Aurora Mall. Aurora (Denver), Colorado



Similar documents
TENANT DESIGN MANUAL UPDATED JULY 2015

NMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet

7014 E. Camelback Road, Scottsdale, AZ 85251

city of edmonds development information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Building Permit Application

City of Elk River BASEMENT Office Use Only

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

FIRE ALARM SYSTEM CHECKLIST For Addressable Systems PRIOR TO INSPECTION

City of Oviedo Commercial Shell Building Permit Application Guidelines

SECTION MORTUARY REFRIGERATORS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Arapahoe County Residential Water Heater Installation and Inspection Guide

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Element D Services Plumbing

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Element D Services Heating, Ventilating, and Air Conditioning

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Monday, 17 June, 13

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

HVAC Systems in Schools & Commercial Buildings and Radon

APC APPLICATION NOTE #112

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

BUILDING SAFETY UNIT

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

Automatic fire-extinguishing systems for commercial cooking

COMPREHENSIVE PROPERTY INSPECTIONS

Air Conditioning Contractors of America

Gramercy Place Condo Association, Inc.

HVAC Checklist - Long Form

READ AND SAVE THESE INSTRUCTIONS

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

SWF Home Inspections

Name Of Occupancy Date. Yes No Describe

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

Condensing Boiler Efficiency

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

bout your apartment SOLVING ODOUR TRANSFER PROBLEMS IN YOUR APARTMENT Understanding Air Movement in Your Building

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

CITY OF LOS ANGELES 2011 PLUMBING/MECHANICAL PLAN CHECK LIST

General Fire Code Requirements Within Commercial Tenant Spaces

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

INVENTORY AND CONDITION FORM CONCERNING THE PROPERTY AT

FIVE GUYS BURGERS and FRIES

Current as of 11/10/08 1 of 1

Cooktop Low-Profile Ventilation Hoods

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

ENHANCED LABORATORY HVAC SYSTEM

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Wentz Concert Hall and Fine Arts Center 171 E. Chicago Avenue Naperville, IL Existing Electrical Systems Will Lesieutre

Bold items are particular to the City of Euless

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

PLAN SUBMITTAL INFORMATION

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Glossary of HVAC Terms

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Crawford Inspection Services C.C.B. #

Home Inspection Report

Print Shop/Mail Room

I NI NP R Inspected Items

FIRE DETECTION AND ALARM

PLAN REVIEW GUIDE FOR FIRE ALARM

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Factors in Considering a Shopping Centre Location

Element D Services Plumbing

PULASKI AND DUBLIN MIDDLE SCHOOLS

EXHIBIT A SCOPE OF WORK

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

Integrating Kitchen Exhaust Systems with Building HVAC

THE APPLICATION OF OZONE FOR AIR TREATMENT: CASE STUDY OF A BINGO HALL HVAC SYSTEM

SECTION FIRE ALARM AND DETECTION SYSTEM

HVAC Systems and Indoor Air Quality. Douglas K. Spratt, M.Sc., P.Eng.

Inspecton Report. Property Address:

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Glossary of Heating, Ventilation and Air Conditioning Terms

PROPERTY INSPECTION REPORT

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Applications for building permits will not be reviewed until all of the required information has been submitted.

MY HOME IN A HOUSING BLOCK A GUIDE FOR RESIDENTS

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

How to report a repair

Printed Monday, August 27, 2007 Inspected By: Michelle Teague. Client Information: Inspection, Condo City Lane Chicago, IL. Inspected 8/22/07 8:00 AM

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

Transcription:

is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion in summer 2005. When completed, the mall will house a new food court with indoor and outdoor patio seating, a new children s play area, soft seating and an exciting retail lineup, including a new 180,000 s.f. Dillard s opening in 2006 Aurora Mall New Main Entrance

is conveniently located at I- 224 and Alameda Avenue, 10 miles east of Denver and 20 minutes south of Denver International Airport. Aurora Mall

The Tenant Information Package is intended to provide the you with the project s design and construction criteria and consists of two parts: Tenant Design Manual Lease Outline Drawings The Lease Outline Drawings are usually delivered about two weeks behind this Tenant Design Manual. This Tenant Design Manual will provide you with the tenant architectural and engineering design criteria. The Lease Outline Drawings are the specific architectural and engineering base building drawings for your space. If you have any questions regarding the Landlord s design and construction requirements, please contact your Tenant Coordinator or call 317-636-1600 and ask for Tenant Coordination.

This Manual contains information that you will need to design your store. The contents of the Manual are also burned onto a CD inside the back cover. Additionally, the Manual, the Lease Outline Drawings, contractor lists, permitting requirements and other useful information will be available on our BuzzSaw TM project WEB site. An invitation to BuzzSaw TM will be sent to you, your architect and engineer as soon as we obtain your email address. Once you have access to BuzzSaw TM, you and your architect/engineer will be able to download either a.pdf image of your Lease Outline Drawings or a.dwg drawing file for direct import into your CAD system. As updated information is available, Bulletins will be issued through BuzzSaw TM with automatic notification to you and your architect. If you have any difficulties working with BuzzSaw TM, please contact your Tenant Coordinator.

Demising Wall Mall Ceiling (15-0 above floor). Tenant to utilize a maximum of 70% of this area. Stop construction 1 short of Mall ceiling. Mall bulkhead and neutral pier (bulkhead is solid behind storefront). 3 0 12-0 3 storefront popout. Tenant to bring mall floor finish to base of sales counter. All employee access to the space shall be via the rear entrance.

Thermal Exhaust A 24 x 16 duct tap-- designed for a maximum of 3,000 CFM with a modulating damper--to a common thermal exhaust system (not to be used for grease exhaust) is provided in each Food Court Tenant space. The damper is controlled by space temperature. The temperature control device is provided by the Landlord and installed by the Tenant at the Tenant's expense. The thermal exhaust system is designed to be the first stage of cooling. If the thermal exhaust system provides adequate comfort conditioning, no other source of cooling shall be required. The replacement air for the thermal exhaust ONLY shall be introduced from the Mall common area. Intake grilles for thermal exhaust shall be located a minimum of 6'-0" from any exhaust hood to avoid affecting the performance of the exhaust hood system. Any additional Make-up air shall be the responsibility of the Tenant. Supplemental Equipment A downflow rooftop unit on full curb with gas heat may be provided for supplemental cooling. Condensate Drain Condensate to be piped through rooftop unit curb to Tenant provided floor drain. PVC pipe not permitted. Outside / Relief Air Economizer and barometric or fan powered relief through Tenant installed components. Economizer not permitted for odor producing/food Tenants, provide low ambient controls. Return Plenum (Ducted return is for odor producing/food Tenants only and subject to Landlord approval). Smoke Exhaust/Relief None required. Toilet Exhaust By Tenant including fan, ductwork and roof cap. Odor & Process Equipment Exhaust Size for application by Tenant. Replacement Air From Tenant outside air and dedicated makeup air units, except as noted under Thermal Exhaust. Temperature Controls Thermal Exhaust system shall be controlled via Landlord provided temperature sensor and interface with central control system. Tenant to locate sensor within space where heat will be effectively sensed. When supplemental cooling is required, provide a standalone electric/electronic control system by Tenant. Test & Balance Tenant shall employ Landlord designated contractor to perform final testing and balancing. Building Thermal Values Exterior wall U=0.13 Roof U=0.05. Aurora Mall

Water Provided by utility company via overhead mains. Designated connection point within or adjacent to space. Food Tenants: 2" valved connection with 45 psi minimum pressure available. Food Court Tenant to supply meter w/remote reader. Waste. Designated connection point within or adjacent to space. Vent Through roof by Tenant. Grease Waste Landlord has provided central grease interceptors and greasy waste lines to designated food spaces with 4" wye connection off Landlord main. Location of separate, in-ground interceptors as approved by Landlord. Where not designated food areas, utilize above floor interceptors where possible. Natural Gas Gas is available from the utility at exterior meter bank(s) on the roof for Food Court Tenants. Coordinate available pressure with utility company. Toilet Rooms Toilet rooms are not required in Food Court spaces. Service Sink Food tenants to consult with Health Department for specific requirements. Aurora Mall

Implementation Tenant shall directly employ the Landlord designated contractor to modify existing grid or utilize connection provided. Tenant Flow Switch Not permitted. Valve for Tenant Space Not permitted. Sprinkler Heads Quick response required throughout.

Voltage 208V, 3ph, 4-wire. Landlord Equipment Tenant to provide fusible switches at common wireway in central locations. Power Tenant is a direct customer of the utility company. Metering Utility company meter in Landlord meter room. Capacity Up to 400A with 4"C with pull wire for Food Court Tenants Telephone 1" conduit with pull wire to designated connection point in central locations. Fire Alarm Tenant to provide smoke detectors and shut-down controls for the fan system when supplemental HVAC is provided. Tenant is to tie into Landlord's central detection and annunciation system for hood suppression system only.

Forms and worksheets needed by the Tenant s engineer to calculate and comply with Landlord s MEP design criteria are included in the back pocket of this manual. The forms and worksheets are also on the CD inside the back cover and include the following: Maintenance Form Rooftop Unit Specifications Form HVAC Calc. Form Electrical Load Summary Form. Appliance Heat Gain, Kitchen Fan and Makeup Air Unit Form