Process retrofitting. Davide Manca. Lesson 5 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano

Similar documents
Dynamic Conceptual Design

Conceptual Design. Davide Manca. Lesson 2 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano

Energy Savings in Methanol Synthesis : Use of Heat Integration Techniques and Simulation Tools.

Study Plan. MASTER IN (Energy Management) (Thesis Track)

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

Zero Emission Engine. An Economic and Environmental Benefit

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

Natural Gas Conversions of Existing Coal-Fired Boilers

Modelling and Simulation of the Freezing Systems and Heat Pumps Using Unisim Design

GAS HEATING IN COMMERCIAL PREMISES

Hydrogen from Natural Gas via Steam Methane Reforming (SMR)

The. Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes.

OROT RABIN POWER STATION UNITS x 350 MW

How To Prevent Corrosion In A Steam Electric Power Plant

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

Reliability Modeling Software Defined

Advanced gas turbine cycles: new solutions for the near future needs

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Balance of Fuel Cell Power Plant (BOP)

COMPARISON CONCERNING TO THE COGENERATION SYSTEMS DEVELOPMENT

Optimization of Natural Gas Processing Plants Including Business Aspects

Energy consumption and heat recovery of refrigeration system in modern Arena

Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, Garching, Germany

CCS in the Oil refining Industry System Solutions and Assessment of Capture Potential

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS

Petroleum Refinery Hydrogen Production Unit: Exergy and Production Cost Evaluation

How To Make A High Co 2 Gas Blend

The soot and scale problems

The Second Law of Thermodynamics

How To Calculate The Performance Of A Refrigerator And Heat Pump

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS

HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS

PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION REFRIGERATION SYSTEM WITH R404A, R407C AND R410A

B0401 Abstract 029 Oral Presentation Session B04 Innovative Applications and Designs - Tuesday, July 1, :00 h

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

Financing Hydrogen Projects Business cases and political support

How To Power A Power Plant With Waste Heat

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

DE-TOP User s Manual. Version 2.0 Beta

Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant

Chapter 3.4: HVAC & Refrigeration System

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

RecoPhos Bench Scale Reactor

10 Nuclear Power Reactors Figure 10.1

Latest developments in ammonia production technology

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant

MICRO-COGENERATION AND DESALINATION USING ROTARY STEAM ENGINE (RSE) TECHNOLOGY

The Second Law of Thermodynamics

Introduction to Process Engineering Economics. based on size of major equipment items allow to decide whether to invest in a detailed study

Basics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology

GT ANALYSIS OF A MICROGASTURBINE FED BY NATURAL GAS AND SYNTHESIS GAS: MGT TEST BENCH AND COMBUSTOR CFD ANALYSIS

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

Low grade thermal energy sources and uses from the process industry in the UK

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3

Continuous flow direct water heating for potable hot water

ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES

Comparative Economic Investigation Options for Liquefied Petroleum Gas Production from Natural Gas Liquids

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Steam Turbine Concepts for the Future Volatile Power Market

Value of storage in providing balancing services for electricity generation systems with high wind penetration

12.5: Generating Current Electricity pg. 518

The Sustainability Revolution Research, innovation and optimal solutions for environmental sustainability

GENERATION TECHNOLOGY ASSESSMENT

Energy Efficiency in Steam Systems

How To Make A Mine Guard Fosil Process

TERMOSOLAR BORGES: A THERMOSOLAR HYBRID PLANT WITH BIOMASS

Fact Sheet Technology. Bergius-Pier Process (1)

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction

6 18 A steam power plant receives heat from a furnace at a rate of 280 GJ/h. Heat losses to the surrounding air from the steam as it passes through

Energy saving technology to deliver the fastest returns. Top 10 energy saving options

Directorate for the Built Environment Building Standards Division

This is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training.

From solid fuels to substitute natural gas (SNG) using TREMP

Putting a chill on global warming

Last update: January 2009 Doc.: 08A05203_e

Making Coal Use Compatible with Measures to Counter Global Warming

Conventional Energy Sources

Waste Heat Recovery through Air Conditioning System

Thermal Coupling Of Cooling and Heating Systems

Committed to make a better world

Siemens Steam Turbine SST-600

THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS

ALONE. small scale solar cooling device Project No TREN FP7EN Project No TREN/FP7EN/ ALONE. small scale solar cooling device

Energy savings in commercial refrigeration. Low pressure control

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Development of a model for the simulation of Organic Rankine Cycles based on group contribution techniques

VAD. Variable Area Desuperheaters

Our Deep Geothermal Energy Potential: A Case Study in Saskatchewan with Application Throughout the Western Canadian Sedimentary Basin

Transcription:

Process retrofitting Davide Manca Lesson 5 of Process Systems Engineering Master Degree in Chemical Engineering Politecnico di Milano L5

Process retrofitting Retrofitting refers to the addition of new technology or features to older systems. Process retrofitting consists in adding/modifying/revisiting/revising an existing process by introducing alternative ways of producing or exploiting some production issues so to enhance its operation, improve its efficiency, increase its economic appeal, reduce its impact, increase its sustainability, improve its flexibility. Retrofitting an existing industrial plant, by using the latest technology, usually allows increasing the production capacity and reducing the limitations and inefficiencies that were intrinsic to the original design. After retrofitting, the plant operation is usually more stable and can be operated more easily and with higher efficiency. Some examples: new profiles in the blades of wind turbines, new heat exchangers with improved efficiency, lower emission engines, more resistant building materials, more efficient mixers and separators, Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 2

Retrofitting the HDA process The design procedure should answer the following questions: What are the most important solutions to increase the productivity of new plants or to enhance the efficiency of existing ones? What are the process alternatives (i.e. Process Subsections, PSs) capable of retrofitting the existing plant? Is the PS a viable solution to cope with plant retrofitting? Is the PS economically viable in terms of revenues, installation costs, and working capital? If the PS is the optimal solution, how long should it run? Are there some suitable time intervals in the day, week, season, and even year when the designed PS should be run? Are there distinct PSs that should be operated in an alternating way by switching between them? D. Manca, R. Grana. Computers and Chemical Engineering 34 (2010) 656 667 Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 3

A case study The proposed case-study allows tackling the retrofitting of a well-known process where the design activity is supported by the methodological approach to dynamic conceptual design. We focus on the hydrodealkylation process, HDA, that converts toluene to benzene. By observing the HDA process we can highlight a significant enthalpic content of the outlet stream from the reactor. Such stream is quenched to block any further side conversion of toluene to biphenyl and its enthalpic content is exploited to preheat the inlet stream to the reaction section (although it is not sufficient and some further heating is provided in the furnace to comply with the process specification). The questions are: is it possible to exploit the enthalpic content of the reactor outlet by a different equipment setup? are there any process units that could extract more value from the reactor outlet stream? Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 4

Stabilizer Product column Recycle column Flash The Feed-Effluent Heat Exchanger Purge Quench Gas recycle Furnace Compressor Cooler Reactor Heat exchanger Hydrogen feed Fuel Methane Toluene feed Benzene Toluene Biphenyl Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 5

Retrofitting the HDA process Some hints to the process retrofitting deal with a better exploitation of the energy content of the outlet stream from the reactor. Is it physically possible and economically viable to produce electric energy from the steam obtained by recovering the outlet enthalpic flux from the reactor? Is a power generation subsection feasible? We define the energy production section: EPS. It is the plant section where electric energy may be produced. Consequently, if we install the EPS it will also be necessary to preheat the inlet stream to the reactor by means of additional heat provided by the furnace. We have two alternatives with a further branch: Install the EPS Run the EPS continuously (i.e. 24/7) Run the EPS discontinuously when its revenues are higher then the additional expenditures due to the increased use of the furnace (i.e. a portion of the daily 24 hours) Not install the EPS Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 6

Retrofitting the HDA process In case of discontinuous operation of the EPS and FEHE alternatives, we are in front of a process alternative that could be operated at specific time intervals: D. Manca, R. Grana. Computers and Chemical Engineering 34 (2010) 656 667 Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 7

Retrofitting the HDA process The alternating operation of the FEHE and the EPS requires switching between the exploitation of the energy flux from the reactor to preheat its inlet stream through the FEHE: Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 8

Retrofitting the HDA process and operating the EPS by bypassing the FEHE: We can suppose that the EPS is operated when the revenues from selling the electric energy are high whilst it could be more economically viable operating the FEHE when the price of electric energy is low, thus saving money by burning a smaller amount of fuel in the furnace. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 9

Retrofitting the HDA process This is a more in depth detail of the HDA plant running with the EPS layout: Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 10

Retrofitting the HDA process The EPS layout calls for new pieces of equipment such as: Evaporator/superheater Steam turbine Steam condenser Water recycle pump These process units must be designed and economically assessed in terms of CAPEX and OPEX terms. The OPEX terms should also take into account the increased demand of energy required by the furnace to heat the inlet stream to the reaction section since, when the EPS is running, the contribution from the FEHE is missing (actually the FEHE is bypassed and it is in standby). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 11

Retrofitting the HDA process The EPS design undergoes a rather simplified approach that does not go into the mechanical and electrical details (where the support of both mechanical and electrical engineers is absolutely mandatory). By assuming an overall thermodynamic efficiency of the EPS equal to 35% we can appraise the amount of electric energy produced as a function of the enthalpic flux of the outlet stream from the reactor. We get the following thermal and electrical powers of the EPS: Evaporator Turbine Condenser Water pump 2.191E8 kj/h 0.767E8 kj/h 1.439E8 kj/h 0.015E8 kj/h Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 12

Retrofitting the HDA process According to the previous estimates, we can determine that: the turbine supplies an electric power of 21583 kw the furnace consumes more fuel equal to a thermal power of 2.4344E8 kj/h If we burn fuel oil in the furnace, whose price was modeled as a function of the CO quotation, we have the following properties: Oil density: 900 kg/m 3 Heat of combustion: 40813 kj/kg We can deduce that, when the EPS is running, there is an additional request of 5964 kg/h of burning oil to operate the furnace according to the specifications for the inlet stream to the reactor. N.B.: the additional amount of fuel oil to the furnace could lead to an increased capacity of that process unit, thus increasing its investment cost. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 13

Economic assessment of the retrofitted HDA By using the simulated scenarios for the economic assessment of the conventional HDA plant we can determine the dynamic contribution of the economic potential of the EPS: Revenues k,, i j $ h F F ueloilstd max 0, C W W C F C 2 2 cond EE, k, i, j turb pump H O H O FuelOil, k, i FuelOilEPS F IC [$] IC IC IC IC IC IC tot turb evap cond pump furnaceeps furnacestd nweeks nhours DEPEPS, k $ Revenuesk, i, j ndaysperweek i 1 j 1 k 1,..., nscenarios IC tot Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 14

Economic assessment of the retrofitted HDA Since the model of the CO quotation was developed on a weekly basis then the price of EE will be averaged on the same weekly basis for each of the 24 time bands of the day. N.B.: the EPS and STD subscripts for the FuelOil and Furnace contributions refer respectively to the different costs of the equipment and operating expenses in presence or absence of the EPS. N.B.: the investment/installation costs, IC, of the additional equipment for the EPS can be evaluated by means of the Guthrie s formula (Guthrie, 1969). N.B.: the investment costs, IC, are not annualized. Conversely, they are considered as a whole since the very beginning of the EPS operation. By doing so, it is possible to determine the pay back period and the following economic feasibility of the EPS. N.B.: the EPS Revenues, by formalizing the max function contribution, translate the decision to operate that plant section only when the profit is positive. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 15

Economic assessment of the retrofitted HDA N.B.: the proposed economic assessment is quite simplified. No transients are taken into account when evaluating the DEP EPS. The absence of transients assumes that the plant can instantaneously switch from the FEHE to the EPS layout and back. In addition, no investigation about mechanical and thermal stresses on the involved equipment (furnace refractory, furnace pipes, turbine shaft, turbine blades, FEHE, evaporator, superheater, condenser) has been performed. N.B.: the unavoidable transients produced by switching between the FEHE and EPS alternatives may also produce some off-specs on the production quality thus introducing further elements to be discussed and possibly quantified. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 16

Economic assessment of the retrofitted HDA The cumulative revenues for 50 distinct scenarios show the following trend: US$ -10,013,000 Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 17

Economic assessment of the retrofitted HDA A five year period is on average not sufficient to recover from the initial investment, as it is shown in the fan diagram reporting 3,000 distinct scenarios: Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 18

Economic assessment of the retrofitted HDA as also shown in the following diagram of the probability density function: Only 33% of the scenarios allow reaching the break-even point between the expenses and revenues over a payback period of only five years. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 19

Economic assessment of the retrofitted HDA Equally, the cumulative distribution of the probability function over the same five-year horizon shows that only 1/3 of the economic scenarios have a positive return from the initial capital investment of US$ 10,013,000, whilst 2/3 have still a negative return. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 20

Economic assessment of the retrofitted HDA For longer time horizons the probability of not recovering from the investment decreases as shown in the following table: 5 years 66.5% 10 years 45.4% 15 years 27.5% 20 years 19.4% Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 21

About switching on and off the EPS It is quite interesting studying the distribution of the hours in the day and of the days/weeks in the year when the EPS should be operated. By picking just one forecasting economic scenario, for the five-year period, we can observe how the EPS should be operated only by daylight (i.e. in the 8:00 am - 9:00 pm band). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 22

About switching on and off the EPS By considering the real market quotations of EE in the 2005-2009 period, we would obtain: The hole in year 2008 corresponds to the high CO quotations. We can also observe that according to the period of the year the EPS should be switched on a different number of times in the day. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 23

About switching on and off the EPS The distribution of the times when switching on the EPS during a single day is the following: It is worth observing how the EPS should be switched on (and consequently off) a maximum of 3 times per day. In addition there is a good agreement between the historical data (yellow bars) and the five-year simulations (orange bars). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 24

About switching on and off the EPS Further constraints can be introduced in the economic assessment of the retrofitted HDA plant so to reduce to a maximum of 1 or 2 operations per day the EPS. A further constraint can also be the definition of the minimum time both EPS and FEHE sections should be operated (once again to reduce the mechanical and thermal stresses on the equipment). Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 25

References Fini, E., Oliosi, M. (2010). Dynamic Conceptual Design. Tesi di Laurea specialistica. POLIMI. Guthrie, K. M. (1969). Capital cost estimating. Chemical Engineering, 76 (6), 114. Manca, D., Grana, R. (2010). Dynamic Conceptual Design of Industrial Processes. Comp. & Chem. Eng. 34 (5), 656-667. Manca D. (2013). Modeling the Commodity Fluctuations of Opex Terms, Computers and Chemical Engineering, 57, 3-9. Manca D. (2013). A Methodology to Forecast the Price of Electric Energy, Computer Aided Chemical Engineering, 32, 679-684. Mazzetto, F., Ortiz-Gutiérrez, R.A., Manca, D., Bezzo, F. (2013). Strategic Design of Bioethanol Supply Chains Including Commodity Market Dynamics, Industrial & Engineering Chemistry Research, 52, 10305 10316. Rasello, R., Manca, D. (2014). Stochastic Price/Cost Models for Supply Chain Management of Refineries, Computer Aided Chemical Engineering, 33, 433-438. Davide Manca Process Systems Engineering Master Degree in ChemEng Politecnico di Milano L5 26