Toxic Municipal Waste Water Treatment



Similar documents
Sewerage Management System for Reduction of River Pollution

WASTEWATER TREATMENT

Implementation of Environmental Taxes in China: Transition from Charges to Taxes

Istat experience on surveying water statistics: the Water Survey System questionnaires

Phosphorus Removal in Wastewater Treatment

Floating Treatment Wetland Technology: Nutrient Removal from Wastewater

Advanced Wastewater Treatment Process

Report prepared by: Kelly Hagan and Mark Anderson Grand River Conservation Authority 400 Clyde Road Cambridge ON N1R 5W6

Nutrient Removal at Wastewater Treatment Facilities. Nitrogen and Phosphorus. Gary M. Grey HydroQual, Inc X 7167

International Cooperation in Water Management and Pollution Control in the Danube River Basin. Joachim Bendow ICPDR Executive Secretary

Annex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas

WASTEWATER TREATMENT OBJECTIVES

LEGAL ISSUES PERTAINING WASTEWATER TREATMENT AND REUSE IN TURKEY

Phosphorus Removal. Wastewater Treatment

ECONOMIC ANALYSIS OF WATER USES GESTÃO INTEGRADA DE BACIAS HIDROGRÁFICAS INSTITUTO SUPERIOR TÉCNICO

ADVANCED LAGOON TREATMENT TECHNOLOGIES FOR WASTEWATER TREATMENT

The murky future of global water quality

case study 7: south east queensland healthy waterways partnership

On-site Treatmentt for Domestic Wastewater in Thailand Suwanna. K. Boontanon Mahidol Univ. 2

City of Lakeland s Wetlands Treatment System An Overview

Use of Substitute Fuels in Large Combustion Plants (LCPs)

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

MBJ Environmental Programmes

GEC s Survey and Review on Water Footprint from Japanese Perspective

Environmental aspects of water fluoridation

EN Water quality in the Danube river basin: progress in implementing the water framework directive but still some way to go.

1.3 Wastewater and Ambient Water Quality

DRAINAGE DISCHARGE AGREEMENTS A WAY OF MANAGING RISK Mr. Sam Green Goulburn-Murray Water

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

Hydrological and Material Cycle Simulation in Lake Biwa Basin Coupling Models about Land, Lake Flow, and Lake Ecosystem

The implementation of the European Union Environmental Liability Directive

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

A Clean Harbour for Hong Kong. Government s Initial Response To The Report of the International Review Panel On Sewage Treatment for the Harbour Area

Water management in South Africa

CONVENTION ON THE PROTECTION AND USE OF TRANSBOUNDARY WATERCOURSES AND INTERNATIONAL LAKES. done at Helsinki, on 17 March 1992

An introduction to EPAS

Ecological Sustainability

Institutional Development for Septage Management

OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM MIDDLEBURY, VT. Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc.

Welcome to the Understanding Dissolved Oxygen learning module. This section provides information on the following topics:

1.782 Environmental Engineering Masters of Engineering Project

COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens

Rehabilitation of Wastewater Treatment Plant of Sakhnin City in Israel by Using Advanced Technologies

6 Chemicals from human settlements

Summary: Introduction

Engineers Edge, LLC PDH & Professional Training

Environmetric Data Interpretation to Assess Surface Water Quality

Department of Environmental Engineering

Water and Wastewater. Sample Collection and Analysis

Small scale sewage treatment system with membrane bioreactor technology

TURKEY ANATOLIA WATERSHED REHABILITATION PROJECT Sedat Kadioglu Ministry of Environment Abdulmecit Yesil Ministry of Agriculture and Rural Affairs

The Northern Apennines District River Basin Management Plan: PoMs,, Indicators, and Cross-compliance with the Floods Directive

INDONESIA - LAW ON WATER RESOURCES,

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER

National Planning Policy for Waste

NPDES Permit No. IL Notice No. SKT: bah. Public Notice Beginning Date: April 9, Public Notice Ending Date: May 9, 2014

Energy self-sufficient Semi-central Supply and Treatment Centre

Financing sustainable and resilient water and sanitation infrastructure in African cities

Best Practice Guide NO. BPGCS002. Wastewater Treatment Activated Sludge Process

MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8

POTW PHOSPHORUS REMOVAL PROCESSES

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Hebron Regional Wastewater Treatment Facilities

Achilleas Papadopoulos & Simos Malamis & Kostas Moustakas & Christos T. Kiranoudis & Maria Loizidou

LAKE OHRID CONSERVATION PROJECT (Case Study on Monitoring &Evaluation)

FRESHWATER COUNTRY PROFILE NORWAY

Collection and disposal of wastewater

Regulating Water Pollution in Ontario s Municipalities Windsor s Sewer Use By-law Prepared by Derek Coronado

GUIDELINES FOR LEACHATE CONTROL

Presented by Paul Krauth Utah DEQ. Salt Lake Countywide Watershed Symposium October 28-29, 2008

ENGINEERING REPORT Sewage Treatment System

How do storm water and wastewater networks function together with the wastewater treatment plant? Theo G. Schmitt, Kaiserslautern University (Germany)

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract

Glossary of Wastewater Terms

research highlight Remote Monitoring and Control of On-Site Wastewater Treatment, Recycling, and Reuse Systems

Draft Water Services Strategic Plan

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009

Ground Water Contamination by Leachate

How To Assess The Vulnerability Of The Neman River To Climate Change

WASTEWATER TREATMENT AND DISCHARGE

Planning, Designing, Monitoring and Inspection of Wastewater Treatment Systems of Industries

Virginia Street Tree Box Filters Demonstration Project

City of East Lansing CSO Control Facility Evaluation Demonstrative Approach to Meet WQS

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS

PRESENTATION 2 MAJOR ENVIRONMENTAL PROBLEMS

THE NEW NSF 350 AND 350-1

Natural and Advanced Treatment Systems for Wastewater Management at Municipal Solid Waste Disposal Site in Developing Countries

Transcription:

FINAL IC/24 February 2000 Recommendation concerning the Treatment of Municipal Waste Water

2 Recommendation concerning the Treatment of Municipal Waste Water The Commission, recalling Paragraph 1 of Article 2 of the Danube River Protection Convention in which the Contracting parties shall strive at achieving the goals of a sustainable and equitable water management, including the conservation, improvement and the rational use of surface waters and ground water in the catchment area as far as possible, recalling also Paragraph 2 of Article 2 of the Danube River Protection Convention according to which the Contracting Parties pursuant to the provisions of this Convention shall cooperate on fundamental water management issues and take all appropriate legal, administrative and technical measures, to at least maintain and improve the current environmental and water quality conditions of the Danube River and of the waters in its catchment area and to prevent and reduce as far as possible adverse impacts and changes occurring or likely to be caused; recalling further Paragraph 4 of Article 2 of the Danube River Convention in which the Contracting Parties agree with that the 'Polluter pays Principle' and the 'Precautionary Principle' constitute a basis for all measures aiming at the protection of the Danube River and of the waters within its catchment area; recalling further Paragraph 2 b of Article 5 in which the Contracting Parties agree with to adopt legal provisions providing for requirements including time limits to be met by waste water discharges; recalling further Paragraph 1 of Article 7 in which is agreed with by the Contracting Parties that for municipal waste water, emission limits shall be based in the application of at least biological or an equivalent level of treatment; recognising that the treatment of municipal waste waters including phosphorus and nitrogen removals has been found to be necessary in all parts of the Danube River catchment area in order to improve the ecological status of its waters and that of the Black Sea; recognising that some Contracting Parties have to implement and other Contracting Parties will have to implement the requirements established in European Directives concerning urban waste water treatment; recognising also that in an urban area the sewerage system and the sewage treatment plant must be regarded as a unit when the pollution load is dealt with; recognising also that the major pollutants of municipal waste water are organic matters (measured e.g. as BOD 5 ), nitrogen and phosphorous;

3 desiring to limit this pollution by effective treatment of municipal waste waters; recommends to the Contracting Parties of the Danube River Protection Convention that: a) municipal waste water (waste water from households of the mixture of waste water from households with industrial waste water and/or run-off rain water), loaded with more than 2000 population equivalents (1 p. e. = 60 g BOD 5 /d), should be collected and treated before being discharged into water bodies. Where the establishing of a collecting system is not justified either because it would produce no environmental benefit or because it would involve excessive cost, individual systems or other appropriate systems which achieve the same level of environmental protection should be used. b) municipal waste water which is collected in a sewerage system and treated in waste water treatment plants, loaded with more than 2,000 population equivalents, should be treated by biological methods or other methods giving equivalent results, in order to achieve the following results (homogenised unfiltered, undecanted sample; flow-proportional or time-based 24 hour-samples 1 ): 2 BOD 5 25 mg/l or 70-90 minimum percentage of reduction 3 COD cr 125 mg/l or 75 minimum percentage of reduction 3 For these two parameters the maximum number of samples which are allowed to fail the requirements, expressed in concentrations and/or percentages reductions is specified in the Annex. For the parameters, expressed in concentrations, the failing samples must not deviate from the required values by more than 100 %. Alternative methods to those just mentioned may be used provided that it can be demonstrated that equivalent results are obtained. c) municipal waste water, loaded with more than 10,000 p. e., which is foreseen for nitrogen and phosphorus removal, should be treated in order to achieve the following results (homogenised unfiltered, undecanted sample, annual mean values): Total Phosphorus 2 mg/l P (10,000-100,000 p. e.) } or 80 minimum percentage 1 mg/l P } of reduction 3 (more than 100,000 p.e.) Total Nitrogen 4 15 mg/l N 5 10,000-100,000 p. e.) } or 70-80 minimum 10 mg/l N 5 } percentage of reduction 3 (more than 100,000 p. e.) 1 Alternative methods may be used provided that it can be demonstrated that equivalent results are obtained. 2 Determination of dissolved oxygen before and after five-day incubation at 20 C F 1 C, in complete darkness. Addition of a nitrification inhibitor. 3 Reduction in relation to the load of the influent. 4 Total Nitrogen means the sum of NH4-N, NO2-N, NO3-N and organic N. 5 The implementation of these limit values indicated for nitrogen which are annual mean values could be checked by daily mean values, if daily mean values do not exceed 20 mg/l. This requirement refers to a water temperature of 12 C or more during the operation of the waste water treatment plant. As a substitute for the condition concerning the temperature, it is possible to apply a limited time of operation, which takes into account the regional climate conditions.

4 One or both parameters may be applied depending on the local situation. The requirements for Total Phosphorus and Total Nitrogen need not apply for every municipal waste water treatment plant, if it can be shown, that the minimum percentage of reduction of the overall load entering all municipal waste water treatment plants in that area is at least 75 % for total phosphorus and at least 75 % for nitrogen. In case of lack of investments for tertiary treatment priorities should be aimed first at phosphorus removal, starting with plants bigger than 100,000 p. e. Nitrogen removal should at least be considered in the planning process. d) Sludge arising from waste water treatment should be re-used whenever appropriate. The disposal of sludge to surface waters should be phased out. The disposal of sludge should be subject to general rules or authorisation. Recommends further that inventories of municipal discharges or waste water treatment plants loaded with more than 10,000 p. e. are compiled by the Contracting Parties every second year beginning one year after the adoption of this Recommendation and sent to the Commission including a report of actions. Recommends further that in the light of possible new developments this recommendation should be rediscussed at the latest in 2004.

5 Annex Series of samples taken in any year Maximum permitted number of samples, which fail to conform 4 7 1 8 16 2 17 28 3 29 40 4 41 53 5 54 67 6 68 81 7 82 95 8 96 110 9 111 125 10 126 140 11 141 155 12 156 171 13 172 187 14 188 203 15 204 219 16 220 235 17 236 251 18 252 268 19 269 284 20 285 300 21 301 317 22 318 334 23 335 350 24 351-365 25