METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE



Similar documents
Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER

Site sampling and testing of concrete

LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO

METHOD A10 (a) THE DETERMINATION OF THE IN-PLACE DRY DENSITY OF SOIL OR GRAVEL BY THE SAND REPLACEMENT METHOD

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

Lab 1 Concrete Proportioning, Mixing, and Testing

SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES

GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE

Standard Test Procedures Manual

The University of Toledo Soil Mechanics Laboratory

EXPERIMENT NO.1. : Vicat s apparatus, plunger

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

DRY CLEANING PAPER DOCUMENTS

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

Evaluation of In-Place Strength of Concrete By The Break-Off Method. Tarun Naik Ziad Salameh Amr Hassaballah

DryWeight BulkVolume

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

Florida Method of Test for TESTING OF GROUND TIRE RUBBER Designation: FM 5-559

Division 2 Section Section 02795

The entire document shall be read and understood before proceeding with a test. ISTA 3B Page 1 of 35

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

Laying the First Course. 1. Excavate the site and construct the footing.

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Tools and Glue. Required Materials

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

FIELD SAMPLING AND TESTING MANUAL TESTING PROCEDURES FOR ALL TESTS

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

Evaluation of Initial Setting Time of Fresh Concrete

DE Frame with C Series Sidelight

Guidelines for Earthquake Bracing of Residential Water Heaters

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Shower Walls and Tub Surrounds

Residential Roofing Guide

LAYING BLOCK AND BRICK

Calibration of Volumetric Glassware

Apr 17, 2000 LAB MANUAL PARTICLE SIZE ANALYSIS OF SOILS AASHTO Designation T 88 (Mn/DOT Modified)

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

How to build a Pizza Oven in 4 days

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

The Analytical Balance

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0

Construction Specifications for Keyhole Pavement Coring and Reinstatement

4-02 Gravel Base Ballast and Crushed Surfacing

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

COMMENTARY TO AG:PT/T251 - BALL PENETRATION TEST

Care and Maintenance for Wood Flooring

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Quality Assurance Concepts. Outline

FRAMED & MOUNTED TILE MURAL

EDUCATIONAL GUIDE TO MORTAR TESTING

S.3.6. BULK DENSITY AND TAPPED DENSITY OF POWDERS. Final text for addition to The International Pharmacopoeia

Inspections: Central Laboratory of the Regions

CH. 2 LOADS ON BUILDINGS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS

Work. Example. If a block is pushed by a constant force of 200 lb. Through a distance of 20 ft., then the total work done is 4000 ft-lbs. 20 ft.

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

6 RETROFITTING POST & PIER HOUSES

Installation PowerPoint for Grasscrete Formers

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

Make Your Own Hypertufa Container. Supplies. The recipe. by Michelle Gervais

VERIFYING CALIBRATION OF WEIGHING DEVICES USED FOR LABORATORY TESTING

Manufacturing Tooling Cutting Tool Design. Elements of Machining. Chip Formation. Nageswara Rao Posinasetti

Apr 17, 2000 LAB MANUAL

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Hive Top Ventilation Shims

INJECTION MOULD DESIGN: MARPLEX PVC RESINS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

EXPERIMENT 10 CONSTANT HEAD METHOD

THINGS YOU SHOULD KNOW

Knowledge Domain: Plumbing Unit: Leaking Skill: Epoxy

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens

C. Section TESTING LABORATORY SERVICE.

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

SECTION STORM DRAINAGE SYSTEM

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Standard Test Procedures Manual

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Minor Cracks in Horizontal Surfaces

FORM DESIGN. easy to work with, and generally available.

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

Section SEWER PIPE INSTALLATION AND TESTING

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM

PRE INSTALLATION MANUAL

( ) where W is work, f(x) is force as a function of distance, and x is distance.

Owner's Manual & Assembly Instructions

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the A325 structural bolt. Rev.

Properties of Fresh Concrete

Transcription:

STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Blvd. Sacramento, California 95819-4612 A. SCOPE METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE This test method describes the procedure for determining the unit weight of freshly mixed concrete. Formulas incorporating the measured unit weight and observed scale weights of all ingredients are included for the calculation of batch volume and actual cement content. B. REFERENCES California Test 539 Sampling Fresh Concrete ASTM C 138 Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete C. APPARATUS 1. Measure: a cylindrical watertight, steel measure with two handles. The capacity of the measure must conform to the requirements in the following table. Minimum Capacity of Measure Maximum Size of Capacity of Coarse Aggregate Specified Measure 1 in. or less 0.25 ft 3 1½ in. 0.50 ft 3 It must have an inside height of 115 % ± 15 % of the inside diameter. It must be constructed of No. 10 to No. 12 US gage steel. It must be reinforced around the top with a steel band of the same thickness 1½ in. wide. The top rim must be machined to a plane surface. 2. Balance: a balance or scale of at least 105 lb capacity. Accuracy of the scale must be within 0.1 % of the required capacity for the entire range of use. 3. Tamping rod: a round, straight steel rod with a diameter of 5 8 in. ± 1 16 in. and length of at least 4 in. greater than the depth of the measure in which rodding is to be performed (but not more than 24 in.). One or both ends of the tamping rod must be rounded to a hemispherical tip of the same diameter as the rod. 4. Cover plate: glass approximately 12 in. square, ¼ in. thick, and wire-reinforced, or acrylic plastic cover plate approximately 12 in. square and ¼ in. thick. 5. Platform with hinged, collapsible wings on three sides, made of plywood, with level bubbles attached to the platform at 1 corner. - 1 -

D. CALIBRATION OF MEASURE Verify the value of the calibration factor at the start of each job and at any time there is reason to suspect a change. Calibrate the measure by filling it with water having a temperature 60F to 70F measured with a thermometer. Place the cover plate firmly in contact with the rim of the measure and add water if necessary to eliminate bubbles under the glass. Wipe surplus water from the outside of the measure and cover plate. Weigh to the nearest 0.05 lb with the cover plate in place. Subtract the tare weight of the empty, dry measure and cover plate. Compute the calibration factor, F. Where F 62.3 weight of water E. PROCEDURE 1. Sampling Fresh Concrete a. Sample fresh mixed concrete in accordance with California Test 539. b. Transport sample in watertight containers to the place where the test is to be performed. 2. Filling the Measure with Concrete a. Place the measure on a level, firm surface. b. Using a scoop, fill the measure in 3 layers of equal depth. Move the scoop around the perimeter of the measure opening to ensure an even distribution of the material with minimal segregation. Fill the topmost layer to over flowing. Level the surface of each layer with the fingers prior to tamping. (1) Rod each layer 25 times with the rounded end of the tamping rod, distributing the strokes evenly over the surface of the layer. (2) While rodding the first layer, penetrate nearly full depth into the layer, but avoid striking the measure bottom. (3) While rodding the second and third layers, penetrate approximately 1 in. into the layer below with each stroke. (4) After each layer is rodded, tap the sides of the measure with a hand, stake or mallet using such force so as to close any voids left by the tamping rod and to release any large bubbles of air that may have been trapped. (5) Level the surface of the concrete with the fingers or a straightedge in such a way that any slight projections of the larger pieces of coarse aggregate approximately balance the larger voids in the surface below the top of the measure. (6) If harsh or stiff concrete is being tested, jig the measure after each addition of concrete to remove major air voids before - 2 -

rodding. Jigging consists of raising alternate sides of the measure about 2 in. and allowing it to drop in such a manner to impart a sharp, slapping blow. (7) Avoid striking the top, machined edge of the measure with the rod. (8) Clean the rim of the measure for a distance of about 6 in. Place one side of the cover plate firmly in position on the cleaned portion of the rim. Advance the plate with a sawing motion across the measure using sufficient pressure to maintain tight contact with the rim. There should always be a slight surplus of mortar ahead of the plate. If particles of coarse aggregate appear in front of the advancing edge of the plate, use a gloved hand to shove them down into the concrete. (9) Using a cloth or damp sponge, clean off all concrete or other material adhering to the outside of the measure and glass plate. 3. Adjust the plywood platform to a level condition with the wings set in position to eliminate the effect of wind. Place the scale on the platform and adjust the counterweight on the scale beam so that the pointer indicates zero. Place the filled measure, with the cover plate in place, on the scale and weigh to the nearest 0.05 lb. Record the weight. 4. Slide the cover plate off the measure using a sawing motion. Examine the surface for evidence of incomplete filling of the measure. A slight depression of the surface near 1 edge of the measure and shallow voids up to ¾ in. in diameter with a depth no greater than 1 16 in. may be disregarded. Deeper voids are indications that the measure was incompletely filled. In case of uncertainty, add a small amount of concrete and repeat the operations of screeding with the rod and working the glass plate into position. Weigh again. If the new weight agrees within 0.1 lb with the first weight, the original weight may be taken as correct. If not within 0.1 lb, repeat sampling and testing procedures. F. CALCULATIONS 1. Determine unit weight of concrete: W = Net Weight of concrete F (1) Where: W = Unit weight, lb/ft 3 (to the nearest 0.1 lb) F = Calibration factor for the measure used Net Weight of Concrete = Wt. of (Measure + Concrete + Cover Plate) Wt. of (Measure + Cover Plate) 2. Determine the volume of concrete, S, per batch: S = (Wa +Wf + Wc + Ww) (2) W - 3 -

Where: S = Volume of concrete per batch, ft 3 Volume, yd 3 = S / 27 W a = Total weight of cement in the batch, lb W f = Total weight of fine aggregate, including moisture as batched, lb W c = Total weight of coarse aggregate, including moisture as batched, lb Ww = Total weight of water added during mixing per batch, lb W = Unit weight of concrete, lb/ft 3 (Equation 1) 3. Determine the cement content, CC, in lb/yd 3 of concrete produced: G. PRECAUTIONS N CC S Where: N = Amount of cement in the batch, lb CY = Volume of concrete produced per batch, cu yd (Equation 2) 1. Always use the standard rod. Do not substitute. 2. Keep scale level while weighing. 3. The plywood windshield is helpful when weighing on a windy day. Watch for scale movements caused by wind and take the necessary steps to eliminate these effects. 4. Be sure to clean off all material adhering to the outside of the measure and glass cover plate before weighing. Clean the measure well, particularly around the handles and inside corners, to avoid build-up of any hardened concrete on the measure thereby changing its tare weight and volume. Check tare weight before each test. H. TEST REPORT The test report must include: Penetration of the batch of concrete tested, Air content by the pressure method (if determined), Calculated unit weight, W, of the concrete in lb/ft 3, Calculated size of the batch, S, in yd 3, Calculated cement content, CC in lb/yd 3, Date and time, and Station number or portion of the structure in which the concrete was placed. I. HEALTH AND SAFETY It is the responsibility of the user of this test method to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Prior to handling, testing or disposing of any materials, testers must be knowledgeable about safe - 4 -

laboratory practices, hazards and exposure, chemical procurement and storage, and personal protective apparel and equipment. Caltrans Laboratory Safety Manual is available at: http://www.dot.ca.gov/hq/esc/ctms/pdf/lab_safety_manual.pdf End of Text (California Test 518 contains 5 Pages) - 5 -