Preventative Maintenance For Feed Processing Facilities and. Equipment



Similar documents
Presentation of. factory at Segmon, Grums municipal.

AESCO/MADSEN. Self-Erect Silos by AESCO/MADSEN

We will discuss common industrial applications with guides for the proper use of electric motors on these.

Model No. 4 Vertical Mixer 9 Screw Feeder Inlet H15400, May 1999 (# )

Mechanical Installation

#9. EFFECTIVE CLEANING, MAINTENANCE, AND PEST CONTROL PROGRAMS FOR YOUR HACCP PLAN

King Fahd University of Petroleum and Minerals Electrical Engineering Department EE399 Summer Training. Prepared for. By Baqer Bu-Shafie ID:

4. HOUSE RULES PEST CONTROL

FOR SALE: RECYCLING PLANT FOR. - Aluminum scrap - Light metals - WEEE - Mixed industrial waste BANO PREMAC HYDRO. Single shaft shredder

Boiler Efficiency. Charles Stark Department of Poultry Science.

NEW CONVEYOR EQUIPMENT Parts & Services

ASPHALT PLANT, NOMINAL PRODUCTION OF 160 T/H, IN

Useful Key Performance Indicators for Maintenance

Topics of the Presentation

2100 AD Mirror Elevator Ball Nut Replacement Procedure

How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later

Choosing Between Electromechanical and Fluid Power Linear Actuators in Industrial Systems Design

1300 MAXTRAK SPECIFICATION

HMHF DIRECT DRIVE BELT DRIVE. Manufactured by UDY Corporation. Cyclone Models Available:

MAINTENANCE OF WHEELMOVE IRRIGATION SYSTEMS

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Product Brochure. Controlled start transmission

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

Belt Drives and Chain Drives. Power Train. Power Train

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.

FOREWORD. Right and left as used throughout this manual are determined by facing the direction the machine will travel when in use.

Controlled Start transmission

(3) Explosion proof. Designed to prevent ignition of any explosive gases or dust and dirt which may surround the motor.

Instructions and precautions. Fork Height. Visit our website at:

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District

Cooking at the Speed of light!

The Pelleting Process

INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR THREE PHASE INDUCTION MOTORS

SINGLE PHASE MOTORS. INSTALLATION AND MAINTENANCE MANUAL March 21, 2006

3620 W 11th Streetб Houston, TX Telephone: sales@kellogg-american.com Website:

Reasons for reissue of this instruction sheet are provided in Section 5, REVISION SUMMARY.

UNIVERSAL CLEANERS. Seed Conditioning And Processing Global Solution UNIVERSAL 240

OWNER S/OPERATOR S - PARTS MANUAL CEMENT MIXER MODEL MX-80

First Aid Kit The Expert in Lubrication Solutions

INTEGRATED PEST MANAGEMENT

Pump Maintenance - Repair

Technical Guide 08/15/14

APPENDIX F VIBRATION TESTING PROCEDURE

Title: Plant and Equipment Management Procedure

Name of Business. Record 1- Approved Food Suppliers List

FORKLIFT SAFETY BASICS & OPERATOR S DAILY CHECKLIST

PEST CONTROL SYSTEMS

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

Cement Processing Overview. Power Transmission Products & Solutions for Cement Processing

BLASTING SYSTEMS. Turbine blasting systems. Air blasting systems. Automatic Painting plants

UTILITIES DEPARTMENT

Federal Wage System Job Grading Standard for Air Conditioning Equipment Mechanic, Table of Contents

SUPER 600. Tracked Paver SUPER 600. Pave Widths 0.5m 2.7m. Maximum Laydown Rate 200 tonnes/h. Clearance Width 1.2m

Information and Instructions

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

Compressors Buying Guide

Mini Pallet Jack OWNER S MANUAL

World-Class Oil Sampling It is Possible

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS

Belt Tensioning Methods for Small Package Conveyors What s the best solution?

Integrated Pest Management Program Contract Guide Specification Revision -

Income Statement A Financial Management Tool

Free Examples of plant layout drawing

Contents. Acknowledgements... iv. Source of Data...v

ULTRA 865HD HIGH PERFORMANCE MULTI PURPOSE GREASE

After close to 50 years working with an unloading

MASTER DATA THE BACKBONE OF A SUCCESSFUL COMPUTERISED MAINTENANCE MANAGEMENT SYSTEM. KEYWORDS: Master Data, Maintenance, ERP, CMMS, SAP.

Feed Mill Operations & Key Performance Indicators. Charles Stark North Carolina State University

In-Track Repair of Concrete Ties. Deland Humpherys, Director Track Mtce

A. The top cover quality is not adequate for the system/material being conveyed. Upgrade to a heavier top cover. Upgrade to a better cover compound.

CNC MILLING MACHINE TROUBLE SHOOTING. 1. Trouble Shooting. No Trouble Solution. 1.Check the air pressure

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

Batching and Mixing Plants

Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, Table of Contents

Rutgers Environmental Health and Safety

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

DUGARD. Machine Tools Since Dugard 700L Series Heavy Duty CNC Lathes.

WASTE WATER TREATMENT for surface treatment applications

Convoy Application For Motor Oil Limited Warranty

Hygiene Standards for all Food Businesses

Eaton 9-Speed Synchronized Transmissions Double H Shift Control Configuration TRDR0070

T160 Heating Refrigeration and AC Technician MTCU Code Program Learning Outcomes

Manual piston sampler...m 11

10 tips for getting more reliability from your air-conditioning system [reliability]

DIESEL Technician. Endorsement: Diesel Technician Prerequisite: None CORE STANDARDS, OBJECTIVES, AND INDICATORS

KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850

Ingredion ANZ Pty Ltd

TECHNICAL INFORMATION

Septic System Owner s Manual

REQUEST FOR QUOTES (RFQ) FOR HVAC MAINTENANCE AND REPAIR SERVICES. RFQ Release Date: August 3, Quote Due Date: August 21, 2015 at 5:00 p.m.

Unit 24: Applications of Pneumatics and Hydraulics

TPM at the heart of Lean - March 2005 Art Smalley

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

Interactive Computer Based Courses

Transcription:

MF-2041 1 Feed Manufacturing The goal of onfarm feed manufacturing is to produce feed that meets the intended specifications, both in nutritional composition and desired medication level, and is free of contaminants. The production of quality feed will enhance animal performance and improve the profitability of the livestock enterprise. A set of guidelines for processing feed, referred to as Good Manufacturing Practices (GMPs), are designed to prevent feed contamination and provide reasonable assurance that the feed is manufactured accurately. These guidelines serve as Food and Drug Administration (FDA) regulations. Everyone involved in producing medicated or nonmedicated feed, whether at a commercial off-farm plant or at an on-farm mill or grinder/mixer, must comply with the GMPs. The objective of this bulletin is to provide the onfarm feed processor or nonregistered commercial mill operator with useful information pertaining to the maintenance of facilities and equipment. Correct application of these technologies will improve feed quality and operation efficiency, reduce the likelihood of feed contamination, and help ensure safe meat, milk, and eggs destined for human consumption. Buildings and Grounds Buildings and grounds must be constructed and maintained to prevent the contamination of feed by rodents, insects, birds, nonfeed additives (chemicals, lubricants, dangerous foreign material such as glass), and moisture. The Code of Federal Regulations (CFR s Title 21 Part 225.120) states that buildings used for production of medicated feed shall provide adequate space for equipment, processing, and orderly receipt and storage of medicated feed. Areas shall include access for routine maintenance and cleaning of equipment. Preventative Maintenance For Feed Processing Facilities and Equipment Fred Fairchild Extension Specialist, Feed Manufacturing Grain Science and Industry Department of Grain Science and Industry Buildings and grounds shall be constructed and maintained in a manner to minimize vermin and pest infestation. Grain bins, hatches, lids, augers, and terrain around the bin should all prevent moisture from entering the grain and feed components. Feed ingredients must be protected from excess moisture to avoid contamination by mold that can possibly produce harmful toxins and reduce palatability. Rodents, birds, and insects can potentially spread disease through feces, urine, and body parts such as feathers or hair. They can cause grain to become sample grade or another type of grade reduction, and they can consume significant amounts of feed ingredients. Roofs, walls, doors, and floors of feed manufacturing and storage facilities should be designed and maintained to prevent entry of these pests. For further information pertaining to the design of bulk and bagged storage facilities for feed and feed ingredients, refer to Kansas State University Extension Bulletins MF-2039 and MF-2040. Equipment Feed processing equipment must be designed, maintained, and operated in such a manner to ensure accuracy in ingredient proportioning and adequate processing. The CFRs (Part 225.130) for feed manufacturing equipment state, equipment shall be capable of producing medicated feed of intended potency and purity and shall be maintained in a reasonably clean and orderly manner. Scales and liquid metering devices shall be accurate and of suitable size, design, construction, precision, and accuracy for their intended purposes. All equipment shall be designed, constructed, installed, and maintained so as to facilitate inspection and use of clean-out procedure(s). Kansas State University Agricultural Experiment Station and Cooperative Extension Service

2 Preventive Maintenance A plan to regularly check (or service) equipment and make necessary repairs on a scheduled basis will more than pay for itself when compared to having to do the same work in a crisis or hurried situation. As a general rule, for every dollar spent on preventive maintenance, you will save at least five dollars in subsequent expenses. Maintenance is defined as the proper planning and action to minimize and avoid breakdowns and lost time. If an incident does occur, maintenance is a prepared and organized plan to return operations to normal in as short a time as possible. Maintenance can be divided into four different types. Routine maintenance consists of servicing equipment on a scheduled basis. This may consist of activities such as lubrication of bearings, replacing hammermill screens, turning or replacing hammers, checking drive V-belts, and checking oil levels in gear boxes. Emergency maintenance entails reacting to unscheduled breakdowns. This maintenance must be done immediately and supersedes all other types. Call-in maintenance usually involves an emergency situation where the people required are not at hand and must be summoned from somewhere else, such as a millwright service or contractor. Preventive maintenance consists of scheduled inspections and making adjustments and repairs to equipment to make sure it is in proper working order. This includes the replacement (based on observed conditions or known useful life spans) of worn parts prior to failure. The first step in developing a maintenance program entails collecting good information and organizing it in a useful form. The charts in the back of this bulletin will assist the preparation of an individualized program. This information may be gathered under the following headings: 1. Equipment identification 2. Equipment information 3. Equipment maintenance requirements 4. Parts inventory 5. Maintenance records Equipment Identification At some point, every piece of equipment in the feed mill will need maintenance of some type. In order to track the frequency of maintenance needed and its type and cost, each piece of equipment must be identified in some manner. Each piece of equipment should have its own identification number. An easy way to accomplish this is to draw a flow of the entire feed milling process showing each piece of equipment along with its identification number (Figure 1). It also may be desirable, in larger plants, to not only identify the equipment by number, but also by system, cost center, or physical location. An example would be A-RE-1 which says receiving conveyor #1 is located in building or area A. Once the decision has been made on how to assign identification numbers to the equipment, it is necessary to prepare a master list of the equipment showing each identification number and the piece of equipment it identifies (See Chart 1). Equipment Information Having an equipment identification system is useless unless it is used as the key to getting and keeping information about each machine. This is most easily done by filling out an information sheet on each piece of equipment. A sample information sheet is shown in Chart 2. The information may be gathered from operating manuals, purchase records, visual inspection, supplier information, or other sources. The information should include not only key part data and sizes, but also a supplier code to show where parts may be found. This code could indicate a supplier s name, address, and phone number; or if the part is in plant inventory the code may just say inv. A type of supplier master list could be used as shown in Chart 3. Separate supplier code pages should be used for each letter of the alphabet. Equipment Maintenance Requirements Each manufacturer can supply recommended routine maintenance procedures and schedules for the equipment they supply. This information may be found in installation and operating manuals, catalogs, or by direct contact with the supplier. Lubrication frequencies depend on operating conditions and time intervals. The equipment supplier, or your lubricant supplier, can suggest proper scheduling intervals and amounts to be used. Regular equipment checking and maintenance also will help to identify proper preventative maintenance scheduling and types. Emergency maintenance situations, especially as a history is developed for a machine, will determine routine and preventive maintenance scheduling. A suggested maintenance schedule form is shown in Chart 4. Maintenance procedures, except for emergency maintenance, should be tied to a calendar to ensure that required maintenance occurs as scheduled. See Chart 5 for a sample maintenance calendar.

3 Parts Inventory It would be wonderful if every time an emergency maintenance situation occurred, the necessary parts were on hand and available. Unfortunately, no company can afford the cash outlay it would require for the parts. A sensible approach to the parts inventory situation is to classify parts into three categories. Critical hard-to-get parts, Parts readily available from a supplier, Parts that allow sufficient time for securing. Parts that are crucial or hard to get should be kept on hand or where they can be immediately obtained. Noncritical parts may be ordered from suppliers as needed. On the Equipment Information sheets you may want to include a required availability code by each part or piece of equipment. A suggested coding might be: I = On hand (plant inventory), S = On hand at supplier, and O = must be ordered. The parts needed in plant inventory will be determined by how often they are needed. Routine, preventive, and emergency maintenance records will help identify availability requirements for parts. Maintenance Records As maintenance work is performed, a separate record of what was done, parts required, labor required, special equipment required, and other cost items should be kept. A total cost for each maintenance operation should be figured and shown on the record form. This information will soon establish the maintenance cost for each machine. It will indicate potential and continuing trouble spots. It will tell how often preventive maintenance should be scheduled and what should be done to avoid emergency maintenance situations. It helps in making decisions about repairing or replacing equipment or even eliminating an operation or process. A simple maintenance record form is shown in Chart 6. Figure 1. Feed mill flow diagram 5 29 40 54 55 11 12 39 53 41 42 56 28 23 24 30 43 44 45 57 6 7 10 9 8 16 22 INGREDIENT BINS PELLET MASH GRAIN & PELLET BINS 61 SACKING BINS BULK FEED BINS 14 13 17 18 21 19 20 4 25 26 27 32 34 33 31 35 46 52 47 48 62 63 64 65 59 58 15 1 2 3 36 37 49 50 66 60 38 51 OUTSIDE STORAGE GRINDING RAIL & TRUCK RECEIVING GRAIN CRIMPING MIING PELLETING MOLASSES FEED SACKING BULK STORAGE & LOAD OUT

4 Chart 1 7 EQUIPMENT LIST I.D. # Description 1. Rail Receiving Conveyor 2. Truck Receiving Conveyor 3. Magnet 4. Receiving Elevator 5. 6. Transfer Conveyor 7. Turnhead Distributor 8. Corn Storage Bin 9. Milo Storage Bin 10. Alfalfa Storage Bin 11. Receiving Scalper 12. Receiving Distributor 13. Storage Bin Feeders 14. Grain Transfer Conveyor 15. Grain Transfer Elevator 16. 17. Surge Bin and Level Control 18. Feeder 19. 20. Discharge Conveyor 21. Air System 22. Grinding Elevator 23. Grinding Distributor 24. Pneumatic Receiving Pipes I.D. # Description 25. Grain Screener (with Aspiration) 26. 27. Grain Crimper 28. Crimped Grain Elevator 29. Transfer Conveyor 30. 31. Ingredient Bin Screw Feeders 32. Main Ingredient Scale 33. Mineral Ingredient Scale 34. Scale Air Gate 35. Scale Air Gate 36. Batch Mixer 37. Surge Bin 38. Surge Conveyor 39. Mixing Elevator 40. Magnet 41. Mash Cleaner 42. Overs Regrinder 43. Mash Distributor 44. Mash Transfer Conveyor 45. Mash Distributor 46. Slide Gates 47. Surge Bin 48. Pellet Mill Chart 2 8 EQUIPMENT INFORMATION Equipment ID# 4 Description Receiving Date Installed 6/85 Installer Goodwell Construction Motors (Supplier Code A-1 ) Brand Bagdor Frame HP 15 Serial RPM 1800 Shaft Volts 230/460 Sleeve Amps Design Input RPM Code Output RPM Tongue Bearings (Fan) Misc. Gearbox (Supplier Code P-5 ) Brand Dodge Input Shaft Model TT 525 Input Sheave Serial Output Shaft Ratio 25:1 Misc. V-Belts 5V630 Leg Belt _ Chain Leg Cups_ Couplings Augers Misc. Driven Equipment (Supplier Code ) Bearings (Supplier Code ) Driven Shaft Leg (top) (bottom) Driven Sheave Sprocket Auger (tail shaft) (hangers) Jackshaft Input Shaft Shafts Input Sheave, Sprocket Shafts Output Shaft Misc. Bearings Output Sheave, Sprocket Misc. Bearings Final Shaft Misc. Bearings Final Sheave, Sprocket Misc. Bearings Belt/Chain (Supplier Code ) Cups/Paddles (Supplier Code ) Brand Brand Type Style Width Size Ply/Size Spacing Length Bolts Splice Punching _ Fastener Quantity _ Other Information Supplier Code ( ) ( ) ( ) ( )

5 Chart 3 A 9 SUPPLIER LIST Code A-1 Code Name: Acme Electric Co. Name: Address: _ 201 S. Green Address: _ Jones, Kan. 66000 913-555-0000 FA: 913-555-0900 FA: 913-666-5678 Contact: Bill Smith Contact: Code A-2 Name: Adams Supply Address: _ 1613 Highway 1 Southtown, Kan. 60006 316-444-5555 FA: 316-444-1000 316-321-9876 Contact: John Adams Code Name: Address: _ FA: Contact: Code Name: Address: _ FA: Contact: Code Name: Address: _ FA: Contact: Chart 4 10 MAINTENANCE SCHEDULE Equipment ID: 4 Description: Receiving Elevator 1. Check Grease Bearings 2. Check Gearbox Oil 3. Change Gearbox Oil 4. Grease Motor Bearings 5. Check V-Belts Daily Weekly Monthly 6 Months 12 Months 6. Oil Chains 7. Check Leg Belt 8. Check Leg Cups 9. Check Roto Guard/Oil/Belt 10. Check Head Pulley 11. Check Grad Chain Paddles 12. Check Hanger Bearings 13. Check Air Filter 14. Blow Off Condensate 15. Check Crankcase Oil 16. Change Crankcase Oil 17. Check Hydraulic Oil/Leaks 18. Additional Maintenance

6 Chart 5 Month: 11 MAINTENANCE CALENDAR 1 2 3 4 5 6 7 Pellet Mills Oil Mixer Auger 60, 102, 61 96, 96-A, 100, 101 Milo Cooler Boiler Air Compressors Milo Cooler Fan Fan 28A-2708B&C Chemical Pump Bins 11 thru 22 Bins 27-27A-28-Augers Bin 99 Bins 29 Thru 46 Rollers 1-2 -Fines Fan 8 9 10 11 12 13 14 Pellet Mill s Air Conditioner Bins 29 thru 36 Boiler Balance Scales Air Lifts Three Ton Mixer Air Compressors Tractors Bobcat Fat Filter Mol. Filter 15 16 17 18 19 20 21 Bins 1 thru 10 Pellet Mills Man Lift Boiler Air Compressors Rolls 1-2 Bagging Scales 10 Shots no more 22 23 24 25 26 27 28 Pellet Mills Boiler Air Compressors Hydraulic Pump Molasses & Fat Pumps Tractors Bobcat Legs 43-33 Augers 41 thru 106 Scalper Legs 53-54 - Leg Pellet Cooler Leg 10 & 20 Hole Distributors Leg References Hamil, J.R., 1994. Maintenance programs. In: R.R. McEllhiney, ed., Feed Manufacturing Technology IV, American Feed Industry Association, Arlington, VA. Heintzelman, J.E., 1976. The Complete Handbook of Maintenance Management, Prentice Hall, Inc., Englewood Cliffs, NJ. MF-2039. 1995. Bulk Ingredient Storage. KSU Cooperative Extension Service. Manhattan, KS. MF-2040. 1995. Bagged Ingredient Storage. KSU Cooperative Extension Service. Manhattan, KS. 29 30 31 Pellet Mills Boiler Air Compressors Chart 6 12 MAINTENANCE RECORD Equipment ID: 4 Description: Receiving Elevator Date Repair Work Performed: Workers: Cost: 10/1/88 Splice Belt Replace Caps Elev. 325.00 Brand names appearing in this publication are for product identification purposes only. No endorsement is intended, nor is criticism implied of similar products not mentioned. Contents of this publication may be freely reproduced for educational purposes. All other rights reserved. In each case, credit Fred Fairchild, Preventative Maintenance for Feed Processing Facilities and Equipment, Kansas State University, January 1997. 12/3/89 Replace Headshaft Bearing Goodwell 983.00 Kansas State University Agricultural Experiment Station and Cooperative Extension Service MF-2041 January 1997 It is the policy of Kansas State University Agricultural Experiment Station and Cooperative Extension Service that all persons shall have equal opportunity and access to its educational programs, services, activities, and materials without regard to race, color, religion, national origin, sex, age or disability. Kansas State University is an equal opportunity organization. Issued in furtherance of Cooperative Extension Work, Acts of May 8 and June 30, 1914, as amended. Kansas State University, County Extension Councils, Extension Districts, and United States Department of Agriculture Cooperating, Marc A. Johnson, Director.

Chart 1 7 EQUIPMENT LIST I.D. # Description Rail Receiving Conveyor 1. Truck Receiving Conveyor 2. Magnet 3. Receiving Elevator 4. 5. Transfer Conveyor 6. Turnhead Distributor 7. Corn Storage Bin 8. Milo Storage Bin 9. Alfalfa Storage Bin 10. Receiving Scalper 11. Receiving Distributor 12. Storage Bin Feeders 13. Grain Transfer Conveyor 14. Grain Transfer Elevator 15. 16. Surge Bin and Level Control 17. Feeder 18. 19. Discharge Conveyor 20. Air System 21. Grinding Elevator 22. Grinding Distributor 23. Pneumatic Receiving Pipes 24. I.D. # Description Grain Screener (with Aspiration) 25. 26. Grain Crimper 27. Crimped Grain Elevator 28. Transfer Conveyor 29. 30. Ingredient Bin Screw Feeders 31. Main Ingredient Scale 32. Mineral Ingredient Scale 33. Scale Air Gate 34. Scale Air Gate 35. Batch Mixer 36. Surge Bin 37. Surge Conveyor 38. Mixing Elevator 39. Magnet 40. Mash Cleaner 41. Overs Regrinder 42. Mash Distributor 43. Mash Transfer Conveyor 44. Mash Distributor 45. Slide Gates 46. Surge Bin 47. Pellet Mill 48.

Chart 2 8 EQUIPMENT INFORMATION Equipment ID# Date Installed Description Installer Motors (Supplier Code ) Brand HP RPM Volts Amps Input RPM Output RPM Bearings (Fan) Gearbox (Supplier Code ) Brand Model Serial Ratio V-Belts Chain Couplings Misc. Driven Equipment (Supplier Code ) Driven Shaft Driven Sheave Sprocket Jackshaft Input Shaft Input Sheave, Sprocket Output Shaft Output Sheave, Sprocket Final Shaft Final Sheave, Sprocket Belt/Chain (Supplier Code ) Brand Type Width Ply/Size Length Splice Fastener Frame Serial Shaft Sleeve Design Code Tongue Misc. Input Shaft Input Sheave Output Shaft Misc. Leg Belt _ Leg Cups_ Augers Bearings (Supplier Code ) Leg (top) (bottom) Auger (tail shaft) (hangers) Shafts Shafts Misc. Bearings Misc. Bearings Misc. Bearings Misc. Bearings Cups/Paddles (Supplier Code ) Brand Style Size Spacing Bolts Punching _ Quantity _ Other Information Supplier Code ( ) ( ) ( ) ( )

Chart 3 A 9 SUPPLIER LIST Code A-1 Code Name: Acme Electric Co. Name: Address: _ 201 S. Green Address: _ Jones, Kan. 66000 913-555-0000 FA: 913-555-0900 FA: 913-666-5678 Contact: Bill Smith Contact: Code A-2 Name: Adams Supply Address: _ 1613 Highway 1 Southtown, Kan. 60006 316-444-5555 FA: 316-444-1000 316-321-9876 Contact: John Adams Code Name: Address: _ FA: Contact: Code Name: Address: _ FA: Contact: Code Name: Address: _ FA: Contact:

Chart 4 10 MAINTENANCE SCHEDULE Equipment ID: 4 Description: Receiving Elevator Daily Weekly Monthly 6 Months 12 Months 1. Check Grease Bearings 2. Check Gearbox Oil 3. Change Gearbox Oil 4. Grease Motor Bearings 5. Check V-Belts 6. Oil Chains 7. Check Leg Belt 8. Check Leg Cups 9. Check Roto Guard/Oil/Belt 10. Check Head Pulley 11. Check Grad Chain Paddles 12. Check Hanger Bearings 13. Check Air Filter 14. Blow Off Condensate 15. Check Crankcase Oil 16. Change Crankcase Oil 17. Check Hydraulic Oil/Leaks 18. Additional Maintenance

Chart 5 11 MAINTENANCE CALENDAR Month: 1 2 3 4 5 6 7 Pellet Mills Oil Mixer Auger 60, 102, 61 96, 96-A, 100, 101 Milo Cooler Boiler Air Compressors Milo Cooler Fan Fan 28A-2708B&C Chemical Pump Bins 11 thru 22 Bins 27-27A-28-Augers Bin 99 Bins 29 Thru 46 Rollers 1-2 -Fines Fan Legs 43-33 Augers 41 thru 106 Scalper 8 9 10 11 12 13 14 Pellet Mill s Air Conditioner Bins 29 thru 36 Boiler Balance Scales Three Ton Mixer Air Compressors Air Lifts Tractors Bobcat Fat Filter Mol. Filter Legs 53-54 - Leg Pellet Cooler Leg 15 16 17 18 19 20 21 Bins 1 thru 10 Pellet Mills Man Lift Boiler Air Compressors Rolls 1-2 Bagging Scales 10 Shots no more 10 & 20 Hole Distributors 22 23 24 25 26 27 28 Pellet Mills Boiler Air Compressors Hydraulic Pump Molasses & Fat Pumps Tractors Bobcat Leg 29 30 31 Pellet Mills Boiler Air Compressors

Chart 6 12 MAINTENANCE RECORD Equipment ID: Description: Date Repair Work Performed: Workers: Cost: 10/1/88 Splice Belt Replace Caps Elev. 325.00 12/3/89 Replace Headshaft Bearing Goodwell 983.00