phone: 561-586-1600 Fax: 561-586-1750 1. ROLL CALL: 2. PLEDGE OF ALLEGIANCE: AGENDA-Revised CITY OF LAKE WORTH ELECTRIC UTILITY ADVISORY

More information

Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting

Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting Tom Hoff, President, Research & Consulting ISES Webinar February 23, 2015 Copyright 2015 Clean Power Research,

More information

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No.

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No. FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No. AD14-14-000) October 28, 2014 Market Presentation Design Title & Analysis

More information

U.S. Department of Energy Electricity Advisory Committee Meeting Virtual Meeting Arlington, VA January 24, 2014 Minutes

U.S. Department of Energy Electricity Advisory Committee Meeting Virtual Meeting Arlington, VA January 24, 2014 Minutes U.S. Department of Energy Electricity Advisory Committee Meeting Virtual Meeting Arlington, VA January 24, 2014 Minutes PARTICIPANTS EAC: BILLY BALL Southern Company ANJAN BOSE Washington State University

More information

Operational Benefits of Meeting California s Energy Storage Targets

Operational Benefits of Meeting California s Energy Storage Targets Operational Benefits of Meeting California s Energy Storage Targets Josh Eichman, Paul Denholm, and Jennie Jorgenson National Renewable Energy Laboratory Udi Helman Helman Analytics NREL is a national

More information

Village of North Palm Beach Police and Fire Pension Fund

Village of North Palm Beach Police and Fire Pension Fund Village of North Palm Beach Police and Fire Pension Fund MINUTES OF MEETING HELD September 2, 2008 Chairman, Robert DiGloria called the meeting to order at 2:07 PM in the Conference Room of the North Palm

More information

APPENDIX B TO PROPOSED ADJUSTMENTS TO SRP S STANDARD ELECTRIC PRICE PLANS EFFECTIVE WITH THE NOVEMBER 2012 BILLING CYCLE COST COMPARISON DATA

APPENDIX B TO PROPOSED ADJUSTMENTS TO SRP S STANDARD ELECTRIC PRICE PLANS EFFECTIVE WITH THE NOVEMBER 2012 BILLING CYCLE COST COMPARISON DATA APPENDIX B TO PROPOSED ADJUSTMENTS TO SRP S STANDARD ELECTRIC PRICE PLANS EFFECTIVE WITH THE NOVEMBER 2012 BILLING CYCLE COST COMPARISON DATA SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT

More information

State Capitol Sacramento, California 95814 California Legislature

State Capitol Sacramento, California 95814 California Legislature State Capitol Sacramento, California 95814 California Legislature California Assembly Utilities and Commerce Committee & Joint Legislative Committee on Emergency Management Briefing Paper on September

More information

Reclamation Manual Directives and Standards

Reclamation Manual Directives and Standards Vulnerability Assessment Requirements 1. Introduction. Vulnerability assessment testing is required for all access points into an electronic security perimeter (ESP), all cyber assets within the ESP, and

More information

Audit-Ready SharePoint Applications

Audit-Ready SharePoint Applications Audit-Ready SharePoint Applications Page 1 of 16 July 7, 2015 Table of Contents 1 Overview... 3 2 Company Background... 4 3 Audit-Ready SharePoint Applications... 4 3.1 Audit-Ready Compliance Dashboard...

More information

ISACA North Dallas Chapter

ISACA North Dallas Chapter ISACA rth Dallas Chapter Business Continuity Planning Observations of Critical Infrastructure Environments Ron Blume, P.E. Ron.blume@dyonyx.com 214-280-8925 Focus of Discussion Business Impact Analysis

More information

SmartSacramento. Green Summit 2011. Jim Parks Program Manager SmartSacramento Team. April 19, 2011

SmartSacramento. Green Summit 2011. Jim Parks Program Manager SmartSacramento Team. April 19, 2011 SmartSacramento Green Summit 2011 April 19, 2011 Jim Parks Program Manager SmartSacramento Team The Current State of the Grid Current grid tends toward dumb We typically learn about outages via phone Many

More information

ReliabilityFirst CIP Evidence List CIP-002 through CIP-009 are applicable to RC, BA, IA, TSP, TO, TOP, GO, GOP, LSE, NERC, & RE

ReliabilityFirst CIP Evidence List CIP-002 through CIP-009 are applicable to RC, BA, IA, TSP, TO, TOP, GO, GOP, LSE, NERC, & RE R1 Provide Risk Based Assessment Methodology (RBAM) R1.1 Provide evidence that the RBAM includes both procedures and evaluation criteria, and that the evaluation criteria are riskbased R1.2 Provide evidence

More information

5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics.

5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics. Overview of Energy Storage Value Propositions and Business Cases Ben Kaun Senior Project Manager ESA Energy Storage 101 Workshop Agenda Utility Cost-Function: Foundation of Energy Storage Economics Utility

More information

Southern California Edison s

Southern California Edison s Welcome to Southern California Edison s Energy Efficiency Programs 1 Energy Efficiency #1 Resource The California Energy Action Plan of 2005 establishes energy efficiency as the state s top priority procurement

More information

AGENDA TUESDAY, AUGUST 4, 2015 11:00 A.M. MEL LEVINE, President. WILLIAM W. FUNDERBURK, JR., Vice President. JILL BANKS BARAD, Commissioner

AGENDA TUESDAY, AUGUST 4, 2015 11:00 A.M. MEL LEVINE, President. WILLIAM W. FUNDERBURK, JR., Vice President. JILL BANKS BARAD, Commissioner BOARD OF WATER AND POWER COMMISSIONERS DEPARTMENT OF WATER AND POWER OF THE CITY OF LOS ANGELES Room 1555-H, 111 North Hope Street, Los Angeles, CA 90012 AGENDA TUESDAY, AUGUST 4, 2015 11:00 A.M. MEL LEVINE,

More information

CITY AND COUNTY OF SAN FRANCISCO

CITY AND COUNTY OF SAN FRANCISCO CITY AND COUNTY OF SAN FRANCISCO Mayor Gavin Newsom City Attorney Dennis Herrera Supervisor Michela Alioto-Pier Supervisor David Chiu Supervisor Sophenia Maxwell General Manager Edward Harrington May 8,

More information

Standard CIP 007 3 Cyber Security Systems Security Management

Standard CIP 007 3 Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-3 3. Purpose: Standard CIP-007-3 requires Responsible Entities to define methods, processes, and procedures for securing

More information

Alberta Reliability Standard Cyber Security Implementation Plan for Version 5 CIP Security Standards CIP-PLAN-AB-1

Alberta Reliability Standard Cyber Security Implementation Plan for Version 5 CIP Security Standards CIP-PLAN-AB-1 External Consultation Draft Version 1.0 December 12, 2013 1. Purpose The purpose of this reliability standard is to set the effective dates for the Version 5 CIP Cyber Security reliability standards and

More information