Pipeline Rehabilitation by Sliplining with Polyethylene Pipe
|
|
|
- Constance Ball
- 10 years ago
- Views:
Transcription
1
2 Pipeline Rehabilitation by Sliplining with Polyethylene Pipe Foreword Table of Contents Introduction 1 Design Considerations 2 Select a Pipe Liner Diameter 2 Determine a Liner Wall Thickness 2 Analyze the Flow Capacity 6 Design the Accesses 9 Develop the Contract Documents 12 Sliplining Procedure 12 Inspect the Existing Pipe 13 Clean and Clear the Line 13 Join Lengths of Polyethylene Pipe 13 Butt Fusion 13 Gasketed Bell and Spigot Joining 15 Access the Original Liner 16 Position the Liner 17 Make Service and Lateral Connections 20 Make Terminal Connections and Stabilize the 21 Annular Space Where Required Other Rehabilitation Methods 22 Summary 24 References 25 Acknowledgements 27
3 List of Tables Table 1 Allowable Height of Water Above Pipe, No Grout vs Grout 5 Table 2 Typical Manning Flow Coefficients for Water Flowing 8 Through Common Piping Materials List of Tables Figure 1 Typical Manhole Seal for Gravity Flow Applications 9 Figure 2 Newly Constructed Headwall or Manhole Placement 10 Figure 3 Lateral Service Connections for Sliplining Gravity Pipelines 11 Figure 4 Lateral Connections for Sliplined Pressure Pipelines 12 Figure 5 Typical Sliplining Access Pit for Prefused Lengths of 16 Polyethylene Liner Figure 6 Typical Sliplining Access Pit for Bell and Spigot 17 Polyethylene Liner Figure 7 Fabricated Mechanical Pulling Heads 18 Figure 8 Field - Fabricated Pulling Heads 18 Figure 9 Push Technique for Solid Wall Polyethylene Pipe 20 Figure 10 Terminal and Transition Connections for 21 Pressurized Insertion Renewal Projects
4 Foreword Pipeline Rehabilitation by Sliplining with Polyethylene Pipe is one of the chapters being prepared for inclusion in the Plastics Pipe Institute s PPI Handbook of Polyethylene Piping, which will be issued as a complete volume in the future. This handbook will cover other uses of polyethylene piping systems including municipal, mining, and industrial applications. Other topics to be addressed in the handbook will include engineering principles, design and installation of polyethylene piping systems, and relevant codes and standards. The Municipal and Industrial (M&I) subgroup of PPI are producing the PPI Handbook of Polyethylene Piping. M&I membership consist of major North American manufacturers of polyethylene (PE) pipe and fittings, PE piping materials, machinery, and equipment used for joining and installing PE piping, related test laboratories, and professional organizations. PPI maintains additional subgroups, which address other applications, such as gas distribution. PPI and its subgroups provide technical and promotional support for the effective use and continued application of thermoplastics pipe and related products, consistent with the best public interest. PPI membership also includes producers of polyvinyl chloride (PVC), chlorinated polyvinyl chloride (CPVC), polybutylene (PB), and crosslinked PE (PEX) piping products and materials. For a list of other publications available from PPI and/or further information, please contact: The Plastics Pipe Institute The information in the publication was prepared by SPI as a service to its members and the industry. While prepared in good faith and believed to be accurate, SPI, its members, and contributors disclaim all liability for any loss or damage arising from reliance on this information by any person. SPI does not endorse the proprietary products or processes of any manufacturer. Consult the product manufacturer for specific information. February, 1998
5 Pipeline Rehabilitation by Sliplining with Polyethylene Pipe Introduction Pipeline Rehabilitation - 1 An integral part of the infrastructure in the United States is its vast network of pipeline, conduits, and culverts. These are among the assets we take for granted, since most are buried and we never see them. We do not see them deteriorate either, but we know that they do. Television inspection of the interiors of these structures often reveals misaligned pipe segments, leaking pipe joints, or other failing pipe integrity. The effects of continued deterioration of a pipeline could be quite drastic and costly. A dilapidated gravity sewer system permits substantial infiltration of groundwater, which increases the volume of flow and reduces the available hydraulic capacity of the existing line. So the old pipeline often increases treatment and transportation costs for the intended flow stream (23). Continued infiltration may also erode the soil envelope surrounding the pipe structure and cause eventual subsidence of the soil. The case for positive-pressure pipelines is somewhat different, but the results are equally unacceptable. In this situation, continued leakage through the existing structure allows exfiltration of the contents of the flow stream that eventually leads to extensive property damage or water resource pollution. Also, in many cases, the contents of the flow stream are valuable enough that their loss through exfiltration becomes another economic factor. When the harmful results of pipeline deterioration become apparent, we must either find the most economical method that will restore the original function or abandon the function. Excavation and replacement of the deteriorating structure can prove prohibitively expensive and will also disrupt the service for which the original line is intended (17). An alternate method for restoration is sliplining or insertion renewal with polyethylene pipe. Over 30 years of field experience shows that this is a proven cost-effective means that provides a new pipe structure with minimum disruption of service, surface traffic, or property damage that would be caused by extensive excavation. The sliplining method involves accessing the deteriorated line at strategic points within the system and subsequently inserting polyethylene pipe lengths, joined into a continuous tube, through the existing pipe structure. This technique has been used to rehabilitate gravity sewers (10,23), sanitary force mains, water mains, outfall lines, gas mains(1,12), highway and drainage culverts (17), and other piping structures with extremely satisfactory results. It is equally appropriate for rehabilitating a drain culvert 40 feet long under a road or straight sewer line with manhole access as far as ½ mile apart. The technique has been used to restore pipe as small as 1-inch, and there are no apparent maximum pipe diameters.
6 Pipeline Rehabilitation - 2 Design Considerations The engineering design procedure required a sliplining project consist of five straightforward steps: 1. Select a pipe liner diameter 2. Determine a liner wall thickness 3. Analyze the flow capacity 4. Design necessary accesses such as terminal manholes, headwall service, and transition connections 5. Develop the contract documents Select a Pipe Liner Diameter To attain a maximum flow capacity, select the largest feasible diameter for the pipe liner. This is limited by the size and condition of the original pipe through which it will be inserted. Sufficient clearance will be required during the sliplining process to insure trouble-free insertion, considering the grade and direction, the severity of any offset joints, and the structural integrity of the existing pipe system. The selection of a polyethylene liner that has an outside diameter 10% less than the inside diameter of the pipe to be rehabilitated will generally serve two purposes. First, this size differential usually provides adequate clearance to accommodate the insertion process. And second, 75% to 100% or more of the original flow capacity may be maintained. A differential of less than 10% may provide adequate clearance in larger diameter piping structures. It is quite common to select a 5% to 10% differential for piping systems with greater than 24-inch diameters, assuming that the conditions of the existing pipe structure will permit insertion of the liner. Determine a Liner Wall Thickness Non-Pressure Pipe In the majority of gravity pipeline liner projects, the principal load that will act on the polyethylene pipe is the hydrostatic load that is created when the water table rises above the crown (top) of the liner. The generic Love s equation (Eq. 1) shows that the ability of a free-standing pipe to withstand external hydrostatic loading Is essentially a function of the pipe wall moment of inertia and the apparent modulus of elasticity of the pipe material. The critical buckling pressure, Pc, for a specific pipe construction can be determined by using equation Eq. 1.
7 Pipeline Rehabilitation - 3 Love s Equation Where Pc = Critical buckling pressure, psi E = Apparent modulus of elasticity at F (23 0 C), 50 year loading I = Pipe wall moment of inertia, inches = t 3 /12 m = Poisson s ratio for polyethylene; 0.45 Dm = Mean diameter, inches = Inside diameter + one wall thickness C = Ovality correction factor, [OD (min) /OD (max) ] 3 To compute the buckling pressure of a dimension ratio (DR) series polyethylene pipe (i.e., a grouping of solid wall pipes of different diameters but with the same ratio of specified outside diameter to minimum wall thickness), the following variation of Love s equation (21), Eq. 2, is used. Love s Equation for DR Solid Wall Pipe Where DR = OD/t OD = Outside diameter, inches t = Minimum wall thickness, inches The process of calculating the buckling resistance of a free-standing pipe is iterative in that, once the critical buckling resistance of a trial choice has been determined, it can be compared to the anticipated hydrostatic load. If the pipe s calculated buckling resistance is significantly larger than the anticipated hydrostatic loading, the procedure can be used to evaluate a lesser wall thickness (with the advantages of lighter weight materials and lower costs). The prudent practice is to select a design buckling resistance that provides an adequate safety factor (SF) over the maximum anticipated hydrostatic load.
8 Pipeline Rehabilitation - 4 Safety Factor, SF For an example of the calculations that can be made with Equations 2 and 3, consider a 22-inch DR 32.5 solid-wall polyethylene liner placed within a 24-inch clay tile pipe and subjected to a maximum excess hydrostatic load of 3 feet of water table. First, calculate the equivalent hydrostatic load in psi. Water load = (3ft) x (62.4 lb/ft 3 ) x (1 ft 2 /144 in 2 ) = 1.3 psi Next, using Eq. 2, calculate the critical buckling pressure, Pc, assuming 50-year hydrostatic loading. Pc = 2.41 psi for 22-inch DR 32.5 polyethylene pipe with an installed ovality of 4% Finally, calculate the safety factor, SF, from Eq. 3 for this load assumption. SF= 2.41/1.3 = 1.85 A safety factor of less than 2.0 computed on this basis has been shown to be satisfactory for those situations where the external maximum hydrostatic load is an infrequent occurrence. A safety factor of 2.0 or greater is often used for frequent or long-term exposure to such loads. If a larger safety factor is preferred, repeat the procedure for a heavier wall configuration or consider the enhancement of the pipe s buckling strength by the effects of external restraint. Love s equation assumes that the liner being subjected to the indicated hydrostatic load is free standing and is not restrained by any external forces. Actually, the existing pipe structure serves to cradle the flexible liner, enhancing its collapse resistance. Maximum external reinforcement can be provided, where required, by placing a stable loadbearing material such as cement, fly ash, polyurethane foam, or low-density grout in the annular space between the liner and the existing pipe. Studies show that filling the annular cavity will enhance the collapse resistance of a polyethylene pipe by at least a three-fold factor and often considerably more, depending on the load-bearing capabilities of the particular fill material. Contact the pipe suppliers for additional Information. For solid wall pipe, Table 1 indicates what a typical manufacturer might recommend for safe long-term (50-year) hydrostatic loading. This Information was derived according to the procedure shown in ASTM F585 (4) and indicates the added resistance to collapse due to hydrostatic loading provided by grouting.
9 Pipeline Rehabilitation - 5 Table 1 Allowable Height of Water Above Pipe, No Grout vs Grout Pipe DR Height of Water (ft) Height of Water (ft) Above Pipe (50 yrs) Above Pipe (50 yrs) No Grout Grout The figures in this table represent a Safety Factor, SF, of 1.0. If the existing sewer will not provide structural integrity, a more conservative Safety Factor should be used. For profile wall pipe, the following equation is one manufacturer s recommendation for estimating the maximum allowable long-term (50 year) height of water above the pipe with no grout: Where H = Height of Water, feet RSC = Ring Stiffness Constant (if RSC is not measured, use 90% of RSC class value) D m = Mean Diameter, feet This equation contains a Safety Factor (SF) of 2.0 based on pipe with a maximum 3% deflection. For grouted profile wall pipe, using grout with a minimum compressive strength of 500 psi at 24 hours (1800 psi at 28 days), the allowable long-term (50 year) height of water above the pipe may be determined from the following equation: This equation contains a Safety Factor (SF) of 2.0.
10 Pipeline Rehabilitation - 6 Pressure Pipe A liner, which will be exposed to a constant internal pressure or to a combination of internal and external stresses, must be analyzed in a more detailed manner. The guidelines for a detailed loading analysis such as this are available from a variety of resources that discuss in detail the design principles concerned with underground installation of flexible piping materials (2,14,15.18,25,28) In those installations where the liner will be subjected to direct earth loading, the pipe/ soil system must be capable of withstanding all anticipated loads. These include earth loading, hydrostatic loading, and superimposed loads. The structural stability of a polyethylene liner under these conditions is determined largely by the quality of the external support. For these situations, refer to any of the above referenced information sources that concern direct burial of thermoplastic pipe. A polyethylene liner that has been selected to resist hydrostatic loading will generally accommodate typical external loading conditions if it is installed properly. Other Loading Considerations Filling of the entire annular space is rarely required. If it is properly positioned and sealed off at the termination points, a polyethylene liner will eliminate the sluice path that could contribute to the continued deterioration of most existing pipe structures. With a liner, a gradual accumulation of silt or sediment occurs within the annular space and this acts to eliminate the potential sluice path. On occasion, deterioration of the original pipe may continue to occur even after the liner has been installed (17). This unusual situation may be the result of excessive groundwater movement combined with a soil quality that precludes sedimentation within the annular space. As a result, uneven or concentrated point loading upon the pipe liner or even subsidence of the soil above the pipe system may occur. This can be avoided by filling the annular space with a cement-sand mixture, a low-density grout material (9), or fly ash. Analyze the Flow Capacity The third step In the sliplining process is to assess the impact of sliplining on the hydraulic capacity of the existing pipe system. This is accomplished by using commonlyaccepted flow equations to compare the flow capacity of the original line against that of the smaller, newly-installed polyethylene liner. Two equations widely used for this calculation are the Manning Equation (Eq. 6) and the Hazen-Williams Approximation for other than gravity flow systems (Eq. 7) (1,4).
11 Pipeline Rehabilitation - 7 Manning Equation for Gravity Flow where Q = Flow in cu ft/sec A = Cross sectional area in square feet = x (D i /2) 2 R = Hydraulic Radius in feet = D i /4 for full flow S = Slope, ft/ft N = Manning Flow Factor for piping material = for smooth wall polyethylene D i = Inside Diameter in feet Hazen-Williams Approximation for Other Than Gravity Flow Where H = Friction loss in ft H 2 O/100 ft G = Volumetric Flow Rate in gallons/minute = x V x D i 2 where V = Flow velocity in ft/sec D i = inside diameter in inches C H = Hazen-Williams Flow Factor = 150 for polyethylene The insertion of a smaller pipe within the existing system may appear to reduce the original flow capacity. In the majority of sliplining applications, however, this is not the case. The polyethylene liner is extremely smooth in comparison to most piping materials. The improved flow characteristic for clear water is evidenced by a comparatively low Manning Flow Coefficient, N of 0.009, and a Hazen-Williams factor, C H, of 150. While a reduction in pipe diameter does occur as a consequence of sliplining, it is largely compensated by the significant reduction in the Manning Flow Coefficient. As a
12 Pipeline Rehabilitation - 8 result, flow capacity is maintained at or near the original flow condition (17). Manning Flow Coefficients for a variety of piping materials are listed in Table 2 (8,14). These factors may be used to approximate the relative flow capacities of various piping materials. Table 2 Typical Manning Flow Coefficients for Water Flowing Through Common Piping Materials Concrete Clay Tile Asbestos Cement PVC Polyethylene Quite often the hydraulic capacity of a gravity flow pipe can actually be improved by an insertion renewal. For example, consider the following illustrations of calculations using the Manning Equation (Eq.10.6). Calculation for Flow Rate, Q, Through 24-inch ID Concrete Pipe at 1% Slope (1 ft/100 ft) = 19.6 cu ft/sec = 8800 GPM Calculation of Flow Rate, Q Through 22-inch OD Polyethylene Pipe with a lnch ID at 1% Slope (1 ft/100 ft) = cu ft/sec = 9800 GPM
13 Comparison of the two calculated flow rates shows that sliplining this 24-inch concrete pipe with the smaller polyethylene pipe actually improves the capacity by 1000 gallons per minute. This will often be the situation. Occasionally, however, the theoretical flow capacity of the liner may appear to be equivalent to or slightly less than that of the original system. In many such cases, the presence of the liner eliminates the infiltration associated with the deterioration of the original pipe and the corresponding burden this place on the existing flow capacity. So an apparently small reduction in theoretical flow capacity may, in reality, prove to be quite acceptable since it eliminates the infiltration and the effect this produces on available hydraulic capacity. Design the Accesses Pipeline Rehabilitation - 9 The polyethylene liner will need to be connected to existing system components or appurtenances. Proper planning for a rehabilitation project must include the specific engineering designs by which these connections will be made. Gravity flow pipeline rehabilitation often requires that the individual liner lengths be terminated at manholes or concrete headwalls that already exist within the system that is being sliplined. The annular space at these locations must provide a water-tight seal against continued infiltration In the void area that exists between the liner and the original pipe where they connect to these structures. Typically, the required seal can be made by compacting a ring or collar of Okum saturated with non-shrink grout into the void area to a distance equal to one-half to one full liner diameter. The annular space is then dressed with a non-shrink elastomeric grout. The face of the elastomeric grout may then be covered with quickset chemical-resistant concrete. The same concrete material may then be used to reconstruct an invert in the manhole. This type of seal is shown in Figure 1. Figure 1 Typical Manhole Seal for Gravity Flow Applications
14 Pipeline Rehabilitation - 10 For those installations where a new manhole or headwall will be set, the amount of elastomeric grout may be minimized by fusing a water-stop or stub end onto the liner length before it is finally positioned. This fitting may then be embedded within the poured headwall or grouted into the new manhole. Some typical connecting arrangements for newly constructed appurtenances are shown in Figure 2. Figure 2 Newly Constructed Headwall or Manhole Placements Deteriorated lateral service connections are a leading cause of Infiltration in gravity flow pipelines (18). An integral part of the insertion process is rebuilding these connections. This aspect of sliplining assures maximum reduction of infiltration, provides for longterm structural stability of the service, and minimizes the potential for continued deterioration of the existing pipe system. Individual home services or other laterals may be connected to the liner by using any of several different connection methods. For example, upon relaxation of the liner, sanitary sewer connections may be made to the polyethylene liner by using a strap-on service saddle or a side-wall fusion fitting. Either of these options provides a secure watertight connection to the liner and allows for effective renewal of the riser with no reduction in the inside diameter of the service. Both of these types of connection are shown In Figure 3. Rehabilitation of pressure pipelines often requires that connections be made to lateral pressure-rated piping runs. Connections to these lines should be designed to insure full
15 Pipeline Rehabilitation - 11 pressure capability of the rehabilitated system. Several alternatives are available to meet this requirement. These include in-trench fusion of molded or fabricated tees; sidewall fusion of branch saddles insertion of flanged spool pieces and insertion of lowprofile mechanical connectors. Several of these options are illustrated schematically in Figure 4. Performance requirements and installation parameters of the rehabilitation project most often dictate the selection of one specific connection design. Figure 3 Lateral Service Connections for Sliplining Gravity Pipelines
16 Pipeline Rehabilitation - 12 Figure 4 Lateral Connections for Sliplined Pressure Pipelines Develop the Contract Documents When the rehabilitation design has been completed, attention will be focused on writing the specifications and contract documents that will ensure a successful installation. Reference documents for this purpose include: ASTM D3350 (3), ASTM F585 (4), ASTM F714 (5), and ASTM F894 (6). To assist further in the development of these documents, a model sliplining specification is being prepared by the Plastics Pipe Institute. The Sliplining Procedure The standard sliplining procedure is normally a seven-step process. While the actual number of steps may vary to some degree in the field, the procedure remains the same for all practical purposes (22,23). The procedures for rehabilitation of gravity and positive pressure pipelines are essentially the same. Some subtle differences become appar-
17 Pipeline Rehabilitation - 13 ent in the manner by which some of the basic steps are implemented. The seven basic steps are: 1. Inspect the existing pipe. 2. Clean and clear the line. 3. Join lengths of polyethylene pipe. 4. Access the original line. 5. Position the liner. 6. Make service and lateral connections. 7. Make terminal connections and stabilize annular space. Inspect the Existing Pipe The first step for a sliplining project is the inspection of the existing pipe. This will determine the condition of the line and the feasibility of insertion renewal. During this step, identify the number and the locations of offset pipe segments and other potential obstructions. Use a remote-controlled closed-circuit television camera to inspect the pipe interior. As the unit is pulled or floated through the original pipe, the pictures can be viewed and recorded with on-site television recording equipment. Clean and Clear the Line The existing pipeline needs to be relatively clean to facilitate placement of the polyethylene liner. This second step will ensure ease of installation. It may be accomplished by using cleaning buckets, kites or plugs, or by pulling a test section of polyethylene liner through the existing pipe structure. Obviously, to attempt a liner insertion through a pipeline obstructed with excess sand, slime, tree roots, or deteriorated piping components would be uneconomical or even impossible. Step 2 is often undertaken in conjunction with the inspection process of Step 1. Join Lengths of Polyethylene Pipe Polyethylene pipe may be joined by either butt fusion technology or by gasketed bell and spigot joining methods. The specific method to be used will be determined by the type of polyethylene pipe being inserted into the existing pipe structure. Solid wall polyethylene pipe is usually joined during butt fusion techniques. Polyethylene profile pipe, on the other hand, is typically joined by integral gasketed bell and spigot joining methods. Butt Fusion Individual lengths of solid wall polyethylene pipe are joined by using butt fusion techniques. The integrity of this joining procedure is such that, when it is performed properly, the strength of the resulting joint equals or exceeds the structural stability of the pipe itself. This facilitates the placement of a leak-free liner throughout the section of the
18 Pipeline Rehabilitation - 14 existing system under rehabilitation. The external fusion bead, formed during the butt fusion process, can be removed following the completion of joint quality assurance procedures, by using a special tool prior to insertion into the existing system. The removal of the bead may be necessary in cases of minimal clearance between the liner and the existing pipeline. Individual pulling lengths are usually determined by naturally occurring changes in grade or direction of the existing pipe system. Severe changes in direction that exceed the maximum bending radius of the polyethylene liner may be used as access points. Likewise, severe offset joints, as revealed during the television survey, are also used commonly as access points. By judicious planning, potential obstructions to the lining procedure may be used to advantage. There is a frequent question regarding the maximum pulling length for a given system. The answer, quite simply, is that ideally each pull should be as long as economically possible without exceeding the tensile strength of the polyethylene material. It is rare that a pull of this magnitude is ever attempted. As a matter of practicality, pulling lengths are more often restricted by physical considerations at the job site or by equipment limitations (22). To ensure a satisfactory installation, however, the designer may want to analyze what is considered the maximum pulling length for a given situation. Maximum pulling length is a function of the tensile strength and weight of the polyethylene liner, the temperature at which the liner will be manipulated, the physical dimensions of the liner, and the frictional drag along the pipe length to be attempted. Equations 8 and 9 are generally accepted for determination of the maximum feasible pulling length. One of the important factors in these calculations is the tensile strength of the particular polyethylene pipe product, which must be obtained form the manufacturer s literature. Maximum Pulling Force, MPF (lb-force) where MPF = Maximum Pulling Force TS = Tensile strength of polyethylene; psi at F (23 0 C) P = OD = Outside diameter in inches ID = Inside diameter in inches FS = An acceptable Factor of Safety; usually equal to or greater than 1.50.
19 Pipeline Rehabilitation - 15 Maximum Pulling Length, MPL (feet) where MPL = Maximum straight pulling length on relatively flat surface MPF = Maximum pulling force (Eq. 8) W = Pipe Weight, lbs/ft 0.70 = Coefficient of friction for polyethylene on smooth sandy soils (static) Gasketed Bell and Spigot Joining Polyethylene profile pipe is typically joined using gasketed bell and spigot techniques. The integral bell and spigot method does not require fusion joining. Instead, the pipe segments are joined by pushing or jacking the spigot on the leading end of each pipe into the trailing bell on the preceding pipe as it is installed into the deteriorating pipe structure. In this case, the major design consideration is the maximum push length, which can be calculated by using Eq. 10 and Eq. 11. Maximum Pushing Force, MPHF (lb-force) where S = Wall thickness of pipe waterway, inches ID = Inside Diameter, inches P = PHS = Allowable Pushing Stress, psi (typically 400 psi for profile wall pipe) Maximum Pushing Length, MPHL (feet) where MPHF = Maximum Pushing Force (Eq. 10) W = Weight per foot, lb/ft CF = Coefficient of friction
20 Pipeline Rehabilitation - 16 A coefficient of friction, CF in Eq. 11, is a measure of the relative difficulty encountered as the liner is pushed through the deteriorated pipe. Typically, pushing is accomplished while a flow is present through the old pipe; for this condition, CF = Where there is no flow present, a typical value is CF = Access the Original Line Excavation of the access pits is the next step in the insertion renewal procedure. Access pits will vary considerably in size and configuration, depending on a number of project-related factors such as: depth of the existing pipe diameters of the liner and the existing pipe prevailing soil conditions equipment availability traffic and service requirements job site geography For example, a fairly large access pit may be required when attempting to slipline a large diameter system that is buried deep in relatively unstable soil. In contrast, the access pit for a smaller diameter pipeline that is buried reasonably shallow (5 to 8 feet) may be only slightly wider than the liner itself. In actual practice, the simpler situation is more prevalent. An experienced contractor will recognize the limiting factors at a particular job site and utilize them to the best economic advantage, thus assuring a costeffective Installation. Figure 5 Typical Sliplining Access Pit for Prefused Lengths of Polyethylene Liner
21 Pipeline Rehabilitation - 17 Figure 6 Typical Sliplining Access Pit for Bell and Spigot Polyethylene Liner A typical access pit for sliplining with pre-fused lengths of solid wall polyethylene pipe is illustrated in Figure 5. Figure 6 is a schematic of an access method that may be used with gasketed profile pipe. Position the Liner Insertion of the polyethylene liner may be accomplished by one of several techniques. Prefused lengths of solid wall polyethylene pipe may be pulled or pushed into place. Gasket-jointed profile pipe, on the other hand, must be installed by the push method to maintain a watertight seal. The Pull Technique Prefused lengths of solid wall polyethylene liner may be pulled into place by using a cable and winch arrangement. The cable from the winch is fed through the section of pipe that is to be sliplined. Then the cable is fastened securely to the liner segment, thus permitting the liner to be pulled through the existing pipe and into place. Figure 10.5 is a schematic of an installation in which the liner is being pulled through the existing pipe from the left side toward a manhole at the right. This procedure requires some means, such as a pulling head, to attach the cable to the leading edge of the liner. The pulling head may be as simple or as sophisticated as the particular project demands or as economics may allow. The pulling head may be fabricated of steel and fastened to the liner with bolts. They are spaced evenly around the circumference of the profile so that a uniform pulling force is distributed around the pipe wall. This type of fabricated pulling head will usually have a conical shape, aiding the liner as it glides over minor irregularities or through slightly offset joints in the old pipe system. The mechanical pulling head does not normally
22 Pipeline Rehabilitation - 18 extend beyond the profile of the polyethylene liner and is usually perforated to accommodate flow as quickly as possible, once the liner is inserted inside the old system. Three practical styles of typical mechanical pulling heads are shown in Figure 7. A less sophisticated but cost-effective approach is to fabricate a pulling head out of a few extra feet of liner that has been fused onto a single pipe pull. Cut evenly spaced wedges into the leading edge of the extra liner footage, making it look like the end of a banana being peeled. Collapse the ends toward the center and fasten them together with bolts or all-thread rods. Then attach the cable to secondary bolts that extend across the collapsed cross section. This simple technique is illustrated in Figure 8. As the polyethylene liner is pulled into the pipeline, a slight elongation of the liner may occur. A 24-hour relaxation period will allow the liner to return to its original dimensions. After the relaxation period, the field fabricated pulling head may be cut off. Figure 10.7 Fabricated Mechanical Pulling Heads Figure 8 Field-Fabricated Pulling Heads
23 The pull technique permits a smooth and relatively quick placement of the liner within an old pipe system. However, this method may not be entirely satisfactory when attempting to install a large-diameter heavy-walled polyethylene pipe. This Is especially true when the load requires an unusually large downstream winch. A similar problem may exist as longer and larger pulls are attempted so that a heavier pulling cable is required. When the pull technique is not practical, consider the advantages that may be offered by the push technique. The Push Technique The push method of insertion renewal has become increasingly popular as larger and longer pipeline rehabilitations are attempted. This procedure circumvents the equipment limitations often encountered when trying to pull a large diameter polyethylene liner into place. When used for gasketed pipe, the push method allows insertion without disruption of flow. The push technique for solid wall polyethylene pipe is illustrated schematically in Figure This procedure uses a choker strap, placed around the liner at a workable distance from the access point. A track-hoe, back-hoe, or other piece of mechanical equipment pulls the choker to push the liner through the existing pipe. With each stroke of the back-hoe, the choker grips the pipe and pushes the leading edge of the liner further into the deteriorated pipe. At the end of each stroke, the choker must be moved back on the liner, usually by hand. Having a front-end loader or bulldozer simultaneously push on the trailing end of the liner segment may assist the whole process. Gasketed polyethylene pipe typically uses the push technique to effct the pipe seal as well as the position the liner. The push technique for gasketed pipe is shown schematically in Figure 10. This process inserts the liner without the necessity for having a high capacity winch and cable arrangement. The Combination Technique Pipeline Rehabilitation - 19 The push and pull techniques can sometimes be combined to provide the most efficient installation method. Typically, this arrangement can be used when attempting the placement of unusually heavy walled or long lengths of polyethylene liner.
24 Pipeline Rehabilitation - 20 Flow Control Figure 9 Push Technique for Solid Wall Polyethylene Pipe For most insertion renewal projects it is not necessary to eliminate the entire flow stream within the existing pipe structure. Actually, some amount of flow can assist positioning of the liner by providing a lubricant along the liner length as it moves through the deteriorated pipe structure. However, an excessive flow can inhibit the insertion process. Likewise, the disruption of a flow stream in excess of 50% of pipe capacity should be avoided. The insertion procedure should be timed to take advantage of cyclic periods of low flow that occur during the operation of most gravity piping systems. During the insertion of the liner often a period of 30 minutes or less the annular space will probably carry sufficient flow to maintain a safe level in the operating sections of the system being rehabilitated. Flow can then be diverted into the liner upon final positioning of the liner. During periods of extensive flow blockage, the upstream piping system can be monitored to avoid unexpected flooding of drainage areas. Consider establishing a flow control procedure for those gravity applications in which the depth of flow exceeds 50%. The flow may be controlled by judicious operation of pump stations, plugging or blocking the flow, or bypass pumping of the flow stream. Pressurized piping systems will require judicious operation of pump stations during the liner installation. Make Service and Lateral Connections After the recommended 24-hour relaxation period following the insertion of the polyethylene liner, each Individual service connection and lateral can be added to the new system. One common method of making these connections involves the use of a wraparound service saddle. The saddle is placed over a hole that has been cut through the liner and the entire saddle and gasket assembly is then fastened into place with stainless steel bands. Additional joint integrity can be obtained by extrusion welding of the
25 Pipeline Rehabilitation - 21 lap joint created between the saddle base and the liner. The service lateral can then be connected Into the saddle, using a readily available flexible coupling (10). Once the lateral has been connected, following standard direct burial procedures can stabilize the entire area. Figure 10 Terminal and Transition connections for Pressurized Insertion Renewal Projects For pressure applications, lateral connections can be made using sidewall fusion of branch saddles onto the liner. As an alternate, a molded or fabricated tee may be fused or flanged into the liner at the point where the lateral connection Is required (see Figures 3 and 4). Make Terminal Connections and Stabilize the Annular Space Where Required Making the terminal connections of the liner is the final step in the insertion renewal procedure. Pressurized pipe systems will require connection of the liner to the various system appurtenances. These terminal connections can be made readily through the use of pressure-rated polyethylene fittings and flanges with fusion technology. Several common types of pressurized terminal connections are illustrated in Figure All of these require stabilization of the transition region to prevent point loading of the liner. Gravity lines do not typically require pressure-capable connections to the other system appurtenances. In these situations, the annular space will be sealed to prevent migration of ground water along the annulus and, ultimately, infiltration through the manhole or headwall connection. The typical method for making this type of connection is shown in Figure 1. Sealing materials should be placed by gravity flow methods so that the liner s buckling resistance is not exceeded during installation. Consideration should be given to the specific load bearing characteristics of the fill material in light of the anticipated loading of the liner.
26 Pipeline Rehabilitation - 22 Other Rehabilitation Methods Rehabilitation by sliplining is only one (but probably the most popular) of a number of methods using polyethylene or PVC pipe currently available for pipeline rehabilitation. As mentioned in the Introduction to this chapter, sliplining has been in use for over thirty years. Several other methods of rehabilitation that use polyethylene or PVC piping will be described briefly here. Note that, due to rapidly advancing technology, any listing will be incomplete very quickly. Also note that any reference to proprietary products or processes is made only as required to explain a particular methodology. VlP-Liner This uses segments of polyethylene pipe which are jacked into position from existing manholes. Joints are flush with O-ring gaskets. It can be grouted, if required. Duratron System Very similar to the VlP-Liner system; however, the joints are threaded. It may also be grouted, if required. Swagelining A continuous length of polyethylene pipe passes through a machine where it is heated. It then passes through a heated die which reduces the outside diameter (OD). Insertion into the original pipeline then follows through an insertion pit. The liner pipe expands (pressurization may be used to speed the process) until the OD of the liner matches the inside diameter (ID) of the original pipeline. Grouting is not required. Rolldown This system is very similar to swagelining except size reduction is by mechanical means and expansion is through pressurization. Titeliner A system which is very similar to the swagelining and rolldown systems. U-Liner Continuous lengths of polyethylene pipe are heated, mechanically folded into a U shape, and then coiled for shipment. Insertion is made through existing manholes. Expansion is by means of a patented heat/pressure procedure which utilizes steam. The pipe is made, according to the manufacturer, to conform to the ID of the original pipeline; therefore grouting is not required. NuPipe The is somewhat similar to the U-Liner system. However, it uses PVC pipe and expansion is by means of a Rounding Device and heated air.
27 Danby Process Profiled PVC strips are spirally wound through existing manholes to form a liner. It requires grouting. Rib-Loc This is very similar to the Danby Process. It uses a tape to maintain a reduced OD until insertion is completed. Expandit, PIM, and Expand-A-Line Pipeline Rehabilitation - 23 A pipe-bursting machine destroys the existing pipeline and pushes the debris into the surrounding backfill material. Polyethylene pipe is then inserted into the resulting cavity. The new pipeline may be larger than the one which Is destroyed. Pit evacuation Is required.
28 Pipeline Rehabilitation - 24 Summary This chapter has provided an introductory discussion on the rehabilitation of a deteriorated pipe structure by insertion renewal with continuous lengths of polyethylene pipe. It also includes a brief description of other rehabilitation methods that utilize polyethylene and PVC piping. The sliplining or insertion renewal procedure is a cost-effective means by which a new pipeline is obtained with a minimum interference with surface traffic. An inherent benefit of the technology is the installation of a new, structurally sound, leak-free piping system with improved flow characteristics. The resulting pipe structure allows for a flow capacity at or near that of the deteriorating pipe system while eliminating the potential for infiltration or exfiltration. And the best feature of all is the vastly improved longevity of the plastic pipe, especially compared to the decay normally associated with piping materials of the past. The continuing deterioration of this country s infrastructure necessitates innovative solutions to persistent and costly problems. Insertion renewal, or sliplining, is a cost-effective means by which one aspect of the infrastructure dilemma may be corrected without the expense and long-term service disruption associated with pipeline replacement.
29 References 1. ASTM D2321, Standard Practices for Underground Installation of Flexible Thermoplastic Sewer Pipe, Annual book of Standards, American Society for Testing and Materials (ASTM). 2. ASTM D2774, Standard Practices for Underground Installation of Thermoplastic Pressure Piping, Annual book of Standards, American Society for Testing and Materials (ASTM). 3. ASTM D3350, Standard Specification for Polyethylene Pipe and Fittings Materials, Annual book of Standards, American Society for Testing and Materials (ASTM), ASTM F585, Standard Practices for Insertion of Flexible Polyethylene Pipe into Existing Sewers, Annual book of Standards, American Society for Testing and Materials (ASTM). 5. ASTM F714, Standard Specification for Polyethylene Pipe (SDR-PR) Based Outside Diameter, Annual book of Standards, American Society for Testing and Materials (ASTM). 6. ASTM F894, Standard Specification for Polyethylene (PE) Large Diameter Profile Wall Sewer and Drain Pipe, Annual book of Standards, American Society for Testing and Materials (ASTM). 7. Diskin, Joe, Plastic Pipe Insertion, (NF) Pipeline and Gas Journal, May Driscopipe System Design, A Publication of Phillips Driscopipe, Inc., January Elastizell Product Catalog, The Elastizell Advantage, A Publication of the Plastizell Corporation of America, Existing Sewer Evaluation and Rehabilitation, American Society of Civil Engineers and the Water Environment Federation, New York, NY, Fernco Product Catalog 185, a Publication of Ferncom Inc., January Gross, Sid, Plastic Pipe in Gas Distribution, Twenty- Five Years of Achievement, Gas Industries, May Gross, Sid, Choosing Between Liners for Sewer Rehabilitation, Public Works, September Handbook of PVC Pipe, a Publication of the Uni-Bell Plastic Pipe Association, Dallas, TX, February Pipeline Rehabilitation - 25
30 Pipeline Rehabilitation Howard, A. E. and C. E. Selander, Laboratory Load Tests on Buried Thermosetting, Thermoplastic and Steel Pipe, Journal AWWA, September, Jenkins, C. F. and A. E. Kroll, External Hydrostatic Loading of Polyethylene Pipe, Proceedings of the International Conference on Underground Plastic Pipe, sponsored by the Pipeline Division of the American Society of Civil Engineers, March 30 to April 1, Lake, Donald W., Jr., Innovative Rehabilitation of Embankment Conduits, a technical paper present to the 1984 winter meeting of the American Society of Agricultural Engineers, December, Plastics Pipe Institute, Technical Report TR-31, Underground Installation of Polyolefin Piping, September Polyolefin Piping, a Publication of the Plastics Pipe Institute, May Recommended Specifications for Sewer Connection Rehabilitation, a Publication of the National Society of Service Companies, January, Renewing Sewers with Polyolefin Pipe, a Publication of the Plastics Pipe Institute, June Sandstrum, S. D., Sewer Rehabilitation with Polyethylene Pipe, a technical paper presented at the Second Annual Sewer Maintenance and Rehabilitation Conference, Center for Local Government Technology, Oklahoma State University, August, Schock, David B., New Pipes Do Job Better, Mount Pleasant Morning Sun, August 6, Spangler, M.G., The Structural Design of Flexible Pipe Culverts, Bulletin 153, lowa State Engineering Experiment Station, Spiral Engineered Systems, a Publication of Spirolite, a Subsidiary of the Chevron Corporation. 26. Watkins, R. K., Buried Structures, Foundation Engineering Handbook, Utah State University, Watkins, R. K., Principles of Structural Performance of Buffed Pipes, Utah State University, 1977.
31 Acknowledgements This chapter has been produced by an industry task force of authors and reviewers, working under the direction of Steve Sandstrum, Solvay Polymers, Inc., chief editor of the PPI Handbook of Polyethylene Piping. Other members of this task force include: William Adams, PLEXCO C. B. Treuil, Solvay Polymers, Inc. Peter Blackett, Hoechst Celanese Corp. Stephan Boros, Solvay Polymers, Inc. Norman Bryan, Jr., Plastics Pipe Institute David Dutton, McElroy Manufacturing, Inc. Donald Duvall, L. J. Broutman & Associates Ltd. Ray Glossop, T. D. Williamson, Inc. James Inhofe, Central Plastics Co. James Leech, Union Carbide Chemicals and Plastics Co., Inc. Stanley Mruk, Plastics Pipe Institute William Nicol, Phillips Driscopipe, Inc. Paul Peterson, Hoechst Celanese Corp. Larry Petroff, PLEXCO Will Bezner, Poly Pipe Industries, Inc. Roy Wood, Phillips Driscopipe, Inc. Pipeline Rehabilitation - 27
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
INSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe
The Most Advanced Name in Drainage Systems Sanitary Sewer Pipe SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling,
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING
TRENCHLESS TECHNOLOGIES RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION CLOSE FIT THERMOPLASTIC LINING NEW VERSION AUGUST 2005 1. OVERVIEW The use of liners that are deliberately deformed
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General
General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling
SECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
CHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Royal Seal Gasketed Sewer Pipe
Royal Seal Gasketed Sewer Pipe Royal Seal Gasketed Sewer Pipe Royal Seal gasketed sewer pipe with our specially designed Double Seal Locked-In (DSLI ) gasket is an extremely durable pipe with a leak proof
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE
1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
Flowtite Jacking Pipe
U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe
Pipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
IS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water
MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org HDPE
725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
General Guidelines for Butt, Saddle, and Socket Fusion of Unlike Polyethylene Pipes and Fittings TN-13/2007
General Guidelines for Butt, Saddle, and Socket Fusion of Unlike Polyethylene Pipes and Fittings TN-13/2007 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.
SECTION 3000 - SANITARY SEWERS 3001 SCOPE. This section applies to sanitary sewer construction and shall consist of furnishing all labor, materials, and equipment for the complete installation of sewers
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
SECTION 603 SANITARY SEWER FORCE MAINS
SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
General Guidelines for Repairing Buried PE Potable Water Pressure Pipes
515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes
PIPE REHABILITATION Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes About Us An HDPE after mechanical insertion into an egg-shaped brick work sewer sized 1400 x 2100 mm (or 56
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
02780 LINER FOR SEWER REHABILITATION
Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
Waste Collection Systems
Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
Installation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
08003-1 WATER SERVICE 2
08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS
REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS by Harald W. Van Aller, PE Geotechnical Engineer, Maryland Dam Safety
60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING
60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed
LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE
Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting
Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting Setting the Industry Standard for the Rehabilitation of Underground Utilities The International Pipe Bursting Association
SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.
SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
Table of Contents 2.1 INTRODUCTION...2-1 2.2 MATERIALS IN USE...2-1
Table of Contents PIPING Page 2.1 INTRODUCTION...2-1 2.2 MATERIALS IN USE...2-1 2.3 ABOVE OR BELOW GRADE INSTALLATION...2-3 2.3.1 Buried Pipes...2-3 2.3.2 Utilidor Construction...2-4 2.4 PIPE MATERIAL
City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING
1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS
1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
Rehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections