In-House Technical & Engineering Support Technical procurement support at engineering stage Technical document review Production of reports to the requirements of the client In-depth project planning Route & port survey work Detailed transportation stability and suitability analysis Production of Manuals including Method Statements, sea fastening designs Project-specific Risk Assessments road transportation and delivery phase Production of operational report packs Regular HSSE diligence inspections are also carried out at load ports, on board vessels and at subcontractors premises
Occupational Safety & Engineering Support Structure and Accreditation Policies and procedures Training appropriate to level and role Plant and equipment operation, maintenance and certification Risk identification and Mitigation Safe systems of Work and Permits to Work Site inspections and Audits Emergency planning, Hazardous substances / Dangerous goods Accident and incident investigation and corrective action Setting Targets, Key Performance Indicators (KPI s) and Statistics Communication and Representation
PAWLOWO WIND FARM, POLAND Client: ACCIONA WINDPOWER Project Description: Scope: 53 WTG from FCA Acciona s workshops and storage yards in Spain to FOT Gdynia Port in Poland. 370 special transports, 60 trucks, 12 vessels. Volume: App 120.000 Cbm Period: On - going2012 / 2013
PAWLOWO WIND FARM, POLAND Client: ACCIONA WINDPOWER
KNOWLEDGECENTRE KLUISTAG Client: ACCIONA BLADES Project Description: Spot Project Scope: From FAS Port of Bilbao up to Kluistag Knowledgecentre facilities in Netherlands. 56.7 mts blade for testing. New multi MW machines blades generation BRA/SAF
CANELA II PROJECT Client: Acciona Wind Power Project Description: 40 sets of windmills. Scope: FOB, EXW to place of rest in Coquimbo/10 charter vessels (full and part cargo)/cargo tracking & tracing/ overall documentation/customs clearance. loaded in: Bilbao and Ferrol (Spain), Houston (Texas), Duluth (Great Lakes) Discharged Port: Coquimbo (Chile)
WAUBRA WINDPARK PROJECT Client: Acciona Wind Power Project Description: Client: Acciona Windpower, Spain 49 windmills..blades. Loaded in: Little Rock, Usa Discharged in:australia Scope: Ex works Little Rock USA to under hook Portland- Australia Loading of blades at vendors facility at Little Rock, trucking to Houston port, export customs clearance in USA marshalling at the port, loading on board the vessel, ocean freight to discharging port at Australia Period: 2008 2009
GUNNING WIND FARM PROJECT Client: Acciona Wind Power Project Description: 31 sets of windmills. Scope: From FOB Port of origin Spain & Korea. Ocean freight to destination port - Port Kembla (AUS) At port of destination unload cargo and transfe r to 2nd Zone 2 to collection truck, including port handling. The park is located in the state of New South Wales, in the town of Gunning, about 240 km southwest of the port of Sydney and 180 km fr om Port Kembla, Australia Period: 2010
DUNAS DE PARACURU, CEARÁ BRAZIL WIND FARM PROJECT Client: GAMESA Project Description: 21 sets of windmills. Scope: FOT Bilbao Ocean Transport onshore Receive Nacelles alongside the vessel at the port of Salvador, Bahia. Customs Clearance and transport to jobsite at Camari. Period: 2011
IV Jornadas Energía Eólica - AUdEE APR Energy Project UTE Planta Delta del Tigre 200 MW y La Tablada 100MW