GREEN SCHOOLS CASE STUDY. West Wing Elementary



Similar documents
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

6 Schedule quarterly communications to keep employees involved in environmental improvements. WASTE REDUCTION REQUIRED MEASURES

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee

Green House, Hungary

MURCH ELEMENTARY SCHOOL

This report presents the findings and recommendations of the assessment of energy use and

Each icon on this map represents the physical location of a station.

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

LEED PRESENTATION OUTLINE

Challenging Sustainable Goals for Landscape Architects

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

Whistler Green: Project Checklist

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

High Performance School Buildings Resource and Strategy Guide

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

TTU Green Standards. TTU Green Standards

Renaissance Academy. Virginia Educational Facility Planners 2010 Architectural Exhibit

How school administrators and board members are improving learning and saving money

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Sika Sarnafil World Class Roofing and Waterproofing

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Los Angeles Community College District

Green and Sustainable Buildings

Going for LEED Gold: SUSTAINABLE DESIGN IN THE RICHARD IVEY BUILDING

Green Guide for Businesses Strategy: Energy

CAMPUS LANDSCAPING. Tulane. Ecological Design. February 2000 Prepared by: The Office of Campus Planning Tulane Page 1

Columbus State Community College MASTER PLANNING

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

TOWARD A SUSTAINABLE DALLAS

Building Permit Application

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Vision Home Inspection

Water Conservation and the State s New Green Building Code for Residential Construction

BUILDING SAFETY UNIT

HomeSpec REPORT SUMMARY

Home Inspection Report

Green Building Initiatives. New York State

GREEN FACTS. Marina Bay Sands

November 3, 2015 Bond and District Additional Assistance Election Information

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

L A N D S C A P E P A T T E R N S

The LACCD Sustainable Building Program. Redefining the Student Experience

University Center Texas State Technical College Harlingen

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

The Raleigh Convention Center Raleigh, North Carolina Green Building Education A Self Guided Walking Tour

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Stanford Graduate School of Business Knight Management Center Campus

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

w

Friday, March 9, Grant Street, 1st Floor conference room

Colleges & Universities

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code

CASE STUDY: The EVERGREEN

Speaking the Same Language THE UNIVERSITY OF MICHIGAN LAW SCHOOL SOUTH HALL Ann Arbor, MI

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Holistic Approach in Delivering Government Buildings The Low Carbon Concept

Za abeel Energy City Master Plan. Dubai, United Arab Emirates

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

BUNKER HILL ELEMENTARY SCHOOL

BLOCK 400 PLANNED COMMUNITY DISTRICT

Making San Francisco a Water Sensitive City. Sarah Minick SFPUC Urban Watershed Management Program June 2009

Reed College Environmental Policy Statement. Ecoroof Terrace Description. Maintenance and Monitoring. Roof Assembly and Details

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

How To Improve A Building

Energy Audit Data Collection Form

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Print Shop/Mail Room

Stormwater Credit Open House Q&A

Solar Power at Vernier Software & Technology

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Town of Beaumont. Lot Grading Guidelines

HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS. Attention

OPERATIONS & MAINTENANCE FY Adopted Budget

Architectural Inspection Site Structures

Innovation in Affordable Housing Incorporating GREEN in Development

What is a Green Building?

Net Zero Station Design for The Cooper Centre for the Environmental Learning in Tucson, Arizona: Improving the performance of existing buildings

unprecedented opportunity MOFFET T TOW ERS unparalleled visibility

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

How school facilities managers and business officials are reducing operating costs and saving money

GREEN SCHOOL DESIGN (Revision no.1, Dated 07/14/2010)

Prince George s Community College 301 Largo Road Largo, MD (301) Higher Education Member since November 2009

Green Codes & IGCC Update

Mechanical, Plumbing, and Fire Protection Conditions

Gloria Marshall Elementary School. Spring Independent School District Houston, TX

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Deep Energy Savings in Existing Buildings

Beseck Switching Station Inspection

Transcription:

GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location: northwest Phoenix Grade Levels: (K- 6, 9-12, etc.) K-8 Number of students: projected 900 Number of staff: 66 Superintendent/Principal: Dr. Linda Price-Barry Phone number: 623-376-5004 Physical descriptors: building area 90,330 sf number of stories 3 number of buildings 2 number of classrooms 54 floor area of conditioned space 86,039 sf site area 15.2 Acres landscape area 9.56 acres Building footprint area 48,832 sf Date of commissioning : August 2005 School Cost: Total construction cost: $11.2 million Cost per square foot: $130.74/sf Additional funding sources: none SUSTAINABLE SITES GOALS Building area used as Community Space Erosion and Sedimentation Control Site selection Alternative Transportation Alternative Transportation Reduced Site Disturbance Reduced Site Disturbance Stormwater Management Stormwater management Light Pollution Reduction Sustainable sites strategies used Lower basin of site used for play fields because the basin was relatively flat compared to the rest of the site. This lower basin had already been disturbed by the developer. Designed to protect and restore open space and reduce site disturbance. Building drawn up into a three story building to minimize building footprint. 1

Building orientated across the slope of the hill in a two story walk-out configuration to minimize amount of rock excavation. Even though the building was three stories tall the smallest face of the building was placed perpendicular to the community to lessen the school s impact. Building laid out in an east west configuration to better control day lighting into the classrooms. This also better controls the indoor air quality. Building functions laid out in a manner so that the kids would cross the site at the same elevation instead of climbing the hill to the multi-purpose building. Kept native landscaping where possible. Bicycle storage and changing rooms for students. Dedicated parking for carpooling. Site designed to manage Stormwater through rate and quantity and use of retention ponds. Results obtained Neighborhood seems pleased with the design, no complaints have been received. The east west configuration is working well. Considering building orientation on the site improved cost effectiveness of maintaining the school YES Building is used as community space multipurpose area, 15,000 sf - 20% of school WATER EFFICIENCY GOALS Water efficient landscaping Water Use Reduction Water efficiency strategies used The 70-0 high hill created a potential storm drainage problem. The upper parking structure was designed to contain the water runoff. This water was then piped through storm drain pipes and head walls under the building to the lower playfields. The water from the hill above, building roof run-off and run-off from the parking lots then was allowed to free flow onto the grass playing fields. This water then gravity flowed across the grass ball fields filtering the water. At the end of the ball fields the water was again collected and permitted to free flow into the community retention basin. The sprinkler irrigation system contains a moisture reading module that can sense if the irrigation system needs to skip a watering cycle because of recent weather conditions. All plantings above the building are low water use plants reclaimed from the existing vegetation. There is a field booster pump as an override. Installed sensor hand washing stations. Installed waterless urinals and low flush toilets. 2

Results obtained The Calsense sprinkler and irrigation system has worked during the rain storms to stop automatic watering until sensors show a need. No specific data but seems to help. Additional information: Including water saving devices increased overall cost YES NO Unknown Overall, incorporating water saving devices into the school was worthwhile YES NO ENERGY AND ATMOSPHERE Energy sources: electric, natural gas, solar HVAC type Air Cooled Chillers Number of Units 2 BTU Rating 321 Tons A/C Insulation R- roof R-42 walls R-25.76 Values Window types U=0.29 Hollow metal windows with insulating glass Low E on south side ENERGY AND ATMOSPHERE GOALS Green power shading Coefficient = 0.44 Visible Light transmission= 69% Energy and Atmosphere strategies used The bank of light fixtures adjacent to the window wall in the classrooms is switched separately from the rest of the light fixture switches. This switch is located adjacent to the teacher s desk in the front of the classroom. The theory is that the teacher will be able to monitor when additional lighting would be needed. If all switches where placed at the classroom door the tendency would be to turn all lights on without checking for adequate daylight. Fluorescent light fixtures have electronic ballasts and T-8 lamps. Transformers are high efficiency with 25% less losses than NEMA TP-1. Transformers are K-13 rated by Powersmiths International esaver. No third party testing of systems but A and E team checked. Exterior lights are on sensor system and shut down and ramp up accordingly. 3

Results obtained Studies on energy savings are still being completed. Comparison suggests that when compared to a comparable school, energy usage has not been reduced by per square foot or per student. The cause may lie with the chillers. The chiller systems ran 24/7 during warranty test for three to four weeks. There is heavy usage of the Multipurpose room by the community on the weekends and the energy management system is not coordinated for weekend activities. There is also a high amount of traffic in and out of the buildings causing the doors to be open for long periods of time. MATERIALS AND RESOURCES GOALS Storage and Collection of Recyclables Recyclables are commingled. INDOOR ENVIRONMENTAL QUALITY GOALS Environmental Tobacco Smoke Control Carbon Dioxide (CO2) Monitoring Low emitting Materials (Adhesives and Sealants) Low Emitting materials (Composite wood & Agrifiber) Daylight and views Indoor environmental quality strategies used Building laid out in an east west configuration to better control day lighting into the classrooms. Each classroom has exterior windows. Windows are placed high along the teaching walls to allow wide marker boards. The suspended ceiling slopes up to the exterior windows so light can bounce off the ceiling to the center of the classroom. Each classroom has a full height window so even little children can see out the window. This window is placed adjacent to a wall so the light entering the room can bounce off the wall into the room. Windows along the south side of the building have low-e glass to maximize lighting while minimizing heat gain. The view from the windows will either be the natural desert hill remaining on site or a view of the mountains located across the development. Where windows could be broken like in a gymnasium the glass windows are replaced with translucent insulated panels. Also sound transmission from Band and Music rooms have been minimized by replacing the glass windows with translucent panels. Room lighting has split controls Didn t use infrared or motion sensors next school will Zero tolerance for tobacco products Cleanable duct work currently using pleated filters that filter to a 97% level. The school is researching changing to the use of HEPA filters. Outside air on return circulation is 15% make up. 4

Additional Information: The benefit from incorporating daylighting as been: Very beneficial beneficial no change not worth the effort Students and staff like dislike the daylighting aspects of the buildings. Staff absenteeism has decreased: Yes No Unknown Student absenteeism has decreased: Asthma attacks have decreased: Yes Yes No Unknown No Unknown OVERALL BENEFITS The green projects included in the design and operation of this school have improved the overall efficiency of the campus: Yes No More study is needed We have used the green features of our school as teaching tools: Yes No TRAINING Did staff attended trainings on Design for Green Schools? Yes No Staff attended trainings on Green Schools Operations and Maintenance? Yes No Has staff attended trainings on energy efficient operations? Yes No Has staff attended trainings on IPM? Yes No Staff has attended trainings on water conservation? Yes No Has staff attended trainings on pollution prevention for transportation? Yes No If only one of your Green Features could be highlighted, it would be: The daylighting features make the campus more upbeat than other schools in the district. The students and teachers like working in the daylit areas. This is the best feature of the school because of its benefits. Daylighting is the best green item we did in this school. 5

Architect: Paul Holland, HDA Architects LLC, 459 N. Gilbert Road, Ste C-200, Gilbert, AZ 85234, 480-539-8800 Construction Co.: Jim Brignall, Brignall Construction Co., 141 E. Palm Lane Suite 205, Phoenix, Arizona 85004, 602-265-8339 6