Subject: Compact Disk (CD) of Certificate of conformity Please take note that only the document on paper support shall be considered as the authentic Certificate of conformity. General Secretary Virginio Scarioni MOD 137 E Revisione 01
A C A E ASSOCIAZIONE PER LA CERTIFICAZIONE DELLE APPARECCHIATURE ELETTRICHE Via Tito Livio, 5-24123 BERGAMO (Italy) Tel. +39 035 4775244 e-mail: acae@acaecert.it Certificate of conformity no A 09.034/E page 1 of I Apparatus: MV bushing "Plug-in inside cone" 24kV - 250,{ for MV/LV transformers This Cenificate applies onll'to the apparatus tested. The rcp..nsibilin for conlormity of an] apparanì5 har ine the same dcignation ri ith tiat tested rò1. urdl thc manulacrurer or rcp..irsibìe l endor Ocì1 ::r,*raì raproduction of C--r: iì;a-re or reproductions aìl1-i F:rg. aé.lrmpanied b! ::-i3 : a,n shrch are staîed iò:s reai:,{l:l;d and the t:;r-c ::t;c ;haracteristics of i[f"![:l1i:ete.i- are lsst:c ::.-:: -f: AC,I-E Designation: VEGA/S 3018 ENEL Code 305631 Manufacturer or responsible vendor: ELETTRORESIN S.r.t. Via 302 Zona Indus. Basso Marino - 63100 Ascoli Piceno Product manufactured by ELETTRORESIN S.r.l. in the factory atzona Industriale Basso Marino - Ascoli Piceno -Italv Tested for: ELETTRORESIN S.r.l. Tested by: Elettroresin S.r.l. Laboratory ABB Sace S.p.A. - IA 01 Laboratory Omeco S.r.l. Laboratory CMTE of "Dipartimento di Ingegneria Elettrica,o - Genova University Laboratory Standard and technical specification : -ENEL DJ 1111Ed.2 March 1994 -ENEL DJ 1561 Ed.2March 1994 -ENEL DJ 4855 Jtne 1994 draft. This document certifies the compliance of the tested Apparatus with the above mentioned Specification and Standards. This certificate is based on the "Inspection and evaluation repolt" : n. RIV 08.178/E Issue Date: 23.04.2014 caried out according to the ENEL Distribuzione S.p.A. procedure CERT/01 Ed.1- September 2006. PRD NOOTOE Signatory of EA, IAF and ILAC Mutual Recognition Agreements The General Secretary Date:2014.04.23 N.4OD 006 I pag.1
23.O4_2014 Rtv 08.178/E 1di4 lndice 1. Object 2, Place and date of the inspections 3. Standards and technical Specifications 4. Verification of the Laboratories ability 5. Tests performed 6. ldentification of the specimens 7. Minutes of the inspections 8. Non conformity 9. Gonformity assessment of the product 10. Annexes Emitted and verified by the Technical lnspector P.i. EmaniBesana Approved by the General Secretary Dott. lng Virginio i ISPITTORE TECTI MOD 083 Revisione 00
23.04.2014 Rtv 08.r78lE 2di4 1. Object This report is to show the operations canied-out according to the ENEL CERT/01: procedure for the verification of the tests canied-out on the MV bushing plug-in inside cone 24kV 250A for transformers MT/BT according to ENEL specification DJ 1111 manufactured by Elettroresin srl. The dimensions of the product are shown in the drawings VEGA/S3018 (Annex l),scher301b (Annex 1A),SCHER3O1B-T (Annex 1B),GUAR301B (Annex 1C) Aim of the tests is the certification of the conformity to the ENEL Specifications of the point 3 of this report. 2. Place and date of the inspections The inspections have been canied-out in the Laboratory: - Elettroresin srl-via 312-Zona lndustriale Basso Marino 63100 Ascoli Piceno - ABB Sace SpA-Via Baioni 3*24123 Bergamo - OMECO srl-via Monviso 56-20052 Monza (Mi) - CMTE del Dipartimento di lngegneria Elettrica dell'università di Genova-Via - all'opera Pia11A-16145 Genova in the time of tests from A6.02.2007 to 28.03.2007 3. 4. Reference Specfications. Procedura per la certificazione dei materiali destinati ad Enel Distribuzione CERT/01 Ed.1 Settembre 2006. Specifica ENEL DJ 111 1 Ed.2Marzo 1994 "lsolatore passante con presa a spina 24kV 250A per trasformatori MT/BT. Specifica ENEL DJ 1561 Ed.2Marzo 1994" Prescrizioni per il collaudo degli isolatori passanticon prese a spina 24kV,25OA pertrasformatori MT/BT. Specifica ENEL DJ,î855 Boza Giugno 1994 "Prescrizioni per le prove dei componenti degli accessori per cavi di energia" Verification of the Laboratories ability -The Laboratory ABB Sace SpA have been qualified by with number la 01.This Laboratory is also accreditated by SINAL with number 062 -The Laboratory Elettroresin srl is part of the factory operating in compliance of the standard ISO 9001 accreditated with certificate n"9191 ELRE issue date 06.09.2006 -The Laboratory CMTE is part of Dipartimento di lngegneria Elettrica dell'università degli Studi di Genova -The laboratory OMECO srl is accreditated by SINAL with number di 0003. The lnspector witnessed the tests canied-out in Elettroresin and CMT Labotatories- MOD 083 Revisione 00
23.O4.2014 Rtv 08.178/E 3 di4 5. Tests performed The product has been subjected to the type tests of the ENEL Specification DJ 1561. All the tests have been canied-out in the Laboratories of the point 2 The test results are shown in the test reports -Elettroresin srl 005/08 issue date 03.07.2009 Annex 2 - la 01 08.178 issue date 2009.01.29 Annex 3 -CMTE I22 CMTEST issue date 08.07.2009 Annex 4 -OMECO SPT/0834/09 issue date 17.07.2009 Annex 5 b. ldentification of the specimens After the end of the tests the Inspector has verified the characteristics of the specimens. The documentation is annexed to this report -Documentation ENEL A&B Annex 6 -Photograph documents Annex 7 -Dimentional and electrical characteristics Annex 8 -List of the components Annex 9 -lnstructions for the assembly Annex 10 -List of the drawings Annex 11 -Conformity declaration Annex 12 All the documents and drawings have been stamped and signed by the lnspector and by the technical responsible of Elettroresin SrL. One sample of the tested product wil! be kept by the manufacturer for the entire validity time of the Certificate. 7. Minutes of the inspections. According with procedure, the tests in the Laboratories have been witnessed by the Inspector who composed the minutes with description the procedures and the results of the tests.allthe minutes will be kept in the archive. B. Non conformity. During and at the and of the tests the lnspector didn't find non conformity- o Conformity evaluetion of the product The positive results of the tests,the general performances and the verifications of the characteristics made by the drawings and documentations certifies the compliance of the tested product to the mentioned ENEL Specifications. MOD 083 Revisione 00 Nome/Name E.6ES
23.04.2014 Rtv 08.178/E 4di4 10. Annexes - Annex 1- Disegno Elettroresin VEGA/S301B 1 A-Disegno Elettroresin SCHER301 B 'l B-Disegno Elettroresin SCHER301 B-T 1 C-Disegno Elettroresin GUAR301 B 2-RP Elettroresin 005/08 del 03.07.2009 3-RP la01 08.178 del 2009.01.29 4-RP CMTE I22íCMTEST del 08.07.2009 5-RP OMECO SPT/0834/09 del 17.07.2009 O-Eleftroresin Elenco documentazione tipo A&B 7- " Documentazione fotografica I 9- " Elenco materiali 10- " lstruzionidi montaggio 11-12- Caratteristiche dimensionali ed elettriche Distinta disegni Dichiarazione di conformità a ili ACA: NomeÀame e TE Cil tc MOD O83 Revisbne 00