US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing



Similar documents
Environmental Impact Assessment

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Proposed General Plan Update Goals, Policies, and Implementation Actions

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION

March 17, Dear Mr. Sullins:

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

DEPARTMENT OF TRANSPORTATION. Notice of Limitation on Claims against a Proposed Transportation Project

APPLICATION FOR STATE REVOLVING FUND LOAN

COMMUNITY CERTIFICATIONS

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526

List of Preparers AKRF, INC. Robert F. Conway, P.E. EIS Project Manager; Construction Impacts

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

PUBLIC NOTICE Application for Permit

Gold Ray Dam Interagency Technical Team Meeting

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

Foreign Affairs Security Training Center (FASTC) U.S. General Services Administration U.S. Department of State

J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

Performance Goals and Objectives:

Veterans Memorial Bridge (Orange Avenue) PD&E Study

NASA Stennis Space Center Environmental Resources Document

Public Information & Public Scoping Meeting

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

Land Protection Planning for the National Wildlife Refuge System

North Face. South Face. Figure Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Pipeline Regulatory and Environmental Permits

Floodplain Development Land Use Review

Sec. 22a-1a page 1 (4-97)

SR-18 Corridor Improvements in Wood County

CHAPTER 9 List of Preparers

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

OTHER FUNDS AND ACCOUNTS

Chapter 5 Financial Plan

AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW

U.S. Department of Transportation Federal Highway Administration. Western Federal Lands Highway Division Vancouver, Washington

Northern Middlesex Council of Governments

Trouble with the Feds: An Overview of Federal Constitutional and Statutory Issues in Local Urban Planning and Zoning Law

GAO PIPELINE PERMITTING. Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps, and Time Frames Vary

THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS

Environmental Guidance for

Prepared by Kory Menken & Andrew Finzen 10/26/14. North Sioux City Economic Development Corporation Flynn Business Park

CHAPTER 4 ALTERNATIVES COMPARISON

Executive Director s Recommendation Commission Meeting: March 5, 2015

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

Corridor Goals and Objectives

Virginia Department of Transportation Rural Rustic Road Program Manual

March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

Addendum D. Nomination of Moody Wash ACEC

Categorical Exclusion Determination Bonneville Power Administration Department of Energy

Procedures for Applying for Financial Assistance

Section 8.1 ADVANCE ACQUISITION

Timberland Property Tax in Texas. Yanshu Li Texas Forest Service

St. Clair College Planning Area Introduction

The Cadmus Group, Inc. U.S. General Services Administration Schedule Contract Federal Supply Service Authorized Federal Supply Schedule Price List

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

Disaster Recovery Managing and Leveraging Multiple Funding Sources

Flood Risk Management

Flood Risk Management

DEVELOPMENT DUE DILIGENCE CHECKLIST

CLASSIFICATION AND SALARY RANGES RIGHT-OF-WAY PERSONNEL

NEPA Environmental Assessment. Broadband Technology Opportunities Program. Statewide Fiber Optic Network. Prepared For: On Behalf Of: Prepared By:

URBAN DRAINAGE CRITERIA

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Project Manager & Key Staff Standards for Technical Proposals Projects using Level A and/or Level B prequalification disciplines

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

Transcription:

US 281 AT PREMONT PUBLIC HEARING

Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project Learn about alternatives studied Review the Preferred Alternative Provide comments and input 2

Hearing Agenda Introductions Meeting Format Technical & Environmental Presentation Public Comments 3

Meeting Format Options for Commenting 1. Make a verbal comment (3 minutes per speaker) 2. Place comment card in the comment box 3. Provide comments to onsite court reporter 4. Email comments to: Victor.Vourcos@TxDOT.gov 5. Mail comments to: TxDOT Corpus Christi District Office Attn: Victor Vourcos 1701 South Padre Island Drive Corpus Christi, Texas 78416 Deadline for comments : January 7, 2015 4

ENGINEERING AND ENVIRONMENTAL PRESENTATION US 281 at Premont

Project History N N 6

Need and Purpose Improve safety for the traveling public Develop statewide significant interstate corridor (I-69C segment) along existing US 281 INTERSTATE TEXAS 69C 7

Alternatives Considered Relief route through Premont on a bridge Relief route through Premont at street level Relief route east of Premont Two relief routes west of Premont As shown at the September 2008 Public Open House 8

Community Impact Assessment Alternatives and Results As shown at the October 2012 Public Open House 9

Alternative Advanced for Detailed Study Plan View 418 3D View N 419 10

Alternative Advanced for Detailed Study Plan View 3D View 422 N 422 11

Alternative Advanced for Detailed Study Plan View N Cemetery 3D View Cemetery SE 1st Street 12

Alternative Advanced for Detailed Study Plan View 422 SE 1 st Street Donald Street NE 8 th Street N Cemetery 3D View 13

Right-of Way/Utility Adjustments Right-of-way 192.8 acres of new right-of-way 79 acres of existing right-of-way ROW width varies from 270 to 500 feet Utilities water lines sewer lines gas lines telephone cables electrical lines other underground and overhead utilities 14

Estimated Cost Total project cost estimate: $58.14 million Funding breakdown $50.56 million for construction $7.58 million in contingencies/indirect costs 15

National Environmental Policy Act (NEPA) Clean Water Act Endangered Species Act Environmental Justice (Executive Order 12898) National Historic Preservation Act Section 4(f) of the Department of Transportation Act Clean Air Act Title VI of the Civil Rights Act Uniform Relocation Assistance and Migratory Bird Treaty Act Floodplain Management (Executive Order 11988) Comprehensive Environmental Response, Compensation and Liability Act Resource Conservation and Recovery Act Farmland Protection Policy Act Land and Water Conservation Fund Real Property Acquisition Policies Act Act Americans with Disabilities Act Highway Noise Standards Endangered Species Act Public Involvement Requirements AND MORE, including state and local requirements 16

NEPA Studies Draft Environmental Assessment (EA) includes: Purpose and Need statement Evaluation of alternatives considered Evaluation of the affected environment Assessment of environmental consequences Public involvement Recommendation of the preferred alternative FHWA declared the US 281 EA Satisfactory for further processing on November 3, 2014 17

NEPA Studies Traffic Land Use and Zoning Population Characteristics Economics Community Cohesion Aesthetics and Visual Quality Right-of-Way Acquisitions Utility Infrastructure Soils - Prime Farmland Soils Vegetation Wildlife/Wildlife Habitat Threatened and Endangered Species Non-archeological Historic Resources Archeological Resources Wetlands and Waters of the U.S. Water Quality Floodplains Air Quality Hazardous Materials Indirect and Cumulative Impacts 18

US 281 at Premont Project Impacts Proposed project includes construction in 100-year floodplain area Proposed design will adhere to federal and state hydraulic design policies and procedures Proposed project will not increase the current base flood plain level Proposed project is designed to accommodate large floods without substantial damage to project or property 19

NEPA Conclusion 20

Provide Your Comments Options for Commenting 1. Make a verbal comment 2. Place comment card in the comment box 3. Provide comments to onsite court reporter 4. Email comments to: Victor.Vourcos@TxDOT.gov 5. Mail comments to: TxDOT Corpus Christi District Office Attn: Victor Vourcos 1701 South Padre Island Drive Corpus Christi, Texas 78416 Deadline for comments : January 7, 2015 Public Hearing Report will be posted at www.txdot.gov when analysis is complete 21

VERBAL COMMENTS US 281 at Premont

3:00 Minutes For Each Speaker

Closing Remarks Thank You for Your Participation! 24

Provide Your Comments Options for Commenting 1. Place comment card in the comment box 2. Provide comments to onsite court reporter 3. Email comments to: Victor.Vourcos@TxDOT.gov 4. Mail comments to: TxDOT Corpus Christi District Office Attn: Victor Vourcos 1701 South Padre Island Drive Corpus Christi, Texas 78416 Deadline for comments : January 7, 2015 25