At the request of CFE s Area of Electric Systems Programming



Similar documents
Optimizing Business Processes. Comisión Federal de Electricidad México Luis Young

Curriculum Reform in Computing in Spain

Energy Efficiency and Renewable Energy in Mexico

Nuclear Power Plant Instrumentation and Control in MEXICO

Mexico s Guidelines for Clean Energy Certificates Will Support Renewable Energy Development

University of Central Florida Class Specification Administrative and Professional. Network Operations Manager (Enterprise)

Curriculum Vitae Lic. José Rafael Pino Rusconi Chio +52 (998)

Trains crossing at Toronto s Old Mill Station 2009 TTC. Train Control

Alternatives of Financing for New Nuclear Reactors in Mexico

Sample Career Ladder/Lattice for Information Technology

EUROPASS DIPLOMA SUPPLEMENT TO HIGHER TECHNICAL VOCATIONAL TRAINING

IAEA-TECDOC-1469 Comparative assessment of energy options and strategies in Mexico until 2025

Promoting the Cross-Border Renewable Energy Market

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

EUROPASS DIPLOMA SUPPLEMENT

Business Intelligence Unit 2015

Radiological Assessment Display and Control System

EUROPASS DIPLOMA SUPPLEMENT

Mexican Energy Reform. Implications and opportunities in the national electricity network

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

Financing for CC Mitigation measures. Sustainable Energy and Climate Change Unit. Technical Workshop of Science and Policy of Shortlived

SGE: Information System for Strategic Planning Management Applied to an Electric Utility

Updating the International Standard Classification of Occupations (ISCO) Draft ISCO-08 Group Definitions: Occupations in ICT

Career Tracks- Information Technology Family

Design & Implementation about Mining Enterprise EAM (Enterprise Asset Management) System

This summary covers decrees containing secondary energy laws issued by the Federal Executive in the Official Gazette dated August 11 of this year.

General Dynamics One Source, LLC Alliant GS00Q09BGD0030 Labor Category Descriptions April

Industrial IT for Substation Automation & Protection

Your Go! to intelligent operational management

IBM PureSystems: Familia de Sistemas Expertos Integrados

IT Service Management with System Center Service Manager

Renewable Energy Policy in México

Ames Consolidated Information Technology Services (A-CITS) Statement of Work

N.K. Srivastava GM-R&M-Engg.Services NTPC- CC/Noida

SPECIAL UPDATE. A New Power Market in Mexico. A Competitive Power Market. Wholesale Market Participants

CAREER TRACKS PHASE 1 UCSD Information Technology Family Function and Job Function Summary

Exhibit F. VA CAI - Staff Aug Job Titles and Descriptions Effective 2015

INFORMATION UNIFICATION BE- TWEEN ENTERPRISE RESOURCE PLANNING SYSTEM AND PRODUC- TION CONTROL SYSTEM

INFORMATION SYSTEMS SPECIALIST

Task Area 1: IT Services for Biomedical Research, Health Sciences, and Healthcare

MEXICAN ENERGY REFORMS

GUIDE TO FEDERAL REGULATION OF SALES OF IMPORTED ELECTRICITY IN CANADA, MEXICO, AND THE UNITED STATES

Please Note: Temporary Graduate 485 skills assessments applicants should only apply for ANZSCO codes listed in the Skilled Occupation List above.

Infrastructure Interdependencies

Fundación México Estados Unidos para la Ciencia The United States Mexico Foundation for Science

Grupo de Ingeniería de Sistemas Integrados (ISIS) Dpto. Tecnología Electrónica Universidad de Málaga

CF Dashboard Offering

Empresas Asociadas del Noreste

Labor Category Descriptions

Labor Category Descriptions

Master Plan Study for Rural Electrification by Renewable Energy in the Republic of Peru. Volume 3 Educational Material.

Solutions and IT services for Oil-Gas & Energy markets

SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Functional Area 3. Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011)

A Dynamic, Real-Time Alarm System for Power Plants

«COSWIN 7i helps you increase your return on assets while boosting their productivity.»

Oracle Audit Vault Oracle FLEXCUBE Universal Banking Release [April] [2014]

Q. Please provide resumes for Gary L. Murray, Sean LaCour, Glenn Samms, Trina L. Troke, Trina Cormier.

EC 350 Simplifies Billing Data Integration in PowerSpring Software

Endless possibilities

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, Electric Grid Operations

NORTHERN TECHNICAL UNIVERSITY. Budget Management System

Track & Trace Solutions

Cloud computing for maintenance of railway signalling systems

Introduction to Networks

SECTION A: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Maintenance Management Process in the Electricity Distribution Business: Analytic Models. June 2014

The fi rst fully network-based integrated OR

SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Article C.1 Introduction This contract is intended to provide IT solutions and services as

IT Service Management with System Center Service Manager

Fulvio Terzuoli. Prof. Francesco D Auria. Workshop Nazionale UNIVERSITÀ DI PISA. Simulazione del Sistema Energetico GRUPPO DI RICERCA NUCLEARE

SCADA 2014 systems for wind

OCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Systems and Infrastructure CLASS FAMILY DESCRIPTION:

SMART ASSET MANAGEMENT MAXIMISE VALUE AND RELIABILITY

Main Automation Contractor (MAC) Targets Long-Term Control System Success

IT Sample Duties and Responsibilities Statements BAND B POSITION CONCEPT: JOURNEYWORKER / WORKING SUPERVISOR / LEAD WORKER

Updated: April Copyright DBA Software Inc. All rights reserved. 2 Getting Started Guide

Systems Operation Department

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

REQUIREMENTS FOR AUTOMATED FAULT AND DISTURBANCE DATA ANALYSIS

SiteWeb Monitoring System. Real Time Power and Environment Monitoring Platform for Telecom Applications

GE Energy. Solutions

Descripcion Horas Codigo Productividad Microsoft (Deducibles INCES)

FOR IMMEDIATE RELEASE

The Prospects for Small Hydropower in Mexico

Emulated Digital Control System Validation in Nuclear Power Plant Training Simulators

How To Build A 100Mw Wind Farm In Ques

Virtualization Reduces the Cost of Supporting Open Industrial Control Systems

Calculating Total Power Requirements for Data Centers

How the distribution management system (DMS) is becoming a core function of the Smart Grid

U.S. Nuclear Regulatory Commission

SEC STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.

The IBM Solution Architecture for Energy and Utilities Framework

Questions to be responded to by the firm submitting the application

Energy Systems Integration

How To Optimize Data Center Performance

IT Service Management with System Center Service Manager

Transcription:

Network Analysis Electric Systems Expansion and Operation Planning Transmission Pricing Services At the request of CFE s Area of Electric Systems Programming (Gerencia de Programación de Sistemas Eléctricos, GPSE) a program was developed that calculates the prices for transmission services with the official methodology, approved by the Energy Regulatory Commission (Comisión Reguladora de Energía, CRE) for 115, 230 and 400 KV, among a pre-established group of regions. of the new version of CFE s internal market were developed, tested and put into operation. The operation of the internal market will allow the assimilation of valuable experience, in preparation for deregulation plans that may be approved by Congress. Projects Related to CFE s Internal Energy Market IIE contributed to the design and documentation of the rules and operating procedures of the virtual internal energy market that operates in the National Center for Energy Control (Centro Nacional de Control de Energía, Cenace). The models and systems required for the implementation 1 1

Control and Instrumentation Digital Control and Communication Systems Development of Modern Control Strategies for Gas Turbogenerators Type 5001, in an Industrial Controller The development and factory testing of the Digital Control System for the Turbo gas Units 5001 (SCD-UT 5001) in an industrial platform was concluded, including the software for the speed and power fuzzy controllers. The studies undertaken in this project generated the required knowhow for technology development, as well as for its implementation in actual gas turbine controls to improve the profitable operation of these machines. The implantation of the SCD-UT 5001 in an industrial platform makes the commercialization of this product feasible in the short term. Separation Header Flow Measurement and Monitoring at the Mora Battery Complex A real-time measurement and monitoring system was developed to improve the conventional well production measuring procedure used by Pemex. The precision, reliability and repeatability of the gas flow measurement comply with the American Gas Association standards, and those of liquid flow comply with the American Petroleum Institute standards. The commissioning of the Real Time Measurement and Monitoring System will allow Pemex to optimize its production, schedule maintenance, evaluate the wells residual life and schedule their production, as well as to anticipate possible contingencies. Following the evaluation of results of this system, Pemex might install similar systems in other Battery complexes throughout the country. Electric Variables Recorder for Distribution Lines (RVE-23) The RVE-23 electronic device was developed to measure Ampere-hour when applied in the detection of illegal power consumption and for calculations of energy balance and quality. This product may provide financial 2

savings for the power utilities, and an opportunity for IIE to transfer its technology to the industry. Technical Assistance for the Analysis and Emission of Corporate Policies and Technical Specifications of SISPA, and the Specification and Installation of CIAME in Pemex The Subsystem of Industrial Safety and Environmental Protection (Subsistema de Información de Seguridad Industrial y Protección Ambiental, SISPA) was developed and put into service at Pemex industrial plants, and the Institutional Center of Emergency Attention and Administration (Centro Institucional de Atención y Manejo de Emergencias, CIAME) was implemented at the Pemex Administrative Center in Mexico City. With these systems, Pemex will efficiently supervise, attend and coordinate all necessary actions to mitigate the impact of incidents and/or accidents, which might occur in any of its industrial plants. Also, the number of industrial safety and environmental protection reports and their content will be optimized; minimizing the delivery time to the required destinations. In addition, the performance indices linking the efficiency of the actions to the established goals at the work centers will be calculated. Information Technology Support for the Office of Technology and Professional Development (Subdirección de Tecnología y Desarrollo Profesional, STDP) at PEP A prototype was built to evaluate knowledge administration technologies. A virtual university was integrated into the STDP Intranet, for accessing didactic material on demand and managing courses, students and instructors. Support was provided to specify hardware and software for STDP procurement, which already has an operative infrastructure that supports critical technologies, groups of specialists, and multidisciplinary projects. Support was also provided to users in Mexico City and Villahermosa, Tabasco; the information infrastructure was maintained and videos were prepared for Web transmission. 3 Instituto Instituto de Investigaciones de Eléctricas Eléctricas 3

Simulation Development of Simulators for Operator Training and Equipment Testing Upgrade of the Computer Equipment Platform for Simulator I The Simulator I was delivered and ready for training in CFE s Operator Training Center in Ixtapantongo (Centro de Adiestramiento de Ope radores de Ixtapantongo, CAOI) in 1984. The computer equipment was a set of two SEL mini-computers series 32/77, linked by a shared memory. CAOI asked IIE to update the Simulator I computer equipment. The new equipment consists of a network of workstations, using the same hardware architecture and simulation environment as Laguna Verde s new simulator platform. The benefits that CAOI obtained by replacing the Simulator s platform included the ability to select operating scenarios, utilization of standard software systems, guaranteed maintenance and spare part service according to the conditions provided by each manufacturer. Also, the peripheral equipment is based on standards that will assure the compatibility of future components with the computer equipment and, with that, a simpler and quicker preventive maintenance, which represents savings. Simulator for Training of Combined Cycle Plant Operators Based on the Unit 1 of the Samalayuca II Combined Cycle Plant, Using a Commercial Development Platform The simulator for the training of combined cycle plant operators was based on the document "Technical Specifications for the Design, Construction, Installation and Start-up of a Simulator with the Samalayuca II Combined Cycle Power Plant Unit 1 as a Reference Plant", sent by CAOI. The results of this project include the development of a full-scale simulator that reproduces the behavior of the Unit 1 of the Combined Cycle Plant in its entire operation range, according to the scope offered by the ProTRAX v 6.1 package. The results also include the simulator s documentation, model specification, and the computer equipment and software licenses required for simulator operation. 4 Instituto de de Investigaciones Eléctricas 4

Information Systems Advanced Information Technology Specialized Technical Assistance in the Implementation of the SAP R/3 System in CFE IIE s Information Systems Area (Gerencia de Sistemas Informáticos, GSI) continued with the project entitled Automation of Administrative Solutions in Real Time (Automatización de Soluciones Administrativos en Tiempo Real, Asare) for the General Office of CFE, through the implementation of the SAP R/3 system in its regions. The design, development, revision, correction and tests of the Sapscript formularies were carried out. The necessary workflow structures were created for the startup in CFE s Occidental and Central Production Regional Areas, and support was provided to the users of the different CFE regions. Information System for the Calculation of the Outage Time Per User at LyFC (Luz y Fuerza del Centro) Requirement Specifications of the Telecommunications Administration System of CFE s Area of Information Technology and Telecommunications (GIT) GSI developed the technical specifications for the Telecommunications Administration System (Sistema de Administración de las Telecomunicaciones, Satel) and a prototype for the administration of frequencies and payments to the Secretary of Communica-tions and Transportation (Secretaría de Comunicaciones y Transportes, SCT) for CFE. The development of the Information System for the Calculation of Outage Time per User (Sistema de Información para el Cálculo del Tiempo de Interrupción por Usuario, SICTIU) included the design phases of the database, and the development of the interface and information modules. These products were installed in LyFC s server and client terminals. Functional testing was performed and the staff was trained in the use of SICTIU, as well as in the use of the development tools. A client/server architecture system with a centralized database was developed, with user friendly interfaces for capture and consulting of the outages from the Mexico City offices. 5

The entity/relation model and the data dictionary were developed for the following telecommunications modules: frequencies, equipment, installations and operating personnel. The prototype of the frequency and payment modules has a three-layer client/server architecture: Data Base Server (DBS), Web Applications Server (WAS) and Client. The entity/relation model and the data dictionary were developed for the telecommunications modules, which are frequencies, equipment, installations and operating personnel. The prototype of the frequency and payment modules has a three-layer client/server architecture: Data Base Server (DBS), Web Applications Server (WAS) and Client. System for the Administration of Multimedia Courses Via Internet GSI developed a prototype of a course administration system via Internet, with the goal of scheduling training courses in diverse operative areas of CFE or other companies, through its private virtual communication network (Intranet). This prototype is to be used as a support tool for IIE, CFE, and Pemex training programs. Technical Support for PEP s Information Systems In collaboration with STDP, GSI developed PEP s census of technical professionals and its insertion in the Integral Professional Development System (Sistema Integral de Desarrollo Profesional, SIDP), as well as the Budget Administration System (Sistema de Administración del Ejercicio Presupuestal, SAEP) and the Foreign Commission Control System (Sistema de Control de Comisiones al Extranjero, SCCE). Finally, PEP s census of technical professionals was integrated into STDP s Web page. Knowledge Discovering for Non-Technical Energy Loss Detection in Electrical Distribution Circuits In collaboration with CFE s Areas of Information Technology and Telecommunications (GIT) and Commercialization (GC) IIE carried out data mining experiments over a subset of commercialization data with more than 35,000 records. The objective was to analyze energy consumption patterns in order to detect those that incur in illicit uses of electric energy Additionally IIE designed the relational model of a database, using Oracle Designer 2000, that integrates all the charging, service and control processes of CFE s Commercialization Area; data storage was also designed for their processes. 6 6

Process Supervision In order to support the monitoring plan commissioning for Laguna Verde, training was offered to CFE personnel in the use of tools for plant behavior ana-lysis. Supervision requirements were established for the turbine building service water system and for the turbine s closed circuit cooling water system, according to the EPRI- 107668 guide. Real Time Integral Information Systems Specialized Technical Support for Computer Systems at the Laguna Verde Nuclear Power Plant (Central Nucleoeléctrica de Laguna Verde, CNLV) The Integral Process Information System (Sistema Integral de Infor mación del Proceso, SIIP) was improved in the design, installation and testing of the calculation algorithms and meteorological parameter and effluent displays, which were incorporated into the system to support the plant s External Radiological Emergency Plan. The system was also modified to increase its data acquisition capacity by 50% through the incorporation of two formatters. As part of the development of the Unit 1 SIIP interfaces, advances were obtained in the Wide Range Nuclear Monitoring (WRNM) and the Automated Traversing In-core Probe (ATIP) systems. Feasibility Study for the Implantation of SIIP in the CNLV Operator Training Simulator Global specifications were defined for the requirements to couple the Integral Information System to the Laguna Verde training simulator. The scope of the SIIP functions and components necessary for the integration were defined, including an initial conceptual design and an analysis of the signals of the Safety Process Parameter Exhibition System (Sistema de Exhibición de Parámetros de Seguridad del Proceso, SEPS) that are implemented in the simulator. The development of the material infrastructure was initiated, in particular, a wooden template scale 1:1 of the SIIP consoles was installed in the Main Control Room; the construction of three of the eight consoles required for the SIIP was initiated at IIE. 7

Development and Implementation of the Data Extractor and Database Modules of the Integral Information System for Diagnosis and Predictive Maintenance (Sistema Integral de Información para el Diagnóstico y Mantenimiento Predictivo, SIIDMP) for Thermoelectric Plants The data extraction and database configuration stage was completed. ODBC techniques were used to implement extraction/insertion mechanisms to obtain information from the Heat Rate Control System to be transferred to the SIIDMP. Generation of models, consulting procedures and data extraction services was carried out for the database administrator. Development of Software to Extend the Applications of Energy Measurement in the Automated Energy Acquisition System (Sistema de Adquisición Automatizado de Energía, SAAE) for LyFC The implementation of the SAAE system will provide LyFC with automated mechanisms to gather and store energy data in a timely and efficient manner. This system will receive energy data from data concentrators installed in the substations and generating plants, through remote access mechanisms. In this way, the system will take charge of validating, processing and presenting the required energy reports. Other Projects in this Area: Development and Integration of the Information Infrastructure for Acquisition and Concentration of Energy Data, that Permits the Elaboration of Energy Balances in LyFC s Commercial Units and/or Substation Feeders Technical Assistance on the Strategic Plan for Technology Transfer of the New Toll System between ALSTOM and the Mexican Toll Highway Operator (Caminos y Puentes Federales, CAPUFE). Support in the Implementation of the Numac RWM and SRNM at the Laguna Verde Nuclear Power Plant Simulator. Quality Assurance in the Area of Process Supervision. 8 8 Instituto Instituto de de Investigaciones Eléctricas 8