Mechanical Operation and Maintenance Vacuum Group



Similar documents
Industrial Involvement in the Construction of Synchrotron Light Sources

Projects and R&D activities

Large Systems Commissioning

FIVE PROJECTS OF HIGH RF POWER INPUT COUPLERS & WINDOWS FOR SRF ACCELERATORS*

CAVITY DESIGN REPORT

Cleaning Methods of SRF Power Couplers. Mircea Stirbet

THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK

10 Project Costs and Schedule

Tom Wilson Product Marketing Manager Delivery Systems Varian Medical Systems International AG. CERN Accelerator School, May 2015

Catherine LeCocq, Robert Ruland. February, 2008

Status Overview The Australian Synchrotron. Steven Banks Control Systems Group

Short overview of TEUFEL-project

Reliability and Availability Aspects of. the IPHI Project

Status of the HOM Damped Cavity for the Willy Wien Ring

Solutions Manufacturing Performance

Cathode Ray Tube. Introduction. Functional principle

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

The APS Machine Protection System (MPS) *

ABB Australia Pty Limited. SF 6 gas management solutions Managing SF6 in switchgear installations

Calculation of Eigenmodes in Superconducting Cavities

Integrated Custom Systems

ORGANIC SAMPLE PREPARATION

Linac RF Commissioning with the SNS HPRF Systems

Systems, Inc. Energy Advanced

Slice Emittance Measurements at the SLAC Gun Test Facility*

11th International Computational Accelerator Physics Conference (ICAP) August 19 24, 2012, Rostock-Warnemünde (Germany)

Horizontal Sterilizer MU 012.B / I (09/07) Page 2/46. 1 Index... 2

Waters Corporation. Waters 2690/5 USER & TROUBLESHOOTING GUIDE

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

Project X: A multi-mw Proton Source at Fermilab. Steve Holmes Extreme Beam Lecture Series

RF & Microwave Contract Manufacturing

Status of Radiation Safety System at

Beam Energy (GeV) 2 Beam Current (ma) 400 Horizontal Emittance (nm)

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

INSTRUMENTATION & CONTROLS VALVE & AUTOMATION EXPERTS VALVE REPAIR TUBE SERVICES

Advanced Photon Source. RF Beam Position Monitor Upgrade Robert M. Lill

Results: Low current ( ) Worst case: 800 MHz, GeV, 4 turns Energy oscillation amplitude 154 MeV, where

81000 Series Aluminum Gate Valve Installation and Repair Manual

STEAM STERILIZERS FOR THE LIFE SCIENCES MADE IN THE USA

OVERVIEW OF PROTON DRIVERS FOR NEUTRINO SUPER BEAMS AND NEUTRINO FACTORIES*

Status of the Free Electron Laser

The BESSY HOM Damped Cavity with Ferrite Absorbers. Review of prototype cavity test results, taperedwaveguidesvshomogenouswaveguides

Manufacturing Division Overview

Cryogenic Vacuum Pumps

March 2 13, 2015 Advanced Manufacturing Training Courses at

City of Columbus Department of Building and Zoning Services

Beamline Automation at the APS

Heavy Duty Equipment Mechanic (Class Code 3743) Task List. Inspection and Diagnosis

DTC P0401, DTC P1491,

Institute of Accelerator Technologies of Ankara University and TARLA Facility

Boiler & Pressure Vessel Inspection discrepancies and failures

Model 2128 AIR COMPRESSOR PUMP Operating Instructions

AUTOMATIC CHANGEOVER MANIFOLD Series 915

Diagnostics for Mobile Homes: HVAC

Mobile Case Studies in Success

CLS Naming and Numbering Convention

Electrical tests on PCB insulation materials and investigation of influence of solder fillets geometry on partial discharge

FORMATION DAMAGE AND WELL TREATMENT SYSTEM

Air Pollution Control Division. Technical Services Program

Hazards associated with the gas system and how to mitigate them

cams Management Systems Technology focused on conserving energy Performance. Period.

Gas Oven Repair Guide

Project Dashboard - February 2013

Final Report to IOC. 26 th Linear Accelerator Conference Sep 9-14, 2012, Tel Aviv, Israel

T146 Electro Mechanical Engineering Technician MTCU Code Program Learning Outcomes

KNC Model 3666 Automatic Pressure Calibration System

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

PREVENTATIVE MAINTENANCE

Chromatograph Maintenance and Troubleshooting Class # 5050

Assembly of LPCC Packages AN-0001

Release: 1. UEE60211 Advanced Diploma of Electronics and Communications Engineering

Figure 1: Lattice drawing for the APS storage ring.

Frequency Map Experiments at the Advanced Light Source. David Robin Advanced Light Source

Status And Future Plans. Mitsuyoshi Tanaka. AGS Department.Brookhaven National Laboratory* Upton NY 11973, USA INTRODUCTION

Balzers Sputter Coater SCD 050

BNL Infrastructure Management

RF SYSTEM FOR VEPP-5 DAMPING RING

IN-SERVICE REPAIRS TO LEAKING ABOVE GROUND STORAGE TANK ROOFS

The IR FEL at the Fritz Haber Institute Berlin: A Tool for IR Spectroscopy of Molecules, Clusters, and Solids

FACET First Beam Commissioning. Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA

NASDAQ:BLDP TSX:BLD. Smarter Solutions for a Clean Energy Future

Diagnosing Hydraulic Problems

LLRF. Digital RF Stabilization System

Laboratory & Scientific Line. Bulk Steam Sterilizers. Since

Transcription:

Mechanical Operation and Maintenance Vacuum Group AES-MOM Vacuum Group UHV support and services APS Argonne National Laboratory National Laboratories The AES-MOM Vacuum Group at Argonne National Laboratory delivers engineering support to the Advanced Photon source, beamline users, Argonne and its sister laboratories. The Vacuum Group has been at Argonne since the APS was being built. The group has aided in design and manufacture of the APS and many other accelerator systems. The continued focus is the maintenance and upgrade of the APS by utilizing new UHV technology and practices. The Vacuum Group also pursues R&D activities for future accelerator and beamline components. All new UHV designs need to be tested and that is where this group comes in. We have the facilities and knowledge to aid in the design and completion of UHV systems.

AES-MOM Vacuum Group Who we are Staff George Goeppner Group Leader Joe Gagliano Section Leader John Hoyt - Engineer Try Leng Kruy Engineer Mark Martens Chief Technician John Zientek - Engineer Technicians Scott Abbeduto Jack Burke Cheri Giacomi Guy Harris Kevin Knoerzer Aaron Lopez Raul Mascote Wayne Michalek Russ Otto Cristen Sarne (CJ) Robert Wilson 2

AES-MOM Vacuum Group What we do Provide support for all APS vacuum related equipment Linac, Par, Booster, Storage Ring and Front Ends Provide support for all pneumatic related systems Gate valves, safety shutters, photon shutters and beamline pneumatic doors Provide support to the USER community USER Beamlines (vacuum and pneumatic systems) Unique fabrication capabilities in building 382 Aqueous cleaning, robotic welding, inspection of components, vacuum leak checking, high temperature vacuum oven, assembly of critical components, vacuum testing and vacuum certification 3

Sulfur Hexafluoride (SF 6 ) System for LINAC Sulfur Hexafluoride (SF₆) as a dielectric Decomposition of SF₆ is due to extreme arcing and moisture Assumed responsibility for the SF₆ system in 1997 Out of gas condition and pressure switch failures caused many hours of down time SF₆ Molecule 4

SF 6 Linac Waveguide A control system developed by the Vacuum Group and has been in operation since fall of 1998 Currently, the SF₆ gas that is removed from the Linac waveguide is expelled into the atmosphere New SF₆ Control System Developed and currently being tested in building 382 Will reclaim more the 98% of this green house gas Automated testing of SF₆ for S0₂ contamination Linac Stage 3 SF₆ Switching Waveguide Thermionic RF Gun SF₆ Switching Waveguide 5

Storage Ring Residual Gas Analyzer (RGA) Storage Ring RGA systems Original system was Spectra No longer supported by vendor Brooks VQM STORAGE RING MEZZANINE PENETRATION PC CONNECTED TO EPICS Current system is Brooks 835 VQM 15 M RF CABLE ANALYZER HEAD CONNECTED TO VACUUM CHAMBER IN STORAGE RING Storage Ring RGA Configuration 6

Storage Ring - BNL Bellows Test BNL Bellows Test at APS NSLS II BNL bellows installed into Sector 25 - April 2010 Successful testing concluded in April 2012 BNL Bellows Test Setup at Sector 25 7

Storage Ring - Diagnostic Snubbers Diagnostic Snubbers In FY10, designed, prototyped and installed Snubbers Snubber design significantly reduced and/or eliminated transverse electric modes (TE) Effectively alters the geometry of the vacuum chamber by periodically shorting the high field region in the small gap At present, 13 sectors are installed with Snubbers Installation is ongoing Diagnostic Snubber Carrier Diagnostic Snubber Carriers and Connecting Links 8

Storage Ring Current Monitor New DCCT Current Monitor installed in Sector 36 during September 2012 Size Comparison New and Old DCCT Installed in Sector 36 9

Linac Thermionic RF Guns - PC Gun BBC Gun - T Cavity Continue to give support on the LINAC Thermionic RF Guns, Ballistic Bunch Compression Gun (BBC), Photo Cathode Gun (PC) and the Deflecting T-Cavity Generation III RF Gun New Photo Cathode Gun 10

Sector 37 Scraper Continued support on the Sector 37 Scraper design, fabrication and installation Currently working on a new scraper design with ASD Physics and AES-MED personnel Scraper Installed at Sector 37 11

Superconducting Undulator 12

Front End Pneumatics Responsible for the design, fabrication, installation and commissioning of pneumatic components for all new front ends New Front End Pneumatic Cylinders at 23 ID 13

Pneumatic Door Upgrade for APS Beamline Stations Responsible for maintaining beamline pneumatic doors Existing design has more than 80 pneumatic connections Existing design extremely difficult to troubleshoot Designed and fabricated new pneumatic control box New pneumatic control box uses state of the art components currently used on new front ends Existing Pneumatic Door Box Robert Wilson - Upgraded Pneumatic Door Box 14

Building 382 UHV Vacuum Factory Complete fabrication facility Inspection Aqueous cleaning Baking of vacuum components Welding Assembly and testing Precision advanced arc welding systems Multi-axis contouring, integrating all welding parameters for a given weld path 15

Building 382 Vacuum Factory Aqueous Cleaning Inspection 16

Building 382 UHV Vacuum Factory Vacuum Oven Vacuum Chamber Testing and Certification 17

Alternate Aluminum Gasket supplier for ANL Storage Ring Gasket Sizes 2.75 4.5 6 8 12 Gasket test apparatus 18

Precision Advanced Arc Welding Systems Manual and Automated welding services Provide weld development Provide welded components that meet or exceed Mil Spec requirements Components fabricated using automated welding equipment All vacuum chambers for APS All ID vacuum chambers for APS 19

Components Fabricated at APS BESSY II chambers DESY FEL chambers SLS chambers ESRF chamber CLS chambers LBL chambers KEK chambers NSLSII storage ring chambers LCLS chambers Fermi Numi Horn fabricated at Argonne using innovative welding methods to assemble and straighten the Numi Horn for Fermi lab Neutrino Experiment 20

Support of Brookhaven National Lab NSLS II Inspection and Inventory Welding UHV Bake and Vacuum Certification 21

Precision Advanced Arc Welding Systems NSLS II Chamber 22

APS and USER Support All AES-MOM vacuum services are available to all Argonne facilities Routine maintenance on all vacuum pumps and Leak Detectors Verify beamline vacuum status Provide leak check service Building 400 and 382 clean room Building 382 UHV services 23

MOM Ticket System and Tech Tuesday Ticket system Support for mid-sized tasks that require less than 40 hours of support services are requested through a simple-to-use on-line request system. http://www.aps.anl.gov/aps_engineering_support_division/mechanical_operations_a nd_maintenance/support/support.html Tech Tuesday Jobs requiring only a few hours of support - On Tech Tuesdays technical assistance is provided for small, quick tasks on Tuesday afternoons during user beam operations - Tuesdays typically being maintenance days. Requests are submitted through a simpleto-use-line request system. http://www.aps.anl.gov/aps_engineering_support_division/online_aes_support/supp ort_tt.html 24

Thank you George Goeppner Joe Gagliano Nick Sereno Links http://www.aps.anl.gov/aps_engineering_support_division/mechanical_operations_ and_maintenance/ 25