A Breathtaking. Kansas City s new performing arts center is a showcase of outstanding steel-framed structures.



Similar documents
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

SHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E.

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

INSTALLATION. General. Important Note. Design. Transport

THE ACOUSTIC DESIGN OF THE NEW DRAMA HOUSE FOR THE ROYAL THEATRE IN COPENHAGEN

Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center

Steel joists and joist girders are

Page & Turnbull imagining change in historic environments through design, research, and technology

Table of contents. What is new in Advance Steel 2011

High Strain Dynamic Load Testing of Drilled Shafts

The Collapse of Building 7 by Arthur Scheuerman December 8, 06

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

8/18/14. Introduction to. Framing. Terminology and Concepts

March 14, Installation of Bay, Bow and Garden Windows

METHOD OF STATEMENT FOR STATIC LOADING TEST

Scheduling Estimating Module

Stage roof systems. Stage roof systems

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

Handling, Erection and Bracing of Wood Trusses

d e n v e r a r t m u s e u m

Art Gallery Ontario Toronto, Ontario, Canada

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Chapter 6 ROOF-CEILING SYSTEMS

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301)

US 51 Ohio River Bridge Engineering and Environmental Study

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:

TEKLA SOFTWARE IN PRACTICE: SPEEDING UP THE STEEL JOIST DELIVERY PROCESS

Building Construction. Lightweight construction. Conventional Construction

Code of Standard Practice for Timber Frame Structures

TECHNICAL NOTE. Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006 IBC. On Cold-Formed Steel Construction INTRODUCTION

Technical Notes 3B - Brick Masonry Section Properties May 1993

Pro-Lift Steel Pile Foundation Repair

Layher. Protective Systems. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

The Roskilde Domes 2011 and 2012

THE ROAD TO PRODUCTIVITY

SUPER SHED. Indoor shelter for your outdoor tools.

STRUCTURAL STEEL DESIGN AND CONSTRUCTION. Gary S. Berman, PE GREYHAWK North America, LLC. GREYHAWK North America, LLC

Quality Control and Quality Assurance Guide

BIM keeps on trucking:

Simplified Steel Stair Design for Commercial and Institutional Buildings

How to secure your property after a disaster

EAST LYME HIGH SCHOOL

The Analysis of Open Web Steel Joists in Existing Buildings

Installation Instructions For Slider Casement Air Conditioners

Residential Deck Safety, Construction, and Repair

Raising the Roof Creating Roofs in Revit David Cohn

HORIZONTAL INSTALLATION

PS.12. 4D Scheduling A Case Study

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Forensic engineering of a bored pile wall

Chapter 3 - Structural Design

How To Understand The World Trade Center'S Structural Design

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Bracing Webs in Trusses that have Dissimilar Configurations

STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 5: Detailed Design of Trusses

High Capacity Helical Piles Limited Access Projects

Acoustic design according to room shape

Joist. Reinforcement. Draft 12/7/02

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

COMPUTATIONAL ENGINEERING OF FINITE ELEMENT MODELLING FOR AUTOMOTIVE APPLICATION USING ABAQUS

New Features in TerraScan. Arttu Soininen Software developer Terrasolid Ltd

Stilling Well Recommendations

STORAGE SYSTEMS PUSH BACK RACK SYSTEMS. Innovative Solutions for Storage and Material Handling Systems

Section A Roof Truss

co-chairmen On September 16th and 17th, 2011, the doors will open to reveal the interior beauty and exquisite sounds of the two performance halls.

The Keep It Simple, Steel (KISS) Standard

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

PART E SPECIFICATIONS

How SolidWorks Speeds Consumer Product Design

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

Installation Instructions

INSTRUCTION BOOK FOR. Lace And Grommet Theater-Type Screens

FABRICATION DRAWINGS A Paradigm Shift

Technical Analysis and High-End Structural Design

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Steel... 5 Where to find information?... 6

APPENDIX H DESIGN CRITERIA FOR NCHRP PROJECT NEW BRIDGE DESIGNS

Optimum proportions for the design of suspension bridge

Buildings Construction Procurement Strategy

INTRODUCTION TO BEAMS

4A6(1) Case Study Hartford Arena Roof Collapse Group 11. 4A6(1) Case Study. Group 11: Hartford Arena Roof Collapse

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

MULTI-RESIDENTIAL BUILDING SOLUTIONS

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Mark Cramer Inspection Services, Inc.

An introduction to 3D draughting & solid modelling using AutoCAD

TD AMERITRADE Park Omaha

Quality and the Bridge Engineer

PUMP JACK SYSTEM AND ACCESSORIES

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

Activity 2.3b Engineering Problem Solving Answer Key

Davit Systems and Outriggers

How To Design A Post Tensioned Deck For A Building

Owner s Guide to Understanding Checks in Glued Laminated Timber

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Transcription:

Kansas City s new performing arts center is a showcase of outstanding steel-framed structures. A Breathtaking PreludeBy mitch gehringer AAtop a hill with a commanding view to the south and overlooking the revived Crossroads Arts District sits the newest addition to the Kansas City skyline, the Kauffman Center for the Performing Arts. This world-class entertainment venue has proven to be as challenging to design and build as it is expected to be beautiful and functional. Scheduled to be completed and ready for the 2011 performance season, it will be the performance home for the Kansas City Symphony, the Lyric Opera of Kansas City, and the Kansas City Ballet. The Kauffman Center, envisioned by Muriel Kauffman of Kansas City as early as 1995, was finally brought to fruition by her daughter Julia Irene Kaufmann. The 285,000-sq.-ft facility consists of the 1,600-seat Helzberg Hall, for symphonic concerts, and the 1,800-seat Muriel Irene McBrien Kauffman Theatre for live stage performances. A third independent structure acts as a shell enveloping the two internal buildings. This unique architectural showpiece starts with a series of segmented vertical arcs forming the north wall and, from the top of the arcs, descends to the south with a gentle sweep ending with its signature cable-supported glass atrium. A Structural Framing Challenge The complex geometry and intricate connections required to connect the symphony of trusses and rolled beams resulted in hardly a 90 angle or straight piece of steel anywhere in the structure. Working as a subcontractor to J.E. Dunn Construction, Hirschfeld Industries was specifically selected as the structural steel contractor on this unique project because of its history of expertise with complex steel structures and in particular, the detailing, fabrication, and erection of elaborate trusses. When completed, the structure weighed in at 3,989 tons of steel with 938 tons, or 24% of the total structure, being rolled steel. Rolling was equally split in the hard direction and in the easy direction. The top and bottom chords of the north wall vertical trusses are typically W14 99s and W14 211s rolled the easy way. The top and bottom chords of the east/west trusses forming the roof of the shell and curved in the horizontal plane are typically W14 90s rolled the hard way. The concert hall, located on the east side of the site, consists

Hirschfeld Industries Kansas City s new Kauffman Center for the Performing Arts actually consists of three steel-framed structures. The two internal structures a concert hall and a theater are enveloped by a third, shelllike structure. Top: The box truss that defines the extreme south end of the steel structure was assembled on the ground in six segments. The segments were lifted into place by a single large crane. Middle: The south side of the Kauffman Center s steel structure is defined by a box truss that extends the entire length of the structure. Bottom: The massive free-standing lattice shell forming the north wall is composed of 27 vertically curved north/south trusses rising to a height of 139 ft above the ground. The straight members extending to the left at the top of the curved truss attach to the horizontal box truss along the south side of the structure. of six levels of structural steel framing. The roof of this structure comprises six straight east/west trusses with clear spans ranging from 43 ft to 104 ft and an average depth of 14 ft, all supported by the concrete at Level 8. The organ trusses, aptly named for shaping the back wall of the organ chamber and echoing the shape of the outer shell, are located at the north end of the structure and consist of eight curved vertical trusses each approximately 47 ft in height extending from the concrete frame at Level 8 and connecting at the top to one of two trusses. The second internal building, the proscenium theater, is located on the west side of the site and also consists of six levels of structural steel framing. This structure takes a slightly simpler approach with the roof structure consisting of only four straight east/west trusses with the northernmost truss tied into the concrete stage tower just to the north. A maze of multi-leveled curved catwalks is hung from the trusses. The massive free-standing lattice shell forming the north wall is composed of 27 vertically curved north/south trusses rising to a height of 139 ft above the ground. Stretching between the top of the trusses and the box truss and defining the extreme south end of the steel structure, is a series of W24s and W21s in the same vertical plane of each of the corresponding curved trusses. Lateral resistance in the north/south direction is provided by six braced frames. Lateral resistance in the east/west direction is also provided by braced frames between the north wall trusses. Acoustical Issues Internal noise abatement is a critical consideration for dual-use venues such as this. Throughout the design and construction of the Workers attach the first component of roofing system to the curved trusses. The complex geometry and intricate connections required to connect the symphony of trusses and rolled beams resulted in hardly a 90 angle anywhere in the structure. is director of preconstruction for Hirschfeld Industries. His career spans two decades and includes projects throughout Europe, the Middle East, Southeast Asia, and the U.S. october 2010 MODERN STEEL CONSTRUCTION

Many of the connections required multiple connection plates at various angles, posing challenges to both the detailer and the fabricator. steel framing, careful consideration was given to avoiding the transfer of airborne noise as well as reverberations throughout the structure. The structural steel frames for the concert hall and theater were designed to be completely independent of the surrounding steel and concrete structure. A minimum acoustic joint of 2 in. at ground level, increasing to more than 6 in. at the top of the structure where the wind loads are more significant, was required between the inner buildings and the shell to control both airborne and structure-borne noise from entering the occupied space. Inspections conducted at the end of the erection of each sequence before vacating a specific area ensured that all temporary erection aids had been removed, thus preserving the acoustic isolation. Detailing Connection Design Consteel Technical Services, a wholly owned subsidiary of Hirschfeld Industries, used Tekla Structures, version 11.3, to provide highly accurate and interactive 3D computer modeling. With the structure being predominantly curved with braced frames on radial grid lines, it was by far the most complex and challenging structure the team had detailed. Structural Solutions, Inc., designed the bolted connections using standard holes, per the erector s requirement for immediate stability of the member, and slip critical bolts using a Class B faying surface. This resulted in a lower bolt shear capacity than for a bearing condition, so the quantity of bolts and size of the connections increased. However, it was required to eliminate any slippage in the connection and maintain the specified tension in the cable structure connected to the structural steel. As many as 20 modelers, editors, and checkers were working in the Tekla model at any one time. Difficulties sometimes were encountered in avoiding clashes within the model, although these were not insurmountable problems. Unexpected problems were encountered, however, as the size of the model eventually approached the capacity of the software simply due to the complexity of the geometry. This was resolved by separating the model into two independent models one for the concert hall and proscenium theater internal buildings and another for the external shell. The separa-

tion was done after the overall geometry had been established and shop drawings were being developed for the north wall, so there was little potential for any unknown clashes between the two models. However interface checks between the models still were done on a regular basis. (See sidebar No More Maxing Out. ) Throughout the detailing process, close collaboration between the design team, connection engineer, general contractor, and steel fabricator was a necessity in finalizing the structural design. Virtual meetings using online visual and audio links (via Go to Meeting ) were an essential tool in bringing all parties together to visualize, design, and detail, the complex nodes with massive shear plates converging at different relative angles. As the 3D model was being developed, a detailer was brought in to work face to face with the design team, thereby incorporating the myriad of painting and fireproofing details on the steel as well as the exact location of the shopattached pourstop. This preplanning was extremely beneficial to all and resulted in minimal field modifications and interruptions. The lateral load resistance system, braced frames, consisted of wide flange No More Maxing Out diagonals connected For modeling software, just to gusset plates with like all computer-related things, claw angle connections. The axial trans- capabilities continue to grow. Although the initial Kauffman fer forces across the Center model pushed the limits of joints were accommodated with massive the then-current version of Tekla Structures, subsequent releases end plate connections, are 64-bit versions that eliminate some as long as 11 ft the memory restrictions associated and up to 3 in. thick, with 32-bit systems. The result is with the flanges shopwelded to the end that almost any size project can be handled in one model. plates. This applied tension to the end plate bolts, reducing their effective clamping force and thus their slip resistance. The connections were carefully designed to ensure the required capacities were achieved, all while allowing for no connection slip at strength-level forces. The cable supported glass system at the south end of the building introduced significant challenges to the connection design. Due to the high tensile forces required developed by the cable system, significant lateral and vertical loads were imparted into the external shell structure. No connection slip could be permitted in order to ensure the cables maintained their required tensile forces. The connection design information was provided by the connection engineer to the detailer via connection tables for the simpler connections and intricate AutoCAD sketches for the more complicated joints. As the joint complexity increased, this process became iterative, with the connection engineer and detailer sharing copies of the 3D model until the joints were finally and completely detailed. Before the shop drawings were sent to the design team for approval, the connection engineer reviewed each one to ensure the connection design intent was correctly interpreted. The result was a steel structure of untold complexity erected with very few fit-up issues in the field. { } Fabrication Dividing the structure into ten fabrication/erection sequences (one for the concert hall, one for the proscenium theater, and eight for the outer shell) and further subdividing the structure into 54 Jennifer Jernigan A showcase for BIM, the Kauffman Center information-rich model presents a complex geometry with a high degree of detail, such as showing connection components as well as member profiles and thicknesses. Truss fabrication was done mostly in Hirschfeld s Abilene, Texas, shops. Trusses were shop assembled to the greatest extent possible still allowing the shipping of oversized and overweight assemblies to Kansas City via permit. The framing for the sloped roof of the concert hall prior to its being enveloped by the curved outer shell. The concrete box in the background is the proscenium theater. october 2010 MODERN STEEL CONSTRUCTION

manageable shipping priorities allowed the construction site to maintain the erection at a productive rate while keeping the staging areas from being inundated with not-yet-needed assemblies. To accommodate the compressed fabrication schedule, truss fabrication was done mostly in Hirschfeld s Abilene, Texas, shops with the structural work being conducted in its San Angelo, Texas, shops. Trusses were shop assembled to the greatest extent possible still allowing the shipping of oversized and overweight assemblies to Kansas City via permit. During crucial fabrication periods, Hirschfeld engaged a detailer to be present in the shops armed with the latest technology and electronic total station and the industrial measurement software. That enabled extraction of the 3D coordinates from the Tekla model and their transformation into any plane required to achieve the complex build of the roof steel curved members as well as satisfy the tolerances required during fabrication. This essentially gave the shops the capability of building any achievable shape. Conversely, the shops could take the as-built subassembly dimensions and transfer the data back into the model to provide actual to theoretical comparisons. This would then allow a simulated trial erection of fully formed truss assemblies before lifting and confirming that the interface with adjoining members worked. The curved organ trusses (three are visible here) echo the shape of the outer shell and form the back wall of the organ chamber. Located at the north end of the structure, they consist of eight curved vertical trusses each approximately 47 ft in height and extend from the concrete frame at Level 8 and connect to one of two trusses at the top. Erection Not unlike the talent of the performers and the tireless rehearsals needed to create the magnificent sound soon to be found in the Kauffman Center, the construction process of the structure required the absolute best contractor partnerships in the industry to orchestrate every detail. Integral to the preplanning and execution of the erection of the structural steel was the 3D modeling and staged analysis of an elaborate 52-stage erection/stability plan created by the Midwest Steel erection team. Twenty-three drawings, by section, were generated for stability bracing, 14 drawings for rigging of all lifts and seven drawings for crane logistics. Critical to the development of the detailed erection plan was a staged load analysis to maintain stability for the partially erected structure. Secondary construction loads were considered to accommodate the follow-on trades during erection as needed. There were 26 critical lifts planned and executed on this project. The connection points at the tops of each building were erected several months prior to the erection of the vertically curved trusses. Control of the position was critical in order to erect the back of the house and close the structure. Jacking frames were designed to stabilize and maintain geometry of the trusses. The front of the house had a continuous curved box truss that ran from one end of the project to the other connecting the exterior structures of the concert hall and the proscenium theater. This was considered the most critical geometry on the project and served as the geometrically critical connection basis to the structure for the cable-supported glass atrium that served as the entire front of the structure. For each lift a critical lift plan was developed and team meetings were conducted to simulate every detail and to be sure everyone understood their roles in the process. The Tekla model was a critical tool for this project. Within the model, Midwest Steel was able to verify piece weight and geometry, determine the center of gravity of the pick piece and to review the swing path for the piece. Crane staging was verified in relation to the initial staging position, the final set position and to verify a clear swing path. Lay-down areas were coordinated for pre-assembly, trip and set. A universal lifting apparatus was designed and modified as detailing progressed. Prior to erection, a practice lift was performed to verify crane capacity using the onboard computer and to make sure the swing path was unobstructed. This was a major concern due to the geometry of the building. There were many levels of concrete and steel to navigate the crane boom and picked piece around in order to set each piece. In addition, step-by-step, bullet point directions were created and used by the crew during the lift which kept everyone focused on safety. Another factor of expertise was appropriate equipment selection to execute the lifts. Plans were developed that reduced crane movement and lowered the sled weights. These details saved time, eliminated the need for a secondary crane, and resulted in safer execution of the lifts. The Kauffman Center s structural steel work was completed in February 2010. The facility is scheduled to be fully operational for the 2011 performance season. For more information, visit www. kauffmancenter.org. As with all large undertakings, the development of the Kauffman Center project has been a collaborative team effort. Jon Vinson, who recently completed his 40th year with Hirschfeld, has been a key player from the inception of this project. He spearheaded the realization of the design as it advanced toward the fabrication stage and deserves a lot of credit for its successful completion. The author also wishes to thank Tom Broad of Midwest Steel for providing information on the erection methodology. Owner Kauffman Center for the Performing Arts Architect Moshie Safdie and Associates, Somerville, Mass., and BNIM Architects, Kansas City, Mo. Structural Engineer Ove Arup & Partners, New York, and Structural Engineering Associates, Kansas City, Mo. Connection Engineer Structural Solutions, Inc., Fort Worth, Texas (AISC Member) General Contractor J.E. Dunn Construction, Kansas City, Mo. Steel Fabricator Hirschfeld Industries, San Angelo, Texas (AISC Member) Steel Erector Midwest Steel, Inc., Detroit (AISC Member) Steel Detailing ConSteel Technical Services Ltd., San Angelo, Texas (AISC Member)