Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV)



Similar documents
D E P A R T M E N T O F THE NAVY

ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA

bñåéêéí=ñêçã=íüé== mêçåééçáåöë= çñ=íüé= péåçåç=^ååì~ä=^åèìáëáíáçå= oéëé~êåü=póãéçëáìã=

How To Build A Successful Weapons System Program

Department of Defense DIRECTIVE

NAVAL SEA SYSTEMS COMMAND STRATEGIC BUSINESS PLAN

OPERATING AND SUPPORT COST-ESTIMATING GUIDE OFFICE OF THE SECRETARY OF DEFENSE COST ANALYSIS IMPROVEMENT GROUP

Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs (D )

PEO IWS Enterprise Product Lifecycle Management Integrated Data Environment (eplm IDE) Jolene Marshall Thomas Murphy

OPERATING AND SUPPORT COST-ESTIMATING GUIDE

Encl: (1) Surface Warfare Tactical Requirement Group Membership

Status of Enterprise Resource Planning Systems Cost, Schedule, and Management Actions Taken to Address Prior Recommendations

Navy and Marine Corps Have Weak Procurement Processes for Cost reimbursement Contract Issuance and Management

Forecast to Industry 2015 External Contracting Opportunities

Ms. Patricia Hamburger

SBIR and STTR Phase III Guidebook For Program Managers, Contracting Officers And Small Business Professionals

FY2011 Naval Human Systems Integration Management Plan. Version 3.0

A community of organizations working together to accomplish their respective missions with a common goal of improving human performance through

TECHNICAL REVIEW MANUAL (TRM)

Improvements Needed for Awarding Service Contracts at Naval Special Warfare Command

DEPARTMENT OF THE NAVY. OFFICE OF THE SECRETARY JAN 3a NAVY PENTAGON WASHINGTON, D.C

Department of Defense INSTRUCTION

OPNAVINST N00 4 Jun 2012

DODIG July 18, Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets

Report No. DoDIG April 27, Navy Organic Airborne and Surface Influence Sweep Program Needs Defense Contract Management Agency Support

SPAWAR HQ ARCHITECTURE AND HUMAN SYSTEMS GROUP Human-Systems Integration/Systems Engineering Support Performance Work Statement

Bid & Proposal Cost: How can Government and Industry work to get Better Bang for your Buck?

Subj: CIVILIAN EMPLOYEE TRAINING AND CAREER DEVELOPMENT

UNITED STATES AIR FORCE. Air Force Product Support Enterprise Vision

OPNAVINST A USFF/CNO N3/N5 10 Nov 2014

Empowering IT Acquisitions

a GAO GAO DEFENSE WORKING CAPITAL FUND Military Services Did Not Calculate and Report Carryover Amounts Correctly

(1) Acquisition Professional of the Year. (3) Major Acquisition Activity Award. (4) Field Acquisition Activity Award

The Department of Defense (DoD) has reached

BETTER BUYING POWER 2.0 INITIATIVES DESCRIPTIONS

Space and Naval Warfare Systems Center Atlantic

Department of the Navy Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Phase III Guidebook

Town of Bradford West Gwillimbury. Asset Management Strategy and Plan Project. Asset Management and IT Strategy Executive Summary

Department of Defense MANUAL. DoD Integrated Materiel Management (IMM) for Consumable Items: Operating Procedures for Item Management Coding (IMC)

Space and Naval Warfare Systems Center Atlantic

Enabling Joint and Coalition Success: A Perspective from the System Provider RDML Jim Syring Program Executive Officer Integrated Warfare Systems

Small Business Contracting at Marine Corps Systems Command Needs Improvement

SECRETARY OF THE NAVY SAFETY EXCELLENCE AWARDS

Recognizing and Mitigating Risk in Acquisition Programs

The Navy Needs to Improve the Management of Parts Required to Sustain the AN/SPY 1 Phased Array Radar System

MCO LR 15 May 2009

TechNet Land Forces South Small Business Opportunities. Carey Webster Director, Federal Information Solutions Deltek

Joint Operational Medicine Information Systems Program

MARCORSYSCOM SPAWARINST NAVFACINST NAVSUPINST NAVAIRINST B NAVSEAINST

National Defense Industrial Association Systems Engineering Division Task Group Report Top Five Systems Engineering Issues

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC

Department of Defense INSTRUCTION

WEAPON SYSTEM ACQUISITIONS. Opportunities Exist to Improve the Department of Defense s Portfolio Management

Strategic Plan 2011 Office of Small Business Programs

OPERATIONAL REQUIREMENTS DOCUMENT

Department of Defense MANUAL. Procedures for Ensuring the Accessibility of Electronic and Information Technology (E&IT) Procured by DoD Organizations

Engineering a EIA - 632

Better Buying Power 2.0 A Guide to Help You Think

Accurate Risk Assessment Using Multi-Relational Hazard/Mishap Pairings

Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain

Enterprise Resource Planning Systems Schedule Delays and Reengineering Weaknesses Increase Risks to DoD's Auditability Goals

OPNAVINST A N4 5 Jun Subj: OPERATING MATERIALS AND SUPPLIES AND GOVERNMENT FURNISHED MATERIAL MANAGEMENT

Team Orlando International Team Analysis. By Capital Communications & Consulting, 2013

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

SYSTEMS ENGINEERING FUNDAMENTALS

Information Technology

U.S. Department of Defense Extension to:

Acquisition Decision Memorandum for the Defense Integrated Military Human Resources System

NAVSEA Leadership Development Continuum

INTRODUCTION... 6 PART I: PLANNING AND ORGANIZING Objective... 18

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RAOM WILLIAM A. MOFFETT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND

IISUP-. NAVAL SUPPLY SVSTE:MS COMMAND. Ready. Resourceful. Responsive!

Defense Logistics Agency INSTRUCTION

Program Life Cycle Cost Driver Model (LCCDM) Daniel W. Miles, General Physics, June 2008

System Life Cycle and Methodologies

Department of the Navy ebusiness Operations Office

NAVSEA SBIR Program Phase II Proposal Instructions

EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, D. C December 5, 2012

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE

How To Write A Defense Science And Technology Policy Report

DOD BUSINESS SYSTEMS MODERNIZATION. Additional Action Needed to Achieve Intended Outcomes

DEFENSE ACQUISITION MANAGEMENT FRAMEWORK AND A GUIDE TO INCREASED RELIABILITY AND REDUCED LOGISTICS FOOTPRINT...

TABLE OF CONTENTS. Chapter 1: EXECUTIVE SUMMARY... 1

Flexible, Life-Cycle Support for Unique Mission Requirements

DOD Fleet Management Training and Certification 7/31/13

Transcription:

Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV) Dr. Jeffrey Beach Naval Surface Warfare Center Carderock Division; Survivability, Structures and Materials Directorate 1

2. Definitions: TOC Total Ownership Cost (TOC) Total Ownership Cost includes all costs associated with the research, development, procurement, operation, logistical support and disposal of an individual weapon system including: the total supporting infrastructure that plans, manages, and executes that weapon system program over its full life, and the cost of requirements for common support items and systems that are incurred because of introduction of that weapon system,. but excludes indirect, non-linked Navy infrastructure costs that are not affected by individual weapon systems development, introduction, deployment or operations. (Source: ASN(RDA) Total Ownership Cost Strategic Goal Management Board) TOC is a Noun 2

2. Definitions: TOC Total Ownership Cost (TOC) Total Navy Such as: Development Cost, Procurement Cost, Operating and Support Cost, SYSCOM PM Staff, Etc. Such as: System Training Site, Navy Resource Sponsor, SYSCOM, Contracts Office, etc. TOC DIRECT COST + INDIRECT COST (Linked to Weapon Sys) INDIRECT COST (Not Linked to Weapon Sys) Such as: Cornet Player in Navy Band, # of Shore Based Hospitals, Etc. Definition: Total Ownership Cost includes all costs associated with the research, development, procurement, operation, logistical support and disposal of an individual weapon system including the total supporting infrastructure that plans, manages and executes that weapon system program over its full life. And: But: The cost of requirements for common support items and systems that are incurred because of introduction of the weapon system. Excludes indirect non-linked Navy infrastructure costs that are not affected by individual Weapon systems development, introduction, deployment or operations. TOC is an Inclusive Concept of the Totality of Costs Associated with a Weapon System. 3

2. Definitions: TOC Linked - Indirect + common support items $ + common support systems $ Cost + infrastructure $ for planning, managing, operating, and executing + research $ + development $ + procurement $ + operation $ + logistical support $ + disposal $ Direct + research $ + development $ + procurement $ + operation $ + logistical support $ + disposal $ Direct Life Cycle Cost TOC TOC is More than LCC For the TOC Element Structure, see http://www.navsea.navy.mil/sea017/toc.htm 4

Cost as an Independent Variable (CAIV) CAIV is a strategy for acquiring and supporting defense systems that entails setting aggressive, realistic cost objectives (and thresholds) for both new acquisitions and fielded systems, and managing to those objectives. The cost objectives must balance mission needs with projected out-year resources, taking into account anticipated process improvements in both DoD and defense industries. This concept means that once the system performance and objective(s) are decided (on a basis of cost-performance trade-offs), the acquisition process will make cost more of a constraint, and less of a variable while obtaining the needed military performance. (Source: NAVSEA TOC / CAIV PAT) CAIV is a Management Strategy from which Affordable, Executable Programs can Emerge. 5

Policy Guidance THE ASSISTANT SECRETARY OF THE NAVY MEMORANDUM FOR THE SECRETARY OF THE NAVY UNDER SECRETARY OF THE NAVY FROM: SUBJECT: PURPOSE: John W. Douglass, Assistant Secretary of the Navy (RD&A) COST AS AN INDEPENDENT VARIABLE (CAIV) POLICY GUIDANCE ACTION MEMORANDUM The Department of the Navy s CAIV policy guidance is submitted for Secretary of the Navy signature DISCUSSION: Change three to the DoD 5000 series (currently out for Service concurrence with a January 1998 deadline) places significant added requirements on the Program Manager to implement CAIV (i.e., CAIVbased objectives in the Acquisition Program baseline). There are widely varying definitions and understandings about what constitutes CAIV and what needs to be done to execute CAIV. This policy guidance was developed by an IPT comprised of representation from OPNAV, PEOs, SYSCOMs, PMs, and Marine Corps. Its purpose is to establish a singular and comprehensive statement on what constitutes CAIV in the Department of the Navy. The next step in the DoN CAIV implementation is to revise and restate our processes for what needs to be done to properly execute CAIV. These process changes are in development. Presently, there is a need to establish a consistent understanding within the Department on exactly what CAIV is and what it is not. This policy guidance serves that purpose. ASN (RDA) Weighs-In with Advice for Implementing CAIV. 6

Policy Guidance 1. CAIV is a DoN strategic management process. 2. CAIV is a top-down, bottom-up, continuous, and comprehensive process. 3. CAIV recognizes that limited resource availability drives TOC target. 4. CAIV employs a hierarchy of cost reduction activities, expanding the potential trade space. 5. CAIV recognizes that carefully structured contracting incentives can offer great leverage in achieving CAIV objectives. 6. CAIV requires risk management (due to aggressive, realistic cost objectives). 7. CAIV is a cradle to grave process. CAIV is a Verb; It Has Seven Tenets. 7

Policy Guidance 1. CAIV is a DoN strategic management process. Establish mission area resource allocations for each sponsor community Determine operational requirements to meet mission needs Estimate TOC to satisfy requirements Project long-range availability of resources, by appropriation, by priority Assess cost, schedule, and performance relationships Establish aggressive cost targets Identify cost reduction opportunities and trade-offs to meet aggressive targets Develop plans, metrics, and provisions for managing program execution 2. CAIV is a top-down, bottom-up, continuous, and comprehensive process. Top-down Effectiveness optimized within constraints of available and projected resources Bottom-up Government-industry IPTs empowered to recommend cost saving initiatives Continuous From affordability constraint determination, to AoA cost targets, and throughout development, production, operation and support, and disposal The Seven Constituent Tenets of CAIV; Pay Particular Attention to #1. 8

Policy Guidance 3. CAIV recognizes that limited resource availability drives TOC target. Management to the sum of resources required to execute a program within the projected affordability limit, by appropriation, by year 4. CAIV employs a hierarchy of cost reduction activities, expanding the potential trade space. Improve processes and activities, eliminate non-value-added and deficient cost-to-benefit activities Relax or remove requirements that do not contribute to the warfighter s needs Cost-performance trade-offs that reduce cost, but meet all operational requirements Relax operational requirements threshold values 5. CAIV recognizes that carefully structured contracting incentives can offer great leverage in achieving CAIV objectives. Award fee during design and development Procurement price commitment curve for production Profits above typical margins, if contract cost or schedule objectives are significantly improved The Seven Constituent Tenets of CAIV; Pay Particular Attention to #3 and #4. 9

Policy Guidance 6. CAIV requires risk management (due to aggressive, realistic cost objectives). Careful risk analysis Instituting and implementing a Risk Management Plan Defining and measuring meaningful metrics Establishing incentives 7. CAIV is a cradle to grave process. Initiated during the requirements generation phase Continuous throughout life cycle Product and process improvement The Seven Constituent Tenets of CAIV; Pay Particular Attention to #6. 10