ARSAT Licitación Compra Sistema Flyaway Satelital Pliego Técnico Página 1/11
ARSAT Technical Requirements Description; Procurement Satellite Flyaway System Estación Terrena Benavidez Buenos Aires Argentina Track AR.GSER.TDS.REQ.1606.v0R0 Review Prepared Approved Released 0.0 Issued Pablo Bordarampe Gustavo De Gaudenzi Martin Fabris 1.0 Checked document Mariano Goldschmidt Gabriel Borello Pablo Bordarampe Gustavo De Gaudenzi Martin Fabris Página 2/11
Table of Content 1. General considerations... 4 2. Technical specifications... 4 3. Proposals Presentation... 5 4. Important considerations... 6 5. Compliance Matrix... 7 Página 3/11
Abstract To perform the migration satellite plan, is necessary the equipment for the uplink over different configurations according future projects, were Arsat is responsible for the Operation and Satellite Services. This document describes the parameters to follow in the tender for the acquisition of 4 (four) units of satellite flyaway system, according to the technical specifications described in the specific sections. In case of the no specification in any item, it will be required that the system meets the local regulations as appropriate. 1. General considerations 4 (four) independent pieces of equipment are required to be integrated in KU band satellite systems and so allow the uplink using the DVB-S/ DVB- S2/ DVB-S2 Ext. standards permitting the flexibility to use different inputs, encoding s configurations, modulation s configurations, transmission s configurations and path, all according to the specifications detailed in Section 2 of this document. 2. Technical specifications Technical requirements on the devices involved are described hereafter. Those requirements are detailed in compliance matrix in Section 5, where all the requirements must be considered as mandatory except for those cases where it is specifically mentioned as Optional. Analog audio & video encoding. SD-HDI/ HD-SDI audio & video encoding. Data input (TSoIP). DVB-S/ DVB-S2/ DVB-S2X modulation standards. Physical input 75 Ω BNC terminals. Physical input RJ-45 Glan terminals (TSoIP). MPEG2 TS ASI input supported. MPEG2/ MPEG4 Video encoding. MPEG1/ AC-3/ AAC/ HE AAC Audio encoding. 4:2:0 Sampling. (4:2:2 Optional) BISS scrambling. Carrier ID injection. Página 4/11
Support full management from front panel or web browser. SNMP supported. L band internal RF interface for Tx and Rx. HPA minimum power 200 W. Linear polarization KU + KU Ext. antenna. Minimum 61 dbw PIRE @ Tx (including Back-off margin). Antenna Gain Minimum 41,5 dbi @ 11,95GHz Antenna Gain 43 dbi @14,25 Ghz. X-Polarizated Feed. G/T 19.2 dbk min at 11,95 Ghz. Cross Pol isolation min -35 db Transportable packaging. Minimum Antenna Size 120 cm. 3. Proposals Presentation Proposals will be evaluated according to the fulfilment of the mandatory requirements compliance matrix in Section 5, delivery time, prize and optional requirements. Please be free to include as many proposals as you could offer using different models of antennas and TWTAs. Tenders for each proposal must include: Technical specifications. Optional requirements must be specified if it is a license key (field upgradable) or it must be pre-order before shipment. Specific needs identified by the manufacturer and / or integrators (electric, environment, etc.). Full and signed compliance matrix according to product characteristics submitted. (As an affidavit). Commercial, insurance and shipping terms. (All the offers must be in EXW). Detailed document about the considerations mentioned in section 4 (for all the equipment included in the system). Heritage of the company in providing at least 10 (ten) satellite flyaway systems solutions. Any other information / recommendation that the supplier understands needs to be mentioned. If any of the items required below it is not send in the technical proposal, it will be discard. Página 5/11
4. Important considerations A. The quotation should include training on-site (Arsat facilities) for 4 people. Please include in the proposal an explanation about content and hours training. B. The quotation should include technical support for the whole system for one year from the end of training (mentioned on 4.A). C. Due the equipment will be submitted to several moving and to field work; Arsat will take an important consideration about: Transportation weight Transportation packaging dimensions Building materials (structures, Rack, antenna plate, etc.) Water resistance Protection against shocks Easily transportation Mount time & ease Environment specifications (Operational & storage) Página 6/11
5. Compliance Matrix Tenders should fill and signed the compliance matrix according to product characteristics submitted (As an affidavit). All the items must be considered as mandatory except for those cases where it is specifically mentioned as Optional. ID Technical requirements - FLYAWAY system Fulfil Y/N Observations 1.1 1 x 10/100/1000 Base-T. Data input (TSoIP). 1.2 1 x 10/100 Base-T. Management. 1.3 1 x ASI 75Ω BNC inputs w/ autodetect 188/204 bytes. 1.4 2 x ASI 75Ω BNC outputs. 1.5 L band interface between modulator and ODU. 1.6 1 x 50Ω L band Output (Monitor). OPTIONAL 1.7 Inputs/ Outputs 1 x N type RF attenuated output 1.8 1 x BNC AUDIO Digital AES/EBU 110R balanced to IEC 60958 1.9 1 x CVBS PAL / NTSC composite 1Vp-p 75R 1.10 1 x BNC 75Ω SMPTE 259M (SD-SDI) 1.11 1 x BNC 75Ω SMPTE 292M (HD-SDI) 1.12 1.13 2.1 Embedded audio 3 stereo pairs or one multichannel Digital (AES3 or S/PDIF) BT.656 / ANS I/ SMPTE 259M VIDEO MPEG-2 MP@ML (1 to 15Mbps) 2.2 VIDEO MPEG-2 MP@HL (2 to 24 Mbps) 2.3 VIDEO MPEG-4 AVC MP@L3 (0.3 to 8 Mbps) Encoding 2.4 VIDEO MPEG-4 AVC HP@L4 (1 to 20 Mbps) 2.5 AUDIO MPEG-1 Layer II 2.6 AUDIO Dolby Digital (AC-3) Página 7/11
2.7 AUDIO AAC 2.8 AUDIO HE AAC (v1 and v2) 2.9 4:2:0 Sampling 2.10 4:2:2 Sampling (optional) 2.11 Aspect ratio 4:3 & 16:9 2.12 2.13 SD Resolution 576i@25 x 720, 704, 640, 544, 528, 480, 352 pixels SD Resolution 480i@29.97 x 720, 704, 640, 544, 528, 480, 352 pixels 2.14 HD Resolution 720P @50 x 1280 and 960 pixels 2.15 HD Resolution 720P @59.94 x 1280 and 960 pixels 2.16 2.17 HD Resolution 1080i @25 x1920, 1440, 1280 and 960 pixels HD Resolution 1080i @29.97 x1920, 1440, 1280 and 960 pixels Página 8/11
ID Technical requirements - FLYAWAY system Fulfil Y/N Observations 3.1 3.2 3.3 4.1 Multiplexation Ability to modulate two or more multistream TS on a single carrier BISS scrambling for single or multiple programs on TS Carrier ID injection (NIT table and DVB RF Carrier ID) DVB-S/ DVB-S2 Supported 4.2 DVB-S2X Supported (optional) 4.3 4.4 4.5 4.6 4.7 5.1 Modulator QPSK modulation (specify the supported standards,fec and maximum rates ) 8PSK modulation (specify the supported standards FEC and maximum rates) 16QAM modulation (specify the supported standards,fec and maximum rates) 16APSK modulation (specify the supported standards, FEC and maximum rates) 32APSK modulation (specify the supported standards,fec and maximum rates) KU + KU ext. bands output: 13,75 ~ 14,5 GHz 5.2 KU + KU ext. bands input: 11,45 ~ 12,2 GHz 5.3 Output power minimum 200 W 5.4 Minimum 61 dbw PIRE @ Tx (including Back-off margin) 5.5 Antenna Gain Minimum 41,5 dbi @ 11,95GHz 5.6 Antenna Gain 43 dbi @14,25 Ghz. 5.7 Antenna + RF Antenna G/T min 19.3 dbk @ 11,95 Ghz 5.8 Antenna - Linear polarization KU + KU ext. X-pol 5.9 Antenna Cross Pol Isolation min 35db 5.10 Antenna TX/RX isolation min 95 db 5.11 Minimum Antenna Size 120 cm. 5.12 Antenna - Operational wind conditions up to 90 Km/h 5.13 Antenna - 3 axis motorised tracking (optional) Página 9/11
6.1 All the equipment need to have front panel with fully changing configuration ability 6.2 All the equipment need to have remote access via web browser with fully changing configuration and status monitoring ability 6.3 6.4 6.5 6.6 6.7 Configuration/ management All the equipment need to have ability to save the configuration on non volatile memory All the equipment need to have active and previous alarms memory All the equipment need to have SNMP service for monitoring (specify the supported version) All the equipment need to have SNMP traps service (specify the supported version) All the equipment need to have SNMP traps ACK supported (specify the supported version) Página 10/11
ID Technical requirements - FLYAWAY system Fulfil Y/N Observations 7.1 7.2 Monitoring and antenna pointing equipment L band basic and portable spectrum analyser. (optional) IRD - DVB-S/ S2, MPEG2/ 4, BISS, CVBS out, SDI out, etc. (optional) 7.3 Sat-finder. (optional) 8.1 8.2 8.3 8.4 8.5 8.6 8.7 General requirements All the equipment (Excepts LNA/ LNB) - Power 220v 50Hz. All the equipment (Excepts LNA/ LNB) - Dual power supply (optional) All the equipment - Operation temperature: 10 C a +35 C All the equipment - Relative operating humidity: <85% All the equipment (except the antenna) mounted into a transportable, closed and water resistant rack. Antenna - With robust and water resistant box/ cover for equipment care during transportation. Included all the internal wiring and waveguide necessary to operate 8.8 Packing list description (detail in observations box) Página 11/11