A Long-Range Plan: Melbourne s Drinking Water Supply



Similar documents
Integrated Urban Water Management in Dunedin, Florida, USA: Sustainable Practices from a Small Coastal City in the Gulf of Mexico

Utilities Privatization Success Story. Mid-west drought management Enhance water conservation Enhance environmental sustainability

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

WATER SUPPLY FACILITIES WORK PLAN

Tokyo Waterworks supports the capital of Tokyo

Using Technology to Administer a Reclaimed Water Program. Abstract

AQUIFER STORAGE RECOVERY

FY Springs Funding Projects

Proposed General Plan Update Goals, Policies, and Implementation Actions

Water Equipment Technologies. Advanced Membrane Technologies for Solving Worldwide Water Problems

Our Environmental Protection Plan RECYCLING CAPABILITIES AND ENVIRONMENTAL ACCOMPLISHMENTS

Town of New Castle Utility Department Introduction

Update on Aquifer Storage and Recovery

What Our Water s Worth

Water Recycles poster

CENTRAL ARIZONA SALINITY STUDY ---- Phase I. Technical Appendix O. Municipal TDS Research

Attachment 6: Monitoring, Assessment, and Performance Measures

Highly Colored Water Removal Using Nanofiltration Membranes at the Colored Water Treatment Facility. Adam Zacheis, Project Manager Carollo Engineers

Indiana s Newest Filtration Facility; East Chicago

5. Environmental Analysis

City of Richmond Department of Public Utilities

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Tampa Bay Seawater Desalination Plant

Residuals Management Somersworth Drinking Water Treatment Facility. Ian Rohrbacher, Treatment Operator IV

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

How To Improve Water Quality In East Pacificon

Cambridge Wastewater Treatment Facility

Indoor Water Conservation and I&I Reduction (EIR Alternatives 1 and 2)

GOALS, OBJECTIVES AND POLICIES

City of Cape Coral, Florida FY Proposed Operating Budgets

Appendix F6 Option Characterization Reuse

Getting More Out of the Water We Have

Contents. Executive Summary...ES-1

Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay

California Wastewater

Clearwater s Groundwater Replenishment Program

DIRECT POTABLE REUSE: A PATH FORWARD:

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

PINELLAS COUNTY UTILITIES (PCU) is an equal opportunity employer.

Vista Ridge Water Transmission & Purchase Agreement

STORMWATER MANAGEMENT SUB-ELEMENT

Regulatory Options for Membrane Treatment and Residuals Management

AMOUNT New Account Deposit $50.00 Service Delinquent $10.00 Delinquency Notification $15.00 NSF Check processing $20.00

PROJECT NAME BACKGROUND STATUS

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE

STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page

ARIZONA HISTORICAL SOCIETY 949 East Second Street Library and Archives Tucson, AZ (520) Fax: (520)

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

Aquatera 2015/16 Business Plan Highlights

SPECIAL USE PERMIT JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Complete. Water Solutions. for Rural India

Water is a valuable and expensive resource.

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

Water Conservation in Tucson Past, Present and Future. Fernando Molina Public Information /Conservation Officer Tucson Water

City of Charlottetown Wastewater Treatment Expansion & Upgrading

Water Utility Financial Plan and Rates Study

City of Fresno Department of Public Utilities. Strategic Business Plan

Description of the Water Conserv II Facility

SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND

Financial and Business Metrics Report as of August 31, 2015

Sewer servicing and integrated resource management

William E. Dunn Water Reclamation Facility. Facility Overview & Information

How To Know If Your Well Water Is Safe

North San Jose Neighborhoods Planning Taskforce

4 th & Carey Groundwater. Remediation Project and Reverse Osmosis Water Treatment System

Creating a Sustainable Water Supply for Central Florida

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND

Ion Exchange Softening

State of Utah Natural Resource Damage Trustee Southwest Jordan Valley Groundwater Cleanup. Report to the Public June 2004

CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN

Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity

Iron and Manganese BACTERIA AND IRON AND MANGANESE

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

After the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.

Charting the Future 2017

EPA Trends for wastewater Treatment in California

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve

Water LA. capture conserve reuse. California Adaptation Forum 2014 From Watershed to Coast: Adapting to Rising Seas & Prolonged Drought

3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste

FLORIDA ATLANTIC UNIVERSITY

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

Charlotte Board of County Commissioners Strategic Plan. 2015/ /17 Budget Process

Alberta Environment Standards for Advanced Waste Systems

CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS APPLICATION INSTRUCTIONS

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

Irvine Ranch Water District

CREATING A GREEN FUTURE THROUGH WATER REMEDIATION

Septic Tank to Cistern Conversions. Saving Water & Saving Money

Water Treatment Facilities in Washington County Capacity Analysis November 9, 2005

A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN

MUNICIPAL UTILITY OPERATIONS INTERNAL CONTROLS AND BEST PRACTICES

CAPE COD. Regional Wastewater Management Plan Understanding the Cost Factors of Wastewater Treatment and Disposal

Altoona Water Authority. Infrastructure Overview

Fairlington Community Center

Homeowner s GUIDE. to living with a well and septic system. Northeast Colorado. Health. Department. Replacement System. Leach Field. Septic Tank.

Transcription:

April 2002 A Long-Range Plan: Melbourne s Drinking Water Supply The long-term water supply of South Brevard County must be dependable, flexible, and affordable. With those goals in mind, we continue to improve and expand the Melbourne water supply. This publication outlines how Melbourne is meeting these goals. Melbourne s System Over the past seven years, tremendous improvements have been made to Melbourne s water treatment facilities. A new $23 million surface water treatment plant is now online, with a dedication being held at the plant on Feb. 25, 2002. This plant, which draws water from Lake Washington, replaces a 42 year-old facility. The successful operation of Melbourne s reverse osmosis (RO) water treatment plant also provides evidence of the progress being made. By using water from wells, which tap into an underground supply, this facility reduces the community s reliance on Lake Washington. The new surface water plant offers great promise for the future, and plans are proceeding for the doubling of production capacity from wells. These are steps to ensure the water supply will meet our needs into the next century. Melbourne is responsible for providing water to some 150,000 customers. On a typical day, demand for water is about 15 million gallons. Of course, we must also be ready to respond to a peak-day demand that could exceed 20 million gallons. This is accomplished both through production capacity and a storage capacity of 16 million gallons. Because the population of our area continues to expand, it is vital to maintain an adequate reserve capacity. Melbourne s water supply plan must allow for reserves to be assigned to developments which are approved by local government but not yet built. State law requires this assignment of reserves. Melbourne also recognizes the importance of a supply plan that includes improvements to the quality of delivered water. The new surface water plant uses the innovative Actiflo treatment process along with state-of-the-art instrumentation and controls technology. The new plant allows treatment processes to be adjusted much more quickly to changes in the lake. In addition, the development of wellfields has allowed dramatic improvements in quality without greatly escalating production costs. The wells have also allowed us to diversify the water supply, which provides the flexibility to respond to unforeseen circumstances. At the same time, water quality in Lake Washington, the traditional water supply, has been improved by a federal and state restoration project in the Upper St. Johns River Basin. Planning for the Future Melbourne s water supply is

www.melbourneflorida.org Page 2 City of Melbourne Water Service Area Water Demand Projections Demand in Millions of Gallons Per Day (MGD) 30.00 29.00 28.00 27.00 26.00 25.00 24.00 23.00 22.00 21.00 20.00 19.00 18.00 17.00 16.00 15.00 14.00 13.00 12.00 Dec-03 New Actiflo W.T.P. Expansion - 26.5 MGD Peak Daily Demand Dec-08 Dec-13 Average Daily Demand Dec-18 Year Water storage structures throughout Melbourne s distribution system stand ready to meet consumers demands. View of Lake Washington, Melbourne s surface water source.

www.melbourneflorida.org Page 3 designed to ensure ample water well beyond the year 2020 for the communities which we serve. Construction of the second phase of the surface water treatment plant improvement project should begin in 2003. Ozonation will be added as part of this $12.5 million project, which will replace some chlorination steps and provide greater control of taste and odor. Construction of a second phase of the reverse osmosis plant is anticipated in the future as well, which will provide capacity to accommodate a 100 percent build-out of the current service area. Key components of the long-term water supply plan include: The new Surface Water Treatment Plant, which began production in February 2002, will continue to draw water from Lake Washington and will operate with a peak capacity of 20 million gallons per day (MGD). The capacity of this plant can be expanded. The Joe Mullins Reverse Osmosis Water Treatment Plant, which began production in 1995, will continue to operate at a peak capacity of 6.5 MGD. Water from the RO plant will be mixed with treated water from the surface water plant to meet daily demands. An expansion of peak capacity at the RO plant to 13 MGD can be accomplished. Melbourne is exploring alternative disposal options for the by-product as a necessary step toward expanding the RO plant. Preparing for an Expansion By-product from the current RO plant flows into the Eau Gallie River just west of where it meets the Indian River Lagoon. Monitoring is ongoing to determine that the disposal process causes no environmental damage. Extensive technical studies predicted that no damage would occur, and none has. The federal Environmental To the right, water flows after Actiflo treatment, ready for filtration. Protection Agency and the Florida Department of Environmental Protection are now considering Melbourne s applications for permits to allow the by-product to be discharged into an injection well at the D.B. Lee Wastewater Treatment Facility. The review process by these agencies is quite rigorous. Melbourne must show that potential impacts on the aquifer have been The operations building of the new surface water treatment plant is shown to the left. Water treated at this plant is obtained from Lake Washington. The green pipe is for raw water, while the blue pipe is for finished water. Shown to the left are the membrane trains used to treat water obtained from the Floridan Aquifer wells. The peak capacity of the RO plant is 6.5 MGD. Work is in progress to expand the plant capacity.

www.melbourneflorida.org Page 4 thoroughly investigated. A detailed program of monitoring must also be proposed and approved. Melbourne anticipates approval of permits to allow for an expanded RO capacity. In planning water production capacity, Melbourne must anticipate worst case peak demand, shown on the chart on page two. The Water Supply System Melbourne has operated a treatment plant at Lake Washington since 1959. An experienced and accredited staff is responsible for 24-hour plant and laboratory operations. With the recent start-up of the new surface water plant, operators underwent extensive training on the new high-tech computerized operating systems. With the new plant, delivered water continues to meet or exceed the new, even more stringent, state and federal drinking water standards. As with the surface water plant, the start-up of the RO plant in 1995 came after additional, specialized training for plant operators and support staff. Finished water from the two plants enters a distribution system that includes 850 miles of pipeline. Work to improve the distribution system is ongoing, as outlined in the City s water distribution master plan. Protecting Water Resources Lake Washington is becoming more reliable as a water supply. More water is available and the quality is improving. The St. Johns River Water Management District predicted these changes as a consequence of a project started in 1988 to restore portions of the St. Johns River headwaters. The 10- year project included restoration of marshlands and increased the natural filtering and water-control processes of the river system. The District also expects water quality Melbourne s water distribution system serves about 150,000 people, including the City s 73,000 residents as well as these communities: Indialantic Indian Harbour Beach Melbourne Beach Melbourne Village Palm Shores Satellite Beach West Melbourne Nearby County areas to be improved by the recent replacement of the weir at the north end of the lake. The challenges that come with management of the lake as a public water supply will not vanish. These include efforts to combat heavy growths of the aquatic weed hydrilla. Melbourne has joined with the regional water management district in a hydrilla control program. Phase I & II Surface Water Treatment Plant Improvements Lake Washing ton PAC Contactor (Existing W alker U nits Nos. 3, 4) B y-pass Ferric Sulfate (H SO 2 4 /NaoH NaoH) Actiflo Ozone Ozone Contactor Gravel-less less underdrains with air/water backwash R.O. Product Dual Water Media Filter GAC Sand 4-MG Unbaffled Blending Tank Distribution System Head of Plant Flow Eq ualization Tank with Solids Removal

www.melbourneflorida.org Page 5

www.melbourneflorida.org Page 6 Lab Technician Shaniese Alexander takes regular samples from various hydrants throughout the distributions system to bring to the lab for testing. Lab Supervisor Yvonne Gonsalves, along with her staff, perform thousands of tests on the City s water every year and prepare federal and state reports. Melbourne is also prepared to respond to any threat from pollutants entering the lake as a result of accidents or other circumstances. Obviously, diversifying the water supply reduces this threat. As an additional safeguard, Melbourne has entered into emergency supply agreements with both Palm Bay and Cocoa. The Melbourne distribution system can receive water from Cocoa, or send water into the system. Interconnections also exist with Palm Bay. Existing interconnections and piping capacities into Melbourne s system are listed below, reported in millions of gallons per day: Palm Bay Florida Avenue 1.0 MGD Babcock Street 1.0 MGD Cocoa Wickham Road 1.5 MGD Patrick AFB 1.25 MGD S. Patrick Drive 1.0 MGD The RO plant has already allowed source diversification. The water for that plant is drawn from three wells just east of Lake Washington, which tap the Floridan Aquifer. In implementing the first phase of the RO plant, and in planning for the second phase, necessary permits to protect the environment and the community were obtained. As one part of the effort, consultant engineers determined that private wells in the vicinity of Lake Washington will not be adversely impacted by withdrawals from the City s well field. Financing the Water Supply Melbourne s water supply system is funded by charges to consumers. The City provides service to more than 50,000 water meter connections, including meter reading, billing and collections. The revenue goes into the Water and Sewer Fund. Accounting within the fund ensures that both the water services and the sewer services are self-funding, so that one does not subsidize the other. Water system revenue provides for system administration (shared with the wastewater system), operations, maintenance, improvements, and debt services. Total administrative costs are only 10.4 percent of the water and sewer system budget. Professional services provided to the water system by other City departments are purchased at cost and paid for by transfers to the General Fund. This sharing of staff minimizes costs of services provided to the water system Since the water system is selffunded, rates reflect the actual costs of providing service. Impact fees

www.melbourneflorida.org Page 7 are in place to allow new development to pay a fair share of the water supply cost. Melbourne contracts with consultant firms to calculate rates to provide financial stability for the system. Comprehensive rate studies were conducted in 1985, 1986, 1987, 1991, 1994, 1998, 1999 and 2001. The current rates are based on the 1998 rate study. In accordance with state legislation, the most recent study determined rates which are appropriate for service to a diverse and extended geographical area, including consumers who live outside of the Melbourne city limits. Adjustments in rates must be approved by the City Council after public hearings to solicit comments about rate proposals. Current rates provided for major improvements to the Surface Water Treatment Plant, as well as major improvements at the City s wastewater treatment plants. Those system improvements were funded by a $38.8 million, 30-year bond issue. Summary As a water supplier, Melbourne looks forward to cooperating with other cities and Brevard County in projects to protect, improve, and expand our drinking water resources. Melbourne s goal is to provide high quality water that meets all health standards, and to do so at the most economical cost to our customers. Water conservation activities help preserve our precious resource In addition to providing water, Melbourne sponsors an active water conservation program for schools and the community. The City s Environmental Community Outreach Manager visits area schools each year, finding that young people are eager to carry the conservation message and practices home with them. Working as a team to pool resources and enlist support for community-wide conservation efforts, a Melbourne Groundwater Guardian Team was formed five years ago and has accomplished numerous outreach and educational projects. Patterned after the Groundwater Guardian formula, a committee was formed almost two years ago, the Brevard Utilities Water Conservation Committee, made up of representatives from the five public water utilities in Brevard County. The committee has produced and distributed educational posters, newspaper inserts, Florida Friendly Landscaping seminars for the public and is working on a video for middle and high school audiences. Participation in public events is also an important method in water conservation and environmental education, along with visits with homeowners groups and discussions with customers. Another program instituted in Melbourne five years ago is having a tremendous direct effect toward water conservation. The residential toilet retrofit rebate program has already resulted in the replacement of close to 600 water guzzling toilets with new water conserving models, estimated to be saving close to five million gallons of water per year. The staff is also letting the community know about the value of irrigation with reclaimed water, also known as reuse, which reduces the demand on drinking water resources. Used widely for irrigation, customers include many large businesses and commercial properties, City properties, such as both of Melbourne s golf courses, and many medians, as well as large subdivisions. For more information on programs or outreach events, please visit the City s web site at www.melbourneflorida.org.

www.melbourneflorida.org Page 8 * *For emergency use only