NIA Project Registration and PEA Document



Similar documents
Temperature Monitoring Windfarm Cable Circuits

Electricity Network Innovation Competition Screening Submission Pro-forma

Low Carbon Networks Fund Screening Submission Pro-forma

Executive summary 2. 1 Introduction 4

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

ENA Submission to the Parliamentary Renewable and Sustainable Energy Group Inquiry into the access and management of renewables and the Grid

Review of Low Carbon Network Fund proposals

Working with ElectraLink to provide innovative analytics services for DNOs

NETWORK OUTPUT MEASURES CONSULTATION

Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE

Review of Low Carbon Network Fund proposals

Business plan. for our electricity network for East of England. Draft for consultation Eastern network business plan for 2015 to 2023.

Caithness-Moray Needs Case Consultation

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

CABLE ASSET MANAGEMENT PREDICT WITH CERTAINTY. Kuljit Singh BSc Honours MIEE(IET,UK) 5 June 2014

Supply Chain Plan Final Guidance

Flexible Plug and Play Strategic Investment Model for Future Distribution Network Planning - SDRC 9.5

SP Energy Networks Business Plan

A Review of Engineering Recommendations P15, P17 and P27 (Transformers, Cables and Overhead Lines)

1.0 03/02/2014 N/A Adrian Searle N/A Initial version (ED1 July 2013 submission baseline) /02/2014 Chris Ong All Reformatting of initial version

Network Rail Infrastructure Projects Joint Relationship Management Plan

Project Progress Report (PPR)

Response to direct consultation questions

Smart metering A REPORT PREPARED FOR CENTRICA. October Frontier Economics Ltd, London.

Note thatan editable version of this response template is available on our website as an associated document to this consultation.

M E M O R A N D U M. The following is a summary of the key results from the survey: EUGENE WATER & ELECTRIC BOARD

How To Monitor A Project

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

RIIO-ED1 Business Plan Smart Metering Strategy

Services for professional procurement. Be better informed, make better decisions. Trading House Qualification System (THQS)

Customer Engagement Plan Underground Cable Overlay Cost Reduction Project NIA_SSEPD_0014

CABLE MONITORING SOLUTION

Customer-Led Network Revolution Electrical Energy Storage Cost Analysis

New Thames Valley Vision PROJECT PROGRESS REPORT. Southern Electric Power Distribution Ltd

Asset information workshop. Julian Schwarzenbach Project Lead

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel

Making CfDs work for renewable generators

APPLICATION FORM FOR A LICENCE FOR THE VALUE ADDED RESELLING OF PROPERTY SALES DATA

Renewable Energy Management System (REMS): Using optimisation to plan renewable energy infrastructure investment in the Pacific

Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV)

A study report procured for the Electricity Networks Strategy Group

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited

Flexible Plug and Play Implementation of active voltage and active power flow management within FPP Trial area - SDRC 9.6

Contract for Difference for non-uk Renewable Electricity Projects

Curriculum Development Project Knowledge in Sales and Marketing Education and Training

Contracts for Difference Round Guidance

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company 2 nd Floor, Ludgate House 245 Blackfriars Road London, SE1 9UF

SP Energy Networks Business Plan

WHAT IS SOFTWARE PERFORMANCE ENGINEERING? By Michael Foster

SCOTLAND S RENEWABLE ENERGY POTENTIAL: realising the 2020 target

The Enhanced Capital Allowance scheme for energy-saving technologies. A guide to equipment eligible for Enhanced Capital Allowances

White Paper On Pilot Method Of ERP Implementation

National Grid Electricity Transmission s RIIO-T1 business plan overview

Smarter Network Storage - business model consultation

The economic scale of community and locally owned renewable energy in Scotland and projections to 2020

Q: When do I need to get my Digital Enablement Plan to MBIE?

Infrastructure in a low-carbon energy system to 2030: Transmission and distribution. Final report. for. The Committee on Climate Change

SP Transmission RIIO-T1 Business Plan

IFI LCNF REPORT. April 2010 to March 2011

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation

RESPONSE TO PUB ORDER 117/06. PUB Order 117/06 Directive 6

Consultation on proposals for the levels of banded support for solar PV under the Renewables Obligation for the period 1 April 2013 to 31 March 2017

Asset Management Policy for Major PFI Projects

ESB Input to consultation by the Northern Ireland Authority for Utility Regulation (NIAUR) on the NI Energy Efficiency Levy

Distribution Network Visibility Low Carbon Networks Fund Tier 1 project. Ross Thompson UK Power Networks & Sarah Carter PPA Energy

MULTI-DISCIPLINARY SOFTWARE DEVELOPMENT

Big Data Connect Program Guidelines

Methodology & Learning Report. Work package 1.2: Data Analytics Trial

Community and Renewable Energy Scheme Project Development Toolkit

JAMAICA JA-CC2046: IMPLEMENTATION OF BUSINESS CLIMATE REFORMS IN JAMAICA ACCESS TO CREDIT FOR PRODUCTIVE DEVELOPMENT

Rail Mileage Network Marketing - 10 Tips to Calculate Horsepower & biomass

Electricity Market Reform (EMR) Panel of Technical Experts for the Enduring Regime:

ROI CASE STUDY ACT! UCSC

Intelligent Solutions DTS Applications LNG Facilities

DIGITAL STRATEGY

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Amazon Relational Database Service (RDS)

Low Carbon London A Learning Journey. Project Progress Report 17 June, V1.0 Final. Low Carbon London Project Progress Report, June 2011

NEW CABLE? - Understanding the cost to connect renewable generation in Orkney

PJ 22/12. 7 February 2012 English only. Projects Committee/ International Coffee Council 5 8 March 2012 London, United Kingdom

The overall aim for this project is To improve the way that the University currently manages its research publications data

Opening the CfD support scheme to non-uk renewables projects

Cross-Border Cost Allocation application submitted by Gaslink Independent System Operator Ltd: Final decision

2016 ARC Discovery Project Budget Advice

Scotland s public sector workforce. Good practice guide

COMMISSION FOR ENERGY REGULATION

DNO Stakeholder Engagement Best Practice Sharing. Customer-Led Network Revolution Low Carbon Case Study 19 th June 2014

BUSINESS CLASS SERVICE FOR LARGE BUSINESS CUSTOMERS SOLUTION DESCRIPTION

Tasmanian Transmission Revenue Proposal

ElectraLink s New Data Flow Services

SP Energy Networks Business Plan

Thuthuka: How-To s & Frequently Asked Questions

QCA Pricing Practices Recommendations SunWater Implementation Plan

Technology Strategy Board (TSB) Future Cities Demonstrator

Overview. EU Energy Focus. Key aspects of Horizon EU Energy Focus. Funding Actions eligibility and funding rates

Digital Industries Apprenticeship: Assessment Plan. Infrastructure Technician. March 2016

Leveraging Radware s ADC-VX to Reduce Data Center TCO An ROI Paper on Radware s Industry-First ADC Hypervisor

Digital Asset Management. Delivering greater value from your assets by using better asset information to improve investment decisions

Transcription:

Date of Submission April 2015 NIA Project Registration and PEA Document Notes on Completion: Please refer to the appropriate NIA Governance Document to assist in the completion of this form. The full completed submission should not exceed 6 pages in total. Project Registration Project Title Enhanced Real-Time Cable Temperature Monitoring Project Reference NIA_SPEN0003 Project Licensee(s) Project Start Date Project Duration Scottish Power Energy Networks Apr 2015 18 Months Nominated Project Contact(s) Project Budget Geoff Murphy (Geoff.Murphy@spenergynetworks.co.uk ) 995,000 Problem(s) Scottish Power Energy Networks (SPEN) has installed a distributed temperature sensing (DTS) technology, under the Tier 1 LCN Funding mechanism, for monitoring the real-time temperature of cable circuits connected to different wind farms in South Lanarkshire. The project was called Temperature monitoring windfarm cable circuits SPT1005 and it initially included monitoring temperature of three 33kV ducted cable circuits which partly share the same trench. One of the 33kV circuits, however, is not scheduled to be energised until the 2nd quarter of 2015. A fourth 33kV cable circuit was laid in the same trench as the other circuits during the project. Consequently, due to the delay in commissioning all the cable circuits, the cable temperature monitoring trial did not see the full impact within the Tier 1 LCNF SPT1005 project s life-time. It is important to enhance the learning from this trial by carrying out additional analysis on the recorded temperature data when all of the four 33kV cable circuits are energised. This analysis can help to identify the thermal pinch points and their causes along the cable circuits. Learning from data analysis will also inform day to day cable laying activities and the process for estimating network headroom. In order to boost the confidence in the implemented DTS system, dynamic cable rating (DCR) calculations and fully capture the thermal behaviour of the cable circuits, the cable temperature data for at least a 12-month period covering different weather conditions and season affects in conjunction with full generation conditions should be considered. The main benefit of deploying a real-time cable temperature monitoring system can be achieved in an Active Network Management (ANM) application where the outputs of generators are controlled based on the available real-time network capacity. Building up on previous learning points from SPEN s ANM trials, the requirements for integrating a DTS system into an ANM architecture and transition to full business adoption need to be identified. The relevant internal policy documents also need to be updated. For a successful integration to Business as Usual (BaU), an end-to-end solution covering from the design phase to day-to-day operation should be considered. This project provides an opportunity to investigate all of these requirements and make all the necessary preparations for operating the wind farm cable circuits based on DCRs as abau practice. Method(s) The methodology used in this project will be research, development and demonstration. The project will be conducted under five work packages as follows: Work package 1 System Enhancement The performance of the DTS system will be enhanced based on the issues identified in the previous Tier 1 LCNF Temperature NIA_SPEN0003 Created: 10 Apr 2015 Page 1 / 5

monitoring windfarm cable circuits SPT1005 project. This will include reporting the critical data to PI (SPEN data historian), carrying out further system diagnostic tests, and validating dynamic cable rating calculations. Work Package 2 Data Analysis A comprehensive data analysis will be conducted on the historic cable temperature data in conjunction with wind farms outputs for at least a 12-month period. This analysis will aim to investigate the causes of thermal pinch points causes along the cables, seasonal cable temperature profiles and potential cable headroom. The outcomes of the data analysis will be also used to provide recommendations on future cable route planning and the tools required for estimating the available firm and non-firm network capacity for future connection applications. Work Package 3 Application in an ANM System The requirements for application of real-time cable temperature monitoring in an ANM system will be investigated. In order to avoid duplication, the ANM system, which SPEN has already trialled in Tier 2 LCNF Accelerating Renewable Connection ( ARC) project, will be considered as the base model, but further developments for integrating real-time cable monitoring will be recommended. The main outcome of this work package will be the specifications of an ANM architecture informed by the DTS system. The benefit of the proposed ANM system will be demonstrated through desktop analysis based on historic data and examples of existing connections. Work package 4 Dissemination The outcomes and lessons learnt from this project will be disseminated through organising internal and external workshops with other UK DNOs. Work Package 5- Transition to Business as Usual In order to prepare a DTS system for full business adoption, relevant policy documents will be identified and recommendations for modifying them will be made. The policy documents and technical recommendations should provide clear guidelines for DTS equipment specification, design phase practices and rolling out the DTS system within SPEN for future generation connections. Scope The scope of this project will include: 1. Enhancing the cable temperature monitoring system developed in previous SPEN s Tier 1 LCNF project by conducting additional diagnostic tests and validations. 2. Carrying out data analysis of historical cable temperature data for at least 12 month period to Identify temperature hotspots and causes of temperature bottlenecks. 3. Design the architecture of an ANM system informed by real-time cable temperatures. 4. Updating the relevant policy documents and provide recommendation for full business adoption of the DTS system. 5. Dissemination of the outcomes and learning points through workshops with other UK DNOs and conferences as appropriate. Objective(s) The objectives of this project are: 1. Use 12 month period cable temperatures of wind farm circuits to demonstrate the additional network capacity and boost the confidence in deploying cable temperature monitoring systems. 2. Design the ANM system informed by real-time cable temperatures. 3. Provide recommendations for full business adoption of DTS system. 4. Disseminate the key lesson learnt within SPEN and to other UK DNOs. Success Criteria 1. Production of the data analysis report on at least a 12-month period which includes identifying the thermal pinch points and their causes and recommendations for elevation of thermal constraints. 2. Designing an ANM system informed by real-time cable temperatures. 3. Providing recommendations for developing and updating relevant policy documents for adopting DTS in full business as usual. 4. Receiving feedback from other UK DNOs on dissemination of findings and lessons learnt. Technology Readiness Level at Start Technology Readiness Level at Completion NIA_SPEN0003 Created: 10 Apr 2015 Page 2 / 5

6 8 Project Partners and External Funding Potential for New Learning 1. Dynamic thermal behaviour of a cable with and without heating effects from adjacent cables. 2. Daily and seasonal temperature profiles of cables directly connected to wind farms. 3. Recommendations for future cable route planning based on the analysis of thermal pinch points. 4. Requirements for implementations of an ANM system informed by real-time cable temperatures. 5. Requirements and challenges for full business adoption of a DTS system. Scale of Project The scale of this project will include 33kV cable circuits connecting to Calder Water, West Brown Castle, Dungavel and Ardoch over Enoch wind farms. Geographical Area The project will focus on the four cable circuits located in South Lanarkshire, Scotland. The simulation and desktop analysis will also be carried out in Scotland. Revenue Allowed for in the RIIO Settlement Indicative Total NIA Project Expenditure 300,000 695k was spent previously under SPT1005; hence total project cost 995k. NIA_SPEN0003 Created: 10 Apr 2015 Page 3 / 5

Project Eligibility Assessment Specific Requirements 1 1a. A NIA Project must have the potential to have a Direct Impact on a Network Licensee s network or the operations of the System Operator and involve the Research, Development, or Demonstration of at least one of the following (please tick which applies): A specific piece of new (i.e. unproven in GB, or where a Method has been trialled outside GB the Network Licensee must justify repeating it as part of a Project) equipment (including control and communications systems and software) A specific novel arrangement or application of existing licensee equipment (including control and/or communications systems and/or software) A specific novel operational practice directly related to the operation of the Network Licensees System A specific novel commercial arrangement Specific Requirements 2 2a. Has the Potential to Develop Learning That Can be Applied by all Relevant Network Licensees Please answer one of the following: i) Please explain how the learning that will be generated could be used by relevant Network Licenses. The learning from this project can be used by other Network Licensees for cable rating calculations and causes of thermal pinch points along the cable. Network Licensees can also use the outcomes of this project for creating a roadmap to full integration of the cable temperature monitoring system into BaU and ANM systems. ii) Please describe what specific challenge identified in the Network Licensee s innovation strategy that is being addressed by the Project. 2b. Is the default IPR position being applied? Yes No If no, please answer i, ii, iii before continuing: i) Demonstrate how the learning from the Project can be successfully disseminated to Network Licensees and other interested parties ii) Describe any potential constraints or costs caused or resulting from, the imposed IPR arrangements iii) Justify why the proposed IPR arrangements provide value for money for customers 2c. Has the Potential to Deliver Net Financial Benefits to Customers i) Please provide an estimate of the saving if the Problem is solved. SPEN have undertaken Cost Benefit Analysis (CBA) utilising the Ofgem ED1 CBA tool and have identified a number of feasible rollout NIA_SPEN0003 Created: 10 Apr 2015 Page 4 / 5

scenarios and benefits achieved from the application DTS with ANM should it prove successful. The CBA identified an 8 year NPV ranging from 1.4M to 2.4M. ii) Please provide a calculation of the expected financial benefits of a Development or Demonstration Project (not required for Research Projects). (Base Cost Method Cost, Against Agreed Baseline). Base Cost The base cost would be for the upgrading of at least one of the 33kV cables along the 10km shared route ( 1.5M) if one of the existing wind farms seeks a marginal increase in their export capability. Method Cost The method cost would be for the provision of equipment, labour and materials etc. to install a full DTS with ANM system on one circuit, which would be expected to cost in the region of 0.4M. Base Cost Method Cost 1.5M - 0.4M = 0.9M iii) Please provide an estimate of how replicable the Method is across GB in terms of the number of sites, the sort of site the Method could be applied to, or the percentage of the Network Licensees system where it could be rolled-out. The method proposed in this project can be potentially deployed for all of the future cable circuits, in particular wind farm connections across GB. Because the method requires micro-duct installation which should take place in the same time as cable installation, this method is applicable for future connections. In addition, the learning and recommendations from this project can inform assumptions used for cable rating calculations for both existing and future cable circuits across GB. iv) Please provide an outline of the costs of rolling out the Method across GB. An indicative cost for implementation of a DTS integrated to an ANM system is around 480k for a 15km cable circuit. That includes 280k for DTS installation and around 200k for implementation of an ANM system. For future applications, it is expected that the DTS and ANM technologies improve and the costs reduce over time. Assuming that each Licence Area utilises a DTS/ANM system once for a 15km circuit the GB cost would be 6.72M. 2d. Does Not Lead to Unnecessary Duplication i) Please demonstrate below that no unnecessary duplication will occur as a result of the Project. The methodology used in this project, to our best knowledge, has not been trialled in the UK. This project provides a unique opportunity to monitor the temperature profiles of four cable circuits with a 1meter granularity. In addition, to avoid any duplication in developing an ANM system informed by real-time cable temperature, the previous ANM system developed in SPEN s Tier 2 ARC project, will be considered as the base model and it will be enhanced as required. ii) If applicable, justify why you are undertaking a Project similar to those being carried out by any other Network Licensees. NIA_SPEN0003 Created: 10 Apr 2015 Page 5 / 5