Tel: (617) 727-4050 Fax: (617) 727-5363. OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2



Similar documents
Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School

Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services

Construction Management Standards of Practice

EXHIBIT A SCOPE OF SERVICES CONSTRUCTION MANAGEMENT TEAM POSITIONS AND REQUIREMENTS

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

Construction Management/ General Contractor Alternative Contracting Process

Recommended Practices For Hiring Owner s Project Managers. A Guide for Municipal Construction Projects. Edition I

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

Designing and Constructing Public Facilities

PROJECT MINUTES. 2.1 Record Call to Order, 5:30 pm, meeting opened.

Office of the Inspector General

Request of Qualification Proposal for Construction Management Services

esi ning and Constructing ublic acilities

CULVER CITY UNIFIED SCHOOL DISTRICT 4034 Irving Place Culver City, CA (310) REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES

Consultancy Services Proposal

CONTRACT FOR PROJECT MANAGEMENT SERVICES (Green Repair Program)

Division of Capital Asset Management Standard Designer Evaluation Forms for Public Agencies

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

MONTGOMERY COLLEGE JOB CLASS SPECIFICATION

Owner s project control review Baker Tilly Virchow Krause, LLP

COAST COMMUNITY COLLEGE DISTRICT REQUEST FOR PROPOSALS #2013 FOR

Construction Delivery Methods for Texas school districts

PROJECT MANAGEMENT BASICS

T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A

C.A.S.H. WORKSHOP Planning for the Building Season: Exploring and Understanding Project Delivery Methods

Construction Services Procedure

RESOLUTION NO

CONTRACT FOR PROJECT MANAGEMENT SERVICES

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

MASTER AGREEMENT CONSTRUCTION MANAGEMENT SERVICES

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Document Comparison. AIA Documents A and A131CMc 2003

REQUEST FOR PROPOSALS

Program/Construction Management Request for Qualifications

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

Project Management Procedures

TRAVIS UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION MANAGER MULTI-PRIME

Mondays 9:00 a.m. 4:30 p.m. Tuesdays 9:00 a.m. 4:30 p.m. Wednesdays 9:00 a.m. 1:00 p.m. Thursdays 9:00 a.m. 4:30 p.m. Fridays 9:00 a.m. 4:30 p.m.

DEVELOPMENT OF BEST MANAGEMENT PRACTICES TO EXECUTE A SUCCESSFUL CAPITAL IMPROVEMENT PROGRAM

By: Pat Derdenger, Partner Steptoe & Johnson LLP 201 East Washington Street, 16 th Floor Phoenix, Arizona Sub

Project Management Manual for Design and Construction Projects. (Revised August 2010)

S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL PO BOX NASHVILLE, TENNESSEE January 10, Opinion No.

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

AGREEMENT FOR PROGRAM MANAGEMENT SERVICES WITH SINGLE GENERAL CONTRACTOR DELIVERY (Ocean View Elementary School Project)

Request for Qualifications (RFQ NO ) CONSTRUCTION MANAGEMENT/OWNERS REPRESENTATIVE SERVICES APRIL 16, 2015

Work Breakdown Structure Element Dictionary Construction

School Construction Projects

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

MASTER AGREEMENT FOR PROJECT THE DEKALB COUNTY BOARD OF EDUCATION. Dated:

Revision: 3. Author: J McGuire Department: Company. Category: Contract Management. Appr. Signature: CONTENTS 1.0 PURPOSE SCOPE...

Community Program Directors, All Community Facilities Staff, State Architects and Engineers

THIS AGREEMENT is made effective as of this day of in the year of.

CONSTRUCTION MANAGEMENT AGREEMENT BY AND BETWEEN NYU HOSPITALS CENTER - OWNER - AND - CONSTRUCTION MANAGER PROJECT DATED AS OF

Construction Management and project process

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT

GREENFIELD MIDDLE SCHOOL ROOF PROJECT

CONSIDERING GC/CM There are some benefits and risks to using GC/CM. Departments should consider these carefully.

City of Moreno Valley Date Council Approved March 13, 2007 Date Effective April 6, 2007 CLASS SPECIFICATION Senior Electrical Engineer, P.E.

DIRECTORATE OF ESTATES & FACILITIES

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

REQUEST FOR ARCHITECTURAL SERVICES (RFS)

Ocoee, FL July 01, 2016 Advertisement No. 1

NORTH COLONIE CENTRAL SCHOOL DISTRICT 91 FIDDLERS LANE LATHAM, NEW YORK INVITATION FOR CONSTRUCTION MANAGEMENT PROPOSALS

The University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

GLENVIEW SCHOOL DISTRICT 34

INSTRUCTIONS TO BIDDERS

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

Shawnee County ATTN: Bill Kroll 200 SE 7 th Street, Rm B-30 Topeka, KS Phone Bill.Kroll@snco.us

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

GENERAL SERVICES ADMINISTRATION Federal Acquisition Service Mission Oriented Business Integrated Services (MOBIS) SCHEDULE PRICE LIST

STATEMENT of WORK Roof Repair Dauphin County, Harrisburg, Building # Project #

REQUEST FOR PROPOSAL (RFP) FOR SELECTION OF HEALTH CARE CONSULTANCY SERVICES FOR BIHAR MEDICAL SERVICES & INFRASTRUCTURE CORPORATION LTD.

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

Fundamentals of a Construction Audit. August 7, 2014

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK

EXHIBIT F POSITION DESCRIPTIONS

Baltimore City Public Schools Construction & Revitalization Act of 2013

City of Portland Job Code: CLASS SPECIFICATION Landscape Architect

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR

The programming, design

How to Hire a Construction Manager

CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS

COMMUNITY LIBRARY (SUNBURY) RFP for Construction Manager at Risk

Adrian Public Schools

VDOT Prequalification. Suzanne Lucas Construction Division

NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT S. Marion Avenue, Mail Station 2015 Lake City, Florida

Policy Number: Policy Name: Professional Services and Construction Services Procurement

Airport Safety and Construction Management Under The FAA

Projectmates User Guide for Montclair State University Facilities Construction Projects

Getting Connected with the Colorado Department of Transportation (CDOT)

Transcription:

The Commonwealth of Massachusetts Executive Office for Administration and Finance Division of Capital Asset Management One Ashburton Place Boston, Massachusetts 02108 Tel: (617) 727-4050 Fax: (617) 727-5363 OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2 Effective on July 19, 2004, Chapter 193 of the Acts of 2004 inserted a new provision into M.G.L. c. 149, 44, which governs public building procurement. The new provision, M.G.L. c 149, 44A ½, requires public awarding authorities to engage the services on an Owner s Project Manager on all building projects estimated to cost $1.5 million or more*. The law requires that the Owner s Project Manager (OPM) be hired before the project designer, meet required minimal qualification standards, and be selected through a qualifications based selection process. The OPM acts as the awarding authorities agent and consultant throughout the project from design through completion and must be completely independent from the designer, general contractor and any sub-contractors involved in the project at all times. The law provides a listing of the minimally required duties of the OPM as follows: The duties of the owner s project manager shall include, but need not be limited to, providing advice and consultation with respect to design, value engineering, scope of the work, cost estimating, general contractor and subcontractor prequalification pursuant to section 44D ½ or 44D ¾ when applicable, scheduling, construction and the selection, negotiation with and oversight of a designer and a general contractor for the project, ensuring the preparation of time schedules which shall serve as control standards for monitoring performance of the building project, and assisting in project evaluation including, but not limited to, written evaluation of the performance of the design professional, contractors, and subcontractors. Attached to this document is a matrix providing guidance on the role of the OPM through the different phases of a project. Those roles that are mandated by the law appear in bold and consist of advice and consultation in each of the areas. The law lays out minimal mandated roles and awarding authorities should carefully consider what other roles/tasks the OPM can provide to help ensure a successful project. Additional tasks and responsibilities that should be considered appear on the matrix but are not in bold. If the awarding authority determines that some of the nonmandatory tasks and responsibilities will be delegated to persons or entities other than the OPM they should first determine whether those persons or entities are qualified by experience to undertake the tasks. DCAM OPM Guidelines 12-04, Page 1 of 7

OPM Selection and Qualifications As stated above the law requires a qualifications based selection process, similar to a designer selection process that focuses on qualifications as opposed to lowest price. The law sets forth minimum qualifications standards for the OPM that require the OPM be a registered architect or professional engineer and have at least five (5) years of relevant experience in the construction and supervision of construction of buildings. In the event the OPM is not a registered architect or professional engineer they must have at least seven (7) years of relevant experience in the construction and supervision of construction of buildings. These are truly minimal requirements and awarding authorities will want to ensure they retain a highly qualified and experienced OPM to serve as their agent and consultant. Awarding authorities should carefully review OPM applicants to ensure they have significant relevant experience in the supervision of construction of the type and complexity necessary for the project. It is critical that the selected OPM be identified as an individual within a firm and that the identified individual meets, and preferably exceeds, the minimum qualifications. In evaluating applicants due consideration should be given to the potential OPM s personal experience, skills, existing work load, staff available for back-up and assistance, and prior direct experience providing services in both the mandatory tasks and any other additional tasks the awarding authority requires. In particular if the project is undertaken as a CM at Risk project the OPM should have prior experience with the unique aspects of CM at Risk projects including, but not limited to, GMP negotiation and open book cost review. The selected OPM as an individual will be intimately involved in the project and bears the ultimate responsibility of providing the required OPM services to the Awarding Authority. * The law allows a public agency to assign an existing employee to serve as its OPM provided that the designated employee meets or exceeds the minimum qualifications set forth for retaining a private sector project manager and has experience in the construction and supervision of construction of building of similar size and scope of complexity as the project to which the existing employee would be assigned. DCAM OPM Guidelines 12-04, Page 2 of 7

GUIDELINES- ROLE OF OWNER S PROJECT MANAGER UNDER M.G.L. c. 149, 44A1/2 (APPLICABLE TO ALL PROJECTS OVER $1.5 MILLION PROCURED UNDER M.G.L. c. 149, 44A-J and M.G.L. c. 149A) Owner s Project Manager (OPM) Role of Advice and Consultation in these areas is REQUIRED by MGL c. 149, 44A1/2, required role items appear in bold with an asterick Roles applicable to CM at Risk Projects only appear in italics = Advice and Consultation PRE-DESIGN PHASE DESIGN PHASE CONSTRUCTION PROCUREMENT CONSTRUCTION PHASE POST-CONSTRUCTION PHASE TASK SELECTION Designer Selection * Designer Negotiations* Site Selection Coordination of Participation by Stakeholders and other Parties Project Delivery Method Drafting of Designer Selection Materials Design Contracts Procurement of other necessary consultants CM Selection Process* CM Negotiation, Including Pre- Construction & GMP* General Contractor Bid Process * Subcontractor Bid Process* Prequalification of bidders* (when required or selected) Prequalification of CM & Trade Contractors* CM Selection Process* Trade Contractor Bid Process* CM Negotiation, Including Pre- Construction & GMP* Attend Pre-Bid Meetings Construction Contracts Bid Protests Procurement of furniture, fixtures & equipment On-Site Clerk or Resident Engineer Selection Commissioning Consultant(s) Selection Procurement of utilities, services, staff and contracts for building operation and maintenance DCAM OPM Guidelines 12-04 Page 3 of 7

PROJECT Overall Project Oversight* Designer Oversight * Designer Negotiation* Coordination of Consultant Reports & Recommendations A&C Overall Team Leadership as Owner s PM Monthly Status Reports to Owner on Project Establish Schedule Establish Design Criteria Establish Project Scope Design* Designer Evaluation* Permit Planning Establish CM Preconstruction Services Scope CM Oversight preconstruction services Coordination Meetings Design Document Review Permitting Process Contractor Oversight * CM Oversight* Contractor & Sub Evaluation* Oversee the Provision of on site Clerk or Resident Engineer Services i.e. daily logs, monitoring progress & quality, tracking submittals, coordinating testing & inspections Monitor Storage & Protection of Owner Purchased Materials, Furniture & Equipment Designer Evaluation* Regular Reports to Owner on all Aspects of Project Provide Support & Assistance in any Claims Related Matters or Litigation DCAM OPM Guidelines 12-04 Page 4 of 7

COST Cost Estimating * Monitor total project budget Review all project related invoices Develop Total Project Budget and Establish Proposed Expenditures Secure Funding Implement Controls for Project Budget Value Engineering Building Systems & Design* Cost Modeling for Alternative Solutions & Designs On CM Projects Coordinate Open Book Accounting process Analysis of Costs of Bids Bidders & Recommendations Analysis of Costs of CM Proposals & Firms & Recommendations Establish Cost Control mechanisms Monitor & Assess Progress Payments Assist Designer in Review & Approval of Requisitions Monitor Time & Material Activities Demands for Direct Payment Closure of Project Accounts Monitor Project Audit Provide Operation Cost Projects & Analysis of Alternative Contracts TIME Time Scheduling * Develop & Monitor Master Project Schedule & Advise on Schedule issues Develop Preliminary Schedule for all Design & Consultant Processes & Services Review Schedule Updates Insure Designers and Consultants Meet Schedule Dates, Provide Timeline, CPM Risk Analysis and Mitigation Strategies Insure Designers, Consultants & Contractor Meet Schedule Dates, Provide Timeline, CPM Risk Analysis and Mitigation Strategies Develop & Monitor Warranty Period Assessments & Work Until Handed Over to Facility Operational Staff DCAM OPM Guidelines 12-04 Page 5 of 7

CONTRACT ADMINISTRATION Maintain Project Communications & collect all project documentation Attend all Project Meetings as Owner s Rep. Attend & Present on Project at Public Meetings & Forums Maintain & Track Certificates of Insurance, Bonds, etc from designer, contractors & others Expedite Activities & Meetings to Achieve Timely Project Flow Establish Document Control System Establish procedures for reviews, approval, changes, etc. Oversee & Monitor Designer s Compliance with MBE/WBE Requirements Oversee & monitor CM s Compliance with MBE/WBE Requirements Monitor Project Change Log & advise Owner of Status & Financial Implications Proposed Change Requests Monitor Document Control System for Submittals & RFIs Claims for Additional Time or Cost Oversee & Monitor Contractor s Compliance with MBE/WBE Requirements Oversee & Monitor Contractor s Compliance with Prevailing Wage submissions Assist in Development of Punchlists & Monitor Completion of Punchlist Items Insure Warranties, As-Builts, O&M Manuals etc. are provided to Owner Manage & Control Storage & Turnover of All Project Related Records including As Builts, Record Drawings, Warranties & O&M Manuals to Owner Monitor Status & Completion of Punchlist Items Commissioning Commissioning Post-Occupancy Evaluation DCAM OPM Guidelines 12-04 Page 6 of 7

QUALITY AND SAFETY Programming Uses & Design Parameters Feasibility, Constructability, Labor & Materials Availability Develop & Administer Construction Mitigation Plan re: abutters Review & Advise on Design Issues/Problems Monitor Quality Assurance Program during Construction Ensure & Monitor the Development & Administration of Construction Mitigation Plan re abutters Ensure & Monitor Building Systems & Utilities are Tested & Operating Ensure & Monitor Contractor s Final Testing Training & Start-Up of Systems & Utilities DCAM OPM Guidelines 12-04 Page 7 of 7