REPORT OF WORK GUIDELINES



Similar documents
COURSE OUTLINE GEOL 204 MINING COMPUTING 45 HOURS 1.5 CREDITS

Exploration. Exploration methods

What you can do:...3 Data Entry:...3 Drillhole Sample Data:...5 Cross Sections and Level Plans...8 3D Visualization...11

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

PHYSICAL GEOLOGY LAB ONLINE SYLLABUS GLY 1010L Physical Geology Lab Fall 2010

ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES

Chapter 5. Rules and Policies

Appendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources

BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey.

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216

For personal use only

Significant Nickel Sulphides at Killaloe JV Project

Leapfrog : new software for faster and better 3D geological modelling

LABORATORY TWO GEOLOGIC STRUCTURES

Curriculum Map Earth Science - High School

MINIMUM STANDARDS OF ACCURACY, CONTENT AND CERTIFICATION FOR SURVEYS AND MAPS ARTICLE I. TYPES OF SURVEYS

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ASX Announcement (ASX: HMX)

Dip is the vertical angle perpendicular to strike between the imaginary horizontal plane and the inclined planar geological feature.

Krasny license: Operational update September 2015

New Cascade drill results and Ulanzi drill update

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER. GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53

Guidelines: Reporting & Requirements for Geoscience Programs & Operations

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

How To Map A Lake In The North Of The Holland (Fiji)

BUSINESS PLAN FOR THE MINERAL PROJECT FOR [NAME(S) OF PERIMETER(S)] SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES/RWANDA

IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project

Expansion drilling at Mt Marion Lithium Project yields positive results

Exploration Update - Corunna

STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU

Maps A Primer for Content & Production of Topographic Base Maps For Design Presented by SurvBase, LLC

DRILLING COMMENCES AT REMBRANDT GOLD PROJECT

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

SECTION 5 DRAFTING STANDARDS

Basic Elements of Reading Plans

Magnetic survey at Nesodden survey and interpretation report

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

COPPER DISCOVERY GROWS AT TURKEY CREEK

HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR

WHAT IS GIS - AN INRODUCTION

The Basics of Navigation

Integrated Data Management with Oasis montaj and acquire

Weekend Cabin Retreat Project Site Plans

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

STORMWATER MANAGEMENT CHECKLIST

DATA VISUALIZATION GABRIEL PARODI STUDY MATERIAL: PRINCIPLES OF GEOGRAPHIC INFORMATION SYSTEMS AN INTRODUCTORY TEXTBOOK CHAPTER 7

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Porphyry Copper Potential Confirmed By Field Reconnaissance in Peru

New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS. Core has extended its lithium focus in the prospective Bynoe pegmatite field

For personal use only

THE GRADUATE SCHOOL TEXAS SOUTHERN UNIVERSITY GUIDELINES FOR PREPARING THE THESIS

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

Effective July 1, 2010 WYOMING STATE LAW Title 37 Public Utilities Chapter 12 Article 3. DAMAGE TO UNDERGROUND PUBLIC UTILITY FACILITIES

Minnesota Department of Natural Resources \mn_dnr \mn_dnr\spatial \mn_dnr\tabular \mn_dnr\metadata

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

University of Northern Iowa Design Documents Standards. October 2014

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

GEOLOGIC MAPS. PURPOSE: To be able to understand, visualize, and analyze geologic maps

Introduction to Structural Geology

PERC-RITE DRIP DISPERSAL DESIGN GUIDE FOR SEPTIC TANK OR ADVANCED TREATMENT EFFLUENT MAINE

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

720 Contour Grading. General. References. Resources. Definitions

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT

MRL about to be one of world s highest-grade graphite producers

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

3D VISUALIZATION OF GEOTHERMAL WELLS DIRECTIONAL SURVEYS AND INTEGRATION WITH DIGITAL ELEVATION MODEL (DEM)

By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc.

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:

Structural Geology Laboratory 9 (Name)

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

Earth Science & Environmental Science SOL

Mine Plan of Operations Reclamation Bond Checklist

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

INTERPRETATION ADDENDUM CANADIAN MINING COMPANY INC. SUITE WEST HASTINGS STREET VANCOUVER, BC V6E 3X2 3D INDUCED POLARIZATION

Create a folder on your network drive called DEM. This is where data for the first part of this lesson will be stored.

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

TSX-V: CDA WKN: A0M6U5

December, 2015 Quarterly Report First Graphite makes strong progress in strategy to be major supplier of high-grade graphite and graphene in 2016

Public Works Engineering Technician: Speciality Civil Constructions

Further Basement Gold Results Confirm Yamarna Gold Potential

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Model Virginia Map Accuracy Standards Guideline

The Point Rousse Project - An Economic Analysis

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEW DIGITAL TERRAIN MODELING (DTM) TOOLS FOR CABLE ROUTE PLANNING by Dr. Jose M. Andres Makai Ocean Engineering Inc.

Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government

TUTORIAL MOVE : 3D MODEL CONSTRUCTION FROM SURFACE GEOLOGICAL DATA

Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified

Guidelines for Fiber Optic Cable Permits

NORTH PORTIA RESOURCE SUPPORTED BY NEW DRILLING RESULTS

Transcription:

REPORT OF WORK GUIDELINES The following guidelines apply to a report of work submitted under section 56(1) of the Mining Act (http://laws.gnb.ca/en/showdoc/cs/m-14.1). 1 (1) A report of work shall be submitted and: a) a separate report is required for each mineral claim; b) shall be submitted by one of the following methods; i. electronically: NB e-claims (http://nbeclaims.gnb.ca/nbeclaims/), CD, DVD, USB or e-mail to the Recorders office and shall be submitted in the following formats; A. Microsoft Office compatible application; and/or B. unsecured Adobe PDF (version later than 1.7) will be accepted for report text, maps and other illustrations only. All other data shall be submitted in their respective raw data format(s); or ii. a hard copy will be accepted with authorization from the Recorders office and shall be submitted in the following format; A. on a good grade of bond paper B. shall be bound in a durable standard binding which permit easy removal of the text; c) shall have each page of text numbered. 1 (2) The holder of a mineral claim shall not submit receipts with a report of work unless requested by the Recorders office. 2 A report of work shall contain the following information in the following order: a) on the front cover of the report: i. the name of the natural person, partnership or corporation for whom the mineral claim is registered; ii. the name of the natural person, partnership or corporation who performed the work if not the same as 2(a)(i); iii. the mineral claim or lease number and the mineral claim unit references iv. the mineral claim or lease name, which must be named after a topographic feature; v. the general nature of the work; vi. the dates during which the work was performed; vii. the designation of the National Topographic System 1:50,000 sheet(s) on which the mineral claim area or lease area is situated; and 1

viii. the name of the author and the date of the report; b) a table of contents which shall include: i. a list of each principal subdivision of the text with the corresponding page number; and ii. a list of each appendix, plan, map, table, figure or other illustration by title and number indicating the corresponding page number or location in the report; c) a summary of the work performed; d) statement of expenditures; e) an introduction which shall include a brief description of the geographic and geologic setting of the mineral claim area and the means of access to it; f) a property location map at an appropriate scale clearly showing the boundaries of the mineral claim area or lease area in relation to recognizable topographic features and indicating the latitude and longitude of the mineral claim area or lease area; g) a brief description of the previous relevant work performed in the mineral claim area; h) a summary of the present work and results; i) a work location map at an appropriate scale including the grid area or the area mapped in relation to recognizable topographic features or to identifiable features on a lease area boundary; j) the purpose and results from the geophysical work, the detailed technical data and also the conclusions and/or recommendations drawn from the results; k) a list of references; and l) the signature and/or stamp of the author and the date signed. 3 (1) Maps and other illustrations submitted with a report of work shall: a) express all measurements and map scales in metric units and include latitude and longitude where appropriate; b) not exceed a size of 90cm by 120cm as defined by the outer limits of their drafted symbols or lines; be so uncluttered and have such large and clear printing or symbols that they remain readily decipherable; c) have a light background allowing text to be decipherable; d) indicate orientation with respect to astronomic north on plan maps and location maps where appropriate; e) indicate scales and coordinates on sections, profiles or similar diagrams; and f) where appropriate, include in their lower right corner their identifying title, an appropriate bar scale and a legend. 3 (2) All illustrations shall be consecutively numbered. 2

4 The detailed technical data required in subparagraph 2(j) are as follows: a) for grid establishment, a map or maps at an appropriate scale showing the location of each established line; b) for general prospecting: i. description of observations; and ii. a map or maps at an appropriate scale showing: A. the location and result of each instrument reading made; and B. the location and analysis or assay result of each sample taken; c) for trenching, stripping or excavation of pits: i. a description of how the work was performed; ii. the dimensions of each trench, area of stripping or pit, including the depth of bedrock where exposed; and iii. a map or maps at an appropriate scale showing: A. the outline of each trench, area of stripping or pit; B. a brief geological description of the bedrock exposed; and C. the source location and assay results of each sample assayed; d) for shaft sinking, tunneling and other underground work: i. a description of how the work was performed; and ii. maps and sections at an appropriate scale showing the location of the work performed; e) for a geological survey: i. a description of all geological aspects observed including lithology, folding and faulting or other structures, mineralization, veins, alteration, textural and metamorphic features, plutonism, fossils and results of sampling and assaying, relating these aspects to previous work where applicable; ii. a map or maps at an appropriate scale showing the outline of each outcrop examined and rock types, attitudes of bedding and structures, mineralization, sample locations and assay results and a table of lithologies; and iii. such other maps, graphs, profiles or sections as may be useful in presenting the results of the work; f) for a geophysical survey: i. a description of the method procedure followed, including components measured, units of measurement, units in which the results are presented; ii. the make, model and specifications of each instrument used; and iii. where the method used is new and not described in readily available literature, a summary of the underlying theory and a full description of the type of instrument used, the methods of measurement and data reduction and the results from test areas; 3

g) for a ground geophysical survey: i. the data required in paragraph (f); ii. maps or profiles at an appropriate scale showing the numerical values obtained and source locations and providing basic data where filtered or smoothed data are used; and iii. such other maps, graphs, profiles or sections, showing the data in contoured form or otherwise; as may be useful in presenting the results of the work; h) for an airborne geophysical survey: i. the data required in paragraph (f) and the report received from the company having done the work; ii. maps or profiles showing the flight lines and either the actual numerical values obtained or the results in contoured form whichever is more appropriate; and iii. a description of the method procedure followed, including array transmitter location, correction for diurnal variation flight lines interval, ground speed and terrain clearance, where applicable; i) for a ground geochemical survey: i. a description of the sampling procedure: A. details of the land, vegetation and soil, including type of topography, maximum and minimum elevations, drainage, types of vegetation and depths of soil; and B. details of the material or soil horizon sampled and the sample depth; ii. where bedrock has been sampled, a description of the rock type; iii. for sample preparation and analysis: A. a laboratory report; or B. the name of the laboratory or chemist who performed the analysis; C. the mesh size fraction of the sample (if applicable); and D. the analytical method(s) used, describing new methods in detail; iv. an interpretation and evaluation of the results, relating them to the geology, topography and soil types of the test area and to previous work; v. where fewer than six elements have been analyzed, maps or profiles at an appropriate scale showing the source location of each sample and a complete list of tabulated results; vi. where six or more elements have been analyzed: A. a complete tabulated list of all analytical data with the corresponding sample coordinates and technical information collected on site; B. a map at an appropriate scale showing the source location of each sample; and 4

C. where significant variations have been found in the analytical data, a map or maps at an appropriate scale showing the analytical data in raw or contoured form; vii. maps, graphs, sections or other illustrations showing data in contoured form or otherwise as may be useful in presenting the results of the work; j) for drilling: i. for each drill hole, the geographic coordinates; grid coordinates where applicable; dip and azimuth, core size or hole diameter, start and completion dates and name of the company that performed the drilling; ii. for drill holes on mineral claims, the relative collar elevation of each and abandonment information; iii. for drill holes on mining leases, the absolute collar elevations of each and abandonment information; iv. results of all downhill survey data; deviation data; v. complete and clearly legible logs of all core or cuttings, listing all observed mineralization; vi. where assays or lithogeochemical analyses were performed, the complete analytical results clearly correlated with the logs; including the sample number, the length of each interval sampled and the start and end depth of each sample. vii. where geophysical logging was performed, in addition to the data required in 4 f); a graphic geophysical log clearly locating the geophysical data with respect to the drilled hole and the geology intersected by that hole. In the case of electromagnetic surveys a map showing the location of the transmitter loop is required; viii. for diamond drilling, the location of the core storage; ix. a map at an appropriate scale showing the location of each collar or drill hole; and x. cross-sections as are useful in presenting the results of the drilling; k) for sampling and assaying, metallurgical or beneficiation studies, and petrographic or mineralographic studies: i. a description of the procedure for sample collection and preparation; ii. a review of test or study procedures and the test results; iii. a map or maps distinctly showing the source location of each sample site and the corresponding analytical data where applicable; and iv. for metallurgical beneficiation studies, charts or diagrams illustrating procedures and results; l) for all other remotely sensed data or remote imagery: i. a review of the procedures, and the results; and 5

ii. maps, photographs or diagrams illustrating results; m) for boundary survey, the return of a survey, performed in accordance with sections 90 to 94 of the Mining Act, which has been approved by the Director of Surveys; n) for a control survey or topographic mapping: i. a description of the survey procedure ; and ii. an accurate traverse map showing the location of the survey in relation to the boundaries of a lease area or the boundaries of a mineral claim area and to a New Brunswick grid coordinate; o) for road construction i. a description of how the work was performed; ii. the length and width of the road; and iii. a work location map required in subparagraph 2(i). 5 Sections 1 to 4 apply with the necessary modifications to a report for a regional survey as defined in sections 62 to 66 in the Mining Act. 6