Flood Events Preparedness, Remediation and Restoration. Rev 3 Dec 2014



Similar documents
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc

later damage - Loss ControL

Clinic Business Continuity Plan Guidelines

A cure for water damage in real estate

Emergency Response Program

NAIT Guidelines. Implementation Date: February 15, 2011 Replaces: July 1, Table of Contents. Section Description Page

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

University of Victoria EMERGENCY RESPONSE PLAN

Business Continuity Planning. Donna Curran, Director Audit and Risk Management February, 2014

Implementation Date: May 5, Table of Contents. Section Description Page. 1.0 Description Initial Response 2

SCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E (mobile)

The Local Government Purchasing Cooperative

Clinic Business Continuity Plan Guidelines

Jefferson Parish Department of Water Emergency Plan

How To Write A Flood Emergency Response Plan For Texamona University

Factor Restoration. simplifying IT

Response, Reliability and Results. for Managed Property

Guideline - Business Continuity Plan

White Paper AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING AND SOLUTIONS FOR IT AND TELECOM DECISION MAKERS. Executive Summary

Home Repair After a Hurricane Disaster

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

How to Prevent Liquid Damage Property Losses

Restoration Services Company

Verizon, 911 Service and the June 29, 2012, Derecho

11 Common Disaster Planning Mistakes

Restoring your Property: How to be prepared for Rapid Response to Flood Damage

WATER DAMAGE RECOVERY G U I D E

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

A trusted partner to insurance adjusters. Fast, accurate, claims solutions 24 hours a day, 365 days a year.

Water Damage & Catastrophic Water Loss

24/7 Emergency Response Cleaning Services Reconstruction. DISASTERS HAPPEN. We take care of them all.

DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS. By Frank Westfall and Robert Winterburn

APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING

Business continuity plan

Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.

Crisis Management Plan

OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN

Table of Contents ESF

Business Continuity and Disaster Planning

Business Continuity Management

Datacenter Site Selection Checklist

STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY

contractors, etc. and establish relationships with lease and rental companies.

Table of Contents ESF

Draft 8/1/05 SYSTEM First Rev. 8/9/05 2 nd Rev. 8/30/05 EMERGENCY OPERATIONS PLAN

Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form)

Business Continuity Template

Business Continuity Planning (BCP) / Disaster Recovery (DR)

Hurricane Checklist. It is in the best interest to ensure that our employees are safe and that our properties are secure prior to a hurricane event.

Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54

UNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES

Workforce Solutions Business Continuity Plan May 2014

BASEMENT FLOODING. Prevention Guide for. Homeowners

It also provides guidance for rapid alerting and warning to key officials and the general public of a potential or occurring emergency or disaster.

A cure for water damage in Public Sector facilities. Risk Services: Understanding risk across your community

DIR CONTRACT NO. DIR-TEX-AN-NG-CTSA-010 ATTACHMENT F-3 TO EXHIBIT F BUSINESS CONTINUITY AND DISASTER RECOVERY PLAN FINAL VERSION

Business Continuity/June floods Terry Dick, Senior Emergency Management Specialist May 12, 2014

Building and Maintaining a Business Continuity Program

Ohio Supercomputer Center

History of the SPCC Rule

University of Michigan Disaster Recovery / Business Continuity Administrative Information Systems 4/6/2004 1


MAJOR PLANNING CONSIDERATIONS CHECKLIST

Backup Plan Examples. What s Your Backup Plan?

Business Continuity Planning (800)

BCP and DR. P K Patel AGM, MoF

DISASTER PLANNING AND RECOVERY An Ounce of Prevention

Government Commercial Residential. CA License # NV License #

Clark University. Water Outage Preparedness and Response Plan. Revised January 11, 2013

Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0

Learning about an Emergency Management Plan GET READY NOW!

Fire Department Guide. Creating and Maintaining Business Continuity Plans (BCP)

City of Buffalo Municipal Electric Utility Energy Emergency Response

Table of Contents... 1

Business Continuity White Paper

Like it never even happened.

Emergency Preparedness Guidelines

Preparing Your Organization for Disaster. - Preparedness Exercise -

A cure for water damage in offices and habitational facilities. Risk Services: Understanding risk across your business

Disaster Recovery Plan (DRP) / Business Continuity Plan (BCP)

Before. Here is a list of recommended items that will help you in the recovery process:

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

IT Disaster Recovery Plan Template

Disaster Recovery Best Practices & Lessons Learned

Case Studies. Disaster Recovery Restoration Remediation Decontamination

Fundamentals of Business Continuity Planning Have a Plan!

Transcription:

Flood Events Preparedness, Remediation and Restoration Rev 3 Dec 2014

Impacts PART 1 - IMPACTS 2013 Brookfield Johnson Controls January 30, 2015 2

Impacts 2013 Brookfield Johnson Controls January 30, 2015 3

Heavy Rain / Flood Potential Impacts Roof Damage / Roof Leaks Clogged Roof Drains Floor drains backing up / water contaminated with sediment and sewage Flooded parking lots Flooded basements Water penetration under doorways (flush with parking lot) Damaged carpet Water penetration into drywall (will absorb 2 feet from floor) Potential for mould growth Flooded storage tanks & associated environmental spills Electrical hazards Electrical damage Temporary loss of utility service Damage to site electrical services Communication failures (depending on location of service) Loss of Security / FLSS monitoring Damage to physical assets in basement areas Damaged Powered Industrial Vehicles & Charging Stations Consideration for staff safety (stuck at the building, commuting or responding) Closed Roads / Disruptions to mass transit: shift change, etc. Spoilage for perishables / consumer products 2013 Brookfield Johnson Controls January 30, 2015 4

Impacts 2013 Brookfield Johnson Controls January 30, 2015 5

Impacts 2013 Brookfield Johnson Controls January 30, 2015 6

BJCC Potentially Impacted Client Properties Flood Potentially Impacted Sites Client Property Count FI 1 144 FI 2 164 Telco 1 12 Telco 2 6 Industrial 32 Commercial 35 Total 393 2013 Brookfield Johnson Controls January 30, 2015 7

Response Part 2 Response 2013 Brookfield Johnson Controls January 30, 2015 8

BJCC Activation & Response Media Scan of rising water levels Client support requests to Ops Centre Escalation to Facility Managers Activation of CMT Deployment of Security, Janitorial and Mobile Tech Resources to investigate and assist. Account BCP Support Plans activated: Teams Engage with Clients on priorities BJCC and Client Response Assets mobilized & deployed in advance of rising flood waters 2013 Brookfield Johnson Controls January 30, 2015 9

BJCC Mobilization of Resources 2013 Brookfield Johnson Controls January 30, 2015 10

FirstOnSite Mobilization FirstOnSite Restoration receives weather update and notification from BJCC Catastrophic Large Loss Team is activated. (Nashville/Toronto) Account manager is dispatched to BJCC designated Emergency Command Centre to provide communication and prioritization response from the FOS Catastrophic Large Loss Team. FOS activates it s Emergency Command Centre (Mississauga), prioritizes all FOS prep clients. FOS branches in Southern Ont. are notified and are instructed to dispatch crews (project managers, crews, Health& Safety personal, flood equipment, PP Equipment etc..) to FOS Mississauga office. All N.A. FOS branches placed on standby and start to mobilize. FOS environmental vendors notified- will require testing re: category 3 Black Water contamination/ due to backup sewage drains. Procurement dept. notifies rental companies and implements first right of refusal agreements, i.e. lodging, pump trucks, generators, flood tubes etc.. Notification with rental companies N.A. wide. 2013 Brookfield Johnson Controls January 30, 2015 11

FirstOnSite Response FirstOnSite Restoration account manager assigned to BJCC provides response priortity assignments to the FOS emergency command centre. Within the first 2 hours of FOS mobilization the first local/regional crews start arriving to effected BJCC properties with equipment. FOS procurement secures additional resources i.e. rental/supply companies(materials, generators, pump trucks, labour). Sub trades placed on stand by. FOS has 8,000 subcontractors/trades across Canada. Large Loss Team will be assigned to priority damaged properties and PREP locations. (BJCC sites that FOS project managers have toured and recorded property data i.e. floor drains, shut off valves, S/R, security, etc.) FOS branches across Canada supply equipment sent by transport truck to Mississauga office for deployment. Project managers are also being flown in to Toronto from across Canada and U.S. (12 to 24 hrs.) 2013 Brookfield Johnson Controls January 30, 2015 12

FirstOnSite FAQ - Equipment What type and how much equipment does FirstOnSite Restoration have? Air Movers Air Scrubbers Dehu s Dessicant DryIce Hydroxyl Machines Odour Control Ozone Machines Power panels Specialty Drying Vacuums Water Extractors AB 152 24 27 2 3 5 3 3 7 5 8 8 247 ATL 487 38 336 0 62 42 70 1035 BC 734 41 253 0 1 1029 MB 120 17 62 1 7 3 4 8 6 31 7 266 N. ON 128 14 61 2 6 211 QC 484 79 198 5 32 798 SK 109 3 37 3 1 3 1 14 13 184 S. ON 1714 189 508 82 39 2532 3928 405 1482 6 10 5 158 10 57 12 86 143 6302

FirstOnSite Emergency Services Water Damage 70% of property damage involves water Mould growth can start in 48 hours Engage Trained & IIRC certified staff and specialized equipment Thermographic cameras Moisture meters Dessicant Dryers Truck Mount Extraction Systems Trailer mount dryers In wall drying equipment Air Movers, Dehumidifiers, pumps and portable water extractors

BJCC Deployment of Assets 1. Secure Fuel Supply for Emergency Generators / Anticipation of Utility Interruption 2. Airlift flood tubes from base sites. Deploy to threatened critical Infrastructure sites 3. Mobile Technical Responders: Investigate and Report Isolate & Make Safe Reduce impact by moving high value assets to higher levels Transport and set up spill barriers / sandbags Deploy pumps and generators. 4. Security Partners Secure client properties Investigate and Report Access to Evac Zones 2013 Brookfield Johnson Controls January 30, 2015 15

Safeguarding Human Resources January 30, 2015 2013 Brookfield Johnson Controls 16

Risk Mitigation Part 3 Mitigating the Risk 2013 Brookfield Johnson Controls January 30, 2015 17

MITIGATION BY THE NUMBERS Studies show every $1 spent on disaster mitigation saves $4 in community disaster recovery expenses. (PropertyCasualty360) Forty percent of businesses do not reopen after a disaster and another 25 percent fail within one year according to the Federal Emergency Management Agency (FEMA). Up to 40% of businesses affected by a natural or human-caused disaster never reopen. (Source: Insurance Information Institute) According to the US-based Strategic Research Institute, Companies that aren t able to resume operations within 10 days of a disaster are not likely to survive. 24% of companies said they have experienced a full data disaster (Forrester) Average cost of downtime for a midsize company is $70,000 per hour (Gartner) In the past two years, Over 50 percent of businesses experienced an unforeseen interruption, and the vast majority (81%) of these interruptions caused the business to be closed one or more days. 1 (2009 Disaster Recovery and Business Continuity Survey) 80 percent of businesses suffering a major disaster go out of business in three years, while 40 percent of businesses that experience a critical IT failure go out of business within one year. In the case of suffering a fire, 44 percent of enterprises fail to reopen and 33 percent of these failed to survive beyond 3 years. (www.usfst.com Hidden Threats to Enterprise)

Prioritizing Response & Recovery Sequence? Priority Protect VS. Priority Recover Client Business Impact Assessment Client Communication & Collaboration 2013 Brookfield Johnson Controls January 30, 2015 19

Planning & Response Toronto : Simultaneous response to Internal and multiple client disruptions. Power Outages Water Damage Communication Disruption 2013 Brookfield Johnson Controls January 30, 2015 20

Operational Redundancy Kamloops Toronto Shift call volume to Kamloops Operations Centre (Ability to Shift call volume in both directions) 2013 Brookfield Johnson Controls January 30, 2015 21

Team Member Impacts Outside Impacts Securing Temporary Accommodation Family Obligations Community Social Responsibility Fatigue Mitigation Cross Regional Support Virtual EOC Establishing Rotational Shifts EAP Services 2013 Brookfield Johnson Controls January 30, 2015 22

Recovery Competition for Resources Construction Materials Pumper Trucks General Contractors Remediation Specialists Temporary Space Construction Site Amenities 2013 Brookfield Johnson Controls January 30, 2015 23

FirstOnSite Crisis Response Considerations - Mould only needs 24 48 hours to grow causing significant health hazard - Consider emergency access in disaster areas (red zone) during crisis events / structural engineers will be afforded access into secured area. - Your service provider should be prepared to provide Safety training and certification on the ground if required for non-certified or out of province workers. - Your service provider should provide an emergency assessment team to provide early assessment of damage on the ground and coordinate response efforts with your own resources (as FOS does for BJCC) - Completion of an Initial Site Report (ISR) to start the claims process - Prioritize the Work

FirstOnSite Crisis Response Considerations Select a partner with the capacity and ability to meet your needs. FOS mobilized 800 personnel for Calgary floods / Slave Lake mobilized 200 personnel, and constructed a 10 acre dedicated command center. Rapid Mobilization of Catastrophe & Large Loss teams Rapid mobilization of capacity personnel and equipment Mobilization of specialized support teams: H&S, Admin & Reporting, Command team PREP clients get Priority Response Alberta Flooding, 2013 Vancouver Riots 2011 Goderich Tornado, 2011 Slave Lake Fire, 2011