Planning a Soundproof Performance Building Within Budget. Education Session #5, Track 3 October 06, 2015, 11:15 AM 12:15 PM
|
|
- Blake Bridges
- 8 years ago
- Views:
Transcription
1 Planning a Soundproof Performance Building Within Budget Education Session #5, Track 3 October 06, 2015, 11:15 AM 12:15 PM
2 Presenters Eric Norman VP of Finance & Planning The Boston Conservatory Mimi Love Principal Utile Jeffrey Fullerton Acoustics Consultant Acentech Randy Catlin Project Executive Shawmut Construction 2
3 Learning Objectives 1. Transform an urban site into a new performing arts facility and develop a process to select options for mitigation. 2. Interact and coordinate with high-profile neighboring properties. 3. Develop a site to create a new facility while reserving sufficient space for future development of another facility on the same parcel. 4. Meet budget constraints while balancing the requirements of an acoustically soundproof program. 3
4 4
5 About the Owner The Boston Conservatory (TBC) Founded in 1867 Three performing arts disciplines: music, dance and theater Enrolls over 800 students: undergraduate and graduate degrees Offers over 600 performances annually by students, faculty and guest artists Owns less than 200,000 SF of property TBC used low interest rate market to refinance and acquire land near Fenway 5
6 Project Overview TBC competes both nationally and regionally for students and faculty Located in Fenway/Kenmore Area; Boston s Back Bay Arts/Music in Boston: Berklee, Emerson, Mass College of Arts, School of Museum of Fine Arts, New England Conservatory, Boston University, Boston Symphony Facilities, from dormitories to dance studios, are critical Project site 6
7 Merger Discussions with Berklee Announced MOU agreement in June 2015 to explore combination Joint strategic planning Joint academic program development Joint campus master planning 7
8 Campus Master Plan 132 Ipswich Music, Dance, Theater 138 Ipswich Student Center and Residence Hall 8 The Fenway Front Door, Music & Theater; Performances The Fenway Student Center & Liberal Arts 31 Hemenway Theater & Dance; Performances The Boston Conservatory Campus Master Plan can be fully implemented by
9 138 Ipswich Street Residence Hall 9
10 138 Ipswich Street 10
11 Project Parameters and Decisions Define Parameters Financial constraints Bridge loan, capital campaign and operating reserves Building and soft costs were capped at $15M (land purchased at $5M) Project had to be under 20,000 SF Half the lot had to be saved for future development Visibility was critical Completion date was critical Hire contractor with acoustical experience Make Decisions Which half of lot to build on? Design for replication of lost spaces Tradeoffs: building aesthetics vs. functionality Dance studios and orchestral performance space in one building Fundraising, visibility and acoustical needs created a high cost building 11
12 The Site Challenges Required demo of existing warehouse Abatement issues Soil concerns Party wall with Red Sox building Fenway Park within 250 yards High traffic/parking area during baseball season, plus concerts Isolated, dark in winter Mass Pike Train/Commuter Rail Neighbors: residential, commercial, restaurants and Red Sox 12
13 Site Options 13
14 Massing Design Parameters Article 80 small project review Future development Strong visibility Represent program/activity 14
15 Building Program Large Orchestra Rehearsal Space Practice Rooms Offices & Support Space Instrument Lockers Multi-purpose Studios Teaching Studios Social Space Vertical Circulation Mechanical Rooms 15
16 Plans Stacking Considerations Large Assembly Space on L1 Height Requirements o ORH: 25 minimum o Dance Studios 15 minimum Dance Studio over ORH: o efficient for stacking o Less than ideal for acoustics L3 L2 L1 16
17 Sections Stacking Considerations Overall Building Height: 54 feet Center zone for mechanical distribution Pre-fab Practice Rooms Box within box Building Height 54 feet Multi-purpose Studios Floor to floor = 17.5 feet Clear Height = 15 feet Dance Studios Floor to floor = 17.5 feet Clear Height = 15 feet Teaching Studios Floor to floor = 15 feet Clear Height = 12 feet ORH Floor to floor = 30 feet Clear Height = 25 feet 17
18 Acoustic Design 18
19 Acoustical Solutions Design for Exterior Noise Control Commuter rail and buses produce substantial low frequency noise (RUMBLE!) Rehearsal/Performance Hall most critical Façade and interior shell = Mass + Separation Box-in-a-box Construction Mass Mass is needed to reduce the low frequency noise General façade: Masonry, precast, concrete, etc. Interior shell: 4 layers of 5/8-inch GWB Separation Separated framing for building façade (masonry) and building interior (GWB x 4) with more than one foot of insulation and airspace, necessary for isolation 19
20 Acoustical Solutions Design for Exterior Noise Control Mass Exterior windows: Base building windows for thermal requirements Interior windows: ½-inch laminated glass Separation Exterior windows façade framing Interior windows stud framing for GWB approx. 8-inch airspace 20
21 Acoustical Solutions Design for Exterior Noise Control Teaching Studios and Multi-Purpose Spaces Windows were significantly larger, but not upgraded (only meeting thermal requirements) Window systems allow for future upgrades with interior lights 21
22 Acoustical Solutions Incorporate Interior Isolation Box-within-a-Box constructions Use Modular Practice Rooms Provides exceptional acoustical isolation Addresses details for electrical, lighting and HVAC integration (simple hookups) Allows the building shell to remain fairly raw and unfinished (lower cost) Faster assembly/erection (less time & effort) 22
23 Acoustical Solutions Design for Interior Isolation Box-within-a-Box constructions Dance Studio over Rehearsal Room Stiffen the structure - use rhythmic dancing criteria for structural design Float concrete slab for dance studios (with dance floor overtop) Stacked Teaching Studios & Multipurpose Rooms Float wood floors for teaching studios (lower cost) Isolated GWB ceilings below 23
24 Hire Experience/CM Selection Seek a team that has experience with acoustically challenging projects Isabella Stewart Gardener Museum Boston, MA Brown University Granoff Center Providence, RI 24
25 Construction Issues Schedule for Context Schedule pressure created by foundation issues City of Boston Regulatory Requirements ISD, BFD, BTD Red Sox Game Schedule The World Series Impact Weather/Winter Conditions 25
26 Construction Issues Fit-Out Process Traditional fit-out sequence allows early phases of MEP distribution to proceed full weather-tight condition Acoustic details for Conservatory project call for GWB above mechanical distribution Selected Details Floor & Walls 26
27 Construction Issues/Selected Details Ceiling, Floor & Walls 27
28 Construction Issues/Schedule Sequence Traditional Sequence Task Name JAN FEB MAR APR MAY JUN Substantial Weather Tight Substantial Weather Tight 3/30 Run Mains & Risers Run Mains & Risers 3/2 3/27 Interior Framing Interior Framing 3/16 4/10 In-Wall & Overhead Distribution In-Wall & Overhead Distribution 3/30 4/24 Close Walls Close Walls 4/27 5/15 Walls Closed, Ready for Finishes Acoustic Sequence Walls Closed, Ready for Finishes 5/15 Task Name JAN FEB MAR APR MAY JUN Substantial Weather Tight Substantial Weather Tight 3/30 Framing & GWB above M/E/P Mains Framing & GWB above M/E/P Mains 3/30 4/17 Run Mains & Risers Run Mains & Risers 4/13 5/8 Interior Framing Interior Framing 4/27 5/22 In-Wall & Overhead Distribution In-Wall & Overhead Distribution 5/11 6/5 Close Walls Walls Closed, Ready for Finishes 6/8 6/26 Walls Closed, Ready for Finishes 6/26 28
29 Construction Issues Components Practice Rooms Schedule impact Preconstruction lead times vs. Install duration 6 week shop drawing process, 12 week fabrication and delivery 2-3 weeks per area to install (slab depressions required) 29
30 Construction Issues Quality Assurance Use of LEAN process Result: less material on site at a time, less potential for damage / loss Close coordination with Acentech throughout construction Regular site inspections through installation of critical acoustic components Framing and rough-in: isolators and hangers Finishes Practice rooms, acoustic paneling, door hardware 30
31 And Now Performing Piano recitals Percussion recitals Master classes Guest artist residencies 31
32 Thank You! Your questions are welcome. 32
Retrofit structural insulated panels (SIPs) increase sound transmission loss of existing single family houses impacted by highway noise
Baltimore, Maryland NOISE-CON 2010 2010 April 19-21 Retrofit structural insulated panels (SIPs) increase sound transmission loss of existing single family houses impacted by highway noise Scott Harvey
More informationIECC Compliance Guide for Homes in Virginia
IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,
More informationStrategies for Success Advising Guide:
MIDDLESEX COMMUNITY COLLEGE Strategies for Success Advising Guide: Music Major As a student at Middlesex, you can earn either the Associate in Arts Liberal Arts and Science: Fine and Performing Arts, Music
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationBUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
More informationOccupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
More informationCOMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R
Legislation passed by the 82 nd legislature has modified the Texas Engineering Practice Act and the Texas Architect Practice Act. In order to give the public a clearer understanding of these changes, the
More informationEAST TENNESSEE STATE UNIVERSITY FINE ARTS CLASSROOM BUILDING SBC NO. 166/005-08-2013 PROGRAM CONFIRMATION AND REFINEMENT SESSION NO.
EAST TENNESSEE STATE UNIVERSITY FINE ARTS CLASSROOM BUILDING SBC NO. 166/005-08-2013 PROGRAM CONFIRMATION AND REFINEMENT SESSION NO. ONE NOTES Program work sessions were held at ETSU on Monday, August
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More informationCommercial Building Valuation Report
INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location
More informationThe work has continued on final Phase 4 and is nearing completion.
Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now
More informationCAREER LYNX Constructing Careers in Architecture
Students will understand the job description, skills, and education of various Architecture and Planning related jobs. Students will use the newspaper to make inferences about the role of various professionals
More informationDesign Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
More informationFor the non real estate professional
For the non real estate professional An introductory case study of the building of a Transit Oriented Development Views from For Profit vs. Non-Profit Developers For Profit Developer Non-Profit Developer
More informationEstimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
More informationNew Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
More informationMass Loaded Vinyl A review of the performance and cost in acoustical applications
Mass Loaded Vinyl A review of the performance and cost in acoustical applications Overview Driven by building codes and occupants expectations, many rooms in commercial and residential construction require
More informationRequired: Fundamentals of Building Construction: Materials and Methods, 5th EditionEdward Allen, Joseph Iano, ISBN: 0-470-07468-x, 2009
ARCT 231: Commercial Methods and Materials (2 Credits) Course Description This course is a continuation of study for construction methods, terminology, and use of construction materials with an emphasis
More informationCity of St. Charles Basement Finish or Remodel
City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct
More informationHow To Design A Post Tensioned Deck For A Building
SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University
More informationWOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through
More informationSPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
More informationSaint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
More informationName of course: Residential Construction Site Management (RCSM) Level 1
Name of course: Residential Construction Site Management (RCSM) Level 1 Core (required courses) or Optional (elective course): Required Delivery Method: This is an online course only with no classroom
More informationAnalysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
More informationFor Lease or Sale. Landmark Campus. Route 2 Commerce Park 100 Simplex Dr Westminster, MA. 474,105 SF for Lease (easily divisible) World-class Campus
For Lease or Sale Route 2 Commerce Park 100 Simplex Dr Westminster, MA World-class Campus on 95 acres Landmark Campus 474,105 SF for Lease (easily divisible) As the exclusive listing agent, The Stubblebine
More informationThe Role of Acoustics in Curtain Wall Design:
The Role of Acoustics in Curtain Wall Design: Strategies to Achieve Desired Performance Criteria April 22, 2015 John LoVerde, Principal VENEKLASEN ASSOCIATES, INC. Goals Basics of Acoustics Ratings in
More informationRenovating Your Basement
building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:
More information2009 IECC Update. Scope. Content. International Energy Conservation Code
2009 IECC Update International Energy Conservation Code Scope The code applies to both residential and commercial buildings. In the code, the United States is divided into eight climate zones which are
More informationChapter 2: Foundations
Chapter 2: Foundations Crawlspace [V502.1.2] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup under the floor.
More informationCity of Hill Country Village Residential Construction/Development Packet
City of Hill Country Village Residential Construction/Development Packet City Hall has developed this Construction/Development Packet to consolidate instructions, the permits required, and zoning rules
More informationOnce you see it, you get it! A quick overview of projects..
Once you see it, you get it! A quick overview of projects.. Bank of Arizona, Scottsdale We re used to building in 22 months; Modular Technology built our 3 branches in just 5 months! Their quality is superior
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPackaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
More informationPlanning & Scheduling CSTM 462. Managing a project through time and resources. The need for proper planning and scheduling.
Planning & Scheduling CSTM 462 Managing a project through time and resources. The need for proper planning and scheduling. Project Management Objectives 1. Eliminate or reduce project RISK. 2. Obtain a
More informationGYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
More informationMarketing Coordinator Bootcamp Session 2: ABCs of AEC
Marketing Coordinator Bootcamp Session 2: ABCs of AEC Debbie Chen, LEED AP, APMP CF Proposal Development Director Louis Berger hchen@louisberger.com Matthew Daw, PE, LEED AP Principal Keast & Hood mdaw@keasthood.com
More informationTexas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)
Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG) Subrecipient Name: Homeowner Name: Home Address: Homeowner Signature: Building Contractor Name and Address: Work
More information2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
More informationFiberglas, Exterior Wall Thermal Insulation
PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
More information5703 South Sossaman Road Aviation Center
5703 South Sossaman Road Aviation Center has an available Class A aviation center with a 10,000 s.f. hangar. This facility includes 10,000 s.f. of space for offices, avionics repair, or other uses. It
More informationBuilding Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
More informationApplication for a Window Replacement Master Plan Curtis B. Wayne, Architect Ken Lustbader, Preservation Consultant
Application for a Window Replacement Master Plan Curtis B. Wayne, Architect Ken Lustbader, Preservation Consultant 37 West 12 th Street Between 5 th and 6 th Avenues Architectural History Architectural
More information17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
More information24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by
24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL ENERGY CONSERVATION CODE (1) The Department of Labor and Industry adopts and incorporates by reference the International Code Council's International
More informationScheme 3: Rehabilitation of Heritage Building and Redevelopment
Scheme 3: Rehabilitation of Heritage Building and Redevelopment 135 Keefer Street Constructed in 1910 for the Vancouver Gas Company, the building and surrounding site was used primarily by blacksmiths
More informationMILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014
MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from
More informationHOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT
HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT During the last century, concern about the environment increased, as issues such as global warming and the Greenhouse Effect convinced us that the
More informationARTS. presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES
DETROIT SCHOOL OF ARTS presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES of DSA OVERVIEW ONE TEACHER S VISION DR. DENISE DAVIS-COTTON RECOGNIZED MILKEN EDUCATOR Picture of Old DSA FOUNDED IN 1992 RECEIVED
More informationCore Requirement 2.11.2
Core Requirement 2.11.2 The institution has adequate physical resources to support the mission of the Institution and the scope of its programs and services. Impact Statement Baton Rouge Community College
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More informationIntegrated Solar Radiant Systems
Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant
More informationCommercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
More informationResidential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks
More informationSingle Family Residential Basement Finish
How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete
More informationArchitectural Acoustics
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Architectural Acoustics Christopher Jaffe, Ph.D., Hon. AIA, and Russell A. Cooper Architectural acoustical services encompass
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More information29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York
Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE
More informationCARMEL PLACE, NEW YORK, NY
CARMEL PLACE, NEW YORK, NY Carmel Place (formerly known as MY MICRO NY), winner of the adapt NYC competition, optimizes modular construction to provide the city with housing solutions for the expanding
More informationSECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
More informationSOET 352: Advanced REVIT and Building Information Modeling (BIM) Management
STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE SOET 352: Advanced REVIT and Building Information Modeling (BIM) Management Prepared By: Robert F. Burnett CANINO SCHOOL
More informationPreparation for 2015 Residential Code Changes Discussion with Local Builders and Designers
City of Duluth Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers Thank you for taking the time to join us today. We know you are busy and your time is valuable.
More informationVERTICAL DESIGN OPTImAL ACOUSTICS
VERTICAL DESIGN OPTImAL ACOUSTICS 3 8 EnDLESS lines products possibilities Discover the family of products, vertically folding operable walls that unite design, performance, flexibility and acoustics.
More information48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
More informationREQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
More informationSubstantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information
SUBSTANTIAL IMPROVEMENT/DAMAGE WORKSHEET (FEMA 50% RULE) South County: Development Services North County: Development Services 4000 Tamiami Trail S. Room 122 1001 Sarasota Center Blvd Venice, Florida 34293-5076
More informationTAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed
More informationDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
More informationSchematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
More informationTechPractices: Home Front Homes:
TechPractices: Home Front Homes: PATH's Technologies in Practice are large scale housing projects throughout the U.S. where innovative technologies are being installed and used. Information is presented
More informationCHARLOTTE COUNTY Community Development Department
CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50
More informationConstruction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationCELEBRATE. The Music Activities Center: Honoring the Sounds of Aggieland
CELEBRATE S P I R I T A N D M I N D The Music Activities Center: Honoring the Sounds of Aggieland A new Music Activities Center: The encore we ve been waiting for. On a typical weekday, the E.V. Adams
More informationDENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION 17650 SECURITY SYSTEMS
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Inspections and observations by the Owner do not relieve the A/E of contract responsibilities. B. Chain of command 1. The DPS Project Manager is
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More information2014-2015 Academic Year
City of Boston Student Housing Trends: 2014-2015 Academic Year Boston s thriving academic and educational institutions are a cornerstone of the economic and cultural vibrancy of our region; however, with
More information2008-2009 Cost Comparisons for Common Commercial Wall Systems
An Independent Study LA MS KY TN AL GA SC NC FL 2008-2009 Cost Comparisons for Common Commercial Systems CAPITAL BUILDING CONSULTANTS PROFESSIONAL CONSTRUCTION ESTIMATORS 2008 2009 INDEPENDENT COST COMPARISONS
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationSafeway 691 Berkeley. 1444 Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:
Safeway 691 Berkeley Preliminary Draft Environmental Survey for Renovation Store Data: Total Area: 26,327 Sq. Ft. at main level ACM 12x12: 17,600 Sq. Ft. Approx. Est. Vinyl Sheet: NA Other: See Table 1444
More informationAngelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
More informationCASE STUDY: Washington D.C. School Overview. Original Site. Current Site. Construction Cost 1.5.31
1.5.31 School Overview The School for Educational Evolution and Development (SEED) Charter School is located in Washington, D.C. and is best known as the nation s first inner-city public charter boarding
More informationShort Interval Production Schedule Research
Short Interval Production Schedule Research Background Nationals Park has multiple highly repeatable tasks that can be scheduled as efficiently as possible by the development of a Short Interval Production
More informationSpecial Use Commercial Properties
Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding
More informationMIDDLE SCHOOL INSTRUCTIONAL FORM. 1. To understand that music is and always has been an integral part of the human experience.
MIDDLE SCHOOL INSTRUCTIONAL FORM Area: Music Kathleen Sanz (Chairman) I. PROGRAM PHILOSOPHY See District Philosophy II. PROGRAM GOALS 1. To understand that music is and always has been an integral part
More informationSECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
More informationSingle Family Residential Building Permit Questions & Answers
Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday
More information52 Ways To Save. 3. Ask for feedback. Ask about the pros and cons of different elements of your design and how each will affect your budget.
52 Ways To Save As you may know, building a new house can get expensive if you are unaware of ways to keep your costs down. First-time home buyers, along with high-end luxury buyers, all want to know how
More informationEnvelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
More informationD Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
More informationRiverside Community College District / Renaissance Block
Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary
More informationElectrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
More informationConstitution. Berklee Audio Engineering Society Student Chapter
Constitution Berklee Audio Engineering Society Student Chapter ARTICLE I: Section 1: The name of this group shall be The Berklee Audio Engineering Society Student Chapter / Berklee AES Student Chapter
More informationChapter X. Music Building Acoustics
Chapter X Music Building Acoustics Charles Bonner, Acoustician, President BAi, LLC Introduction Typically in music buildings, faculty and administrators (to say nothing of students) only experience a building
More informationManaging Trade Contractors for High Performance Homes. Carl Seville
Managing Trade Contractors for High Performance Homes Carl Seville Overview Implementing Management Systems Why How Steps Troubleshooting Successes High Performance Buildings Attention to detail Management
More informationBuilding Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance
Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements
More information