TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY



Similar documents
Mini-grid systems on the rise in Tanzania Status of implementation and regulatory framework conditions

Tanzania Energy Development and Access Project (TEDAP) and SPPs. Reiche

Tanzania s Experience in Establishing a Regulatory System for Promoting Grid and Off-Grid Small Power Producers (SPPs)

Rural Energy Agency (REA)

From the Bottom Up: How Small Power Producers and Mini-Grids Can Deliver Electrification and Renewable Energy in Africa*

Wind & Mini-hydro Projects in Tanzania

Establishment of REA/REF and Available Financing Opportunities for Rural Energy Projects Paper Presented on:

Uganda s Experience on the Role of Private Operators in Decentralized Electricity Services

Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA

State of Electricity Reforms in the United Republic of Tanzania: Country Base Paper

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand

Simple project evaluation spreadsheet model

N F LOCAL FINANCE INITIATIVE FOR TANZANIA LFI-T ANNUAL PROGRESS REPORT. FOR THE PERIOD FROM JULY 2013 TO JUNE 2014 Dar es Salaam, Tanzania August 2014

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan

Sustainable Energy Markets in Tanzania Report I: Background. David Bauner Melinda Sundell Jacqueline Senyagwa Jeremy Doyle

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY

FIXED CHARGE: This is a cost that goes towards making the service available, including

on climate compatible development Achieving development goals with renewable energy: the case of Tanzania Key messages Author:

POWER AFRICA GEOTHERMAL ROADSHOW. Presented by Mekuria Lemma Ethiopian Electric Power Strategy & Investment Head SEP 28 Oct 3, 2014

Photovoltaic Energy in Mozambique Present and Future Outlook

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

Status of Renewable Energy in Liberia

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF ENERGY AND MINERALS

Prospects for investment in large-scale, grid-connected solar energy in Africa. Ivan Nygaard Senior Researcher, PhD UNEP Risø Centre

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Hawai i s PV Challenge/Opportunity

Solar Energy in Africa Experiences from Ghana

RENEWABLE ENERGY WORKSHOP

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM

TANZANIA LINKING SAVINGS GROUPS TO MOBILE BANKING

B. ENERGY Government Focal Point Ministry of Works and Energy Responding Ministry/Office Department of Energy Progress made in implementation

SECTOR ASSESSMENT (SUMMARY): ENERGY

Presenter: Bruce Clay Clay Energy Fiji

Investment Brief for the Electricity Sector in Liberia

About us The Challenge Younicos Technology Our Services Business Segments & Projects. Page 3

Geneva, March 2009 COUNTRY REPORT: MALAWI

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

Photovoltaic in Mexico Recent Developments and Future

Solar Irrigation in Bangladesh

Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources

Grain Trading Systems and Market Information

Mini-grid Implementation Experience as an EPC Contractor. Fabian Jochem Juwi international GmbH

Investment Brief for the Electricity Sector in Ghana

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

TARIFF AND GOVERNANCE ASSESSMENT

We are smart with diesel. And love solar. We are empowering off-grid customers. Load data as the key to success for PV-Diesel Hybrid Systems

Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun

The Indonesian electricity system - a brief overview

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

P.O. Box 4374 DAR ES SALAAM TEL: /6 FAX:

Smart Power for Environmentally-Sound Economic Development (SPEED), Initiative in Development. power sources

Tanzania Market Intelligence

Grid Operations and Planning

FINANCIAL RESULTS Q1 2016

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà

Overview on SEA output

Course CME 310 Solar Power For Africa. NGOs and SITUATION OF ELECTRICITY IN RWANDA

Electricity in Egypt

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

The Electric Power System

The business model of MICRO POWER ECONOMY DIRECTORY. INENSUS GmbH The business model

Brazil. Economic upswing and sustainable energy development. Marcelo Khaled Poppe

Full Scale Program for Renewable Energy in Egypt

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

Climate Resilient Low Emission Development Strategies: A Regional Overview of Africa

Overview of the Electricity Sector in Egypt

MICRO POWER ECONOMY. Dakar, Senegal, November 14-16, 2011 THE BUSINESS MODEL FOR RURAL ELECTRIFICATION

THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE. Ole Odgaard Denmark

A least-cost electrification proposal for Kisiizi, Uganda Sten Bergman Sr. Energy Specialist, The World Bank

Power Generation Division

Germany's energy transition: Status quo and Challenges.

Mpeketoni Electricity Project

THE AMENDED RENEWABLE ENERGY SOURCES ACT 2014 (EEG 2014)

da Costa (majority shareholder), by Portugal Ventures and also by RP.

]\ 1 PUBLIC NOTICE. (Issued under section 7 of the EWURA Act, Cap. 414 and Section 7 of the Petroleum Act, No 4 of 2008)

Renewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs

NATIONAL COUNCIL FOR TECHNICAL EDUCATION (NACTE)

RENEWABLE ENERGY DEVELOPMENT PROGRAM IN INDONESIA

PV Farms Solar Electric Power for Wholesale Distribution

Tamil Nadu WiNd ENErgy ProfilE

Canada A Global Leader in Renewable Energy Enhancing Collaboration on Renewable Energy Technologies

Energy and Local Participatives in Germany 2011

Germany's renewable energy sector in the context of energy transition.

Ministry of Power & Energy

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

JOINT PRESS RELEASE. ERA and GET FiT announce the first 20 MW of Solar Photovoltaic (PV) projects to be developed in Uganda

Japan. Nagahide Sato and Sadayuki Matsudaira. Nishimura & Asahi

RENEWABLE ENERGIES IN THE KENYAN COMMERCIAL AND INDUSTRIAL SECTORS BY BERNARD OSAWA, FRONTIER INVESTMENT MANAGEMENT & VICE CHAIR ENERGY SECTOR BOARD

Opportunities for the Georgian Hydropower industry to benefit from Directive 2009/28EC of the European Parliament

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

Potential of Solarhomesystems, Biogas-plants and Micro-hydro in Nepal and Opportunities for MFI

An Overview of Power Sector of Bangladesh. November, 2011 Bangladesh Power Development Board

Transcription:

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY 16 TH MARCH 2015 by Eng. Patrice Tsakhara Principal Engineer Small Power Projects 22-Mar-15 1

Contents Company History Overview of power sector in Tanzania Government policy on energy sector Future plans of the energy sector Development of Renewable Energies Small Power Projects (SPP) framework Implementation of SPP program Current status of Isolated mini-grids Plans for grid extension to mini-grids Challenges to implement PV-Hybrid and mitigation measures Support by Germany companies 22-Mar-15 2

Company History TANESCO was established in 1964 with shares from the government and private. In 1975 GoT acquired all shares making TANESCO a state-owned power utility. TANESCO s core business are: to generate, transmit, distribute and supply electricity in Tanzanian mainland and sell bulk power to Zanzibar. TANESCO also import power from Zambia, Uganda and Kenya for electrification of border towns. Likewise, TANESCO also exports power for electrification of border town on Kenyan side at Horohoro. The company has been responsible for planning and implementing various power investment projects. 22-Mar-15 3

Company History cont 1992 Energy policy allowed private sector participation in the energy sector. Up to 2005 only generation segment has attracted private sector. In 1997 TANESCO was specified for privatization. From 2002-2006 TANESCO was placed under management contract. TANESCO was de-specified for privatization in 2005 to allow investments in generation and transmission projects. From 2006 to 2008 there was shortage of power generation due to poor hydrology. This has lead to procurement of the first Emergency Power Projects (EPP) From 2011 to 2013 TANESCO experienced another shortage of power generation due to poor hydrology. Procurement of costly EPPs was then undertaken. 22-Mar-15 4

Overview of the power sector Generation capacity in the interconencted grid system: Total Hydros: 561 MW Total gas fired power plants: 544 MW (only 320 MW is generating power at the moment due to shortage of natural gas) Total liquid fuel fired power plants: 210 MW with 50 MW capacity on short term rental basis Total of 18 isolated mini-grids with total installed capacity of 82 MW. Out of these two mini-grids with installed capacity of 29 MW is running on natural gas while the remaining 15 mini-grids with total installed of capacity of 53 MW are diesel generators. 22-Mar-15 5

Overview of the power sector cont Transmission network: Transmisison system comprises of 48 grid substations interconnected by transmisison lines. 2732 km of 220 kv lines 1555 km of 132 kv lines 578 km of 66 kv lines Distribution network: Comprises of 33 kv, 11kV, 0.4kV lines. 11,124 distribution transformers 17,021 km of 33kv lines, 5,375 km of 11kv lines Over 34,513 km of LV lines 22-Mar-15 6

GoT policy on energy sector The National Energy Policy of 2003: Has allowed private sector participation in the energy sector. The Electricity Act of 2008: Has allowed private sector to participate in the electricity sub sector. This includes generation, transmission and distribution of electric energy to the end users. Following the above act, the government through EWURA took initiative on the development of Small power Projects (SPP). Standardized Power Purchase Agreements (SPPA) and the Guidelines where adopted to facilitate private sector participation in developing renewable energies in small scale (0.1 MW to 10 MW) for direct sell to end use customers and sell excess to TANESCO network. 22-Mar-15 7

GoT policy on energy sector cont.. The Electricity Supply Industry Reform Strategy and Roadmap (2014-2025): Aims at restructuring of the sector. By July 2017 Generation will be separated from the rest of TANESCO By July 2021 Transmission will be separated from Distribution. By July 2023 there will be horizontal unbundling of Distribution. The draft Renewable Energy policy of 2015: The draft policy was recently prepared by GoT and circulated to stakeholders for comments. The draft Energy Policy of 2015: The draft was recently prepared and circulated to stakeholders for comments. 22-Mar-15 8

Future plans of electricity sector Generation expansion plan: In the short term period (now to 5 years) power generation projects will be implemented. Technologies involved are natural gas, wind and solar PV. Over 1000 MW is expected to be added in the Grid system. Transmission expansion plan: In the short term period transmission projects will be implemented for power evacuation to the load centers from generation centers. This will also include 400 kv interconnector lines between Zambia, Tanzania, and Kenya. Also 220 kv interconnector lines between Tanzania, Uganda, Mozambique and Kenya. Development Partners (DP) are currently financing some of these projects and others have shown interest to finance new projects including KfW of Germany. 22-Mar-15 9

Development of Renewable Energies (RE) In the recent years there has been strong interest for private sector to invest in RE power projects, especially wind and solar PV. Since the Government didn t have RE policy in place, there is no conducive environment including incentives to attract private sector investment in RE power projects. There are two potential sites for wind power, that is Sing Ida in central part and Makambako in southern part of the country. Potential sites for solar PV are areas in the central and western part of the country (Dodoma, Singida, Shinyanga, Mwanza). Limited penetration of RE in the grid system is challenging factor. 22-Mar-15 10

Small Power Projects (SPP) framework In 2009 the Government through Energy and Water Utilities Regulatory Authority (EWURA) approved SPP framework. RE projects (mini hydro, biomass, solar PV and wind) with capacity range between 0.1 MW to 10 MW per project were allowed to be developed. Standardized Power Purchase Agreement (SPPA), Standard Tariff calculation Methodology (STM) and technical guidelines on the grid integration of SPPs were approved. Total installed capacities of SPPs are limited to 10% of the grid capacity. For almost 6 years now since introduction of SPPs only mini hydro and biomass power projects are in operation. 22-Mar-15 11

Small Power Projects (SPP) framework cont Determination of SPP tariff is based on the avoided cost principle to TANESCO. The applicable tariff did not attract investors in wind and solar PV power projects due to the low tariff by then and the fact that the cost of solar equipment were high. Economies of scale for investment in wind and solar power projects under SPP arrangement may also have contributed less response from the private sector. Payment of SPP tariff in local currency instead of US Dollar also hindered the interest of developers. Since 2009 to January 2015 depreciation in local currency has been high (above 20%). This has a negative effect on the SPP developers who would have used foreign currency to invest in power projects. 22-Mar-15 12

Status on the implementation of SPPs SPP NAME SUMMARY OF SPP DEVELOPERS TECHNOLOGY EXPORT CAP. (MW) LOCATION SPPA SIGNED COD/ EXPECTED 1 TANWAT - Njombe Biomass 1.5 Grid connec. 17.09.2009 15.06.2010 2 TPC - Moshi Biomass 9.0 Grid connec. 06.10.2009 13.09.2010 3 Mwenga - Mufindi Hydro 4.0 Grid connec. 19.01.2010 21.09.2012 4 Ngombeni - Mafia Island Biomass 1.5 Off Grid 19.01.2010 11.02.2014 5 AHEPO - Mbinga Hydro 1.0 Off Grid 25.02.2013 Mar-15 6 St. Agnes Chipole - Songea Hydro 7.5 Off Grid 11.01.2013 Jul-15 7 NextGen Solawazi - Kigoma Solar 5.0 Off Grid 16.01.2013 8 EA Power Ltd - Tukuyu Hydro 10.0 Grid connec. 25.02.2013 9 Darakuta - Manyara Hydro 0.24 Grid connec. 16.11.2013 Jun-15 10 Mapembasi - Njombe Hydro 10.00 Grid connec. 15.01.2014 TOTAL CAPACITY 49.74 22-Mar-15 13

Status on the implementation of SPPs SPP NAME TECHNOLOGY SELL CAP. LOCATION MAX LOI DATE (MW) 1 Nkwilo project - Sumbawanga Hydro 2.9 Off Grid 12.02.2013 2 Ilundo power project - Tukuyu Hydro 0.4 Grid connec. 11.03.2013 3 Maguta power project - Kilolo Hydro 2.5 Grid connec. 23.10.2013 4 Luganga project - Iringa Rural Hydro 2.8 Grid connec. 23.10.2013 5 Luswisi project - Ileje, Mbeya Hydro 4.7 Grid connec. 23.10.2013 6 Yovi project - Kilosa Hydro 2.0 Grid connec. 31.12.2013 7 Ilungu ward project - Mbeya Hydro 5.0 Grid connec. 31.12.2013 8 Momba power project- Mbeya Hydro 10.0 Grid connec. 25.02.2014 9 Kikuletwa II project - Hai Kili Hydro 7.5 Grid connec. 20.05.2014 10 Ilondo project - Mufindi Hydro 10.0 Grid connec. 16.09.2014 11 Lyamanji hydropower Makete Hydro 2.3 Off Grid 16.09.2014 12 Waste to Energy project Biomass 5.0 Grid connec. 24.09.2014 22-Mar-15 14

Status on the implementation of SPPs SPP NAME TECHNOLOGY SELL CAP. LOCATION MAX LOI DATE 13 Lwega hydropower project Hydro 5.0 Off Grid 25.09.2014 14 Mpanga Hydropower project Hydro 5.8 Grid connec. 07.10.2014 15 Mkumbara biomass project Biomass 5.0 Grid connec. 06.11.2014 16 Mabuki solar power project Solar PV 10.0 Grid connec. 12.12.2014 17 Kishapu solar power project Solar PV 10.0 Grid connec. 12.12.2014 18 Nakatuta hydropower project Hydro 10.0 Grid connec. 15.01.2015 19 Mpanda solar power project Solar PV 1.0 Off Grid 17.02.2015 20 Sumbawanga solar project Solar PV 2.0 Off Grid 17.02.2015 21 Lugarawa power project Hydro 1.7 Grid connec. 20.02.2015 22 Matembwe power project Hydro 0.5 Grid connec. 20.02.2015 23 Kitewaka power project Hydro 4.2 Grid connec. 24.02.2015 24 Uzia hydro power project Hydro 1.0 Off Grid 24.02.2015 25 Kalumbaleza power project Hydro 1.0 Off Grid 24.02.2015 26 Mafia solar power project Solar PV 1.0 Off Grid 24.02.2015 TOTAL CAPACITY 113.3 22-Mar-15 15

SPP Tariff from 2009 to 2014 SUMMARY OF SPP TARIFF FROM 2009 TO 2014 Grid connected tariff (TZS/kWh) Off Gird tariff (TZS/kWh) % of tariff increase Year Eff. Date Wet Season Dry Season % increase Dec July Aug Nov 2009 Jan 09 86.50 115.33 0 334.78 0 2010 Jan 10 99.27 132.36 15% 368.87 10% 2011 May 11 109.02 145.36 10% 380.22 3% 2012 May 12 137.29 183.05 26% 480.5 27% 2013 Sep 13 157.40 209.87 15% 490.5 2% 2014 1 Jul 14 177.58 236.78 12.82% 482.64 1.60% 22-Mar-15 16

Renewable Energy Feed-In Tariff (REFIT) Program In 2013 The Energy Regulatory Authority with financial assistance from USAID engaged a consultant to undertake study that could have come with REFIT. In August 2014 the consultant made presentation of draft final report to the stakeholders. Some of the stakeholders challenged the report. In December 2014 the Authority conducted stakeholders workshop on the REFIT program. They proposed REFIT for mini hydro and biomass both for main grid and minigrid SPPs. Also there was a proposed REFIT for mini-grid connected solar and wind projects. The Authority further proposed to let grid connected solar and wind SPPs to undergo competitive bidding process. We are still waiting on the Authority's decision on the REFIT program. 22-Mar-15 17

Support schemes for mini-grid and rural electrification The Rural Energy Agency (REA) is responsible for financing of rural electrification projects. This is mainly extension of grid connected and mini-grid connected distribution network to the rural areas. In areas where extension of distribution network is technically not possible REA has also financed solar PV projects in some villages. Pilot projects on wind-solar PV hybrid system have also been installed at some public institutions in rural areas. REA get funds from the Government of Tanzania and Development Partners like SIDA, World Bank (TEDAP), NORAD, just to mention a few. SPPs are also being supported by REA by giving them matching grant and performance grants for projects located in rural areas. 22-Mar-15 18

Current status of isolated minigrids operated by TANESCO POWER STATION NO. OF UNITS UNIT CAPACITY (kw) TOTAL CAPACITY (kw) 1 BIHARAMULO 2 424 848 2 BUKOBA 4 640 2,560 3 KASULU 2 1,250 2,500 4 KIBONDO 2 1,250 2,500 5 1,250 2 1,000 5 KIGOMA 12,310 4 640 3 500 6 LIWALE 2 424 848 7 LOLIONDO 4 1,250 5,000 2 510 8 LUDEWA 1,270 1 250 2 640 9 MAFIA ISLAND 2,128 2 424 2 1,250 10 MBINGA 2,750 1 250 22-Mar-15 19

Current status of isolated minigrids operated by TANESCO cont. POWER STATION NO. OF UNITS UNIT CAPACITY (kw) TOTAL CAPACITY (kw) 2 660 11 MPANDA 2,600 2 640 12 NAMTUMBO 1 400 400 13 NGARA 2 476 952 2 1,800 1 1,915 14 SONGEA 8,095 1 660 3 640 15 SUMBAWANGA 4 1,250 5,000 2 640 16 TUNDURU 1,980 2 350 17 SOMANGA 3 2,500 7,500 7 2,000 18 MTWARA 21,800 4 1,950 TOTAL 82,291 22-Mar-15 20

Typical load profile 22-Mar-15 21

Plans for main grid extension to mini-grid areas TANESCO has got short term and long term plans to extend main grid to isolated mini-grid areas. The aim is to get rid off expensive diesel generation. With SIDA support the Makambako Songea transmission line will connect 4 mini-grids to the main grid and rural electrification of villages along the transmission lines. At the moment TANESCO has go no plans to establish new mini-grids. Instead under the Government s policy of electrifying all district headquarters, the same can be done where new districts are going to be established and are far from the main grid network. 22-Mar-15 22

22-Mar-15 23

Future Grid Map by 2033 22-Mar-15 24

Challenges for TANESCO in regard to implement PV-Hybrid The absence of clear Government policy on the development of RE power projects including PV-Hybrid systems. Lack of knowledge and experience as far as dieselsolar PV hybrid system is concerned, especially for megawatts size systems. Uncertainty of SPP tariff under the existing SPP framework. Lack of seriousness for some developers of SPPs. Lack of funds to develop pilot projects for diesel-solar PV hybrid system that would have enlighten other developers in the sector. 22-Mar-15 25

Support by Germany companies It is proposed if Germany companies/financial institutions can assist the Government of Tanzania and TANESCO to develop pilot project for diesel-solar PV hybrid system. Support for technical and financial consultancy services for the proposed diesel-solar PV hybrid system under SPP arrangement. Capacity building training for TANESCO Engineers as far as diesel-solar PV hybrid system is concerned. To assist in the establishment of a sustainable REFIT program. Some other countries in the region have succeeded to establish sustainable RE program. 22-Mar-15 26

END 22-Mar-15 27